Loading...
HomeMy WebLinkAboutRes2005-076 Sponsored by: Corbridge ..... CITY OF SEWARD, ALASKA RESOLUTION 2005-76 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH SWENSON CONSTRUCTION TO CONSTRUCT A 30' X 40' SLAB AND STORAGE BUILDING NORTH OF CITY HALL FOR A PRICE NOT-TO-EXCEED EIGHTY-ONE THOUSAND FOUR HUNDRED DOLLARS ($81,400.00), AND APPROPRIATING FUNDS WHEREAS, The City of Seward has designed a slab and storage building to be located north of City Hall to replace the existing storage building which has deteriorated to the point of requiring demolition; and WHEREAS, two firms responded to the request for bids and Swenson Construction was the lowest responsive bidder; and - WHEREAS, Swenson Construction's bid was Twenty-Four Thousand Dollars ($24,000.00) for the slab and Forty-Eight Thousand Dollars ($48,000.00) for the structure for a total bid price of Seventy-Two Thousand Dollars ($72,000.00); and WHEREAS, The City has added two (2) windows to the scope to be installed for Two Thousand Dollars ($2,000.00) and has also included a 10% contingency of Seven Thousand Four Hundred Dollars ($7,400.00) for a total project cost of Eighty -One Thousand Four Hundred Dollars ($81,400.00) for the slab and storage building. . NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA that: Section 1. The City Manager is authorized to enter into a contract with Swenson Construction to construct a storage building north of City Hall for a not-to-exceed price of Eighty-One Thousand Four Hundred Dollars ($81,400.00). Section 2. Funding in the amount of $81,400 is hereby appropriated from the General Fund fund balance account no. 101-0000-3050 to the Municipal Building buildings account no. 101-1350-5920 Section 3. This resolution shall take affect immediately upon its adoption. -- PASSED AND APPROVED by the City Council of the city of Seward, Alaska, this 22nd day of August, 2005. CITY OF SEWARD, ALASKA RESOLUTION 2005-76 j ...J THE CITY OF SEWARD, ALASKA /jLIi~ ~0-~ Vanta Shafer, Mayor AYES: NOES: ABSENT: ABSTAIN: Branson, Dunham, Amberg, Clark, Lorenz, Shafer None Valdatta None ATTEST: "..tI Ie Lewi\ C y Clerk ",tllI""'1: (City ~1l: O~.~~~-i"'~#. ~ t\. ":'-OOA~'~' '9.A ~ ~ CJ..... .'~o~ . ~"" v ~ :: .'~ ~<>... ~ .. :~ ---- .- lit . . . ~ 0 i SEAL !.! ~-; ". --- ; . "'I,;' ....\f.I If\,.: I '~, fS':o.....lf.All! 1. ~?~X.J,' ..~""'>-.:........ . fA~..~ ~~ t:. OF p...v ~..#' "'.1I1ll\'" ..."J Council Agenda Statement Meeting Date: August 22, 2005 To: Clark Corbridge, City Manager From: Tom Shepard, Project Manager Agenda Item: Replace City Shed with new 30’ x 40’ Storage Building for a price not-to-exceed Eighty-One Thousand and Four Hundred Dollars ($81,400.00). BACKGROUND & JUSTIFICATION: The white City Utility Storage Building located North of City Hall is at the end of its life and is no longer a safe structure Staff recommends replacing the City Storage Building with a 30’ x 40’ structure on the north side of City Hall, east of the satellite dishes. Both the new slab and new building were competitively advertised and bid. Swenson Construction was the lowest responsive bidder for both components of the project, including Twenty-Four Thousand Dollars ($24,000.00) for the slab and Forty-Eight Thousand Dollars ($48,000.00) for the structure, for a total bid of Seventy- Two Thousand Dollars ($72,000.00). The storage building is used for winter salt storage, snow removal equipment such as the tractor and jeep, storage for the rescue jeep and storage for miscellaneous City Hall equipment. The lack of adequate storage space has been a recurring problem for the City, and this storage shed represents the first step in addressing the storage space issue. Cost Summary : $72,000 Swenson Construction Bid $ 2,000 Installation and material for two (2) 6’ x 4’ windows not included in bid $ 7,400 Contingency (10%) $81,400 Total CONSISTENCY CHECKLIST: Yes No 1. Comprehensive Plan ___ ___ 2. Strategic Plan X ___ 3. Other ___ ___ 4. Not applicable FISCAL NOTE: Approved by Finance Department: ________________________ This project was not anticipated in the 2005 Budget and therefore requires an appropriation from the General Fund fund balance account. RECOMMENDATION: Council approves Resolution 2005-___ authorizing the city manager to enter into a Contract with Swenson Construction to replace the City Shed with a new 30’ x 40’ Storage Building for a price not-to-exceed Eighty-One Thousand and Four Hundred Dollars ($81,400.00), and appropriating funds.