Sponsored by: Shealy
CITY OF SEWARD, ALASKA
RESOLUTION 2003-151
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A
FULLY REIMBURSABLE AGREEMENT WITH CRW ENGINEERING,
LLC FOR A COST NOT-TO-EXCEED $13,700 TO PERFORM
ENGINEERING AND DESIGN FOR THE RELOCATION OF THE CITY-
OWNED 14" AC WATERLINE LOCATED BETWEEN RESURRECTION
BLVD AND IRON DRIVE WHICH CONFLICTS WITH THE AKDOT/PF
SEWARD HIGHWAY IMPROVEMENT PROJECT
WHEREAS, the State of Alaska is planning the construction of a pedestrian underpass at
Iron Drive as part of Phase 2 ofthe Seward Highway Rehabilitation Project; and
WHEREAS, the State's planned work will conflict with existing City of Seward water and
sewer utilities on the west side of the Seward Highway, creating the need for a relocation ofthose
utilities; and
WHEREAS, the State of Alaska DOT/PF has authorized the City of Seward to hire CRW
Engineering at a cost of $13,700 to do the engineering work required to resolve the conflict,
allowing construction of the underpass; and
WHEREAS, the State has agreed to reimburse the City for the cost ofthe design work to be
prepared by CRW Engineering Group, LLC.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, that:
Section 1. The City Manager is authorized to enter into an agreement with CRW
Engineering Group, LLC for a cost Not-to-Exceed $13,700 to perform Preliminary Engineering,
Design, Construction Contract Documents, and Construction Engineering Support for the
AKDOT/PF Project 53547 Phase II, NHI-031-1(26)/53547, Seward Highway, MP 0 to 8.
Section 2.
Services.
This project will be charged to Account No. 701-7400-5390, Contracted
Section 3.
This resolution to take effect immediately upon passage.
CITY OF SEWARD, ALASKA
RESOLUTION NO.2003-151
PASSED AND APPROVED by the City Council of the city of Seward, Alaska, this 8th day
of December, 2003.
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
THE CITY OF SEWARD, ALASKA
~ WtJ./ ~~
C. David Brossow, Mayor
Shafer, Branson, Clark, Valdatta, Amberg, Brossow
None
Dunham
None
(J ?~' ^
~~11:1\ '..~. ~ 0
Jean eWIS
City lerk '
(City Seal)
~tl.nlrl',.
tt;" fC .~
......;... 0 ...El'f'. 1'"
!It "A ........ ~'"
.:,,:'" cJ:.~o?<f'O~J:.... () ~
.. I~ ~o" ':0
~ :~ -+- ~ ~
~ I . :
~ CI I SE'.AL : 0 :;:
rt . . _
'" \ : -
". ....- I ·
e: . .-
~ 1J'l.'.ylt..... ~...rv...,'<:('$
~. ?:,}:;:,~.'I~..~C:>~~~
""''''; (;:' OF p..\.. ",~~
.",.....'",
COUNCIL AGENDA STATEMENT
Meeting Date: December 8, 2003
Through: Phil Shealy, City Manager
From: Gerry Welsh, Manager of Engineering
and Construction
Agenda Item: Waterline Relocation Design and Engineering
BACKGROUND & JUSTIFICATION:
Construction of the second and final phase of the Seward Highway rehabilitation (Phase II of Project
53547, NHI-031-1(26)/53547, Seward Highway, MP 0 to 8) is expected to begin in calendar year
2005. The project includes a pedestrian underpass located near the intersection of the Seward
Highway and Iron Drive. This underpass conflicts with subsurface water and sewer lines located
parallel to and west of the Seward Highway, necessitating relocation of these lines.
The City of Seward has received authorization from the State of Alaska DOT&PF to relocate a
portion of our water transmission line adjacent to the Seward Highway at DOT expense, including
engineering costs. The DOT has approved CRW’s proposal to perform these design services. The
actual bidding and construction of utility relocations in this area will be handled by the DOT, which
will coordinate the work with the letting and construction of Seward Highway Phase II. The design
of the sewer conflict will be handled by the DOT engineers, and City personnel will ensure that sewer
relocation is coordinated with all work performed by CRW.
CONSISTENCY CHECKLIST:
Yes No
1. Comprehensive Plan
2. Strategic Plan
3. Other
4. Not applicable X
FISCAL NOTE:
There is no anticipated impact to the City’s Budget since all costs will be reimbursed by AKDOT.
Approved by Finance Department:____________________________
Kris Erchinger, Finance Director
Page 1
RECOMMENDATION:
City Council approve Resolution 03-151 authorizing the City Manager to authorize the engineering
firm of CRW to perform engineering services on the relocation of the waterline conflicts, for a fee of
$13,700 all of which will be reimbursed by the State of Alaska. Funding is available in account 701-
7400-5390.