HomeMy WebLinkAboutRes2010-098 Sponsored by: Oates
... CITY OF SEWARD, ALASKA
RESOLUTION 2010 -098
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A
CONTRACT FOR CONSTRUCTION MANAGER/GENERAL
CONTRACTOR SERVICES FOR THE LIBRARY MUSEUM
REPLACMENT PROJECT WITH PCL CONSTRUCTION SERVICES,
INC. AND APPROPRIATE FUNDS IN AN AMOUNT NOT TO EXCEED
$42,900
WHEREAS, in accordance with Seward City Code 6.10.310 the City of Seward
submitted a request for proposals for Construction Manager /General Contractor (CM /GC)
services for the library museum replacement project; and
WHEREAS, the City received ten proposals and reviewed the proposals based on the
criteria approved by Council and included in the RFP; Similar Project Experience, Project Team
and Key Personnel Experience, Management Plan, Pre - construction Services Plan, Value
Engineering /Project Estimating, Quality Control, Facility Management and Preventative
Maintenance Plan, Capacity, Claims History, Price Proposal- Percentage Based Fee, and Price
Proposal Guaranteed Maximum Price (GMP) for Pre - Construction Services; and
Cr WHEREAS, following the review and evaluation, a short list of proposals, which most
nearly met the requirements and received the most points under the selection criteria approved by
Council, was developed in accordance with SCC 6.10.335; and
WHEREAS, upon receiving the clarifying information, PCL Construction Services
received the most points and remained the highest ranked of the proposers; and
WHEREAS, PCL has submitted a fee proposal to provide CM /GC services through
design development for thirty -nine thousand dollars ($39,000); and
WHEREAS, an additional 10% contingency is being included for a total amount not to
exceed forty two thousand nine hundred dollars ($42,900); and
WHEREAS, included with the RFP was notice to the contractor that the GMP for
Construction Services will return to Council for approval and if the City of Seward was unable to
reach agreement on the GMP with the pre - construction services contractor, the City would
proceed with a different procurement method and /or a different contractor.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEWARD, ALASKA that:
CITY OF SEWARD, ALASKA
Resolution 2010 -098
Page 2 of 2
Section 1. The City Manager is authorized to enter into a contract with PCL
Construction Services in substantial form as attached hereto to provide CM /GC
services for a cost not -to- exceed thirty -nine thousand dollars ($39,000) plus an
additional 10% contingency is being included for a total amount not to exceed
forty two thousand nine hundred dollars ($42,900), and appropriates funds from
the Library /Museum Fund account no. 626 -626x- 4680 -0200 to contracted
services account no. 626 -626X -5390.
Section 2. This resolution shall take effect immediately upon its adoption.
PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 25th day
of October, 2010.
THE CITY • EWARD, ALASKA
Willard E. 1 nham, Mayor
AYES: Valdatta, Bardarson, Smith, Keil, Shafer, Casagranda, Dunham j
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST:
Je., Lewis -
Ci Clerk, CMC
�..... .. , ,,g
$44‘ Of SCyy��'•.
o
(City Seal) : e y , ,,,,,, , 4 - A
- .'54 v . ;
tl +i1 ids= k`d :;"L *t% .�� g F'O F ` Pto °
Council Agenda Statement e{of sew
Meeting Date: October 25, 2010
Through: City Manager Phillip Oates
1 4=ASKP
From: Community Development Director Christy Terry
Agenda Item: PCL Construction Services, Inc. per - construction
services for the new co- located Library Museum
Facility
BACKGROUND & JUSTIFICATION:
Since 2003, the City of Seward, Seward Community Library Association and the Resurrection Bay
Historical Society have been planning to co- locate the Community Library and the Seward Museum
to a new facility. Co- location will create efficiencies of service and space as well as providing the
amount of space needed to meet the existing and future needs of these organizations.
It is the intention of the City to utilize a Construction Manager /General Contractor approach to the
design and construction of this project. After several months of careful development with RISE,
ECI /Hyer, the Project Executive Committee and City staff, the City issued a Request for Proposals to
select a Construction Manager /General Contractor (CM/GC) for the construction of the new library
museum. The selected CM /GC will join the City of Seward and design team at the earliest possible
date to assist with cost effective design development.
In accordance with Seward City Code 6.10.310 the City of Seward submitted a request for proposals
for CM /GC for the library museum replacement project. Ten proposals were reviewed by the
selection committee which included members of the Library Museum Project Executive Committee.
Following the review and evaluation, a short list of proposals, which most nearly met the
requirements and received the most points under the selection criteria approved by Council, was
developed in accordance with SCC 6.10.335. Upon receiving the clarifying information, PCL
Construction Services, Inc. (PCL) received the most points and remained the highest ranked of the
proposers.
This resolution authorizes the City Manager to enter into a contract with PCL for pre - construction
services only. Following the issuance of construction documents, the City will then work with PCL
to develop a Guaranteed Maximum Price for Construction Services that will return to Council for
approval and fund appropriation. It was clearly stated in the RFP that if the City is unable to reach
agreement on a GMP for Construction services, the City reserved the right to abandon negotiations,
pay for the Pre - Construction Services rendered, and proceed with a different procurement method
and /or a different contractor.
INTENT: Authorize the City Manager to enter into a contract with PCL Construction Services,
Inc. to provide CM /GC services for a cost not -to- exceed thirty -nine thousand dollars ($39,000) plus
an additional 10% contingency for a total amount not to exceed forty two thousand nine hundred
dollars ($42,900); and appropriate the necessary funds.
CONSISTENCY CHECKLIST: Where applicable, this resolution is consistent with the Seward
City Code, Charter, Comprehensive Plans, Land Use Plans, Strategic Plan and City Council Rules of
Procedures.
n
I.
FISCAL NOTE: This action proposes to utilize funds accepted from the State of Alaska for the
purpose ofpre - construction services. This action appropriates for the contract with PCL for $39,000
with an additional 10% contingency of $3,900 for a total of $42,900.
Approved by Finance Department: 64,1
ATTORNEY REVIEW: The City Attorney did not review this resolution and agenda statement,
however did assist in the review of the RFP including contract.
RECOMMENDATION:
Approve Resolution 2010 -W, authoring the City Manager to enter into a contract for construction
manager /general contractor services for the Library Museum replacement project with PCL
Construction Services, INC. and appropriating funds in an amount not to exceed $42,900.