HomeMy WebLinkAboutRes1987-034
.
.
.
Sponsored by:
Garzini
CITY OF SEWARD, ALASKA
RESOLUTION NO. 87-034
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SEWARD, ALASKA, APPROPRIATING FUNDS FOR REMODELING
THE TEEN CENTER
WHEREAS, it is necessary to make repairs and remodel
the teen center building to eliminate fire and building code
violations; and
WHEREAS, the repairs and remodeling can be
by a combination of volunteer, city force
contract services for an amount estimated to be
accomplished
account and
$25,000; and
WHEREAS, with the accomplishment of the repairs and
remodeling, the teen center building will comply with fire
and building code requirements and will provide for a
serviceable facility for the teens; and
WHEREAS, there are sufficient funds In the General
Fund-Fund Balance to accomplish the repairs;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF SEWARD, ALASKA, that:
Section 1. The sum of $25,000 is hereby appropriated
from the General Fund-Fund Balance Account No. 101-000-271-
00-00 to the Teen Center Repair and Renovation Account No.
204.
Section 2. The city manager is hereby directed and
authorized to proceed with the renovation and repair of the
teen center building as set forth in the Council memorandum
dated April 2l, 1987, attached and incorporated herein by
reference.
Section 3. This resolution shall take effect immedi-
ately upon its adoption.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
SEWARD, ALASKA, this llth day of May 19 87.
-l-
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. 87-034
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
THE CITY OF SEWARD, ALASKA
BOOHER, DUNHAM, GIESELER, HILTON, MEEHAN, NOLL, & SIMUTIS
NONE
NONE
NONE
APPROVED AS TO FORM:
HUGHES, THORSNESS, GANTZ,
POWELL & BRUNDIN, Attorneys
for the City of Seward, AK
.
.
(City Seal)
'7-~ tJ~
Fred B. Arvidson
City Attorney
-2-
.
.
.
RESOLUTION NO. 87--34 (Attachment)
ru~ -o$/Ir
CITY OF SEWARD
. Main Office (907) 224-3331
. Police (907) 224-3338
. Harbor (907) 224-3341
. Telecopier (907) 224-3248
P.O. BOX 167
SEWARD, ALASKA 9%&4
April 21, 1987
4-031-87-125
MEMORANDUM:
TO:
HONORABLE MAYOR AND MEMBERS OF CITY COUNCIL
THRU:
RONALD A. GARZINI, CITY MANAGER~-
E. PAUL DIENER, MGR. ENGINEERING & UTILITIES
FROM:
SUBJECT:
REMODEL OF TEEN CENTER,
CORRECTION LIFE SAFETY HAZARDS
The City of Seward failed to receive a grant for a new teen center,
therefore, it will be necessary to repair and remodel the existing
teen building to eliminate several fire and building code violations.
In February the Fire Marshall and Building Inspector conducted a joint
inspection of the building. Numerous violations were noted and a Notice
and Order of Abatement was issued under provisions of Chapter l8A of
the Seward City Code. A copy of the order is enclosed.
The life safety hazards that could be quickly corrected were repaired
inunediately in order that the facility could continue to function on
a temporary basis. Major changes were delayed pending the determination
of the grant funding. These items must be corrected if the building
is to continue as a teen center - or other public use. About the only
way to bring the building into compliance will be to remove all interior
partitions, wall coverings, plumbing and rebuild from the inside out.
It is proposed that the work can be done by a combination of volunteer,
City employee and contract services, with contract services limited
to specialty items or work requiring licensed journeyman craftsman
or skilled carpenters. These would include taping sheetrock, electrical,
finish carpentry, floor covering and plumbing work. I have described
a means to accomplish the project below.
1) The work would be supervised
Carpenters would be hired temporarily
would work under Mark's supervision.
by Mark
to cover.
Stauble, City employee.
If available, prisoners
.
.
.
4-031-87-125
Page 2
RESOLUTION NO. 87-034 (Attchmnt)
2) The initial effort to
accomplished by the teens.
materials in the building.
to starting the work.
strip a portion of the interior would be
There are no knoW! asbestos or other toxic
All utilities would be turned off prior
3) City employees will be used to install insulation in the
and hang sheetrock on walls and ceiling. Other carpentry work
also be accomplished by Seward or temporary hired carpenters.
can help with this effort.
walls
would
Teens
4) Painting will be done by volunteers (Teens) supervised by City
employees.
5) The materials would be provided by the City, except small parts
for electrical and plumbing installations.
6) Sheetrock would be repaired, taped
Also plumbing, electrical, heating system,
would be accomplished by contract.
and finished by contract.
repairs and floor covering
The cost of the project, not
$20,410.00, including windows
budget estimates are attached.
including replacement of the windows is
the estimated cost is $25,000.00. The
The existing structure, although in need of repair and correction of
code deficiencies appears to be serviceable. The foundation and
roof-structure appears sound. The electrical service appears to meet
code and be serviceable. Unless extensive dry-rot or other problems
are exposed during the project, no structural repairs needed.
The repairs proposed, including windows will provide for a safe building
in compliance with applicable fire and building codes. Providing the
building is found to be structurally sound, the expense appears
warranted. Without most of the repairs the facility is unsafe and
must be condemned as a Teen Center or for use as other public facility.
RECOMMENDATIONS:
Council appropriate $25,000.00 to upgrade the Teen Center as described
herein.
.
.
.
RESOLUTION NO. 87-034 (Attchmnt)
4/22/87
Inspection of Teen Center for repair/remodel. Diener, Patapoff
Entryway- Reframe entry for larger Door- Install new door
Main Room - Appears to be lined with sheetrock - Also appears to have
insulation in the walls. Work required includes patch and repair walls-
Other works include isolating the heater, in code approved enclosure.
Repair entry hall - need new rail or wall, close off bottom from storage.
Office - Appears walls are
paint and patch sheetrock.
and paint.
covered with 5/8" sheetrock. Remove paneling,
Repair and cover ceiling with 1/2" sheetrock
T.V. Room - Remove wall at hall to widen hallway, sheetrock ceiling,
remove paneling repair walls, sheetrock divider walls.
Bathroom - In an area never improved. Wall covered with wood, fixtures
bas, no handicap, etc. Remove all walls and fixtures, remove plumbing
down to floor level. Construct new stud walls, cover with sheetrock,
green sheetrock around fixtures, sheetrock ceiling, install insulation
in walls, marlite, or equal around fixtures, new doors.
Weight Room - Clean out- discontinue use as
end of hall by bathrooms. Build new stairs
and finish walls.
fire exit- open door at
and handrail. Sheetrock
Hallways - Too narrow: Remove wall at TV Room - Leave end walls
shorten to allow m~n~mum of 42" hallway. Need 5/8" sheetrock
hallways. At both, reconstruct walls for 42" hallway. - Close
closet door- cover with 5/8" sheetrock. Replace door at end with
fire exit - panic hardware, fire light, etc. repair stair outside
porch roof.
but
on
off
32"
and
Floors - Concrete floor, main rooms and weight rooms, no work required.
Floor in office, hallway, bathrooms, TV room - overlay with 5/8"
plywood and recover with carpet or linoleum.
Electrical - Repair as required.
Existing Paneling Remove, patch sheet rock as required and paint.
Pine paneling in main room over sheetrock remains.
Windows - Would be good to replace, loose, rotten, drafty single pane.
Heating System - Repair, improve as required.
TEEN CENTER -BUDGET ESTIMATE
RESOLUTION NO. 87-034 (Attchm1
Gut out unsuitable material and structure -
including wall cover, fixtures, hallway
wall, etc.
Volunteer $ 0
Frame new walls- TV, Baths:
studs 56 x $2.00 $ 112.00 $ 112.00
Install insulation - ext. walls
52 LF x 10' x $.35 $ 182.00
Vapor Barrier L.S. 30.00 $ 212.00
1.
-
2.
3.
4.
Sheet Rock -
Walls @ 5/8" 108 LF x 10'/32 = 34 sheets @ $7.70
Ceiling @ 1/2" 33' x 25'/32 = 26 sheets @ $6.10
Nails, Tape, Mud L.S.
5.
Contract labor to tape and patch sheetrock
3 days x 8 hour x $35.00/hr
.6.
Contract carpenter - finish work
5 days x 8 hour $35.00/hr
7.
Install new doors & frame (labor above)
New door & frame L.S.
Fire Exit Door
Heater Room Door
Bathroom Doors (2 each)
8.
Floor Covering
5/8 plywood @ $12/sheet
Carpet/linoleum @ $23/SF
796SF/32 x $12.00
796/27 x $23.00
.
$ 262.00
160.00
75.00
$ 840.00
$ 1,400.00
$ 600.00
580.00
450.00
400.00
$ 2,030.00
$ 300.00
2,070.00
$ 2,370.00
$
497.00
$
840.00
$1,400.00
$2,030.00
$2,370.00
RESOLUTION NO. B7-03' (AttCbIDnt.l
-
""~
~~ ~ ,
...
r. ~t
@ iiil
1 '
. :~
..
~cu.s. \>> \u
."., " \-
~ UI '), <t
,I V '::>
l). 0 ~
l \\.. I .J
\I- ,\ > \-
() I{\
~ to- W
. CL
\ ~
"l '2
t'- <(
..J
t-
Ql
~ ()
, G
,I ,~ ..J
<::I ~ ~ \1..
"-
j \
\ \
~ \
,,'?,t/.,.,..,tIl
..1--
\---- ----
-;-~
J
I
-