Loading...
HomeMy WebLinkAbout10292019 City Council Work Session Laydown - Budget Part 3 Iq/02.9 (SUS Cityo f Seward 2020/ 2021 Biennial Budget Part 3 General Fund Public Works: Roads & Streets, Snow & Ice, City Shop, Municipal Buildings (OA Water Enterprise Fund Sewer Enterprise Fund 44-50 Capital Improvement Plan 1 Public Works , pg. 32 .`. . Personnel - Replace mechanic/operator with PW superintendent ( + $ 13 , 199 ) Added back Motor Pool contributions both years Maintenance & Repair - loader tires, heavy equipment, maintenance, D- 1 , etc. Operating supplies - cold mix, calcium chloride, grader blades, etc. ADA improvements both years 4 75 -cn_ Added back overtime for snow removal ( removed in 18/ 19 ) City Hall , Annex & Library improvements - CIP 2 or sew. qi Water Fund, p. 111 Awaiting results of rate study Increased depreciation expense due to completion of new water storage tank Third Ave water line DEC loan balance @ 1/ 1/20 $ 1 . 1 million matures 2027 - $ 156K loan payments each year. Motor pool contribution $5k 3 - IL ,S1L '' .:;,,•-:,-----;:7::: 4:,•,.:: drk ,. _ -c. , ,,,,t- ,„,, Water Fund CIP , (4N ° - .--, . ._ City of Seward Capital Improvement Plan Water-Related Capital Projects 2020 and 2021 New or Project Funding Source Project Description Replace Year Cost Rating(a) City Portion Other Source Source Critical Capital Needs: Replace Lowell Canyon 200K gallon Tank with 500K gallon tank R 2021 $975,000 C S0 $575,000 State High Risk Capital Needs: Gateway Tank Roof R 2020 $300,000 H SO 3300,000 State Abandon wells at Fort Raymond R 2020 5250,000 H $250,000 City Moderate Risk Capital Needs: Refurbish#4 production well R $85,000 \I S85,000 City Distribution Piping upgrades(ductile iron pipe) R 2023 $500,000 \I $500,000 City Facility Control upgrades R $80,000 \I $80,000 City GI5 system \ $60,000 \I $60,000 City Replace 10"and 14•'AC water line btwn Phoenix and Sea Lion R 2026 $1,860,000 M City Replace water lines R 2024 3400,000 M $400,000 City Total Water Fund Projects. $4,510,000 $1,375,000 3875,000 Total Water Fund Projects for 2020 and 2021: S1,525,000 S250,000 S875,000 4 Sewer Fund, p. 121 Awaiting results of rate study Lowell Point & SMIC sludge loans balance @ 1/1/20 $ 1 million matures 2035 - Annual payments of $71K Debt cancellation to GF approved via RES 2019-075, no longer owes this debt Motor pool contributions $5K 5 or sew 4 fe J b .., Sewer Fund CIP 4, City of Seward Capital Improvement Plan Wastewater-Related Capital Projects 2020 and 2021 New or Project Funding Source l\o;nc Description Replace Year Cost Rating(a) City Portion Other Source Source Critical Capital Need.: Lowell Point sludge pile disposal R 2020 360,000 C $60,000 Wastewater Fund 81 t�andby,generator m}bile C& �n�-'"S'-trv}�i i' R 2022 375,000 C 3i3,000 Wastewater Fund High-Risk Capital Needs: SMIC piping for bypass,.engineering/design)&construction R 2024 S150,000 H 3150,000 R'asteunter Fund' n Y Four double wall fuel tanks 25k in 2021.2024 (i -r j«Otis R 2021 5100,000 H 3100.000 Wastewater Fund {� Q v' yt�' S Manhole refurbishment R 2021 3120,000 H 3120,000 R'astewater Fund Moderate-Risk Capital Needs: SMIC lower lift station lenginerring onlyi R 2020 S250:000 \f 3^50,000 Wastewater Fund S\IIC lower lift station construction N 2021 3320,000 N! 3320,000 Wastewater Fund 3\IIC Sludge pile disposal R 2019 525,000 \I 325,000 Wastewater Fund Replace existing collection part R 2021 3140,000 \I 3140,000 Wastewater Fund Replace infrastructure past useful life lS 5K) R 2027 3330,000 \I 3330,000 Wastewater Fund Wastewater Lagoon sludge removal 2025 32,000,000 32,000,000 Total Wastewater Fund Projects 33,570.000 S3,5 0,000 SO Total\\•astew-ater Fund Projects for 2020 and 2021: S990,000 S990,000 SO Rating(a): Critical Risk(C): Likely to fail within next 5 years High Risk(11): Likely to fail in 5.10 years 6 ,Moderate Risk(.11):continuous increasing cost to maintain and operate. -Neu"reflects creation or purchase of a neu asset:not replacing an existing asset api a!k J . ., ...„. Capital Improvement Plan 4�� � Capital Improvement Plan General Fund-Related Capital Projects Fiscal Year 2020 and 2021 New or Project Funding Source Project Description Replace Year Cost City Portion Other Source Source Projects Slated for Funding in 2020 and 2021: City Shop and P&R Warehouse Relocation Eng/Design R 2020 2125,000 S125,000 Capital Acquisition Fund Campgrounds:additional utility sites on waterfront N 2020 3400,000 $400,000 Capital Acquisition Fund Williams Park restroom/showerhouse N 2020 S300,000 3200,000 S100,000 Capital.Acquisition Fund Parks&Rec dumpster replacements R 2020 $65,000 S65,000 Capital Acquisition Fund Ballaine playground equipment update R 2020 3300,000 3300,000 Capital Acquisition Fund City Hall boiler&roof repairs R 2020 S85,000 385,000 Capital Acquisition Fund n^ Annex heating system S;building upgrades R 12020 $40,000 340,000 Capital Acquisition Fund K v rea apparatus - Fire R 2020 3237,000 3237,000 Capital Acquisition Fund Lowell Poin erosion mitigation R 2020 S200,000• flPiQ OycO,ia S200,000 Federal/State City Hall fire alarm system upgrade R 2020 $40,000 340,000 Capital Acquisition Fund Library plumbing repairs R 2020 S11,000 311,000 Capital Acquisition Fund Library roof leak repairs R 2020 368,000 S68,000 Capital Acquisition Fund Library LED lights&repairs R 2020 S17,000 317,000 Capital Acquisition Fund City Hall ADA ramp &parking N 2020 345,000 345,000 Capital Acquisition Fund Relocation of PW&Shop R 2021 32,700,000 3.2,700,000 Financing sources ADA sidewalk improvements R 20/21 $75,000 375,000 Capital Acquisition Fund Gateway, Forest Acres playground equipment update R 2021 S25,000 325,000 Capital Acquisition Fund Wellington Pavilion. design and construction N 2021 3400,000 3400,000 Capital Acquisition Fund Bike path resurfacing ` R 2021 $60,000 A $60,000 Capital Acquisition Fund Parks&Rec warehouse replacement ' ii �....,R 4,�0�1 _ 3750,000 $750,000 Capital Acquisition Fund IMMO -1,..1r----1 Total Projects in 2020 and 2021: I t7 l , ej,943,000 132.943,000 S3.000.000 ■ \11/s NM,. 7 40i St* J 4 PO IMP Capital Im rovement Planp . PUBLIC SAFETY: Itstier New animal shelter R $1,000,000 S1,000,000 General Fund Fire Hydrant upgrades. Ph. II R 8200,000 3200,000 General Fund Pubhc Safety Building R $5,665,000 $5,665,000 General Fund Total Public Safety Projects: I S6,865,000 86,865,000 S0 PARKS&RECREATION: Lagoon Boardwalk rebuild R $240,000 $240.000 General Fund Resurface playgrounds; Gateway, Forest Acres,Ballaine, 3rd Ave R 8285,000 8285,000 General Fund Tennis court refurbishment R $i 5,000 S75,000 General Fund John Perry field fencing R S50,000 $50,000 General Fund TYC landscape,fence, play area R S75,000 875.000 General Fund Little League concession stand replacement R $250,000 $250,000 General Fund Total Parks&Recreation Projects• 8975,000 S975.000 S0 CITY HALIn-IBRARY/OTHER: Paint City Hall R 820,000 S20,000 General Fund City Hall building envelope and windows upgrades R $500,000 S500,000 General Fund City Hall electrical upgrades R $65,000 S65,000 General Fund Fix ventilation at City Hall R S85,000 S85,000 General Fund Total City Hal/Library Projects: ' S650,000' S650,000 S0 Total General Fund Projects: 814:433,000 $11,433,000 $3,000,000 Total General Fund Projects for 2020 and 2021: S3.943.000 S2,943.000 S3.000.000 8 ~ate�� J V Harbor CIP 4cr' i______ City of Seward 1 Capital Improvement Plan Harbor-Related Capital Projects 2020 and 2021 New or Project Funding Source Project Description Replace Year Cost Rating(a) City Portion Other Source Source NE Boat Launch Ramp R 2021 52,000,000 C S500,000 S1,500,000 Cif•,ADFG Replace K&L and remainder of G Float R 2022 53.500,000 M S3,500,000 CitrfGrant Replace anodes on concrete floats R 2022 S200,000 M S200,000 City 50 Ton wash down pad N 2022 S500,000 New S500,000 City Replace dumpsters R 2023 530,000 If S30,000 Cit- 5 Ton crane I-dock N 2024 S400,000 New $400,000 City Total Harbor Fund Projects: S6,680,000 S5,160:000 51,500,000 Total Harbor Fund Projects for 2020 and 2021: S2,000,000 S500,000 S1,500,000 9 4a�� d , 1111111. SMIC CIP 4,..... 1 City of Seward Capital Improvement Plan SMIC-Related Capital Projects 2020 and 2021 New or Project Funding Source Project Description Replace Year Cost Rating(a) City Portion Other Source Source Additional water services N 2020 310,000 N $10,000 City Improve Drainage and Fence Storage Area N 2022 31,500,000 N $1,500,000 City/Financing Additional power stalls N 2023 3500,000 N $500,000 City Additional restroom N 2024 $75,000 N 375,000 City Pave City owned boat yard roads N 2024 S1,000,000 N 31,000,000 City/Financing North dock paving N 2024 31,000,000 N 31,000,000 City/Financing Total SMIC Fund Projects: S4,085.000 S4,085.000 S0 Rating(a): Critical Risk(C): Likely to fail within next 5 years High Risk(X): Likely to fail in 5.10 years Moderate Risk(M):continuous increasing cost to maintain and operate. 'Neu'reacts creation or purchase of a reu asset;not replacing an existing asset 10 Parking CIP Capital Improvement Plan Parking-Related Capital Projects 2020 and 2021 New or Project Funding Source Project Description Replace Year Cost Rating ra) Citr Portion Other Source Source Parking officeichalet replacement R 2020 S100,000 S100,000 Parking Other: NE Parking lot paving N 2020 S150,000 S150,000 Parking Total Parking Fund Projects: 5250,000 S250,000 Total Parking Fund Projects for 2020 and 2021: $250.000 $250.000 Rating(a): Critical Risk(C): LikeIy to fail within next 5 years High Risk(H): Likely to fail in 5-10 years Moderate Risk(AI):continuous increasing cost to maintain and operate. "7Vew"reflects creation or purchase of a new asset;not replacing an existing asset 11 J 4tsa� 1ectric CIP City of Seward Capital Improvement Plan Electric-Related Capital Projects 20.20 and 2021 New or P%ect Funding Source Project Description Replace Year Cost Rating is, City Pommn Other Source Source Critical Capital Needs:: Tao.Drove iStoney Creeki y-, �- R 2020 5175,000 C 5175.000 Electric Jesse Lee L'adergrouad Y, R ^_021 S72,000 C S72,000 Electric Radiator Heeds 4 t� '�t R 2020 3200,000 C $200,000 Electric Fort Raymond mice Upgrade R 2020 5130.000 C $130,000 Electric High-Risk Capital Need., Old dill+s3 R 2021 3200,000 H S200.000 Electric Gateway a:pper' R 2021 590.000 H S90,000 Electric Gateway'Loner) ��L _ 2020 _ SS0000 560.000 Electric Woodland Hills L_x' oe S Downtown Alley t2nd and 3rd underground I R Jl, H 31,000,00o Electric ■ Mt ■ Downtown Alley lard and athi underground R 3O, 2,000, H 12,000,000 Electric 'Mir Downtown Alley tith and Sthi underground R ^-03052,000.000 H $2,000,000 Electric Moderate-Risk Capital Needs: Questa Woods R 2020 350,000 %I S50,000 Electric Lowing to Victor Creek Overhead R 2020 S75,000 \I 375,000 Electric Convert transmission ham to 115ley R 2030 512,000,000 l l 212,000,000 etate/Electnc Security Upgrades to substanons N 20 22 5330.000 7,l S130,000 Electric T.Lae Replace Nash Rd N 2030 S2,000,000 ?I 32,000,000 Total Electra Fund Projects. 3"0,352,000 SS,352,000 312.000,000 r r Total Electric Fund Projects for 2020 and 2021: S1.352,000 S1,332,000 S0 Rattwr(a): Critical Rini(Cl'Likely to MI within next$years High flak(ff): Lately to fail en S.10}ears Moderate Risk(3P:continuous increasing cost to maintain and operate. 12 'Neu"reflects creation or purchase of a new asset;not replacing an existing asset • ao,s[y`` IMP Motor Pool CIP ______ Capital Improvement Plan Motor Pool-Related Capital Projects 2020 and 2021 \ew or Project Funding Source Project Description Replace Year Cost City Portion Other Portion Source Parking truck R 2020 17,000 17,000 Parking Public Works loader ts/snotti blower R 2020 340,000 340,000 Motor Pool TYC van r, R— 2020 _ 30,000 30.000 Motor Pool Police cruisers with equipment(3) �I �' l0�' [IMP� 3,000 I ' 133,000 Motor Pool I �I VI Building inspection vehicle R 40,000 40,000 Motor Pool Police cruiser with equipment R 2021 45,000 45,000 Motor Pool Harbor flatbed µ!plow R 2021 80,000 80,000 Motor Pool Public Works sweeper R 2021 250,000 250,000 Motor Pool Parks maintenance truck R 2021 40,000 40,000 Motor Pool Total Motor Pool Fund Projects S97 i,000 S97 7.000 S0 Total Motor Pool Fund Projects for 2020 and 2021: S977.000 S977.000 SO •Mr13 C`� a oc stti ? 1 J Hospital CIP .,... City of Seward Capital Improvement Plan Healthcare-Related Capital Needs 2020 and 2021 Project Project Hospital: Cost Cost Badge readers SCHC front entrance and su 2020 $10,000 Project Description Year 2020 2021 Communications Closet 2021 $100,000 Lab: Expansion IT Room 2020 3200,000 Blood gas analyzer 2020 310,5i5 Iafant warmer 2020 $10,000 Centrifuge 2020 S10,000 Monitors,bedside,fetal 2020 36,850 Microscope 2020 S 70,000 Nurse Call System 2020 3180,000 590,5i5 Patnt Medical Center Exterior 2021 $30,000 Parking lots patched and re-sealed 2020 $10,000 Portable ventilator 2020 S16,000 Mountain Haven: PSNIC fuel tank re-do manhole 2021 37.000 Air\Iatresses 2020 328,000 Storages'NW! 2021 S30,000 Bariatric transport chair 2021 s4,999VentBipap Machine 2020 S20,000 Bus 2020 60,000 S452.850 S167.000 Epic Upgrade 2021 $150,000 Gravel Shed 2020 35,000 iFacilities Mattresses and Furniture 25°i 2020 345,000Gravel Spreader 2020 $8,500 Nurse Call System 2020 $30.000 'Pool cars 2020 345,000 Paint Mountain Haven 2020 S30,000 S53,500 Parking lots patched and re-sealed 2020 S10,000 PSMH lodge front siding 2020 36,000 Total Healthcare Projects for 2020 and 2021: S837,925 S366.99S PSMH roofs 2021 $40,000 Replacement computers&wall mounts 2020 S10,000 Scales 2020 $5,000 Specialty Wheel Chair 2021 34,999 Workstations on wheels 2020 312,000 S241.000 S199,998 14