City of Seward
Water and Wastewater
Enterprise Funds
Gt4:4 \
40b1
4tats4"
Water Enterprise Fund
Water-related cash
Water Enterprise Fund = $957,478 (12i12) versus
1 . 4M cash at c10i12>. Reduction due to payment
toward Third Avenue Water Line Project
versus assets of $9 . 1M HC ; $4M fully depreciated
Li Cash Balance reflects 3rd Ave Water Loan
$ 584K paid in 2012
u Water MRRF = $ 212 , 546 (12/12) versus
$4 , 019 (10/12). Increase due to rate increase
applied to capital needs .
HC = historic cost
•
yof
4 It
,
40,
Water . history
3,500,000
■MRRF n Water Fund
3,000,000
444
2,500,000
2,000,000
1,500,000
1,000,000 --
500,000
2005 2006 2007 2008 2009 2010 2011 2012 est.2013
$1.973M cash held by Hospital Fund in bond reserve to be reimbursed to Water Fund
4lSKp
Water-related debt
Third Avenue Water Line loan balance as of
1/ 1/2013 $2,650,946 ; repay over 20 years at $ 155K
annually; matures 4/2027 .
pG 6E G
CI yrs
Water Projects funded with no debt aP
... ..... . . ... .. .
$397K - Waterline construction GW/FA. .ARRA ( Phase 1 )
❑ $74K - Fire hydrant upgrades/replacements
❑ $ 100K - Drinking water regulations grant
❑ $25K - Water distribution system analysis
❑ $423K - Coast Guard relocation
❑ $ 1 . 5M - ARRV dolphins @ SMC
Total = $ 1 .O2M Water System plus $ 1 .5M dolphins =
$2.52 million in grants managed
Current Water Projects funded yoF�
with no debt
$4 . 5M North Seward Water Storage Tank and Pumping
Facility ( Phase 2) - $ 1 . 99M designated legislative grant plus
$2 . 5M ADEC grant
U $575,000 Lowell Canyon Water Storage Tank
Refurbishment (Currently in Governor's Budget as
designated legislative grant. )
Total = $5 .O6M in Water System grants managed
roc uw_
\ otesa .
® Rate increase 2013 (6% ) projected increase of new
revenue = $ 59K
Average bill increase $39 .89 to $42. 28 =
$2. 39/ month .
u If rates only rise to cover CPI :
2014 rates increase 2 . 6%
■ 2015 rates increase 2 . 6%
[tit~�h s(b
u�, J
Notes
Credit card fees added by RESO $4, 500
o Transfer funds to MRRF to begin to fund critical and
high - risk infrastructure needs ( $208K in 2012 and
$ 199K in 2013)
Water Rate Histor3r
o 2010 rate review showed need for 25 % rate
increase
2010 = 4 . 8% ( 5-year avg . CPI + 2% )
2011 = 5 . 1 % ( 5-year avg . CPI + 2% )
2012 = 4 . 0% ( 5-year avg . CPI + 1 . 2% )
2013 = 6 . 0% ( 5-year avg . CPI + 3 . 4%)
CPI increased since then :
2010 1 . 8% ; 2011 3 . 2% ; 2012 2 . 23% ; 2013 2 . 6%
est. = 9 . 83%
Still behind by ( 25 % - 19 . 9% + 9 . 83% CPI) =
14 . 93% but have made up more than 1/2 of the
shortfall over the past four years .
6[R
v7
J
�lAfKp
Why the focus on capital needs and. rates?
Need cash to leverage matching grants, pay
for capital needs, and qualify for loans
• Annual operating deficits make borrowing
problematic without current cash levels and
sustainable operating budget
PP Major capital investments are needed to
replace aging water system infrastructure
c
status of depreciation rreserves •
Water = $ 212K in MRRF vs . assets of $9 . 1
million ; $4 . 0 million end of useful life
MRRF increased $ 208, 527 in 2012 and will
increase by additional $ 198, 883 in 2013 ; from
$4, 019 to $411 ,429 in two years
Estimated cost to replace 114, 701 linear feet
of pipe is approximately $ 34 . 5M ; 1/3 of
system is near end of useful life
12
Water Capital Needs
p ")
4 c
Water HnterpriseFund Capital Needs
2013 - - - -
2014 4,330,000 - - 4,330,000
2015 875,000 1 , 185,000 - 2,060,000
2016 - - - -
2017 - - 3,085,000 3,085,000
Total : 5,205,000 1 , 185,000 3,085,000 9,475,000
13
Critical
Capital Needs
2013-2017 ' J
Likely to Fail in the Next 5 years, must be accomplished
• New North Water Storage Tank- $4,330,000
$2, 508,000 from ADEC MMG Program
$ 1 ,992,000 from Dept. of Commerce, Community and
Economic Development Division of Community Advocacy.
Grant # 12-RR-030
o Refurbish Lowell Canyon 400,000 gallon tank- $575,000
Currently in Governor's FY2014 budget
® Gateway Tank Roof- $300,000
Funding being sought
Total = $5, 205,000
14
0F tty,
4 a
Water Storage Tanks
, _ _. ._........,.....______
400K Gallon Tank 200K Gallon Tank
,� t
T L
•'9p -.s _ fir ... ,� .
, 1' _ '''t,
,)
`1y t
it. ' - ..: .,./ , )'va,sir. •.••••-,-Ti'---'-',-.
• 1. N ,, I M .KC ,I.V. 1 -
Received offer from ADEC for
low interest loan in the amount Scheduled to be taken
out of service
of $575K to refurbish
[Z V7
4
K �
4,4.0
JCanyon �
Tank Corrosion
p
4 4-
1041' r
e.
„a.
Gateway water Tank �4
r
e '4.,
ti`
4
) \ k
.� 4y 1
4
UPI
a
Needs roof replaced
40$st
p
4t4r.:
High Risk Ca ital Needs 2013 -2022
Likely to fail within 5-10 years
Mobile Generation for Water Wells : $ 285 , 000
u New Production Well : $650 , 000
❑ Abandoning Wells at Fort Raymond : $250 , 000
Total = $ 1 , 185 , 000
18
417:
Moderate Risk Ca . ital Needs 2013-2022 •
Continuous Increasing Cost to Maintain & Operate
a Facility Control Upgrades : $80 , 000
o GIS : $ 30 , 000
a Formal rate study of Water utility : $ 30 , 000
o Replace 5 % of water lines per depreciation
plan : $ 1 , 000, 000/yr.
a Refurbish #4 Production Well : $85 , 000
a Replace 10 " and 14" AC water line between
Phoenix and Sea Lion : $ 1 , 860, 000
Total = $ 3 , 085 , 000 19
414.
Well houses
Well House 2 Well House 4
w
p
xY r �- ...
Iiiik
' t. iii.
•a
.eta' 4.' #064111P11111111k Sit 'r's :
y
it? U.
V
., � .' ,�
ava
w �
4 set.
S.fl,:%
4
441101
'ries**
Well Houses
. ... ._..................._._..............,.........._....,__......._._............_.............._
Well House 5 Well House 6
I ,
% ' *
1 ,
-', : • • • , '-,_. - . —4. , , ,,
. 4 '''• ....... .• ;. -.-,. - : :'
. ' •
'r- Ailde,4`;4•-,,,
• , ---afk" 7* ' . ' .... ,6"51,),
......, , .•
. . •-r. . ' .•,-,. ' ,,
- . .
•::; ''.1't.' ''
••••.,
. .
- ,
e., .
s. , • -- —,, ' '- .."` ,
X411111
111 • 1
. _ .•• ,..• '
, , . ..• ... ,. . .., ,..., •,
. ..
., . •
., , - • — ''
*.•';.'......'s,-..."',°'',•.".•'°_•.-_,'",-''''', ,r., , ',,,,,,,,,
„•-,• ,. -•. ....,
• ..°:
..—
. .
....
. ,
.. :
•
PIIIINS40"3'''71"' - ,s,..... '''." "-..;;•°.A."*.kts:',°°,1%iit;WO"''‘•.;.•'•• 5 1
° --• '7' ' - .s°••'.'° , .'•; ' --•°:'...,,,'„',..,,,,,.. '.;,,l''•°...',0.!",:.;
14 -.. ..
, .
,. . , ..,.
, .
J`S
Annual Replacement of Critical Infrastru
: t
Planning for Depreciation and Replacement 2013-2032
Replacing 5 % of water lines annually
IP A total of 73, 119 linear ft of A. C. , Cast Iron and
Wood Stave pipe needs to be replaced
Replacement cost is approximately $300 per linear
foot
This would require approximately $ 1M in additional
funding annually
® Continued funding of the depreciation plan is
22
critical to the success of the water system
yos k�
Annual Replacement of Critical Infrastrucre
Continued
Ductile Iron Pipe ( DIP)
• DIP systems could have a life expectancy of over 100
years, but the harsh climate of Seward could reduce that
considerably
After all of the A. C. , Cast Iron and Wood Stave pipe is
replaced with DIP, the replacement schedule for pipe
should be on at least a 50 year cycle or 1 . 25% of the
total 122,232 linear feet of pipe
This would require approximately $500K in additional
funding annually
23
Vastewater tFund
Wastewater-related cash
❑ Wastewater Enterprise Fund = $606K ( 12/ 12)
versus assets of $ 12M HC; $7M fully depreciated
❑ Projected ending cash in 2013 is $724K with no
contributions to MRRF
LI Wastewater MRRF = $ 112K
❑ Rate increases still needed to cover cost of
operations
HC = historic cost
•
r.
fl J
Y lt£
11 Wastewater Cash history
,,,c.,
„,„,,,,,
,„,,,,,
�M
e 900,000
DC7
ittA
ill MRRF
A'e
r 800,000
Wastewater
700,000
Fu nd
i w
600,000
434.14
500,000
400,000 0 ''1'4:'''''_ ;.
till ''' ,„ v
300,000
200,000 --._
100,000
2005 2006 2007 2008 2009 2010 2011 Oct-12 est.
2013
u �R
448'FP
Wastewaterre1ated de
1995 Dairy Hill Sewer loan = $2,665
( matures 7/2014)
u1994 Lowell Point loan = $ 59,689
( matures 11/2013)
u*GF loan to repay 1990 debt = $ 1 , 219, 150
• Total : $ 1 , 281 , 504
* Wastewater Fund has not been making $76,840 annual
payments to GF due to cash shortfalls
pf LfW
Gray►
4[ASKp
Wastewater Projects funded without debt •
® $ 57K - Backup Generator - Grant
❑ $278K - Lift Station # 3 - ARRA Grant
Total : $335,000 in Wastewater grants
being managed
6‘447)
Notes
Rate increase 2013 (6% ) expected to generate
$ 59K/year
Avg . bill increased $ 50 . 33 to $ 53 . 35 =
$ 3 . 02/mo .
o Annual debt payments $84K ($60K matures in
11/2013 ) ; assumes no new debt
a Maple Street Sewer ACWF 400K loan offer from
ADEC in hand , MMG pending
o No current funding for MRRF
pc.eK
Wastewater Rate History
o 2010 rate review showed need for 30 %
rate increase
■ 2010 = 4 . 8%
11 2011 = 5 . 1 %
• 2012 = 6 . 0 %
■ 2013 = 6 . 0%
CPI increased since then :
2010 1 . 8% ; 2011 3 . 2% ; 2012 2 . 23% ; 2013 2 . 6%
est. = 9 . 83%
■ We are still behind by ( 30% - 21 . 9 % + 9 . 83 %
CPI ) = 17 . 93 % but have made up 60 % of the
shortfall over the past four years
Status of depreciation reserves AS1F
le Wastewater = $ 112K in MRRF vs . assets
of $ 12 million ; $ 7 . 1 million fully
depreciated
Estimated cost to replace 21 miles of
underground sewer lines is $44M
31
,4,::_ ..4..)
a ital Infrastructure 4,..,0%.S4,..,0%.
Water knterprise Fund — Capital Needs
ri Ica �,;.ig. , - oderate-
Risk Risk
2013 162,000 - - 162,000
2014 640,000 50,000 - 690,000
2015 92,000 270,000 250,000 612,000
2016 - 120,000 85,000 205,000
2017 - - - -
Total 894,000 440,000 335,000 1 ,669,000
32
Critical Capital Needs 2013-2017 t
Likely to Fail in the Next 5 years, must be accomplished
❑ Forest Acres Lift Station : $92K (engineering)
O # 1 Stand - by generator : $ 150K
✓ SMIC bypass valve : $ 72K
o Secure Spruce Creek sewer : $90K
o Sewer sludge removal : $490K
:• TOTAL = $894,000
33
NeedsOi SfHi h Risk Ca ital 2013-2022 J
9/.ASwP
Likely to fail within 5-10 years
D Replace blowers at Lowell Point wastewater
treatment plant : $ 120K
• SMIC piping for bypass (engineering and
design ) : $ 50K
✓ Double wall fuel tanks : $ 150K (funding initially
approved by AES but approval later rescinded )
LJ Manhole refurbishment : $ 120K
Total = $440 , 000 34
0,„
Moderate Risk Capital Needs 2013-2016 .gip
Moderate Risk- Continuous Increasing Cost to Maintain & Operate
o GIS : $ 30K
o Rate study : $ 30K
ri Sludge pile disposal : $25K
o SMIC Lower Lift Station (engineering only) : $250K
❖ Total = $ 335 , 000
Still leaves $600K/yr. over 10 years needed to replace infrastructure past useful
life Depreciation plan for infrastructure past useful life
35
,....4
4,4
Wastewater facilities •
____ _ ..___ ____............_.........._....._......._
Lowell Point Aerated Lowell Point Lagoon
Lagoon Lab/ Blower Bldg .
....,
..•.- . - , . ., :,.. ..., :.
„ . . .
,.. , ',--• ''0 . ai':
, • .:, , ,- ... - ........
' • * .
.
; a i Voi! .1..4 • L._ ' •,.'""'f`..'' " - '-"" j--", * c,;:!?..4., -,r7r...::.,i'l,*4"->—'
-I -
. ..
+ ' _
, . .. i.
•
pF St*.
,tom**
SMIC Wastewater SMI
C Wastewater
Treatment Plant Aerated Lagoon
•
wro
‘,...-.4.
.,„..7: .
Lift Station 1 Lift Station 2
. ,
.. . .
• • .
.,..,.,
.... . , . • .
, .. .
..,,
, .
i............. - . ,
..,..,.. ...
_............____4 •
.
_....._
, ..,
1
a P •
Hr . ---,-,.....----
,
... ,s.
., ,...
1
. ....,....
.... I 11
• .' .....''''..4.::','::. 1. '
...„,
'U 1
1
.44.`
,./ .
. .
.. '
.." ,..
4.
.. .../
. .Z,.4 . --'''.'''..444: ;,.• , ',\:2.''':,4.'/
,,, ,4 4•"
,.; ....
.. . ..11*.
, ...4 ..
. ' .
......,
..,
0K St
i C
J
.41
4011,
4i*sa►
•
Lift Station 3 Lift Station 4
b
, ,--,..„..:_4.....-..; 4:44,44tx:::v.. lit,...:,:l . - - ; .l.:---.7 ''-'''"'rr4-""4-'"'" ''
r e ,Wil'! • IA '
3 4 ti 1
O
a'
i
wi
g."
• . ...
, .
,,--.,' 3'''' ,1‘,....0-'*-- -,,,-•':',.7: :'•-• -.•:- .-;,',-•-•
, . .
i.-
,
'-r,i,d',....L:,• .
• _........-!-.•-rw,iig'''"-:-•''''':',4 -
,7,:-,,'..
.',',•.; . ..
lt. i4 L
.
,%•,-gi.i..,.;;;. .. ,„. ;.'.,..,1 Aitiii ••'' k. - . .- .--- -,
••
,, .-.... . . .„,
..., . ..
.. 1 . ".'is•-• •,. : . ..-4-0,'.'4 • •"!
. • ,...— ,..,•.
..••• .....,.
The backend of
_. .„... 4 _... ...
,. a ..„,..,,,,,,,...44.--rw,,*, • .4
• i 4 .)'—•-- ..„.
.•,y
tA•t,, i . ,
. . ,
7,:',—.• '
1117) it ,,•-'-' . .,.
-.N.
.•,,,L .- , . .0 . . • • ..A
a . ,
. L.
, . ,,.,, the cube van that
'1.44 Iti'l• , , ,—....„...,_ .4.
„ , • . ,.,
has been
,., ...,..1.,,,.. .„
,
,..,,,.• ..,4 • . _ •• •
.. :•,.,,,••.,,.„•• - 4',4•,.•• . •, ,,;• ,
,,,,,,,,A;„: .,.....:,.,..,„ , •: •.„. .4.4.: , , ..:, .. .„ ....
.,.„_.
„..,....:,,„ , ....„,_. ,,, ..• ,, .., • -,........„ , ,..,...,. .,
','.,; •.,:,s-:---', . .- --., ' •-•,,. , : -. -:--.: •...'.. : - -,,-- :-• - 7 . ,..,..• ..,...,...
transformed into
, 4 •- -
., •., 2.,.•
. .
... 1, . . .1
- ... ...
, +^ a mobile work
•-. . ,
4..,,.,
statio y
n. \.[onev
.....
.. . ,
L... .,
'.,f-4,1'.Lr—.,'••:,•.• --, ..."-•
i.1.:0 ..... . .„.„..,.....
•, ••,
. . .
•
I well spent!! !
.
.. ., „.
. , . ......
4 -_,,l, ..
, -
1.. .-..-.-.•:, - -
.....: ._..
,
„1.., • ., ,, -„.
•
+pF iE�
Annual Replacement of Critical Infrastru re
Planning for Depreciation and Replacement 2012-2062
D Replacing 2 % of sewer pipes annually
A total of 125 , 505 linear ft pipe that needs to
be inspected and systematically replaced over
the next 50 years
■ Replacement cost is approximately $ 300 per
linear foot
■ This would require approximately $600K in
additional funding annually
Continued funding of the depreciation plan is
critical to the success of the sewer system
41
a.,..„. „.
,...
4,, .
The I 441 n d.
,.. ..,...,,,
__,..„..,
- 4- • . IL , „
Wit •
- II 51-00L Egli
f e ,
. .. - . ... . .• . . . _
. ,. .• .
1111 .
. -4simar
jll
- - •
;.,,,.
AIIIIIIIIIM.. i C
.?,-:''-.:-,i:‘•-,iT;.4,. --,-,-.4,!::,-..-',-..--,--,- -•