Purpose:
lAeseat:AV41100 -roe 1 Council MentOersiPresent: No/ ceavvekee,
, av ( co iiktip, ,)
/1 , i blivi 30)1,1
w;(0,4 r3,M tr wt / „
pAivk >r6 rft 0.
t%t 4 ;1•-
Called by: ( 1L4 nr I Time it/t/ _.rii , Date_ JOY- Le/ 2 ea)2_
******************************************************
. 106vve4votw\+ r
a c_k_e___P-
,(---e, ,--t-Y--5? -- iGn's CS -661A)
- - Op (WV
,-------....),....---
vtUfrWV
C(f)Nr6;1 61-M61665
0 p ;6)
zu) MD' krEjuji
sitif+,1 -. ppc,u vv‘vok 0-fte-41 cius• -1-71,,
(
vaibteGi _,..,. ,_, ok ok , .5 '. fiaivauvi ()4: Cae,Grol a(4-QA
eyy, stP.D t irawl-AiN • / • 9r APpLath,
coAcA, L _ v\iO,a,„. 1001‘0\/\ IA S5 . I MIA.964).A/ 42a4 L
------7
ay.42,1,-
C.:Maeta 'i9J-9\j\/ 9 VIVS I CAA
qr)vows40Y0 4-0-6\ -?y(1*
—2117(ffdd SIN
zi cyz w(1- wip/a4\11,\( p-a _yykq
N
Cc3'
riov-0 va,k-kak,A o‘A,J Crt-HD )?vtiro3
c-411 1w p-prvv\ ) '"�1d
P rsDr)n e " ON" C t46 m 10 1 0401 C -r . + ¶ 6 0it,Acci s `- rnt'$s i
Annual Annualized YTD
Budget Budget Actual
1111 Personnel 29,336.00 24,446.67 40,967.74 139.7% 6Pi:3 rCS .tCOO\(1tS5f ,S
1120 Personnel 332,498.00 277,081.67 294,636.84 88.6% C.46 M4,-t4`1150 Personnel 209,346.00 174,455.00 105,776.72 50.5% Cary)rr,_ ;4j 1 o ti'
571,180.00 475,983.33 441,381.30 77.3%
i
edt'1'u e„orr,err,
fe-k‘g+\ Ci4z.) (rmtar 8-0 7-12 g\.‘.a, ST 4 Dr4)61.4'0.
r
`l
' A*1-Ni f F 1, Si.i ait ,IY" 4--)" 7s�' 3 i.�JQ ivf6,,S
k leis •T4. Kt/Lk, ilt,S 2012. Y-7W D v5 Q01 i
CITY OF SEWARD
2012 Sales Tax to Hospital Debt Service Fund
2012 Budgeted appropriation $1,041,237
Updated: 09/04/2012
Prior Year
KPB Cash Total Same Period CY to PY Total to remit
Check Receipt Sales Tax Sales Tax Cumulative to Hospital
Date Date Description Receipts Receipts Variance Debt Svc Fund
2012 sales tax(cash receipt) $62,507.36 $74,867.29 -$12,359.93 $15,626.84
24-Feb-12 28-Feb-12 2012 sales tax(cash receipt) $430,010.43 $366,388.24 $51,262.26 $107,502.61
23-Mar-12 2012 sales tax(cash receipt) $35,950.11 $35,213.54 $51,998.83 $8,987.53
23-Apr-12 2012 sales tax(cash receipt) $58,188.76 $67,951.81 $42,235.78 $14,547.19
22-May-12 2012 sales tax(cash receipt) $425,836.06 $374,751.42 $93,320.42 $106,459.02
26-Jun-12 2012 sales tax(cash receipt) 66,376.18 $42,830.31 $116,866.29 $16,594.05
24-Jul-12 2012 sales tax(cash receipt) 158,562.16 $157,580.88 $117,847.57 $39,640.54
28-Aug-12 2012 sales tax(cash receipt) 1,045,249.73 $919,994.53 $243,102.77 $261,312.43
25-Sep-12 2012 sales tax(cash receipt) 290,273.75 $381,763.32 151,613.20 $72,568.44
23-Oct-12 2012 sales tax(cash receipt) 375,227.81 $345,494.22 181,346.79 $93,806.95
Subtotal: 2,948,182.35 2,766,835.56 181,346.79 737,045.59
Appropriation available: 1 304,191.41
14Si 33 ( ( '�r�. • r1uy/ !
) 31a, 010 p`' 44
VaNi aAACe '9
Page 1 11/6/2012
CADI k...„A- _______, . SuAtm/
C---/r+W. ...----
\T
Tr( vrAt
CONSUMER PRICE INDEX INFORMATION AND
CITY OF SEWARD NON-UNION COST-OF-LIVING ADJUSTMENT HISTORY -
Source: 'Source:
http://data.bls.gov/PDQ/servlet/SurveyOutputServlet http://www.ssa.gov/OACT/COLA/AWI.html
CUUSA427SA0 Social Security Administration
Not Seasonally Adjusted-Anchorage,AK,All Items
Base Period: 1982-1984=100
City of Seward
Cost of Basket Annual Cumulative Annual Cumulative
Year of Goods CPI CPI COLA COLA* National Average Wage index
1986 107.800 17,321.82
1987 108.200 0.371% 0.371% 0.00% 0.00% 18,426.51 6.38%
1988 108.600 0.370% 0.741% 0.00% 0.00% 19,334.04 4.93%
1989 111.700 2.855% 3.595% 0.00% 0.00% 20,099.55 3.96%
1990 118.600 6.177% 9.773% 0.00% 0.00% 21,027.98 4.62%
1991 124.000 4.553% 14.326% 4.50% 4.50% 21,811.60 3.73%
1992 128.200 3.387% 17.713% 0.00% 4.50% 22,935.42 5.15%
1993 132.200 3.120% 20.833% 3.60% 8.10% 23,132.67 0.86%
1994 135.000 2.118% 22.951% 0.00% 8.10% 23,753.53 2.68%
1995 138.900 2.889% 25.840% 0.00% 8.10% 24,705.66 4.01%
1996 142.700 2.736% 28.576% 0.00% 8.10% 25,913.90 4.89%
1997 144.800 1.472% 30.047% 0.00% 8.10% 27,426.00 5.84%
1998 146.900 1.450% 31.497% 1.00% 9.10% 28,861.44 5.23%
1999 148.400 1.021% 32.519% 0.00% 9.10% 30 469.84 5.57%
2000 150.900 1.685% 34.203% 2.50% 11.60% ORM 5.53%
2001 155.200 2.850% 37.053% 0.00% 11.60% 2.39%
2002 158.200 1.933% 38.986% 0.00% 11.60% 33,252.09 1.00%
2003 162.500 2.718% 41.704% 1.40% 13.00% • 34,064.95 2.44%
2004 166.700 2.585% 44.288% 0.00% 13.00% 35,648.55 4.65%
2005 171.800 3.059% 47.348% 0.00% 13.00% 36,952.94 3.66%
2006 177.300 3.201% 50.549% 2.60% 15.60% 38,651.41 4.60%
2007 181.237 2.221% 52.770% 3.00% 18.60% 40,405.48 4.54%
2008 189.497 4.558% 57.327% 2.50% 21.10% 41,334.97 2.30%
2009 191.744 1.186% 58.513% 4.50% 25.60% 40,711.61 -1.51%
2010 195.144 1.773% 60.286% 0.00% 25.60% 83 2.36%
2011 201.427 3.220% 63.506% 1.20% 26.80% 42,979.61 3.13%
2012 205.215 1.881% 65.387% 0.00% 26.80%
Note: 2012 reflects first half of year only
1987 thru first-half 2012 65.387% 26.800% 92.939%
2000 thru first-half 2012 32.868% 17.700% 35.095% (t n
1987 thru 2011 63.506% t�% 26.800% 92.939% tw\ 1, �/ �� v
2000 thru 2011 30.987% 17.700% 35.095%
National Average Wage Index Page 1 of 1
National average wage indexing series,1951-2011
Year Index Year Index Year Index
1951 2,799.16 1976 9,226.48 2001 32,921.92
1952 2,973.32 1977 9,779.44 2002 33,252.09
1953 3,139.44 1978 10,556.03 2003 34,064.95
1954 3,155.64 1979 11,479.46 2004 35,648.55
1955 3,301.44 1980 12,513.46 2005 36,952.94
1956 3,532.36 1981 13,773.10 2006 38,651.41
1957 3,641.72 1982 14,531.34 2007 40,405.48
1958 3,673.80 1983 15,239.24 2008 41,334.97
1959 3,855.80 1984 16,135.07 2009 40,711.61
1960 4,007.12 1985 16,822.51 2010 41,673.83
1961 4,086.76 1986 17,321.82 2011 42,979.61
1962 4,291.40 1987 18,426.51
1963 4,396.64 1988 19,334.04 •
1964 4,576.32 1989 20,099.55
1965 4,658.72 1990 21,027.98
1966 4,938.36 1991 21,811.60
1967 5,213.44 1992 22,935.42
1968 5,571.76 1993 23,132.67
1969 5,893.76 1994 23,753.53
1970 6,186.24 1995 24,705.66
1971 6,497.08 1996 25,913.90
1972 7,133.80 1997 27,426.00
1973 7,580.16 1998 28,861.44
1974 8,030.76 1999 30,469.84
1975 8,630.92 2000 32,154.82
•
http://www.ssa.gov/OACT/COLA/AWI.html 11/6/2012
CITY OF SEWARD
IMOTOR POOL FUND
CAPITAL REPLACEMENT REQUIREMENTS
Years till 100K Year to replace Yeasfo
- Unit P Year Vehicle Total Mildffrap Condition& mies a mu based on replace Replace Cost• NOTE:
MOm/Hours .a year mu age based an
Ids hours/miles
age
111
2012 Replacement
II202 P Ree 4999 Dedge 79,921 7,992 Fair 3 2044 2.009 39,000 Postpone replacanenl from 2012
4 44-9 Pal arks 1993 GMG 83,479 4,922 Fair 4 2012 2003 25,000 Porponercplamnert can 2012
496 Pubic Works 2006 Grader 37036 4-,6-79 Geed/44 45000 2812 2021 220,800 Postponercplacement from 2012
4-54 Waw , ee
1997 Beekhee 31339 444 Fair/44 4000 2009 2012 100,000 Poatporeplaara
mtfiom2012
434 Barber 4-9$8 2-52-Beat GoodF10 NA 4998 30,000 Po:Tonerrplacementfrom 2012
l'-' :444 Barber 2004 Flatbed 6-7;64$ 8432 Fair 4 2012 2011 15,000 Postpone replacement from zolz
'`_437 Barber 4999 Ferd 807766 8094 Fair 4 2013 2009 39,000
Postpone replacement from 2012
4-$8 Barber 4688 Beat-trailer Feia' 't NA 2000 12,000 Postposerq,laamnat from 2032
.,,` y'439 Barber 21'Beat Fair40 NA 22,000 Posponereplacemrat from 2012
' 510II
Electric 1995 Trailer Fair/12 NA 2007 b 15,000 �tw
0
Public-Works 4-999 Sweeperl- 41682 468 Geed7 4000 2609 2006
ti•433 Barber 4996 Geed/l2 2008 15,000 Poaponereplacmreatfrom 2012012
, $ Postpone replacancat from 2012
1:463 Barbee 1982 Grader 44 43090 1997 230,800 Poagonerrplao®ouefromzolz it
- . ' Public Worke 4-964 Steep 639'• 44 Peer/? NA tic 1971 15,000 Postpone replacement from 2009
r,, ,P
-_ 14 Electric 1982 Chevy 69,038 2,655 Poor 12 2021 1992 b 40,000 Pnsponeafrom za09rozo12
-;, =%57 Police 2001 Explorer 92,728 11,591 Poor 1 2010 2011 12 37,000 Postponed from 2009 to 2012
-,',L.-5 Public Works 1987 Dump truck 267 13 Poor/I2 10000 2800 1999 0. 120,000
Postponed from 2009 to 2012
04 Electric 2003 Dodge 50,938 8,490 Fair 9 2015 2013 ` 80,000 Eumtlal:move motzfran 2013
i�'',50 Fire 1996 Rescue trk 98600 7585 Good/15 80K 2009 2001 di, 450,000 move to2012from 2013
8VAG 200-5 Ambulance 41033 238 5 UK 23-13 2040
"( $ 1,735,600
l Recommended to purchase in 2012(cash): $ 172,000
- Recommended to purchase in 2012(capital lease): $ 570,000 ,
'`,:74113 Replacement
City-Mgr 2000 Ferri-G, 64949 7,213 Fair 3 204-4 2040 24,000
Postponed replacement from 2013
v-: Bleetrie 1992 Bleaer 72,827 4,84 Fair 6 2015 2002 40,000
Pwroned replaceo®t from 2013
Public Works 2000 Leader 8,444 902 Cet,d/lS 46000 2046 2015 250,000 Postponed miscount from 20I3
Public 41196 Chipper 34-8 24 Fair/15 2011 25,000
Po
•`' Publie-Warks 141180 Light-pl 4894 68 Fair/40 NA 4990 21,000 postponed
replawnent from 2013
Postponed replacaneot from 2013
;^IWaterAVastewater 4989 Vac-Trailer ? $ Fair/42 Ne-data 2009 15,000 Postponed replacement from 2013
'e Berbera-Fire 49814 Bruslttrek* 98494 45930 Fair/42 80009 2909 1991 25,000 Poaponed rcplacmnent from 2013 ^�
Bleetrie 1991 Leader 5,135 28-5 _Fair/44 40000 2009 2006 252,000from ,v
:"a Eleetrie 41186 Fair/12 NA 4998 15,000 P on� zo13
,11- ' Eleetrie 1997 Fele-Trailer Good/42 NA 2009 15,000 Postopomodreplaoarrenttimm2ol3
-'- �- poundal:postponed from 2013
'1_,F i`' Police 1997 Exped 99,120 8,260 Fair 0 2009 2007 il 48,000 Moved from 2011 to 2013
."ti':''' a. Public Works 1987 Dump truck 1,658 79 Poor/12 10000 2114 1999 I 120,000
Mo ed Gan 2010 to 2013
$ 5,121,200
Recommended to purchase in 2013(cash): $ ip 48,000
Recommended to purchase in 2013(capital lease): $ 120,000 a
pit-
rs• ,,•0,,�317s produced by John Bird as part of the F1FrfaoYStudY.Department heads have postponed all non-est-fat purchases to a future data Those ions appeared as strike-out
s i I/6 fi 2,..-,
Harbor Enterprise Fund
City of Seward
A,
2013 Mid-Cycle Budget
Harbor and SMIC
November 6, 2012
0
4, Harbor-related cash4511
IP",, ? Harbor Cash History
Harbor Enterprise Fund cash = $617,784(10/12) Harbor Enterprise Fund-Cash Balance
Balance at December31,20XX
versus assets of$34.2M HC; $11M depreciated s
c1C6/ Harbor MRRF= $797K(10/12) "F{yyvl R+ JR5t 74)( Harbor Fund (nant,' Harbor Fund
Harbor Passenger Fee fund = $654K(10/12)($301K Cash(it;12/31 Cash caab�11/10to be spent by 12/31/12) 2000 449,499 04 388,911
2001 55,457 n5 (157,289)
Harbor CPV(cruise ship tax) Fund = $2.0M(10/12) 2002 81,970 (15 (180,151)
Capital (grant) Projects = $71,842(10/12) 2003 190329 ns (67,284)
2004420,106 n7 109,015
Projected ending cash is$1.4M 2012/2013 2005 3a9azs a7 364,5582006 696,610 4.0 62,473
A� 2007 1,371,228 66 417,849
2008 1,169,083 5.2 101,587
2009 1,160,729 3.8 181,587
2010 134}31 5.7 229,928
HC=historic cost 2011 2,102 76 67 645,484
Dtb NI0J
T
9
't
41,I-,
Harbor Cash HistoryHarbor-related debt @ 1/1/13 6
x 1
2000 E-Float and Fish Cleaning Station Bonds=$1.78M
°°m 2005 Float Extension Bond=$1.14M
' •�"•UM•'1"•"^° 2006 South Harbor Bond=$3.56M
50-ton Boatlift loan=$102K
1 iiiil
Total: $6,582,425
2000 X. 111 St 11.1120. 103 2006 WV Me IIMP 2010 2011
1509969'
AO
'J
-Ap �
�v
odd
Harbor Projects funded with no deft® Highlights, p. 1 „
$2.2M-T-Dock and Bulkhead
$2.OM-Z-Float and upland improvements
$300K-USCG relocation CPI rate increase 2013 (2.6%)
$4.5M-Cruise ship dock dredging a Passenger fees est. at$560K; 2012 YTD
$1.8M-Harbor dredging($1.1M fed; $705K cpv) $547K
$1. M-E. Harbor expansion o Annual debt payments $734K (bonds and
$1.5M-ARRV mooring dolphins
$61,250-Fish ditch upgrades 50-ton lift), assumes no new debt
$25K-Boardwalk extension
Total>$13.3 million
Next two years:
$739K-SMIC washdown pad(2012-2013 project)
$130K-Harb restroom improvements(2013 project)
$400K-CDQ fishing fleet relocation(2012-2013 project)
2
•
tio
Highlights, p. 2 Highlights, p. 3
Fish tax transferred from General Fund to ❑ Approx. 51% of harbor assets paid for
Harbor ($320K) with grants
Assumes portion of fish tax is not used for Need to increase power for resale costs by
capital, since needed for debt service $68,300
($182K) Increase utility costs (refuse) by $12,500
Portion of fish tax transferred to MRRF Increase health insurance (7%) by
($138K) $14,784
Credit card fees increased $43K in 2012 3% cola ($33,209)
RESO
\).1.)\) Vii;\ 913
-1\
........„'N‘'..?. ., •-)- AO
N3S 15 .V
1
Passenger Fee History 6 Passenger Fee History
sexism Revenues versus Debt Service ,
is Passenger Fee Revenue B9 of Passenger:
$700,000 —
5600,000 ._ _. ._ --- - - maw
mosoo
5500,000 ----._—.__ _ 600000
ill II 5um0
5400,000 ------- amm
3WAW
5300.000 h _._._ ____.__ __. �
Homo
5200.000 1ao3xw
0
5100 000 _ 2021 2002 2000000
3 2004 2005 2006 2007 28 202010 2011 2012 2013
Budget oudget
• ro.m 061 ' utak, • Annual nevem.,:
2001 2002 2003 2004 2005 2006 2007 2008 2009r2010r2011 2017 ' 2i
Note: Above 2012 da s through October,2012. Note: Assumes all Harbor bond d it service Is paid with passenger fees.
(exda.s 50-ton lift)
_Jr_;.)*
,, , Q
\ ` J
3
v n—
� c� 3L17'r
I,
Passenger Fee History
Revenues versus Debt Service111
Debt Service5530002- ------ --yriwSlYnlaWk-_a `yrnet'°""`"ei"Fee YAWS - - ---- If 2012 generates $555,000 in Passenger
$51.020_ - --- Fees (budget) the Harbor will need to
541.000 -.-.---.-8888.--- utilize $148,459 from moorage revenues
531,000 to pay this debt service.
$21,002- Previously this difference has been
:,1810 ii,I , I covered by passenger fee reserves,
however these reserves will be insufficient
2021 2022 2023 20M ZOOS 202. 2022 2008 01 2� to cover this difference by the end of
511,18 ■ ' 2012.
5200.01
5300.01
Note Budget reflects what balance Or Passenger Fee Fund would be 8 only Passenger
fees were used to make harbor debt payments n 2012 and 2013.
id I
Prioritized Projects-
Replacing Infrastructure
Harbor Enterprise Fund Critical Risk: Likely to fail within next 5
years
Harbor Capital Improvement n High Risk: Likely to fail in 5-10 years
Plan n Moderate Risk: Continuously increasing
cost to maintain and operate
1
i
4
,
. . f ‘N 1*0 \ tj - '..
(-9/ 5?) )).j:A,()°
w
0 1
9
1, ' ' •\1-1'. )(
Industrial Development
_, I Priority One- Critical Risk
gi
New Infrastructure to: Harbor Dredging- underway iCreate jobs and/or Mostly federally funded $1.128 Million \`•
Support industrial activity City portion $705,858 CPV funds 1
$53,983 MRRF funds
When this project is complete we need the
Corps to perform regular bottom
surveys
'4111
Priority One- Critical Risk Two replacement projects eliminate
(::\/
D-Float Replacement - underway n Fish waste barges were budgeted for
Design should be completed within 3 $70,000 ;
months $100,000 Used oil stations were budgeted for `
Then Bid and Build in 2013 - $2.36 Million $60,000 1
Half of Construction funds are from the
State Harbor grant program
Half from Harbor MRRF
Base case for replacing other harbor docks V
`` —
e t‘))tc\10/
\,,, C
rod\ilii„)r
5
Priority Two- High Risk Priority Two- High Risk
Update Harbormaster Restrooms Replace A B C and S docks
n Delayed work in 2012 Located in the South end of harbor
Time to decide the best way to spend the Preliminary engineering report estimated the cost
$130,000 state grant at$6.1 Million
These restrooms remain open all winter A, B, and C docks have newer electrical service
than D Float
Used by both the public and the harbor Will result in some reconfiguration changes
staff- very efficient S dock- safety repairs were made in 2012
Well maintained, but old State Harbor matching grant program will be the
Updating restrooms will extend the life best source of funds
and improve our public image Will require more than$3 Million of Harbor funds
Priority Two- High Risk Priority Three- Moderate Risk di
Replace K and L docks Replace Pickup
Located in the North end of the harbor Mileage > 115,000
Currently a Rough cost estimate is $2.25 Age > 13 years of short trips
Million Repairs > $2000 in 2012
Broken windshield and body damage
$29,000 budget 2013
Could meet the definition as critical or
high risk category
6
. 4
`).-9 ),x\' 'P i$n
2 u_ (ve
1 , Glo ,N
' /
\ \9V-k\6. \..
. \) \
N\ Priority Three- Moderate Risk ® Priority Three- \I( Berate Risk
Replace Trash dumpsters G 1- , Replace Launch ramps
Request budget increase from $4 ,000 to Repairs made to both North and South
$70,000 ramps in 2012
Funds would purchase our own dumpsters $2 Million cost estimate
Grant program to promote fishing
a u44-_-?{00i
r. okry&t5
4 exe,--kfne, .cf,e,
Industrial Development Industrial Dei elopment 6Public crane 50 ton travelift wash down facility
Homer has a row of hefty cranes operated It would be used substantially more than
by card the facility being designed at SMIC
Cordova has three smaller cranes that are The 250 ton project at SMIC is underway
free Guesstimate $500,000
A public crane allows fishermen marketing
flexibility
Increase budget line from $ 4' %°to
$150,000
a Calif 1.x '511/i v 1,1, -40
u A Lo ak - ta Ovleki :sArt
CA qmpole/t4iU
914/CeL Cpil l\IGNM1
e/ tlitth.\015Y trISIV
i
•
4111,All other projects
No schedule or source of funding SMIC Enterprise Fund
Paving NE parking lot$250,000
Z Float lateral docks $5.5 Million
3 Dock side road pave/landscape$25,000
South harbor uplands pave and landscape
$500,000
Fish cleaning station at North East ramp
$850,000
Fishing pier recreation area $2.6 Million
Priority One- Critical Risk
'MIL Highlights
Requires $38K subsidy from GF in 2013 Complete Harbor
Estimates cash balance $0 end 2013 Unsafe moorage at North dock
Does not cover any costs of depreciation CDQ Fleet anchor tenant
80% of assets were purchased with grants Breakwater needed for protection
Dredging
New floats
$100 Million
$10 Million Bond down payment — '.Q/1('S
caivsom
-n --ni,e.
ybki "tat"
8
," ,..0...,
., • tyd - '
\ ,
1 V IN ‘
%\ I ..e.,...,.. ,
C./ it o-its- "Three- Moderate Risk
1 All other projects
` Replace 250 - ton Travelift No schedule or source of funding
More than 20 years old Restrooms - $75,000
`� Replace with 300 - ton machine Drainage and fencing - $1.5 Million
vl Fits on same pier
Trade in current machine
Net budget - $1.45 Million ($110K/yr. over
20 years if capital financed)
•
11400
+ h- valut
A,LiY
Industrial Development 14 Industrial Development
4 6
250- ton travelift wash down Shipyard transfer rail
facility $3.87 Million cost estimate in 2007
Design - $91,630 grant + $1905 city Double the capacity of the facility
Construction budget - $641,300 Create 50 new jobs
Grant funding insufficient to complete
heated slab
L
A s - -le
- 4,4r v\f erAl.,, 5 Oy\ cs)(i " ,A
Ssb 1OAM 9
10
a at . !1 (x (
a 1„,„,
Electric-related cash
Electric Enterprise Fundz
Electric Enterprise Fund cash = $1.7M (1(1,12,
versus assets of$56.7M HC; $32M fully `\
depreciated \
Electric MRRF = $460,018' \‘''< 0;b')(1
460,018' p)(1
Mid-Cycle 2013 Budget Presentation Transmission Line = $566,136 (Rowclearing)
November 6, 2012 Standby Generator Project = $34,213
Projected ending cash is$1.6M (2013), improved b,►1,/"
due to 2011 delays in capital outlay
HC=historic cost
Electric Cash History ® . Electric Cash History
Electric Enterprise Hund-Cash balance
Balance at Decen,ber31,2OXX
5.000,000
Electric Fuld MRRF C months'
Cash Cash Cash Total
2000 2,862,494 676.664 8.5 3,539.158
3,000500
2001 2,729,835 920,884 5.1 3,650.719
2002 3,072,100 840.884 5.8 3,912,984
2003 3,825,039 840.884 7.7 4.665,923 .000500 - - ,r„„,t
2004 3,260.064 1.340,884 5.5 4.600,948
2005 3,647.834 645,080 5.9 4.292.914
2006 2394.025 1,377,942 3.1 3.771,967 0'
soosoo
2007 2,706,708 1.317.765 4.1 4,(24,473
2008 3.1/3,126 838,105 4.5 3,941231
2009 1,334,884 874.234 1.5 2,209.118 ° 't aeiuiiii:" so an ma an
2010 (233,894) 387,761 (0.3) 153,867
2011 639,0124 460,018 0.7 1,099,642 0Aoo,oml-- -- - -
Est.2012 balance-$1.4M;2013.$1.6M
I4
Electric related debt Electric Highlights, p. 1 IS
2005 Refunding of 1995 transmission line bonds=$795K 2013 rate increase Solo
2008 Replacement generators bond=$5.64
Rate increase is not added onto fuel costs
Total: $6.4 million Fuel costs directly passed from Chugach to
customers based on kwh usage
City outage costs pass thru to customers
based on kwh usage as part of fuel costs
\ )-§) '\I\V '
v
Rate Increase Examples Bills 'it to
(based on July 2011 Rates) Electric Highlights,p. 2
Residential (600 kWh) Budget includes loan repay from GF $111K
. 2013: From $123.08 To $127.26 =$4.18/mo. for previous contributions to SMIC debt
Small General (1500 kWh) Term position mechanic/operator to replace
. 2013: From $323.70 To $334.94 =$11.24/mo. retiring employee; to be paid for two years
(partially with generator grant)
Assumes ROW clearing costs partially
covered by transmission line fund
Electric Highlights,p. 3
g
Generator $4M project(status)
Current contracts allow Icicle Seafoods and
Sealife Center special contracts to expire at Electric Capital Improvement Plan
the end of 2013
Mid-cycle additions: 3% cola for non-union
($4,068); health insurance 7% ($5,376);
utilities $24,950; heating fuel $5,200
',:t...
ON).),:205.9ii;j1
Summary of All Capital Improvement NOM
Critical Capitaly
(No Funding to New Projects) Iaki-1 v.1-t m rhe\ei+i n.� .
Why focus on capital needs and rates? i Lagoon $450K
Clearing-$430K (done 2011=$200K 2012=$120K)
Critical Risk - $2,045,000 ($340K done in 2012) Jesse Lee - $30,000
High Risk - $ 5,610,000 ($0K done in 2012) Camelot - $50,000 (2012 done approx$100K)
Transformer Renovation Ft Ray -
$160,000(2012 done approx$40K)
Moderate Risk - $2,108,000 ($0K done in 2012) Paint Transformers and Substation
Equipment - $90,000 (2012 done approx$30K)
Note: Recent flooding/outages located in areas
identified here as critical/high risk/moderate risk
capital need areas
2
, .
4 ,,, -
a . (`1�V\
,,,,„, \,,,)
<,4„,,, '‘..)93-
Critical Capital Needs 2012-20171I
If we do not fund Critical needs: .;
.4)
Likely to Fail in the Next 5 years.must In acc,mpiished
Exhaust Stack and Roof Generator 3 Expect multiple failures and/or running
$330K (2012 done approx$30K) generators more frequently
Meter Relay and View Screen - $20K , ' "'p Long outage times for residents and
SMIC underground - $105K-Oretore6, businesses
Transformer Renovation Spring Creek 3 Risks to out-of-town personal water
$180K(2012 done approx$20K) infrastructure (wells and septics)
Sectionalized Pole Replacement - Price Higher fuel costs for running the backup
Varies, Generally $17,000 per pole generators
•TOTAL= $2,045,000 remaining ,.
9
High Risk Capital Needs 2017-20% High Risk Capital Needs 2017-202?
to e n, I.,hh,,,rtd.vahin i-IO te,rrs
Old Mill #3 - $120,000 Downtown Alley rd and 3rd install underground -
Gateway (Upper) $180,000 $1,000,000 (install overhead -$500,000)
Downtown Alley 3rd and 4th install underground -
Gateway (Lower) - $80,000 $2,000,000 (install overhead -$1,000,000)
Woodland Hills - $120,000 Downtown Alley 415 and 515 install underground -
Lost Lake Underground $55,000 $2,000,000 (install overhead -$1,000,000)
Software for inventory - $50,000 ■TOTAL= $5,610,000
Moderate Risk Needs 2012-202*..I
Moderate Risk Needs 2012 2022 0.
Hann¢or Past Precieusk F.;umand late lixoeaanc. N. . •P-•i' • I • • ,I..i, I
Update Fort Raymond Controls - $450,000
Lawing Poles - $25,000 Security Upgrades to Substations -
Victor Creek Poles - $110,000 $130,000
Lake Drive (Stony Creek) - $140,000 Automatic Meter Reading (AMR) -
Questa Woods - $80,000 $950,000
AVTEC Underground - $15,000 Switch at Nash Road - $100,000
Southwest Boat Ramp - $33,000
Lawing to Victor Creek Overhead - •TOTAL= $2,108,000
$75,000
3
• w
6
Summary of All Capital Improvement Needs
III Summary of ARCTEC $4M grant .
(No Fund, Projects) PT phase protection
Generator 3 silencer and roof
Critical Risk - $2,045,000
High Risk $ 5,610,000 Move generator 4 into the new building
Move generator 5 into the new building
Moderate Risk $2,108,000 Update and modernize controls to allow
more flexibility in starting and running
GRAND TOTAL: $9.763 million generators—, SGf10i7A S.A 'Q
ANN
Warehouse 1
6 i
Projects Requiring Funding to Complete Projects Requiring Funding to Complete
Converting Fort Raymond substation to r Complete Transmission Line Into
115kV from 69kV $12,000,000 Substation $1,500,000
•This must be done to sync with the rest of the • Sixteen structures to complete (past life
Railbelt system expectancy)
• Currently steps down at Lawing Substation • Potentially funded through ARCTEC
•A higher voltage transmission line would mean ■ When substation ready will give us the ability
less losses in transit to receive 115kV
Projects Requiring Funding to Complete®
Pole Barn $200,000
•Allows us to cover equipment and materials
• During Winter Months makes response time The End
faster
• Saves money for electric department
• 30 year at$200,000 = $6,700 per year
•Average pole price$1,000 / Newest Bucket
Truck $450,000 / Backhoe $90,000
dS(AAA Os el \ ,
Q q_P-- 1 )
I