HomeMy WebLinkAboutRes2015-082 Sponsored by: Hunt
CITY OF SEWARD,ALASKA
RESOLUTION 2015-082
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA AUTHORIZING THE CITY MANAGER TO AMEND THE
CONTRACT WITH R&M CONSULTANTS INC. FOR ENGINEERING
SUPPORT SERVICES DURING CONSTRUCTION FOR THE
REPLACEMENT OF A,B,C,S AND G-FLOATS AT THE SEWARD BOAT
HARBOR,AND APPROPRIATING FUNDS NOT TO EXCEED $134,653
WHEREAS, in December 2014 the City of Seward contracted with R&M Consultants
through a competitive procurement process to design the replacement of A,B,C,S and G-Floats for
the Seward Boat Harbor project; and
WHEREAS, the competitive procurement process has resulted in a contract award for
construction of the A, B, C, S and G-Float replacement project, and a Notice To Proceed has been
issued to the successful proposer; and
WHEREAS, the City has requested and R&M Consultants has provided a cost and task
proposal to conduct the A,B, C, S and G-Float replacement project Engineering Support Services;
and
WHEREAS, this contract amendment will provide the City with Engineering Support
Services, and instructing Harbor crew on testing of vessels with the new required electric GFCI
pedestals, and those goals are best achieved through observation, inspection, coordination,
documentation; and
WHEREAS, through their work on this project since inception, R&M Consultants has
developed an in-depth familiarity with the project,and has worked closely with the administration,
agencies, and the public; and
WHEREAS,R&M Consultants' experience with and understanding of the Seward Harbor
development brings further value to the project, makes them particularly suited to continue
developing the project on behalf of the City, and R&M Consultants can begin the new work
immediately; and
WHEREAS, Seward City Code § 6.10.120A (8) exempts professional services including
accounting,architectural,appraisal,engineering,land surveying,and other specialized service from
the otherwise applicable provisions of that Title requiring competitive procurement procedures.
CITY OF SEWARD,ALASKA
RESOLUTION 2015-082
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SEWARD,ALASKA that:
Section 1. The City Manager is hereby authorized to execute Amendment No. 1 to the
contract with R&M Consultants Inc. for engineering support services and to issue a Notice to
Proceed.
Section 2. Funding in an amount not to exceed$134,653 is hereby appropriated from CPV
Undesignated Reserves account of 11103-0000-3710-0000-11372 to the Harbor Float Replacement
infrastructure account 11372-0000-8101.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND APPROVED by the City Council of the City of Seward, Alaska,this 14th
day of September, 2015.
THE CITY OF SEWARD,ALASKA
can Bardarson,Mayor
AYES: Casagranda, Keil, Terry, Squires,Darling, Bardarson
NOES: None
ABSENT: Butts
ABSTAIN: None
ATTEST:
r I ��J/.�1�_ i •
ohanna Ki `Tai/, CMC
ity Clerk *' fl ode °ga
(City Seal) • a�., y w,
0 °
44.„,,,,„.
O SE/sat
kt
• e d e
♦°� ik ��
® �4% ep .`:. ,1,7 L% �+. k$
B Or.' �j�if`'+` �+
•
Council Agenda tatement
Meeting Date: September 14, 2015 e °F sett,0
�C
Through: Jim Hunt, City Maria. ► •;
q�Sip
From: Norm Regis,Harbormaster
Agenda Item: Approve Change Order No. 1 with R&M Consultants Inc. to provide
Engineering Support Services during construction for the A,B,C,S and G-
Float replacement project
BACKGROUND &JUSTIFICATION:
In October 2014 the City engaged R&M Consultants, Inc. through a competitive RFP process to
provide design engineering for the A,B, C, and S-float replacement project,. The City Council
approved Resolution 2014-102, authorizing an engineering contract with R&M for design and bid
support for A,B, C, S and G-Float replacement project.
With final construction bids let and received and authorization to enter into a construction contract
with Turnagain Marine Construction approved by the City Council in Resolution 2015-076 at its
August 24, 2015 meeting, construction can begin. The focus now will be on Engineering Support
Services, and instructing Harbor crew on testing of vessels with the new required electric GFCI
pedestals, and those goals are best achieved through the observation, inspection, coordination,
documentation and other tasks as described in the attached Fee Estimate(Exhibit A)for Engineering
Support Services from R&M Consultants.
R&M Consultants Inc.is intimately familiar with the A,B,C,S and G-Float replacement project and
is particularly suited to continue the work already begun there.The City has requested and R&M has
provided a fee proposal and schedule of tasks to complete the next steps as described, and is
prepared to begin the work immediately.
INTENT:
To amend the contract with R&M Consultants Inc.to add engineering support services at the Seward
Boat Harbor, changing the Scope of Work to include Project Management, Pile Driving Support,
Reviewing Shop Drawings, Change Orders, Dock inspection, punch list and final punch list and-
inspection and close out services,and increase the amount of the contract in an amount not to exceed
$134,653.00.
CONSISTENCY CHECKLIST: Yes No N/A
Comprehensive Plan (document source here): Continue to support,
1, promote,enhance and develop harbor facilities to accommodate Seward's X
growing demand for marine transport facilities. (page 35)
2 Strategic Plan (document source here): Complete the renovation of the X
Seward Small Boat Harbor. (page 7)
3. Other(list):
26
FISCAL NOTE: This project will be funded from CPV undesignated reserves account.
Approved by Finance Department: v,�/�
•
ATTORNEY REVIEW: Yes No N/A X
RECOMMENDATION:
Recommend approval of Resolution 2015-Q ,authorizing the City Manager to amend the contract
with R&M Consultants,Inc.to provide Engineering Support Services for the A,B,C,S and G-float
replacement project in the Seward Harbor.