City Shop and P&R Warehouse Relocation Eng/Design R 2020 $125,000 $125,000 Capital Acquisition Fund
Campgrounds:additional utility sites on waterfront N 2020 $400,000 $400,000 Capital Acquisition Fund
Williams Park restroom/showerhouse N 2020 $300,000 $200,000 $100,000 Capital Acquisition Fund
Parks&Rec dumpster replacements R 2020 $65,000 $65,000 Capital Acquisition Fund
Ballaine playground equipment update R 2020 $300,000 $300,000 Capital Acquisition Fund
City Hall boiler&roof repairs R 2020 $85,000 $85,000 Capital Acquisition Fund
Annex heating system&building upgrades R 2020 $40,000 $40,000 Capital Acquisition Fund
Breathing apparatus-Fire R 2020 $237,000 $237,000 Capital Acquisition Fund
Lowell Point erosion mitigation R 2020 $200,000 $200,000 Federal/State
City Hall fire alarm system upgrade R 2020 $40,000 $40,000 Capital Acquisition Fund
,kllil (Library plumbing repairs R 2020 $11,000 $11,000 Capital Acquisition Fund
�'N\b, Library roof leak repairs R 2020 $68,000 $68,000 Capital Acquisition Fund
Library LED lights&repairs R 2020 $17,000 $17,000 Capital Acquisition Fund
AzCity Hall ADA ramp&parking N 2020 $45,000 $45,000 Capital Acquisition Fund
Relocation of PW&Shop R 2021 $2,700,000 $2,700,000 Financing sources
RADA sidewalk improvements R 20/21 $75,000 $75,000 Capital Acquisition Fund
Gateway,Forest Acres playground equipment update R 2021 $25,000 $25,000 Capital Acquisition Fund
Wellington Pavilion:design and construction N 2021 $400,000 $400,000 Capital Acquisition Fund
Bike path resurfacing R 2021 $60,000 $60,000 Capital Acquisition Fund
Parks&Rec warehouse replacement R 2021 $750,000 $750,000 Capital Acquisition Fund
Total Projects in 2020 and 2021: $5,9.13,000 $2,9,13,000 $3,000,000
PUBLIC SAFETY:
New animal shelter R $1,000,000 $1,000,000 General Fund
Fire Hydrant upgrades-Ph.II R $200,000 $200,000 General Fund
Public Safety Building R $5,665,000 $5,665,000 General Fund
Total Public Safety Projects: $6,865,000 $6,865,000 $0
PARKS&RECREATION:
Lagoon Boardwalk rebuild R $240,000 $240,000 General Fund
Resurface playgrounds;Gateway,Forest Acres,Ballaine,3rd p R $285,000 $285,000 General Fund
Tennis court refurbishment R $75,000 $75,000 General Fund
John Perry field fencing R $50,000 $50,000 General Fund
TYC landscape,fence,play area R $75,000 $76,000 General Fund
Little League concession stand replacement R $250,000 $250,000 General Fund
Total Parks&Recreation Projects: $975,000 $975,000 $0
CITY HALL/LIBRARY/OTHER:
Paint City Hall R $20,000 $20,000 General Fund
City Hall building envelope and windows upgrades R $500,000 $500,000 General Fund
City Hall electrical upgrades R $65,000 $65,000 General Fund
Fix venitilation at City Hall R $85,000 $85,000 General Fund
Total City Hall/Library Projects: $650,000 $650,000 $0
Total General Fund Projects: $14,433,000 $11,433,000 $3,000,000
Total General Fund Projects for 2020 and 2021: S5,913,000 $2,943,000 $3,000,000
Lvkl a i e,aiM J
City of Seward
Capital Improvement Plan
Harbor-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
NE Boat Launch Ramp R 2021 $2,000,000 C $500.000 $1.500,000 City/ADFG X
Replace K&L and remainder of G Float R 2022 $3,500,000 M $3,500,000 City/Grant X
Replace anodes on concrete floats R 2022 $200,000 M $200,000 City X
50 Ton wash down pad N 2022 $500,000 New $500,000 City X
Replace dumpsters R 2023 $80,000 M $80,000 City X
5 Ton crane I-dock N 2024 $400,000 New $400,000 City X
Total Harbor Fund Projects: $6,680.000 $5,180,000 $1,500,000
Total Harbor Fund Projects for 2020 and 2021: $2,000,000 $500,000 $1,500,000
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
City of Seward
Capital Improvement Plan
SMIC-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Additional water services N 2020 $10,000 N $10,000 City
Improve Drainage and Fence Storage Area N 2022 $1,500,000 N $1,500,000 City/Financing
Additional power stalls N 2023 $500,000 N $500,000 City
Additional restroom N 2024 $75,000 N $75,000 City
Pave City owned boat yard roads N 2024 $1,000,000 N $1,000,000 City/Financing
North dock paving N 2024 $1,000,000 N $1,000,000 City/Financing
Total SMIC Fund Projects: $4,085,000 $4,085,000 $0
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
Capital Improvement Plan
•
Parking-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Parking office/chalet replacement R 2020 $100,000 $100,000 Parking
Other:
NE Parking lot paving N 2020 $150,000 $150,000 Parking
Total Parking Fund Projects: $250,000 $250,000
Total Parking Fund Projects for 2020 and 2021: $250.000 $250,000
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
City of Seward
•
Capital Improvement Plan
Electric-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Critical Capital Needs:
Lake Drive(Stoney Creek) R 2020 $175,000 C $175,000 Electric
Jesse Lee Underground R 2021 $72,000 C $72,000 Electric
Radiator Hoods R 2020 $200,000 C $200,000 Electric
Fort Raymond Fence Upgrade R 2020 $130,000 C $130,000 Electric
High-Risk Capital Needs:
Old Mill#3 R 2021 $200,000 H
$200,000 Electric
Gateway(Upper)
R 2021 $90,000 H $90,000 Electric
Gateway(Lower) R 2020 $80,000 H $80,000 Electric
Woodland Hills R 2021 $120,000 H $120,000 Electric
Downtown Alley(2nd and 3rd)underground R 2030 $1,000,000 H $1,000,000 Electric
Downtown Alley(3rd and 4th)underground R 2030 $2,000,000 H $2,000,000 Electric
Downtown Alley(4th and 5th)underground R 2030 $2,000,000 H $2,000,000 Electric
Moderate-Risk Capital Needs:
Questa Woods R 2020 $80,000 M $80,000
Electric
Lawing to Victor Creek Overhead R 2020 $75,000 M $75,000 Electric
Convert transmission line to 115 kV R 2030 $12,000,000 M $12,000,000 State/Electric
Security Upgrades to substations N 20.22 $130,000 M
$130,000 Electric
T-Line Replace Nash Rd N 2030 $2,000,000 M $2,000,000
Total Electric Fund Projects: $20,352,000 $8,352,000 $12,000,000
Total Electric Fund Projects for 2020 and 2021: $1,352,000 $1,352,000 $0
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
' City of Seward
Capital Improvement Plan
Water-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City PortionOther Source Source
Critical Capital Needs:
Replace Lowell Canyon 200K gallon Tank with 500K gallon tan R 2021 $975,000 C $0 $575,000 State
High Risk Capital Needs:
Gateway Tank Roof R 2020 $300.000 H $0 $300,000 State
Abandon wells at Fort Raymond R 2020 $250,000 H $250.000 City
Moderate Risk Capital Needs:
Refurbish#4 production well R $85,000 M $85,000 City
Distribution Piping upgrades(ductile iron pipe) R 2023 $500,000 M $500,000 City
Facility Control upgrades R $80,000 M $80,000 City
GIS system N $60,000 M $60,000 City
Replace 10"and 14"AC water line btwn Phoenix and Sea Lion R 2026 $1,860,000 M City
Replace water lines R 2024 $400,000 M $400,000 City
Total Water Fund Projects: $4,510,000 $1,375,000 $875,000
Total Water Fund Projects for 2020 and 2021: $1,525,000 $250,000 $875,000
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
•
City of Seward
Capital Improvement Plan
Wastewater-Related Capital Projects
2020 and 2021
• New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Critical Capital Needs:
Lowell Point sludge pile disposal R 2020 S60.000 C $60.000 Wastewater Fund
#1 standby generator mobile R 2022 $75.000 C $75.000 Wastewater Fund
High-Risk Capital Needs:
SMIC piping for bypass(engineering/design)&constructi R 2024 $150,000 H $150,000 Wastewater Fund
Four double wall fuel tanks.25k in 2021-2024 R 2021 $100,000 H $100,000 Wastewater Fund
Manhole refurbishment R 2021 $120,000 H $120,000 Wastewater Fund
Moderate-Risk Capital Needs:
SMIC lower lift station(engineering only) R 2020 $250,000 M $250,000 Wastewater Fund
SMIC lower lift station construction N 2021 $320,000 M $320,000 Wastewater Fund
SMIC Sludge pile disposal R 2019 $25,000 M $25,000 Wastewater Fund
Replace existing collection part R 2021 $140,000 M $140,000 Wastewater Fund
Replace infrastructure past useful life($75K) R 2027 $330,000 M $330,000 Wastewater Fund
Wastewater Lagoon sludge removal 2025 $2,000,000 $2,000,000
Total Wastewater Fund Projects: $3,570,000 $3,570,000 SO
Total Wastewater Fund Projects for 2020 and 2021: $990,000 $990,000 S0
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
'New"reflects creation or purchase of a new asset;not replacing an existing asset
Capital Improvement Plan
Motor Pool-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost City Portion Other Portion Source
Parking truck R 2020 17,000 17,000 Parking
Public Works loader w/snow blower R 2020 340,000 340,000 Motor Pool
TYC van R 2020 30,000 30,000 Motor Pool
Police cruisers with equipment(3) R 2020 135,000 135,000 Motor Pool
Building inspection vehicle R 2021 40,000 40,000 Motor Pool
Police cruiser with equipment R 2021 45,000 45,000 Motor Pool
Harbor flatbed w/plow R 2021 80,000 80,000 Motor Pool
Public Works sweeper R 2021 250.000 250,000 Motor Pool
Parks maintenance truck R 2021 40,000 40,000 Motor Pool
Total Motor Pool Fund Projects: $977,000 $977,000 $0
Total Motor Pool Fund Projects for 2020 and 2021: $977,000 $977,000 $0
City of Seward
Capital Improvement Plan
Healthcare-Related Capital Needs
2020 and 2021
Project Project
Cost Cost
Project Description Year 2020 2021
Lab:
Blood gas analyzer 2020 $10,575
Centrifuge 2020 $10,000
Microscope 2020 $70,000
$90,575
Mountain Haven:
Air Matresses 2020 $28,000
Bariatric transport chair 2021 $4,999
Bus 2020 $60,000
Epic Upgrade 2021 $150,000
Gravel Shed 2020 $5,000
Mattresses and Furniture 25% 2020 $45,000
Nurse Call System 2020 $30,000
Paint Mountain Haven 2020 $30,000
Parking lots patched and re-sealed 2020 $10,000
PSMH lodge front siding 2020 $6,000
PSMH roofs 2021 $40,000
Replacement computers&wall mounts 2020 $10,000
Scales 2020 $5,000
Specialty Wheel Chair 2021 $4,999
Workstations on wheels 2020 $12,000
$241,000 $199,998
Hospital:
Badge readers SCHC front entrance and 2020 $10,000
Communications Closet 2021 $100,000
Expansion IT Room 2020 $200,000
Infant warmer 2020 $10,000
Monitors,bedside,fetal 2020 $6,850
Nurse Call System 2020 $180,000
Paint Medical Center Exterior 2021 $30,000
Parking lots patched and re-sealed 2020 $10,000
Portable ventilator 2020 $16,000
PSMC fuel tank re-do manhole 2021 $7,000
Storage/Space 2021 $30,000
Vent/Bipap Machine 2020 $20,000
$452,850 $167,000
Facilities
Gravel Spreader 2020 $8,500
Pool cars 2020 $45,000
$53,500
Total Healthcare Projects for 2020 and 202l $837,925 $366,998