HomeMy WebLinkAboutRes1985-055
-
.
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. 85-55
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SEWARD, ALASKA, ESTABLISHING RATES AND CHARGES
FOR ELECTRIC POWER FOR THE PERIOD
COMMENCING MAY 15, 1985
WHEREAS, Section 22.6 of the Seward City Code requires that
electric rates and charges be fixed by resolution; and
WHEREAS, Section 22.40 (c) requires the payment of a monthly
television service charge; and
WHEREAS, an April 1985, Cost of Service and Rate Study recom-
mended a revenue increase effective May 15, 1985; and
WHEREAS, the existing rate structure does not enable equitable
billing of customer groups; and
.
WHEREAS, it is necessary to implement the rate increase by May
15, 1985, in order to collect sufficient revenue to pay debt service due
on the transmission line bond; and
WHEREAS, the Seward City Council wishes to amend the electric
rate to effect a revenue increase and a more equitable distribution of
charges to customers;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, that:
Section 1. The schedule of rates for electric power is hereby
established by class as follows:
GROUP $ COST/KWH $ DEMAND/KWH INSIDE CITY OUTSIDE CITY
Residential $ 0.0808 $ $ 20.08 $ 22.28
Small General 0.0980 36.25 45.49
Service (Less
than 50KW)
Large General 0.0259 28.31 36.25 45.49
Service (Greater
than 50 KW)
Street Lights 0.1188 36.25
. Special Contracts--to be determined to meet requirements of user and
subj ect to approval of City Council.
-1-
.
.
.
.
e
CITY OF SEWARD, ALASKA
RESOLUTION NO. 85-55
Section 2. Special Contracts may be negotiated by the Util-
ities Manager with customers that have a demand in excess of 750 KW or
that have unique power requirements that cannot be reasonably addressed
by the large general service tariff. Special contracts may include, but
are not limited to, provisions for instantaneous demand charges, time of
service, interruptible power, minimum and maximum demand, adjustment of
demand level, ownership and payment of new distribution facilities,
termination charges, and power factor. Special contracts will be
approved by the Council.
Section 3. Demand charges will be based on the maximum demand
recorded over a 30-minute period, except if other provisions are includ-
ed in a special contract.
Section 4. Existing large general service customers will be
charged an energy rate of $0.1006 per KWH without a demand charge until
demand meters are installed and at least 3 months of demand data has
been recorded. The utility will provide a sample demand base billing
during the 3 month period, and demand billing will begin with the fourth
billing month. If the demand bill is unreasonably high or low (! 10%),
the test period will continue for an additional 3 months. If the bill
cannot be resolved after 6 months, the utility may request Council to
approve a special contract. In any case, a large general customer with
demand metering will be charged according to the demand tariff within 12
months from the date the demand meter was installed.
Section 5. New large general service customers connected to
service following the effective date of this resolution will be charged
according to the demand tariff.
Section 6. Monthly fuel adjustment surcharges will be charged
to all customers to reflect the fuel adjustment factor charged by CEA
and the cost of operating the City of Seward standby power plant. These
will be in two separate surcharges as follows:
A. CEA Fuel Adjustment. The fuel adjustment charge from CEA
directly distributed to Seward Electric Utility customers
prorated according to the number of KWH the customers
consumed diring the billing period.
B. Seward Fuel Adjustment. The cost of operating the
standby generation plant, including fuel, labor, mainte-
nance and repair when it exceeds the amount budgeted to
date for the fiscal year. The cost will be prorated
according to the number of KWH the customer consumed
during the billing period.
Section 7. The cost of operating the standby generation plant
to meet a specific customer's need will be charged directly to that
customer. Such cost will be the total cost of operating the plant,
including fuel, labor, overtime, maintenance, repair and overhead less
-2-
.
e
CITY OF SEWARD, ALASKA
RESOLUTION NO. 85-55
.
the wholesale value of energy generated in excess of the customer's
need.
Section 8. The monthly yard light charge for 175 watt shall
be $6.75 and for 250 watt shall be $10.00.
Section 9. Miscellaneous charges shall be assessed in
accordance with Attachments A and B.
Section 10. The monthly television charge shall be $4.00.
Section 11. The rates, charges, and provisions set forth in
this resolution shall become effective May 15, 1985.
Section 12. Resolution No. 84-78 is hereby repealed.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, this 13 day of May , 19 85
TH[C ~Y OF SE~ARD, ALASKA
J 114' /
. I~ /1
<1: ;ntt:~ .?
DONALD W. CRIPPS,
.
CRIPPS, GILLESPIE, HILTON, MEEHAN, SCHOLL, SIMUTIS & WILLIAMS
NONE
NONE
NONE
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED AS TO FORM:
HUGHES, THORSNESS, GANTZ, POWELL
AND BRUNDIN, At torneys for the
City of Seward, Alaska
e7J~ f2I t~
Fred B. Arvidson, City Attorney
(City Seal)
.
-3-
.
.
.
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. R~-~~
ATTACHMENT "A"
EXISTING FACILITIES
SCHEDULE OF FEES AND CHARGES
ZONE 1
ZONE 2
.
Inside City Limits (Excluding Small Boat Harbor)
City Limits to Mile 12, Seward Highway and all road
connecting Highway within this area
Mile 12 to Lawing
ZONE 3
I
ZONE FEE OR CHARGE
Meter Testing, each test when previous
test occured within 24 months ...............$ 50.00
Reconnection to approved existing
meter installation ........................... 20.00
Reconnection to approved existing
meter installation outside regular
business hours .............................. 140.00
New Connection Fee .......................... 150.00
Deposit--Residential Account ................ 100.00
Deposit--Commercial or Industrial Account 200.00
Deposit--Interruptible, Off-peak Account
twice estimated monthly bill, whichever
is larger ................................... 200.00
Tampering with or unauthorized breaking
of meter seal ............................... 500.00
Per annum interest or delinquent account .... 12%
Dishonored check fee ........................ 10.00
Reconnection during regular business hours
(after disconnection of delinquent account) 40.00
Reconnection outside regular business hours
(after disconnection of delinquent account) . 140.00
-4-
II
$ 70.00
25.00
170.00
150.00
100.00
200.00
200.00
500.00
12%
10.00
50.00
170.00
III
$ 90.00
30.00
200.00
150.00
100.00
200.00
200.00
500.00
12%
10.00
60.00
200.00
.
.
.
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. 85-55
ATTACHMENT "B"
NEW FACILITIES
.
ENGINEERING SERVICE CHARGE
SCHEDULE OF FEES AND CHARGES
ZONE FEE OR CHARGE
Non-refundable until the service is connected. If the service is
constructed and connected the charge will be actual cost of engineering
service.
I
II
III
Primary overhead extensions (residence) ..
Temporary secondary service .............. $ 50.00 $ 60.00 $ 70.00
Primary Underground extensions (residence)
Secondary service ........................
Primary overhead extensions (Subdivision,
Mobile Home Park, Multi-residence) .......
Primary underground extension (Subdivi-
sion, Moblie Home Park, Multi-residence)
Primary overhead extension (Commercial
and Industrial) ..........................
Primary underground extension (Commercial
and Industrial) ..........................
Modifications of existing facilities .....
Street lighting systems and yard lights ..
-5-
50.00 60.00 70.00
50.00 60.00 70.00
50.00 60.00 70.00
100.00 120.00 140.00
100.00 120.00 140.00
200.00 240.00 260.00
200.00 240.00 260.00
100.00 120.00 140.00
50.00 60.00 70.00