Loading...
HomeMy WebLinkAboutRes2010-073 Sponsored by: Oates CITY OF SEWARD, ALASKA RESOLUTION 2010 -073 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AMENDMENT NUMBER ONE WITH ECI /HYER INC. FOR PROFESSIONAL DESIGN DEVELOPMENT SERVICES (65% DESIGN) FOR THE NEW CO- LOCATED LIBRARY MUSEUM FACILITY, AND APPROPRIATING ADDITIONAL FUNDING NOT -TO- EXCEED THREE HUNDRED THIRTY SIX THOUSAND SIX HUNDRED THIRTY SEVEN DOLLARS ($336,637) WHEREAS, in accordance with Seward City Code 6.10.310 the City of Seward submitted a request for proposals for professional design services for the library museum replacement project; and WHEREAS, following the review and evaluation, a short list of proposals, which most nearly met the requirements and received the most points under the selection criteria approved by Council, was developed in accordance with SCC 6.10.335; and WHEREAS, upon receiving the clarifying information, ECl/Hyer Inc. received the most points and was the highest ranked of the short- listed proposers; and WHEREAS, ECl/Hyer has submitted a fee proposal to continue their design services through design development for two hundred ninety two thousand seven hundred and twenty eight ($292,728); and WHEREAS, the design development deliverables will include (but are not limited to): plans, sections, elevations, typical construction details and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and such other elements as may be appropriate; and WHEREAS, the design development documents shall also include outline specifications that identify major materials and systems and establish in general their quality; and WHEREAS, an additional 15% contingency is being included in this Amendment #1 for a total amount not to exceed forty -three thousand nine hundred nine dollars ($43,909); and WHEREAS, the current total contract amount with ECl/Hyer is five hundred thirteen thousand seven hundred eighty four dollars ($513,784) including contingency; and WHEREAS, further design services for Construction Documents (100% Design) and Construction Management will come before the Council for contract approval and fund appropriations. CITY OF SEWARD, ALASKA Resolution 2010 -073 Page 2 of 2 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA that: Section 1. The City Manager is authorized to enter into Amendment #1 with ECl/Hyer Inc. in substantial form as attached hereto to provide design services through design development for a cost not -to- exceed three hundred thirty six thousand six hundred thirty seven dollars ($336,637) including the 15% contingency, and appropriates funds from the Library/Museum Fund account no. 626 -626x- 4680 -0200 to contracted services account no. 626 -626X -5390. Section 2. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 9th day of August, 2010. THE CITY I F SEWARD, ALASKA ■ de Rim Willard E. Dunham, Mayor AYES: Valdatta, Smith, Bardarson, Keil, Shafer, Dunham NOES: None ABSENT: Amberg ABSTAIN: None ATTEST: J:1 n Lewi �� •p• C y Clerk, C • C 'x ,4. 1 �F . SE {1/q�., • • • (City Seal) SEAL 7 • s • • e NI- •• o- Council Agenda Statement e of sew Meeting Date: August 9, 2010 Through: ,y� g City Manager Phillip Oates�� �° From: Community Development Director Christy Terry q P Agenda Item: ECI /flyer Inc. professional design development services for the new co- located Library Museum Facility BACKGROUND & JUSTIFICATION: Since 2003, the City of Seward, Seward Community Library Association and the Resurrection Bay Historical Society have been planning to co- locate the Community Library and the Seward Museum to a new facility. Co- location will create efficiencies of service and space as well as providing the amount of space needed to meet the existing and future needs of these organizations. In accordance with Seward City Code 6.10.310 the City of Seward submitted a request for proposals for professional design services for the library museum replacement project. Following the review and evaluation, a short list of proposals, which most nearly met the requirements and received the most points under the selection criteria approved by Council, was developed in accordance with SCC 6.10.335. Upon receiving the clarifying information, ECI /Hyer Inc. received the most points and was the highest ranked of the short- listed proposers. ECI /Hyer has submitted a fee proposal to continue their design services through design development for two hundred ninety two thousand seven hundred and twenty eight dollars ($292,728). The design development deliverables from ECI /Hyer will include (but are not limited to): plans, sections, elevations, typical construction details and diagrammatic layouts of building systems to fix and describe the size and character ofthe Project as to architectural, structural, mechanical and electrical systems, and such other elements as may be appropriate. The design development documents shall also include outline specifications that identify major materials and systems and establish in general their quality. ECI /Hyer's proposal was reviewed and approved by the Project Executive Committee per the Memorandum of Agreement between the City of Seward and the Seward Community Library Museum Building Committee. Further design services for Construction Documents (100% Design) will return to the PEC for recommendation and to Council for contract approval and fund appropriations. INTENT: Approve a contract with ECI /Hyer Inc. for Design Development (65 %Design) Services in the amount of three hundred thirty six thousand six hundred and thirty seven dollars ($336,637) including a 15% contingency, and obtain Council approval for the transfer of funds. CONSISTENCY CHECKLIST: Where applicable, this resolution is consistent with the Seward City Code, Charter, Comprehensive Plans, Land Use Plans, Strategic Plan and City Council Rules of Procedures. FISCAL NOTE: This action proposes to utilize funds accepted from the State of Alaska for the purpose of design development services. This action appropriates for the contract with ECI /Hyer, Inc. for $336,637. The current total contract amount with ECI /Hyer is five hundred thirteen thousand seven hundred eighty four dollars ($513,784) including contingency. Prior to this stage of the project, contract funds were transferred to the City from the Seward Community Library Museum Building Committee. Approved by Finance Department: 4e S kite- - ATTORNEY REVIEW: No. U RECOMMENDATION: Approve Resolution 2010 -'73, authorizing the City Manager to enter into Amendment Number One with ECI /Hyer Inc. for professional design development services for the new co- located Library Museum Facility, and appropriating additional funding not -to- exceed three hundred thirty six thousand six hundred and thirty seven dollars ($336,637) 3