HomeMy WebLinkAbout03152021 City Council Work Session Packet - Water Sewer TariffsSeward City Council
Work Session Packet
1
Topic: Review and Discuss Water & Sewer
Tariff Changes
Virtual Meeting
March 15, 2021
City Council Chambers Beginning at 5:30 p.m.
Instructions For
CITIZEN INVOLVEMENT
DURING CITY COUNCIL Virtual WORK SESSIONS
Due to COVID-19, alternate methods for citizen involvement during City Council work sessions
have been created to allow public interaction while keeping everyone safe and healthy. Although
there is no in person public attendance allowed, council wants to encourage citizen participation.
If you wish to participate in a work session, please follow these simple steps:
STEP 1: Sign up on the city clerk's contact list. Send an email to clerk2cityofseward.net
and request to be included on the contact list AND provide your phone number.
Sign up by 5:00 p.m. on the day of the work session. You'll receive a confirmation
email from the city clerk that you're on the list; if you don't receive the
confirmation, please call 224-4045 to confirm.
STEP 2: Keep your phone handy throughout the work session. When answering your phone,
please mute any background noise so you can be heard by council clearly.
How it will work:
During regular intervals throughout the work session, the proceedings will be halted and the city
clerk will call citizens who have signed up. After all citizens have been contacted, council will
continue the work session.
Citizens sign up one time per work session, and will be contacted at every interval during the work
session. Each time you are called, the city clerk will ask if you wish to be contacted at the next
interval during that work session.
How to watch or listen to a work session:
1. Watch Live Streaming on the city's YouTube page. Log onto YouTube and type "City of
Seward Alaska" into the search bar or go to:
2. hltps://www.youtube.com/channel/UCWzsXcDwdyklHKGgvYS_UNQ
3. Listen on the radio. Tune to KIBH-FM 91.7
4. Watch on television. Tune into GCI Cable Channel 9. Note: GCI has recently been
experiencing technical difficulties with the sound; they are working diligently to fix the
problem.
Attending via ZOOM
Enter the following information in the Zoom app or on www.Zoom.us
or Telephone: US: +1 669 900 6833 or 833 548 0276 (Toll Free)
Webinar ID: 998 5672 5829 Passcode: 185698
CITY COUNCIL WORK SESSION
Monday, March 15, 2021 at 5:30 p.m.
TOPIC: Review and Discuss Water & Sewer Tariff Changes
Utility Bill Calculation Tool
75" to 1"............................................................
1" to 2"..............................................................
2.25" to 4"..........................................................
Over4"..............................................................
Pg. 2
Pg. 5
Pg. 15
Pg. 24
Proposed Water Tariff .................................................... Pg. 35
Proposed Wastewater (Sewer) Tariff ...................................
Current 2021 Water Tariff ...............................................
Current 2021 Wastewater (Sewer) Tariff ..............................
Pg. 49
Pg. 63
Pg. 72
1
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
1
3/4" to 1" Service
0
$24.65
$39.78
$15.13
61.4 %
$58.25
$58.25
$0.00
0.0 %
$82.90
$98.03
$15.13
18.3
2
3/4" to 1" Service
1,000
$24.65
$39.78
$15.13
61.4 %
$58.25
$58.25
$0.00
0.0 %
$82.90
$98.03
$15.13
18.3
3
3/4" to 1" Service
2,000
$24.65
$39.78
$15.13
61.4 %
$58.25
$58.25
$0.00
0.0 %
$82.90
$98.03
$15.13
18.3
4
3/4" to 1" Service
3,000
$24.65
$39.78
$15.13
61.4 %
$58.25
$58.25
$0.00
0.0 %
$82.90
$98.03
$15.13
18.3
5
3/4" to 1" Service
4,000
$24.96
$39.78
$14.82
59.4 %
$58.25
$58.25
$0.00
0.0 %
$83.21
$98.03
$14.82
17.8
6
3/4" to 1" Service
5,000
$31.20
$39.78
$8.58
27.5 %
$58.25
$58.25
$0.00
0.0 %
$89.45
$98.03
$8.58
9.6
7
3/4" to 1" Service
6,000
$37.44
$39.78
$2.34
6.3%
$58.25
$58.25
$0.00
0.0 %
$95.69
$98.03
$2.34
2.4
8
3/4"tot"Service
7,000
$43.68
$46.41
$2.73
6.3%
$59.92
$59.29
-$0.63
-1.1%
$103.60
$105.70
$2.10
2.0%
9
3/4"tot"Service
8,000
$49.92
$53.04
$3.12
6.3%
$68.48
$67.76
-$0.72
-1.1%
$118.40
$120.80
$2.40
2.0%
10
3/4" to 1" Service
9,000
$56.16
$59.67
$3.51
6.3%
$77.04
$76.23
-$0.81
-1.1%
$133.20
$135.90
$2.70
2.0%
11
3/4" to 1" Service
10,000
$62.40
$66.30
$3.90
6.2%
$85.60
$84.70
-$0.90
-1.1%
$148.00
$151.00
$3.00
2.0%
12
3/4" to 1" Service
11,000
$68.64
$72.93
$4.29
6.2%
$92.45
$93.17
$0.72
0.8 %
$161.09
$166.10
$5.01
3.1
13
3/4" to 1" Service
12,000
$74.88
$79.56
$4.68
6.3%
$99.30
$101.64
$2.34
2.4 %
$174.18
$181.20
$7.02
4.0
14
3/4" to 1" Service
13,000
$81.12
$86.19
$5.07
6.3%
$106.15
$110.11
$3.96
3.7 %
$187.27
$196.30
$9.03
4.8
15
3/4" to 1" Service
14,000
$87.36
$92.82
$5.46
6.3%
$113.00
$118.58
$5.58
4.9 %
$200.36
$211.40
$11.04
5.5
16
3/4" to 1" Service
15,000
$93.60
$99.45
$5.85
6.3%
$119.85
$127.05
$7.20
6.0 %
$213.45
$226.50
$13.05
6.1
17
3/4"tot"Service
16,000
$99.84
$106.08
$6.24
6.3%
$126.70
$135.52
$8.82
7.0%
$226.54
$241.60
$15.06
6.6%
18
3/4" to 1" Service
17,000
$106.08
$112.71
$6.63
6.3%
$133.55
$143.99
$10.44
7.8%
$239.63
$256.70
$17.07
7.1
19
3/4"tot"Service
18,000
$112.32
$119.34
$7.02
6.3%
$140.40
$152.46
$12.06
8.6%
$252.72
$271.80
$19.08
7.5%
20
3/4"tot"Service
19,000
$118.56
$125.97
$7.41
6.3%
$147.25
$160.93
$13.68
9.3%
$265.81
$286.90
$21.09
7.9%
21
3/4"tot"Service
20,000
$124.80
$132.60
$7.80
6.2%
$154.10
$169.40
$15.30
9.9%
$278.90
$302.00
$23.10
8.3%
22
3/4" to 1" Service
21,000
$131.04
$139.23
$8.19
6.3%
$160.95
$177.87
$16.92
10.5 %
$291.99
$317.10
$25.11
8.6
23
3/4" to 1" Service
22,000
$137.28
$145.86
$8.58
6.2%
$167.80
$186.34
$18.54
11.0 %
$305.08
$332.20
$27.12
8.9
24
3/4" to 1" Service
23,000
$143.52
$152.49
$8.97
6.3%
$174.65
$194.81
$20.16
11.5 %
$318.17
$347.30
$29.13
9.2
25
3/4" to 1" Service
24,000
$149.76
$159.12
$9.36
6.3%
$181.50
$203.28
$21.78
12.0 %
$331.26
$362.40
$31.14
9.4
26
3/4" to 1" Service
25,000
$156.00
$165.75
$9.75
6.3%
$188.35
$211.75
$23.40
12.4 %
$344.35
$377.50
$33.15
9.6
27
3/4" to 1" Service
26,000
$162.24
$172.38
$10.14
6.3%
$195.20
$220.22
$25.02
12.8 %
$357.44
$392.60
$35.16
9.8
28
3/4"tot"Service
27,000
$168.48
$179.01
$10.53
6.2%
$202.05
$228.69
$26.64
13.2%
$370.53
$407.70
$37.17
10.0%
29
3/4"tot"Service
28,000
$174.72
$185.64
$10.92
6.3%
$208.90
$237.16
$28.26
13.5%
$383.62
$422.80
$39.18
10.2%
30
3/4"tot"Service
29,000
$180.96
$192.27
$11.31
6.3%
$215.75
$245.63
$29.88
13.8%
$396.71
$437.90
$41.19
10.4%
31
3/4"tot"Service
30,000
$187.20
$198.90
$11.70
6.3%
$222.60
$254.10
$31.50
14.2%
$409.80
$453.00
$43.20
10.5%
32
3/4"tot"Service
31,000
$193.44
$205.53
$12.09
6.3%
$229.45
$262.57
$33.12
14.4%
$422.89
$468.10
$45.21
10.7%
33
3/4" to 1" Service
32,000
$199.68
$212.16
$12.48
6.3%
$236.30
$271.04
$34.74
14.7 %
$435.98
$483.20
$47.22
10.8
34
3/4" to 1" Service
33,000
$205.92
$218.79
$12.87
6.2%
$243.15
$279.51
$36.36
15.0 %
$449.07
$498.30
$49.23
11.0
35
3/4" to 1" Service
34,000
$212.16
$225.42
$13.26
6.3%
$250.00
$287.98
$37.98
15.2 %
$462.16
$513.40
$51.24
11.1
36
3/4" to 1" Service
35,000
$218.40
$232.05
$13.65
6.3%
$256.85
$296.45
$39.60
15.4 %
$475.25
$528.50
$53.25
11.2
37
3/4" to 1" Service
36,000
$224.64
$238.68
$14.04
6.3%
$263.70
$304.92
$41.22
15.6 %
$488.34
$543.60
$55.26
11.3
38
3/4" to 1" Service
37,000
$230.88
$245.31
$14.43
6.3%
$270.55
$313.39
$42.84
15.8 %
$501.43
$558.70
$57.27
11.4
39
3/4" to 1" Service
38,000
$237.12
$251.94
$14.82
6.3%
$277.40
$321.86
$44.46
16.0 %
$514.52
$573.80
$59.28
11.5
40
3/4" to 1" Service
39,000
$243.36
$258.57
$15.21
6.3%
$284.25
$330.33
$46.08
16.2 %
$527.61
$588.90
$61.29
11.6
41
3/4" to 1" Service
40,000
$249.60
$265.20
$15.60
6.2%
$291.10
$338.80
$47.70
16.4 %
$540.70
$604.00
$63.30
11.7
42
3/4" to 1" Service
41,000
$255.84
$271.83
$15.99
6.3%
$297.95
$347.27
$49.32
16.6 %
$553.79
$619.10
$65.31
11.8
43
3/4" to 1" Service
42,000
$262.08
$278.46
$16.38
6.3%
$304.80
$355.74
$50.94
16.7 %
$566.88
$634.20
$67.32
11.9
44
3/4" to 1" Service
43,000
$268.32
$285.09
$16.77
6.3%
$311.65
$364.21
$52.56
16.9 %
$579.97
$649.30
$69.33
12.0
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water
Proposed
Bill
Difference
Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
45
3/4" to 1" Service
44,000
$274.56
$291.72
$17.16
6.2 %
$318.50
$372.68
$54.18
17.0
%
$593.06
$664.40
$71.34
12.0
46
3/4" to 1" Service
45,000
$280.80
$298.35
$17.55
6.3 %
$325.35
$381.15
$55.80
17.2
%
$606.15
$679.50
$73.35
12.1
47
3/4" to 1" Service
46,000
$287.04
$304.98
$17.94
6.3 %
$332.20
$389.62
$57.42
17.3
%
$619.24
$694.60
$75.36
12.2
48
3/4" to 1" Service
47,000
$293.28
$311.61
$18.33
6.3 %
$339.05
$398.09
$59.04
17.4
%
$632.33
$709.70
$77.37
12.2
49
3/4" to 1" Service
48,000
$299.52
$318.24
$18.72
6.3 %
$345.90
$406.56
$60.66
17.5
%
$645.42
$724.80
$79.38
12.3
50
3/4" to 1" Service
49,000
$305.76
$324.87
$19.11
6.3 %
$352.75
$415.03
$62.28
17.7
%
$658.51
$739.90
$81.39
12.4
51
3/4" to 1" Service
50,000
$312.00
$331.50
$19.50
6.3 %
$359.60
$423.50
$63.90
17.8
%
$671.60
$755.00
$83.40
12.4
52
3/4" to 1" Service
51,000
$316.98
$338.13
$21.15
6.7 %
$365.28
$431.97
$66.69
18.3
%
$682.26
$770.10
$87.84
12.9
53
3/4" to 1" Service
52,000
$321.96
$344.76
$22.80
7.1 %
$370.96
$440.44
$69.48
18.7
%
$692.92
$785.20
$92.28
13.3
54
3/4" to 1" Service
53,000
$326.94
$351.39
$24.45
7.5 %
$376.64
$448.91
$72.27
19.2
%
$703.58
$800.30
$96.72
13.7
55
3/4" to 1" Service
54,000
$331.92
$358.02
$26.10
7.9 %
$382.32
$457.38
$75.06
19.6
%
$714.24
$815.40
$101.16
14.2
56
3/4" to 1" Service
55,000
$336.90
$364.65
$27.75
8.2 %
$388.00
$465.85
$77.85
20.1
%
$724.90
$830.50
$105.60
14.6
57
3/4" to 1" Service
56,000
$341.88
$371.28
$29.40
8.6 %
$393.68
$474.32
$80.64
20.5
%
$735.56
$845.60
$110.04
15.0
58
3/4" to 1" Service
57,000
$346.86
$377.91
$31.05
9.0 %
$399.36
$482.79
$83.43
20.9
%
$746.22
$860.70
$114.48
15.3
59
3/4" to 1" Service
58,000
$351.84
$384.54
$32.70
9.3 %
$405.04
$491.26
$86.22
21.3
%
$756.88
$875.80
$118.92
15.7
60
3/4" to 1" Service
59,000
$356.82
$391.17
$34.35
9.6 %
$410.72
$499.73
$89.01
21.7
%
$767.54
$890.90
$123.36
16.1
61
3/4" to 1" Service
60,000
$361.80
$397.80
$36.00
10.0 %
$416.40
$508.20
$91.80
22.0
%
$778.20
$906.00
$127.80
16.4
62
3/4" to 1" Service
61,000
$366.78
$404.43
$37.65
10.3 %
$422.08
$516.67
$94.59
22.4
%
$788.86
$921.10
$132.24
16.8
63
3/4" to 1" Service
62,000
$371.76
$411.06
$39.30
10.6 %
$427.76
$525.14
$97.38
22.8
%
$799.52
$936.20
$136.68
17.1
64
3/4" to 1" Service
63,000
$376.74
$417.69
$40.95
10.9 %
$433.44
$533.61
$100.17
23.1
%
$810.18
$951.30
$141.12
17.4
65
3/4" to 1" Service
64,000
$381.72
$424.32
$42.60
11.2 %
$439.12
$542.08
$102.96
23.4
%
$820.84
$966.40
$145.56
17.7
66
3/4" to 1" Service
65,000
$386.70
$430.95
$44.25
11.4 %
$444.80
$550.55
$105.75
23.8
%
$831.50
$981.50
$150.00
18.0
67
3/4" to 1" Service
66,000
$391.68
$437.58
$45.90
11.7 %
$450.48
$559.02
$108.54
24.1
%
$842.16
$996.60
$154.44
18.3
68
3/4" to 1" Service
67,000
$396.66
$444.21
$47.55
12.0 %
$456.16
$567.49
$111.33
24.4
%
$852.82
$1,011.70
$158.88
18.6
69
3/4" to 1" Service
68,000
$401.64
$450.84
$49.20
12.2 %
$461.84
$575.96
$114.12
24.7
%
$863.48
$1,026.80
$163.32
18.9
70
3/4" to 1" Service
69,000
$406.62
$457.47
$50.85
12.5 %
$467.52
$584.43
$116.91
25.0
%
$874.14
$1,041.90
$167.76
19.2
71
3/4" to 1" Service
70,000
$411.60
$464.10
$52.50
12.8 %
$473.20
$592.90
$119.70
25.3
%
$884.80
$1,057.00
$172.20
19.5
72
3/4" to 1" Service
71,000
$416.58
$470.73
$54.15
13.0 %
$478.88
$601.37
$122.49
25.6
%
$895.46
$1,072.10
$176.64
19.7
73
3/4" to 1" Service
72,000
$421.56
$477.36
$55.80
13.2 %
$484.56
$609.84
$125.28
25.9
%
$906.12
$1,087.20
$181.08
20.0
74
3/4"tot"Service
73,000
$426.54
$483.99
$57.45
13.5%
$490.24
$618.31
$128.07
26.1%
$916.78
$1,102.30
$185.52
20.2%
75
3/4"tot"Service
74,000
$431.52
$490.62
$59.10
13.7%
$495.92
$626.78
$130.86
26.4%
$927.44
$1,117.40
$189.96
20.5%
76
3/4"tot"Service
75,000
$436.50
$497.25
$60.75
13.9%
$501.60
$635.25
$133.65
26.6%
$938.10
$1,132.50
$194.40
20.7%
77
3/4"tot"Service
76,000
$441.48
$503.88
$62.40
14.1%
$507.28
$643.72
$136.44
26.9%
$948.76
$1,147.60
$198.84
21.0%
78
3/4"tot"Service
77,000
$446.46
$510.51
$64.05
14.3%
$512.96
$652.19
$139.23
27.1%
$959.42
$1,162.70
$203.28
21.2%
79
3/4" to 1" Service
78,000
$451.44
$517.14
$65.70
14.6 %
$518.64
$660.66
$142.02
27.4
%
$970.08
$1,177.80
$207.72
21.4
80
3/4" to 1" Service
79,000
$456.42
$523.77
$67.35
14.8 %
$524.32
$669.13
$144.81
27.6
%
$980.74
$1,192.90
$212.16
21.6
81
3/4" to 1" Service
80,000
$461.40
$530.40
$69.00
15.0 %
$530.00
$677.60
$147.60
27.8
%
$991.40
$1,208.00
$216.60
21.8
82
3/4" to 1" Service
81,000
$466.38
$537.03
$70.65
15.1 %
$535.68
$686.07
$150.39
28.1
%
$1,002.06
$1,223.10
$221.04
22.1
83
3/4" to 1" Service
82,000
$471.36
$543.66
$72.30
15.3 %
$541.36
$694.54
$153.18
28.3
%
$1,012.72
$1,238.20
$225.48
22.3
84
3/4" to 1" Service
83,000
$476.34
$550.29
$73.95
15.5 %
$547.04
$703.01
$155.97
28.5
%
$1,023.38
$1,253.30
$229.92
22.5
85
3/4" to 1" Service
84,000
$481.32
$556.92
$75.60
15.7 %
$552.72
$711.48
$158.76
28.7
%
$1,034.04
$1,268.40
$234.36
22.7
86
3/4" to 1" Service
85,000
$486.30
$563.55
$77.25
15.9 %
$558.40
$719.95
$161.55
28.9
%
$1,044.70
$1,283.50
$238.80
22.9
87
3/4" to 1" Service
86,000
$491.28
$570.18
$78.90
16.1 %
$564.08
$728.42
$164.34
29.1
%
$1,055.36
$1,298.60
$243.24
23.0%
88
3/4" to 1" Service
87,000
$496.26
$576.81
$80.55
16.2 %
$569.76
$736.89
$167.13
29.3
%
$1,066.02
$1,313.70
$247.68
23.2
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water
Proposed
Bill
Difference
Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
89
3/4" to 1" Service
88,000
$501.24
$583.44
$82.20
16.4
%
$575.44
$745.36
$169.92
29.5
%
$1,076.68
$1,328.80
$252.12
23.4
90
3/4" to 1" Service
89,000
$506.22
$590.07
$83.85
16.6
%
$581.12
$753.83
$172.71
29.7
%
$1,087.34
$1,343.90
$256.56
23.6
91
3/4" to 1" Service
90,000
$511.20
$596.70
$85.50
16.7
%
$586.80
$762.30
$175.50
29.9
%
$1,098.00
$1,359.00
$261.00
23.8
92
3/4"tot"Service
91,000
$516.18
$603.33
$87.15
16.9%
$592.48
$770.77
$178.29
30.1%
$1,108.66
$1,374.10
$265.44
23.9%
93
3/4" to 1" Service
92,000
$521.16
$609.96
$88.80
17.0
%
$598.16
$779.24
$181.08
30.3
%
$1,119.32
$1,389.20
$269.88
24.1
94
3/4"tot"Service
93,000
$526.14
$616.59
$90.45
17.2%
$603.84
$787.71
$183.87
30.5%
$1,129.98
$1,404.30
$274.32
24.3%
95
3/4"tot"Service
94,000
$531.12
$623.22
$92.10
17.3%
$609.52
$796.18
$186.66
30.6%
$1,140.64
$1,419.40
$278.76
24.4%
96
3/4"tot"Service
95,000
$536.10
$629.85
$93.75
17.5%
$615.20
$804.65
$189.45
30.8%
$1,151.30
$1,434.50
$283.20
24.6%
97
3/4"tot"Service
96,000
$541.08
$636.48
$95.40
17.6%
$620.88
$813.12
$192.24
31.0%
$1,161.96
$1,449.60
$287.64
24.8%
98
3/4"tot"Service
97,000
$546.06
$643.11
$97.05
17.8%
$626.56
$821.59
$195.03
31.1%
$1,172.62
$1,464.70
$292.08
24.9%
99
3/4" to 1" Service
98,000
$551.04
$649.74
$98.70
17.9
%
$632.24
$830.06
$197.82
31.3
%
$1,183.28
$1,479.80
$296.52
25.1
100
3/4" to 1" Service
99,000
$556.02
$656.37
$100.35
18.0%
$637.92
$838.53
$200.61
31.4%
$1,193.94
$1,494.90
$300.96
25.2%
101
3/4" to 1" Service
100,000
$561.00
$663.00
$102.00
18.2%
$643.60
$847.00
$203.40
31.6%
$1,204.60
$1,510.00
$305.40
25.4%
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
1
1-1/2" to 2" Service
0
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
2
1-1/2" to 2" Service
1,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0%
3
1-1/2" to 2" Service
2,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
4
1-1/2" to 2" Service
3,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
5
1-1/2" to 2" Service
4,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
6
1-1/2" to 2" Service
5,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
7
1-1/2" to 2" Service
6,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
8
1-1/2" to 2" Service
7,000
$49.35
$49.35
$0.00
0.0%
$96.37
$96.37
$0.00
0.0%
$145.72
$145.72
$0.00
0.0
9
1-1/2" to 2" Service
8,000
$49.92
$53.04
$3.12
6.3%
$96.37
$96.37
$0.00
0.0%
$146.29
$149.41
$3.12
2.1%
10
1-1/2" to 2" Service
9,000
$56.16
$59.67
$3.51
6.3%
$96.37
$96.37
$0.00
0.0%
$152.53
$156.04
$3.51
2.3
11
1-1/2" to 2" Service
10,000
$62.40
$66.30
$3.90
6.2%
$96.37
$96.37
$0.00
0.0%
$158.77
$162.67
$3.90
2.5
12
1-1/2" to 2" Service
11,000
$68.64
$72.93
$4.29
6.2%
$96.37
$96.37
$0.00
0.0%
$165.01
$169.30
$4.29
2.6
13
1-1/2" to 2" Service
12,000
$74.88
$79.56
$4.68
6.3%
$99.30
$101.64
$2.34
2.4 %
$174.18
$181.20
$7.02
4.0
14
1-1/2" to 2" Service
13,000
$81.12
$86.19
$5.07
6.3%
$106.15
$110.11
$3.96
3.7 %
$187.27
$196.30
$9.03
4.8
15
1-1/2" to 2" Service
14,000
$87.36
$92.82
$5.46
6.3%
$113.00
$118.58
$5.58
4.9 %
$200.36
$211.40
$11.04
5.5
16
1-1/2" to 2" Service
15,000
$93.60
$99.45
$5.85
6.3%
$119.85
$127.05
$7.20
6.0 %
$213.45
$226.50
$13.05
6.1
17
1-1/2" to 2" Service
16,000
$99.84
$106.08
$6.24
6.3%
$126.70
$135.52
$8.82
7.0 %
$226.54
$241.60
$15.06
6.6
18
1-1/2" to 2" Service
17,000
$106.08
$112.71
$6.63
6.3%
$133.55
$143.99
$10.44
7.8 %
$239.63
$256.70
$17.07
7.1
19
1-1/2" to 2" Service
18,000
$112.32
$119.34
$7.02
6.3%
$140.40
$152.46
$12.06
8.6%
$252.72
$271.80
$19.08
7.5%
20
1-1/2" to 2" Service
19,000
$118.56
$125.97
$7.41
6.3%
$147.25
$160.93
$13.68
9.3%
$265.81
$286.90
$21.09
7.9%
21
1-1/2" to 2" Service
20,000
$124.80
$132.60
$7.80
6.2%
$154.10
$169.40
$15.30
9.9%
$278.90
$302.00
$23.10
8.3%
22
1-1/2" to 2" Service
21,000
$131.04
$139.23
$8.19
6.3%
$160.95
$177.87
$16.92
10.5%
$291.99
$317.10
$25.11
8.6%
23
1-1/2" to 2" Service
22,000
$137.28
$145.86
$8.58
6.2%
$167.80
$186.34
$18.54
11.0%
$305.08
$332.20
$27.12
8.9%
24
1-1/2" to 2" Service
23,000
$143.52
$152.49
$8.97
6.3%
$174.65
$194.81
$20.16
11.5%
$318.17
$347.30
$29.13
9.2%
25
1-1/2" to 2" Service
24,000
$149.76
$159.12
$9.36
6.3%
$181.50
$203.28
$21.78
12.0%
$331.26
$362.40
$31.14
9.4%
26
1-1/2" to 2" Service
25,000
$156.00
$165.75
$9.75
6.3%
$188.35
$211.75
$23.40
12.4%
$344.35
$377.50
$33.15
9.6%
27
1-1/2" to 2" Service
26,000
$162.24
$172.38
$10.14
6.3%
$195.20
$220.22
$25.02
12.8%
$357.44
$392.60
$35.16
9.8%
28
1-1/2" to 2" Service
27,000
$168.48
$179.01
$10.53
6.2%
$202.05
$228.69
$26.64
13.2%
$370.53
$407.70
$37.17
10.0%
29
1-1/2" to 2" Service
28,000
$174.72
$185.64
$10.92
6.3%
$208.90
$237.16
$28.26
13.5%
$383.62
$422.80
$39.18
10.2%
30
1-1/2" to 2" Service
29,000
$180.96
$192.27
$11.31
6.3%
$215.75
$245.63
$29.88
13.8%
$396.71
$437.90
$41.19
10.4%
31
1-1/2" to 2" Service
30,000
$187.20
$198.90
$11.70
6.3%
$222.60
$254.10
$31.50
14.2%
$409.80
$453.00
$43.20
10.5%
32
1-1/2" to 2" Service
31,000
$193.44
$205.53
$12.09
6.3%
$229.45
$262.57
$33.12
14.4%
$422.89
$468.10
$45.21
10.7%
33
1-1/2" to 2" Service
32,000
$199.68
$212.16
$12.48
6.3%
$236.30
$271.04
$34.74
14.7%
$435.98
$483.20
$47.22
10.8%
34
1-1/2" to 2" Service
33,000
$205.92
$218.79
$12.87
6.2%
$243.15
$279.51
$36.36
15.0 %
$449.07
$498.30
$49.23
11.0
35
1-1/2" to 2" Service
34,000
$212.16
$225.42
$13.26
6.3%
$250.00
$287.98
$37.98
15.2 %
$462.16
$513.40
$51.24
11.1
36
1-1/2" to 2" Service
35,000
$218.40
$232.05
$13.65
6.3%
$256.85
$296.45
$39.60
15.4 %
$475.25
$528.50
$53.25
11.2
37
1-1/2" to 2" Service
36,000
$224.64
$238.68
$14.04
6.3%
$263.70
$304.92
$41.22
15.6 %
$488.34
$543.60
$55.26
11.3
38
1-1/2" to 2" Service
37,000
$230.88
$245.31
$14.43
6.3%
$270.55
$313.39
$42.84
15.8 %
$501.43
$558.70
$57.27
11.4
39
1-1/2" to 2" Service
38,000
$237.12
$251.94
$14.82
6.3%
$277.40
$321.86
$44.46
16.0 %
$514.52
$573.80
$59.28
11.5
40
1-1/2" to 2" Service
39,000
$243.36
$258.57
$15.21
6.3%
$284.25
$330.33
$46.08
16.2 %
$527.61
$588.90
$61.29
11.6
41
1-1/2" to 2" Service
40,000
$249.60
$265.20
$15.60
6.2%
$291.10
$338.80
$47.70
16.4 %
$540.70
$604.00
$63.30
11.7
42
1-1/2" to 2" Service
41,000
$255.84
$271.83
$15.99
6.3%
$297.95
$347.27
$49.32
16.6%
$553.79
$619.10
$65.31
11.8%
43
1-1/2" to 2" Service
42,000
$262.08
$278.46
$16.38
6.3%
$304.80
$355.74
$50.94
16.7 %
$566.88
$634.20
$67.32
11.9
44
1-1/2" to 2" Service
43,000
$268.32
$285.09
$16.77
6.3%
$311.65
$364.21
$52.56
16.9 %
$579.97
$649.30
$69.33
12.0
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water
Proposed
Bill
Difference
Amount Percent
Existing
Sewer
Proposed
Bill
Difference
Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
45
1-1/2" to
2" Service
44,000
$274.56
$291.72
$17.16
6.2 %
$318.50
$372.68
$54.18
17.0
%
$593.06
$664.40
$71.34
12.0
46
1-1/2" to
2" Service
45,000
$280.80
$298.35
$17.55
6.3 %
$325.35
$381.15
$55.80
17.2
%
$606.15
$679.50
$73.35
12.1
47
1-1/2" to
2" Service
46,000
$287.04
$304.98
$17.94
6.3 %
$332.20
$389.62
$57.42
17.3
%
$619.24
$694.60
$75.36
12.2
48
1-1/2" to
2" Service
47,000
$293.28
$311.61
$18.33
6.3 %
$339.05
$398.09
$59.04
17.4
%
$632.33
$709.70
$77.37
12.2
49
1-1/2" to
2" Service
48,000
$299.52
$318.24
$18.72
6.3 %
$345.90
$406.56
$60.66
17.5
%
$645.42
$724.80
$79.38
12.3
50
1-1/2" to
2" Service
49,000
$305.76
$324.87
$19.11
6.3 %
$352.75
$415.03
$62.28
17.7
%
$658.51
$739.90
$81.39
12.4
51
1-1/2" to
2" Service
50,000
$312.00
$331.50
$19.50
6.3 %
$359.60
$423.50
$63.90
17.8
%
$671.60
$755.00
$83.40
12.4
52
1-1/2" to
2" Service
51,000
$316.98
$338.13
$21.15
6.7 %
$365.28
$431.97
$66.69
18.3
%
$682.26
$770.10
$87.84
12.9
53
1-1/2" to
2" Service
52,000
$321.96
$344.76
$22.80
7.1 %
$370.96
$440.44
$69.48
18.7
%
$692.92
$785.20
$92.28
13.3
54
1-1/2" to
2" Service
53,000
$326.94
$351.39
$24.45
7.5 %
$376.64
$448.91
$72.27
19.2
%
$703.58
$800.30
$96.72
13.7
55
1-1/2" to
2" Service
54,000
$331.92
$358.02
$26.10
7.9 %
$382.32
$457.38
$75.06
19.6
%
$714.24
$815.40
$101.16
14.2
56
1-1/2" to
2" Service
55,000
$336.90
$364.65
$27.75
8.2 %
$388.00
$465.85
$77.85
20.1
%
$724.90
$830.50
$105.60
14.6
57
1-1/2" to
2" Service
56,000
$341.88
$371.28
$29.40
8.6 %
$393.68
$474.32
$80.64
20.5
%
$735.56
$845.60
$110.04
15.0
58
1-1/2" to
2" Service
57,000
$346.86
$377.91
$31.05
9.0 %
$399.36
$482.79
$83.43
20.9
%
$746.22
$860.70
$114.48
15.3
59
1-1/2" to
2" Service
58,000
$351.84
$384.54
$32.70
9.3 %
$405.04
$491.26
$86.22
21.3
%
$756.88
$875.80
$118.92
15.7
60
1-1/2" to
2" Service
59,000
$356.82
$391.17
$34.35
9.6 %
$410.72
$499.73
$89.01
21.7
%
$767.54
$890.90
$123.36
16.1
61
1-1/2" to
2" Service
60,000
$361.80
$397.80
$36.00
10.0 %
$416.40
$508.20
$91.80
22.0
%
$778.20
$906.00
$127.80
16.4
62
1-1/2" to
2" Service
61,000
$366.78
$404.43
$37.65
10.3 %
$422.08
$516.67
$94.59
22.4
%
$788.86
$921.10
$132.24
16.8
63
1-1/2" to
2" Service
62,000
$371.76
$411.06
$39.30
10.6 %
$427.76
$525.14
$97.38
22.8
%
$799.52
$936.20
$136.68
17.1
64
1-1/2" to
2" Service
63,000
$376.74
$417.69
$40.95
10.9 %
$433.44
$533.61
$100.17
23.1
%
$810.18
$951.30
$141.12
17.4
65
1-1/2" to
2" Service
64,000
$381.72
$424.32
$42.60
11.2 %
$439.12
$542.08
$102.96
23.4
%
$820.84
$966.40
$145.56
17.7
66
1-1/2" to
2" Service
65,000
$386.70
$430.95
$44.25
11.4 %
$444.80
$550.55
$105.75
23.8
%
$831.50
$981.50
$150.00
18.0
67
1-1/2" to
2" Service
66,000
$391.68
$437.58
$45.90
11.7 %
$450.48
$559.02
$108.54
24.1
%
$842.16
$996.60
$154.44
18.3
68
1-1/2" to
2" Service
67,000
$396.66
$444.21
$47.55
12.0 %
$456.16
$567.49
$111.33
24.4
%
$852.82
$1,011.70
$158.88
18.6
69
1-1/2" to
2" Service
68,000
$401.64
$450.84
$49.20
12.2 %
$461.84
$575.96
$114.12
24.7
%
$863.48
$1,026.80
$163.32
18.9
70
1-1/2" to
2" Service
69,000
$406.62
$457.47
$50.85
12.5 %
$467.52
$584.43
$116.91
25.0
%
$874.14
$1,041.90
$167.76
19.2
71
1-1/2" to
2" Service
70,000
$411.60
$464.10
$52.50
12.8 %
$473.20
$592.90
$119.70
25.3
%
$884.80
$1,057.00
$172.20
19.5
72
1-1/2" to
2" Service
71,000
$416.58
$470.73
$54.15
13.0 %
$478.88
$601.37
$122.49
25.6
%
$895.46
$1,072.10
$176.64
19.7
73
1-1/2" to
2" Service
72,000
$421.56
$477.36
$55.80
13.2 %
$484.56
$609.84
$125.28
25.9
%
$906.12
$1,087.20
$181.08
20.0
74
1-1/2" to
2" Service
73,000
$426.54
$483.99
$57.45
13.5 %
$490.24
$618.31
$128.07
26.1
%
$916.78
$1,102.30
$185.52
20.2%
75
1-1/2" to
2" Service
74,000
$431.52
$490.62
$59.10
13.7%
$495.92
$626.78
$130.86
26.4%
$927.44
$1,117.40
$189.96
20.5%
76
1-1/2" to
2" Service
75,000
$436.50
$497.25
$60.75
13.9%
$501.60
$635.25
$133.65
26.6%
$938.10
$1,132.50
$194.40
20.7%
77
1-1/2" to
2" Service
76,000
$441.48
$503.88
$62.40
14.1 %
$507.28
$643.72
$136.44
26.9
%
$948.76
$1,147.60
$198.84
21.0%
78
1-1/2" to
2" Service
77,000
$446.46
$510.51
$64.05
14.3 %
$512.96
$652.19
$139.23
27.1
%
$959.42
$1,162.70
$203.28
21.2%
79
1-1/2" to
2" Service
78,000
$451.44
$517.14
$65.70
14.6%
$518.64
$660.66
$142.02
27.4%
$970.08
$1,177.80
$207.72
21.4%
80
1-1/2" to
2" Service
79,000
$456.42
$523.77
$67.35
14.8%
$524.32
$669.13
$144.81
27.6%
$980.74
$1,192.90
$212.16
21.6%
81
1-1/2" to
2" Service
80,000
$461.40
$530.40
$69.00
15.0 %
$530.00
$677.60
$147.60
27.8
%
$991.40
$1,208.00
$216.60
21.8
82
1-1/2" to
2" Service
81,000
$466.38
$537.03
$70.65
15.1 %
$535.68
$686.07
$150.39
28.1
%
$1,002.06
$1,223.10
$221.04
22.1
83
1-1/2" to
2" Service
82,000
$471.36
$543.66
$72.30
15.3%
$541.36
$694.54
$153.18
28.3%
$1,012.72
$1,238.20
$225.48
22.3%
84
1-1/2" to
2" Service
83,000
$476.34
$550.29
$73.95
15.5%
$547.04
$703.01
$155.97
28.5%
$1,023.38
$1,253.30
$229.92
22.5%
85
1-1/2" to
2" Service
84,000
$481.32
$556.92
$75.60
15.7%
$552.72
$711.48
$158.76
28.7%
$1,034.04
$1,268.40
$234.36
22.7%
86
1-1/2" to
2" Service
85,000
$486.30
$563.55
$77.25
15.9%
$558.40
$719.95
$161.55
28.9%
$1,044.70
$1,283.50
$238.80
22.9%
87
1-1/2" to
2" Service
86,000
$491.28
$570.18
$78.90
16.1 %
$564.08
$728.42
$164.34
29.1
%
$1,055.36
$1,298.60
$243.24
23.0%
88
1-1/2" to
2" Service
87,000
$496.26
$576.81
$80.55
16.2%
$569.76
$736.89
$167.13
29.3%
$1,066.02
$1,313.70
$247.68
23.2%
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water
Proposed
Bill
Difference
Amount Percent
Existing
Sewer
Proposed
Bill
Difference
Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
89
1-1/2" to
2" Service
88,000
$501.24
$583.44
$82.20
16.4%
$575.44
$745.36
$169.92
29.5%
$1,076.68
$1,328.80
$252.12
23.4%
90
1-1/2" to
2" Service
89,000
$506.22
$590.07
$83.85
16.6%
$581.12
$753.83
$172.71
29.7%
$1,087.34
$1,343.90
$256.56
23.6%
91
1-1/2" to
2" Service
90,000
$511.20
$596.70
$85.50
16.7%
$586.80
$762.30
$175.50
29.9%
$1,098.00
$1,359.00
$261.00
23.8%
92
1-1/2" to
2" Service
91,000
$516.18
$603.33
$87.15
16.9%
$592.48
$770.77
$178.29
30.1%
$1,108.66
$1,374.10
$265.44
23.9%
93
1-1/2" to
2" Service
92,000
$521.16
$609.96
$88.80
17.0 %
$598.16
$779.24
$181.08
30.3
%
$1,119.32
$1,389.20
$269.88
24.1
94
1-1/2" to
2" Service
93,000
$526.14
$616.59
$90.45
17.2%
$603.84
$787.71
$183.87
30.5%
$1,129.98
$1,404.30
$274.32
24.3%
95
1-1/2" to
2" Service
94,000
$531.12
$623.22
$92.10
17.3%
$609.52
$796.18
$186.66
30.6%
$1,140.64
$1,419.40
$278.76
24.4%
96
1-1/2" to
2" Service
95,000
$536.10
$629.85
$93.75
17.5%
$615.20
$804.65
$189.45
30.8%
$1,151.30
$1,434.50
$283.20
24.6%
97
1-1/2" to
2" Service
96,000
$541.08
$636.48
$95.40
17.6%
$620.88
$813.12
$192.24
31.0%
$1,161.96
$1,449.60
$287.64
24.8%
98
1-1/2" to
2" Service
97,000
$546.06
$643.11
$97.05
17.8%
$626.56
$821.59
$195.03
31.1%
$1,172.62
$1,464.70
$292.08
24.9%
99
1-1/2" to
2" Service
98,000
$551.04
$649.74
$98.70
17.9 %
$632.24
$830.06
$197.82
31.3
%
$1,183.28
$1,479.80
$296.52
25.1
100
1-1/2" to
2" Service
99,000
$556.02
$656.37
$100.35
18.0%
$637.92
$838.53
$200.61
31.4%
$1,193.94
$1,494.90
$300.96
25.2%
101
1-1/2" to
2" Service
100,000
$561.00
$663.00
$102.00
18.2%
$643.60
$847.00
$203.40
31.6%
$1,204.60
$1,510.00
$305.40
25.4%
102
1-1/2" to
2" Service
101,000
$565.98
$669.63
$103.65
18.3%
$648.72
$855.47
$206.75
31.9%
$1,214.70
$1,525.10
$310.40
25.6%
103
1-1/2" to
2" Service
102,000
$570.96
$676.26
$105.30
18.4 %
$653.84
$863.94
$210.10
32.1
%
$1,224.80
$1,540.20
$315.40
25.8%
104
1-1/2" to
2" Service
103,000
$575.94
$682.89
$106.95
18.6%
$658.96
$872.41
$213.45
32.4%
$1,234.90
$1,555.30
$320.40
25.9%
105
1-1/2" to
2" Service
104,000
$580.92
$689.52
$108.60
18.7 %
$664.08
$880.88
$216.80
32.6
%
$1,245.00
$1,570.40
$325.40
26.1
106
1-1/2" to
2" Service
105,000
$585.90
$696.15
$110.25
18.8%
$669.20
$889.35
$220.15
32.9%
$1,255.10
$1,585.50
$330.40
26.3%
107
1-1/2" to
2" Service
106,000
$590.88
$702.78
$111.90
18.9 %
$674.32
$897.82
$223.50
33.1
%
$1,265.20
$1,600.60
$335.40
26.5%
108
1-1/2" to
2" Service
107,000
$595.86
$709.41
$113.55
19.1 %
$679.44
$906.29
$226.85
33.4
%
$1,275.30
$1,615.70
$340.40
26.7%
109
1-1/2" to
2" Service
108,000
$600.84
$716.04
$115.20
19.2%
$684.56
$914.76
$230.20
33.6%
$1,285.40
$1,630.80
$345.40
26.9%
110
1-1/2" to
2" Service
109,000
$605.82
$722.67
$116.85
19.3%
$689.68
$923.23
$233.55
33.9%
$1,295.50
$1,645.90
$350.40
27.0%
111
1-1/2" to
2" Service
110,000
$610.80
$729.30
$118.50
19.4 %
$694.80
$931.70
$236.90
34.1
%
$1,305.60
$1,661.00
$355.40
27.2%
112
1-1/2" to
2" Service
111,000
$615.78
$735.93
$120.15
19.5%
$699.92
$940.17
$240.25
34.3%
$1,315.70
$1,676.10
$360.40
27.4%
113
1-1/2" to
2" Service
112,000
$620.76
$742.56
$121.80
19.6%
$705.04
$948.64
$243.60
34.6%
$1,325.80
$1,691.20
$365.40
27.6%
114
1-1/2" to
2" Service
113,000
$625.74
$749.19
$123.45
19.7%
$710.16
$957.11
$246.95
34.8%
$1,335.90
$1,706.30
$370.40
27.7%
115
1-1/2" to
2" Service
114,000
$630.72
$755.82
$125.10
19.8%
$715.28
$965.58
$250.30
35.0%
$1,346.00
$1,721.40
$375.40
27.9%
116
1-1/2" to
2" Service
115,000
$635.70
$762.45
$126.75
19.9 %
$720.40
$974.05
$253.65
35.2
%
$1,356.10
$1,736.50
$380.40
28.1
117
1-1/2" to
2" Service
116,000
$640.68
$769.08
$128.40
20.0%
$725.52
$982.52
$257.00
35.4%
$1,366.20
$1,751.60
$385.40
28.2%
118
1-1/2" to
2" Service
117,000
$645.66
$775.71
$130.05
20.1 %
$730.64
$990.99
$260.35
35.6
%
$1,376.30
$1,766.70
$390.40
28.4%
119
1-1/2" to
2" Service
118,000
$650.64
$782.34
$131.70
20.2%
$735.76
$999.46
$263.70
35.8%
$1,386.40
$1,781.80
$395.40
28.5%
120
1-1/2" to
2" Service
119,000
$655.62
$788.97
$133.35
20.3%
$740.88
$1,007.93
$267.05
36.0%
$1,396.50
$1,796.90
$400.40
28.7%
121
1-1/2" to
2" Service
120,000
$660.60
$795.60
$135.00
20.4%
$746.00
$1,016.40
$270.40
36.2%
$1,406.60
$1,812.00
$405.40
28.8%
122
1-1/2" to
2" Service
121,000
$665.58
$802.23
$136.65
20.5%
$751.12
$1,024.87
$273.75
36.4%
$1,416.70
$1,827.10
$410.40
29.0%
123
1-1/2" to
2" Service
122,000
$670.56
$808.86
$138.30
20.6 %
$756.24
$1,033.34
$277.10
36.6
%
$1,426.80
$1,842.20
$415.40
29.1
124
1-1/2" to
2" Service
123,000
$675.54
$815.49
$139.95
20.7%
$761.36
$1,041.81
$280.45
36.8%
$1,436.90
$1,857.30
$420.40
29.3%
125
1-1/2" to
2" Service
124,000
$680.52
$822.12
$141.60
20.8%
$766.48
$1,050.28
$283.80
37.0%
$1,447.00
$1,872.40
$425.40
29.4%
126
1-1/2" to
2" Service
125,000
$685.50
$828.75
$143.25
20.9%
$771.60
$1,058.75
$287.15
37.2%
$1,457.10
$1,887.50
$430.40
29.5%
127
1-1/2" to
2" Service
126,000
$690.48
$835.38
$144.90
21.0%
$776.72
$1,067.22
$290.50
37.4%
$1,467.20
$1,902.60
$435.40
29.7%
128
1-1/2" to
2" Service
127,000
$695.46
$842.01
$146.55
21.1 %
$781.84
$1,075.69
$293.85
37.6
%
$1,477.30
$1,917.70
$440.40
29.8%
129
1-1/2" to
2" Service
128,000
$700.44
$848.64
$148.20
21.2%
$786.96
$1,084.16
$297.20
37.8%
$1,487.40
$1,932.80
$445.40
29.9%
130
1-1/2" to
2" Service
129,000
$705.42
$855.27
$149.85
21.2 %
$792.08
$1,092.63
$300.55
37.9
%
$1,497.50
$1,947.90
$450.40
30.1
131
1-1/2" to
2" Service
130,000
$710.40
$861.90
$151.50
21.3 %
$797.20
$1,101.10
$303.90
38.1
%
$1,507.60
$1,963.00
$455.40
30.2%
132
1-1/2" to
2" Service
131,000
$715.38
$868.53
$153.15
21.4%
$802.32
$1,109.57
$307.25
38.3%
$1,517.70
$1,978.10
$460.40
30.3%
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
133
1-1/2" to 2" Service
132,000
$720.36
$875.16
$154.80
21.5%
$807.44
$1,118.04
$310.60
38.5%
$1,527.80
$1,993.20
$465.40
30.5%
134
1-1/2" to 2" Service
133,000
$725.34
$881.79
$156.45
21.6%
$812.56
$1,126.51
$313.95
38.6%
$1,537.90
$2,008.30
$470.40
30.6%
135
1-1/2" to 2" Service
134,000
$730.32
$888.42
$158.10
21.6%
$817.68
$1,134.98
$317.30
38.8%
$1,548.00
$2,023.40
$475.40
30.7%
136
1-1/2" to 2" Service
135,000
$735.30
$895.05
$159.75
21.7%
$822.80
$1,143.45
$320.65
39.0%
$1,558.10
$2,038.50
$480.40
30.8%
137
1-1/2" to 2" Service
136,000
$740.28
$901.68
$161.40
21.8 %
$827.92
$1,151.92
$324.00
39.1 %
$1,568.20
$2,053.60
$485.40
31.0%
138
1-1/2" to 2" Service
137,000
$745.26
$908.31
$163.05
21.9 %
$833.04
$1,160.39
$327.35
39.3 %
$1,578.30
$2,068.70
$490.40
31.1
139
1-1/2" to 2" Service
138,000
$750.24
$914.94
$164.70
22.0%
$838.16
$1,168.86
$330.70
39.5%
$1,588.40
$2,083.80
$495.40
31.2%
140
1-1/2" to 2" Service
139,000
$755.22
$921.57
$166.35
22.0%
$843.28
$1,177.33
$334.05
39.6%
$1,598.50
$2,098.90
$500.40
31.3%
141
1-1/2" to 2" Service
140,000
$760.20
$928.20
$168.00
22.1 %
$848.40
$1,185.80
$337.40
39.8 %
$1,608.60
$2,114.00
$505.40
31.4%
142
1-1/2" to 2" Service
141,000
$765.18
$934.83
$169.65
22.2%
$853.52
$1,194.27
$340.75
39.9%
$1,618.70
$2,129.10
$510.40
31.5%
143
1-1/2" to 2" Service
142,000
$770.16
$941.46
$171.30
22.2 %
$858.64
$1,202.74
$344.10
40.1 %
$1,628.80
$2,144.20
$515.40
31.6%
144
1-1/2" to 2" Service
143,000
$775.14
$948.09
$172.95
22.3%
$863.76
$1,211.21
$347.45
40.2%
$1,638.90
$2,159.30
$520.40
31.8%
145
1-1/2" to 2" Service
144,000
$780.12
$954.72
$174.60
22.4%
$868.88
$1,219.68
$350.80
40.4%
$1,649.00
$2,174.40
$525.40
31.9%
146
1-1/2" to 2" Service
145,000
$785.10
$961.35
$176.25
22.4%
$874.00
$1,228.15
$354.15
40.5%
$1,659.10
$2,189.50
$530.40
32.0%
147
1-1/2" to 2" Service
146,000
$790.08
$967.98
$177.90
22.5 %
$879.12
$1,236.62
$357.50
40.7 %
$1,669.20
$2,204.60
$535.40
32.1
148
1-1/2" to 2" Service
147,000
$795.06
$974.61
$179.55
22.6%
$884.24
$1,245.09
$360.85
40.8%
$1,679.30
$2,219.70
$540.40
32.2%
149
1-1/2" to 2" Service
148,000
$800.04
$981.24
$181.20
22.6%
$889.36
$1,253.56
$364.20
41.0%
$1,689.40
$2,234.80
$545.40
32.3%
150
1-1/2" to 2" Service
149,000
$805.02
$987.87
$182.85
22.7 %
$894.48
$1,262.03
$367.55
41.1 %
$1,699.50
$2,249.90
$550.40
32.4%
151
1-1/2" to 2" Service
150,000
$810.00
$994.50
$184.50
22.8%
$899.60
$1,270.50
$370.90
41.2%
$1,709.60
$2,265.00
$555.40
32.5%
152
1-1/2" to 2" Service
151,000
$814.98
$1,001.13
$186.15
22.8%
$904.72
$1,278.97
$374.25
41.4%
$1,719.70
$2,280.10
$560.40
32.6%
153
1-1/2" to 2" Service
152,000
$819.96
$1,007.76
$187.80
22.9%
$909.84
$1,287.44
$377.60
41.5%
$1,729.80
$2,295.20
$565.40
32.7%
154
1-1/2" to 2" Service
153,000
$824.94
$1,014.39
$189.45
23.0%
$914.96
$1,295.91
$380.95
41.6%
$1,739.90
$2,310.30
$570.40
32.8%
155
1-1/2" to 2" Service
154,000
$829.92
$1,021.02
$191.10
23.0%
$920.08
$1,304.38
$384.30
41.8%
$1,750.00
$2,325.40
$575.40
32.9%
156
1-1/2" to 2" Service
155,000
$834.90
$1,027.65
$192.75
23.1 %
$925.20
$1,312.85
$387.65
41.9 %
$1,760.10
$2,340.50
$580.40
33.0%
157
1-1/2" to 2" Service
156,000
$839.88
$1,034.28
$194.40
23.1 %
$930.32
$1,321.32
$391.00
42.0 %
$1,770.20
$2,355.60
$585.40
33.1
158
1-1/2" to 2" Service
157,000
$844.86
$1,040.91
$196.05
23.2%
$935.44
$1,329.79
$394.35
42.2%
$1,780.30
$2,370.70
$590.40
33.2%
159
1-1/2" to 2" Service
158,000
$849.84
$1,047.54
$197.70
23.3%
$940.56
$1,338.26
$397.70
42.3%
$1,790.40
$2,385.80
$595.40
33.3%
160
1-1/2" to 2" Service
159,000
$854.82
$1,054.17
$199.35
23.3%
$945.68
$1,346.73
$401.05
42.4%
$1,800.50
$2,400.90
$600.40
33.3%
161
1-1/2" to 2" Service
160,000
$859.80
$1,060.80
$201.00
23.4%
$950.80
$1,355.20
$404.40
42.5%
$1,810.60
$2,416.00
$605.40
33.4%
162
1-1/2" to 2" Service
161,000
$864.78
$1,067.43
$202.65
23.4%
$955.92
$1,363.67
$407.75
42.7%
$1,820.70
$2,431.10
$610.40
33.5%
163
1-1/2" to 2" Service
162,000
$869.76
$1,074.06
$204.30
23.5%
$961.04
$1,372.14
$411.10
42.8%
$1,830.80
$2,446.20
$615.40
33.6%
164
1-1/2" to 2" Service
163,000
$874.74
$1,080.69
$205.95
23.5%
$966.16
$1,380.61
$414.45
42.9%
$1,840.90
$2,461.30
$620.40
33.7%
165
1-1/2" to 2" Service
164,000
$879.72
$1,087.32
$207.60
23.6%
$971.28
$1,389.08
$417.80
43.0%
$1,851.00
$2,476.40
$625.40
33.8%
166
1-1/2" to 2" Service
165,000
$884.70
$1,093.95
$209.25
23.7 %
$976.40
$1,397.55
$421.15
43.1 %
$1,861.10
$2,491.50
$630.40
33.9%
167
1-1/2" to 2" Service
166,000
$889.68
$1,100.58
$210.90
23.7%
$981.52
$1,406.02
$424.50
43.2%
$1,871.20
$2,506.60
$635.40
34.0%
168
1-1/2" to 2" Service
167,000
$894.66
$1,107.21
$212.55
23.8%
$986.64
$1,414.49
$427.85
43.4%
$1,881.30
$2,521.70
$640.40
34.0%
169
1-1/2" to 2" Service
168,000
$899.64
$1,113.84
$214.20
23.8 %
$991.76
$1,422.96
$431.20
43.5 %
$1,891.40
$2,536.80
$645.40
34.1
170
1-1/2" to 2" Service
169,000
$904.62
$1,120.47
$215.85
23.9%
$996.88
$1,431.43
$434.55
43.6%
$1,901.50
$2,551.90
$650.40
34.2%
171
1-1/2" to 2" Service
170,000
$909.60
$1,127.10
$217.50
23.9%
$1,002.00
$1,439.90
$437.90
43.7%
$1,911.60
$2,567.00
$655.40
34.3%
172
1-1/2" to 2" Service
171,000
$914.58
$1,133.73
$219.15
24.0%
$1,007.12
$1,448.37
$441.25
43.8%
$1,921.70
$2,582.10
$660.40
34.4%
173
1-1/2" to 2" Service
172,000
$919.56
$1,140.36
$220.80
24.0%
$1,012.24
$1,456.84
$444.60
43.9%
$1,931.80
$2,597.20
$665.40
34.4%
174
1-1/2" to 2" Service
173,000
$924.54
$1,146.99
$222.45
24.1 %
$1,017.36
$1,465.31
$447.95
44.0 %
$1,941.90
$2,612.30
$670.40
34.5%
175
1-1/2" to 2" Service
174,000
$929.52
$1,153.62
$224.10
24.1 %
$1,022.48
$1,473.78
$451.30
44.1 %
$1,952.00
$2,627.40
$675.40
34.6%
176
1-1/2" to 2" Service
175,000
$934.50
$1,160.25
$225.75
24.2%
$1,027.60
$1,482.25
$454.65
44.2%
$1,962.10
$2,642.50
$680.40
34.7%
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
177
1-1/2" to 2" Service
176,000
$939.48
$1,166.88
$227.40
24.2%
$1,032.72
$1,490.72
$458.00
44.3%
$1,972.20
$2,657.60
$685.40
34.8%
178
1-1/2" to 2" Service
177,000
$944.46
$1,173.51
$229.05
24.3%
$1,037.84
$1,499.19
$461.35
44.5%
$1,982.30
$2,672.70
$690.40
34.8%
179
1-1/2" to 2" Service
178,000
$949.44
$1,180.14
$230.70
24.3%
$1,042.96
$1,507.66
$464.70
44.6%
$1,992.40
$2,687.80
$695.40
34.9%
180
1-1/2" to 2" Service
179,000
$954.42
$1,186.77
$232.35
24.3%
$1,048.08
$1,516.13
$468.05
44.7%
$2,002.50
$2,702.90
$700.40
35.0%
181
1-1/2" to 2" Service
180,000
$959.40
$1,193.40
$234.00
24.4%
$1,053.20
$1,524.60
$471.40
44.8%
$2,012.60
$2,718.00
$705.40
35.0%
182
1-1/2" to 2" Service
181,000
$964.38
$1,200.03
$235.65
24.4 %
$1,058.32
$1,533.07
$474.75
44.9 %
$2,022.70
$2,733.10
$710.40
35.1
183
1-1/2" to 2" Service
182,000
$969.36
$1,206.66
$237.30
24.5%
$1,063.44
$1,541.54
$478.10
45.0%
$2,032.80
$2,748.20
$715.40
35.2%
184
1-1/2" to 2" Service
183,000
$974.34
$1,213.29
$238.95
24.5 %
$1,068.56
$1,550.01
$481.45
45.1 %
$2,042.90
$2,763.30
$720.40
35.3%
185
1-1/2" to 2" Service
184,000
$979.32
$1,219.92
$240.60
24.6%
$1,073.68
$1,558.48
$484.80
45.2%
$2,053.00
$2,778.40
$725.40
35.3%
186
1-1/2" to 2" Service
185,000
$984.30
$1,226.55
$242.25
24.6%
$1,078.80
$1,566.95
$488.15
45.2%
$2,063.10
$2,793.50
$730.40
35.4%
187
1-1/2" to 2" Service
186,000
$989.28
$1,233.18
$243.90
24.7%
$1,083.92
$1,575.42
$491.50
45.3%
$2,073.20
$2,808.60
$735.40
35.5%
188
1-1/2" to 2" Service
187,000
$994.26
$1,239.81
$245.55
24.7%
$1,089.04
$1,583.89
$494.85
45.4%
$2,083.30
$2,823.70
$740.40
35.5%
189
1-1/2" to 2" Service
188,000
$999.24
$1,246.44
$247.20
24.7%
$1,094.16
$1,592.36
$498.20
45.5%
$2,093.40
$2,838.80
$745.40
35.6%
190
1-1/2" to 2" Service
189,000
$1,004.22
$1,253.07
$248.85
24.8%
$1,099.28
$1,600.83
$501.55
45.6%
$2,103.50
$2,853.90
$750.40
35.7%
191
1-1/2" to 2" Service
190,000
$1,009.20
$1,259.70
$250.50
24.8%
$1,104.40
$1,609.30
$504.90
45.7%
$2,113.60
$2,869.00
$755.40
35.7%
192
1-1/2" to 2" Service
191,000
$1,014.18
$1,266.33
$252.15
24.9%
$1,109.52
$1,617.77
$508.25
45.8%
$2,123.70
$2,884.10
$760.40
35.8%
193
1-1/2" to 2" Service
192,000
$1,019.16
$1,272.96
$253.80
24.9%
$1,114.64
$1,626.24
$511.60
45.9%
$2,133.80
$2,899.20
$765.40
35.9%
194
1-1/2" to 2" Service
193,000
$1,024.14
$1,279.59
$255.45
24.9%
$1,119.76
$1,634.71
$514.95
46.0%
$2,143.90
$2,914.30
$770.40
35.9%
195
1-1/2" to 2" Service
194,000
$1,029.12
$1,286.22
$257.10
25.0 %
$1,124.88
$1,643.18
$518.30
46.1 %
$2,154.00
$2,929.40
$775.40
36.0%
196
1-1/2" to 2" Service
195,000
$1,034.10
$1,292.85
$258.75
25.0 %
$1,130.00
$1,651.65
$521.65
46.2%
$2,164.10
$2,944.50
$780.40
36.1
197
1-1/2" to 2" Service
196,000
$1,039.08
$1,299.48
$260.40
25.1 %
$1,135.12
$1,660.12
$525.00
46.3%
$2,174.20
$2,959.60
$785.40
36.1
198
1-1/2" to 2" Service
197,000
$1,044.06
$1,306.11
$262.05
25.1 %
$1,140.24
$1,668.59
$528.35
46.3%
$2,184.30
$2,974.70
$790.40
36.2%
199
1-1/2" to 2" Service
198,000
$1,049.04
$1,312.74
$263.70
25.1 %
$1,145.36
$1,677.06
$531.70
46.4%
$2,194.40
$2,989.80
$795.40
36.2%
200
1-1/2" to 2" Service
199,000
$1,054.02
$1,319.37
$265.35
25.2%
$1,150.48
$1,685.53
$535.05
46.5%
$2,204.50
$3,004.90
$800.40
36.3%
201
1-1/2" to 2" Service
200,000
$1,059.00
$1,326.00
$267.00
25.2%
$1,155.60
$1,694.00
$538.40
46.6%
$2,214.60
$3,020.00
$805.40
36.4%
202
1-1/2" to 2" Service
201,000
$1,063.98
$1,332.63
$268.65
25.2%
$1,158.13
$1,702.47
$544.34
47.0%
$2,222.11
$3,035.10
$812.99
36.6%
203
1-1/2" to 2" Service
202,000
$1,068.96
$1,339.26
$270.30
25.3%
$1,160.66
$1,710.94
$550.28
47.4%
$2,229.62
$3,050.20
$820.58
36.8%
204
1-1/2" to 2" Service
203,000
$1,073.94
$1,345.89
$271.95
25.3%
$1,163.19
$1,719.41
$556.22
47.8%
$2,237.13
$3,065.30
$828.17
37.0%
205
1-1/2" to 2" Service
204,000
$1,078.92
$1,352.52
$273.60
25.4%
$1,165.72
$1,727.88
$562.16
48.2%
$2,244.64
$3,080.40
$835.76
37.2%
206
1-1/2" to 2" Service
205,000
$1,083.90
$1,359.15
$275.25
25.4%
$1,168.25
$1,736.35
$568.10
48.6%
$2,252.15
$3,095.50
$843.35
37.4%
207
1-1/2" to 2" Service
206,000
$1,088.88
$1,365.78
$276.90
25.4%
$1,170.78
$1,744.82
$574.04
49.0%
$2,259.66
$3,110.60
$850.94
37.7%
208
1-1/2" to 2" Service
207,000
$1,093.86
$1,372.41
$278.55
25.5%
$1,173.31
$1,753.29
$579.98
49.4%
$2,267.17
$3,125.70
$858.53
37.9%
209
1-1/2" to 2" Service
208,000
$1,098.84
$1,379.04
$280.20
25.5%
$1,175.84
$1,761.76
$585.92
49.8%
$2,274.68
$3,140.80
$866.12
38.1
210
1-1/2" to 2" Service
209,000
$1,103.82
$1,385.67
$281.85
25.5%
$1,178.37
$1,770.23
$591.86
50.2%
$2,282.19
$3,155.90
$873.71
38.3%
211
1-1/2" to 2" Service
210,000
$1,108.80
$1,392.30
$283.50
25.6%
$1,180.90
$1,778.70
$597.80
50.6%
$2,289.70
$3,171.00
$881.30
38.5%
212
1-1/2" to 2" Service
211,000
$1,113.78
$1,398.93
$285.15
25.6%
$1,183.43
$1,787.17
$603.74
51.0%
$2,297.21
$3,186.10
$888.89
38.7%
213
1-1/2" to 2" Service
212,000
$1,118.76
$1,405.56
$286.80
25.6%
$1,185.96
$1,795.64
$609.68
51.4%
$2,304.72
$3,201.20
$896.48
38.9%
214
1-1/2" to 2" Service
213,000
$1,123.74
$1,412.19
$288.45
25.7%
$1,188.49
$1,804.11
$615.62
51.8%
$2,312.23
$3,216.30
$904.07
39.1
215
1-1/2" to 2" Service
214,000
$1,128.72
$1,418.82
$290.10
25.7%
$1,191.02
$1,812.58
$621.56
52.2%
$2,319.74
$3,231.40
$911.66
39.3%
216
1-1/2" to 2" Service
215,000
$1,133.70
$1,425.45
$291.75
25.7%
$1,193.55
$1,821.05
$627.50
52.6%
$2,327.25
$3,246.50
$919.25
39.5%
217
1-1/2" to 2" Service
216,000
$1,138.68
$1,432.08
$293.40
25.8%
$1,196.08
$1,829.52
$633.44
53.0%
$2,334.76
$3,261.60
$926.84
39.7%
218
1-1/2" to 2" Service
217,000
$1,143.66
$1,438.71
$295.05
25.8%
$1,198.61
$1,837.99
$639.38
53.3%
$2,342.27
$3,276.70
$934.43
39.9%
219
1-1/2" to 2" Service
218,000
$1,148.64
$1,445.34
$296.70
25.8%
$1,201.14
$1,846.46
$645.32
53.7%
$2,349.78
$3,291.80
$942.02
40.1
220
1-1/2" to 2" Service
219,000
$1,153.62
$1,451.97
$298.35
25.9 %
$1,203.67
$1,854.93
$651.26
54.1 %
$2,357.29
$3,306.90
$949.61
40.3%
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
221
1-1/2" to 2" Service
220,000
$1,158.60
$1,458.60
$300.00
25.9%
$1,206.20
$1,863.40
$657.20
54.5%
$2,364.80
$3,322.00
$957.20
40.5%
222
1-1/2" to 2" Service
221,000
$1,163.58
$1,465.23
$301.65
25.9%
$1,208.73
$1,871.87
$663.14
54.9%
$2,372.31
$3,337.10
$964.79
40.7%
223
1-1/2" to 2" Service
222,000
$1,168.56
$1,471.86
$303.30
26.0%
$1,211.26
$1,880.34
$669.08
55.2%
$2,379.82
$3,352.20
$972.38
40.9%
224
1-1/2" to 2" Service
223,000
$1,173.54
$1,478.49
$304.95
26.0%
$1,213.79
$1,888.81
$675.02
55.6%
$2,387.33
$3,367.30
$979.97
41.0%
225
1-1/2" to 2" Service
224,000
$1,178.52
$1,485.12
$306.60
26.0%
$1,216.32
$1,897.28
$680.96
56.0%
$2,394.84
$3,382.40
$987.56
41.2%
226
1-1/2" to 2" Service
225,000
$1,183.50
$1,491.75
$308.25
26.0%
$1,218.85
$1,905.75
$686.90
56.4%
$2,402.35
$3,397.50
$995.15
41.4%
227
1-1/2" to 2" Service
226,000
$1,188.48
$1,498.38
$309.90
26.1%
$1,221.38
$1,914.22
$692.84
56.7%
$2,409.86
$3,412.60
$1,002.74
41.6%
228
1-1/2" to 2" Service
227,000
$1,193.46
$1,505.01
$311.55
26.1%
$1,223.91
$1,922.69
$698.78
57.1 %
$2,417.37
$3,427.70
$1,010.33
41.8%
229
1-1/2" to 2" Service
228,000
$1,198.44
$1,511.64
$313.20
26.1%
$1,226.44
$1,931.16
$704.72
57.5%
$2,424.88
$3,442.80
$1,017.92
42.0%
230
1-1/2" to 2" Service
229,000
$1,203.42
$1,518.27
$314.85
26.2%
$1,228.97
$1,939.63
$710.66
57.8%
$2,432.39
$3,457.90
$1,025.51
42.2%
231
1-1/2" to 2" Service
230,000
$1,208.40
$1,524.90
$316.50
26.2%
$1,231.50
$1,948.10
$716.60
58.2%
$2,439.90
$3,473.00
$1,033.10
42.3%
232
1-1/2" to 2" Service
231,000
$1,213.38
$1,531.53
$318.15
26.2%
$1,234.03
$1,956.57
$722.54
58.6%
$2,447.41
$3,488.10
$1,040.69
42.5%
233
1-1/2" to 2" Service
232,000
$1,218.36
$1,538.16
$319.80
26.2%
$1,236.56
$1,965.04
$728.48
58.9%
$2,454.92
$3,503.20
$1,048.28
42.7%
234
1-1/2" to 2" Service
233,000
$1,223.34
$1,544.79
$321.45
26.3%
$1,239.09
$1,973.51
$734.42
59.3%
$2,462.43
$3,518.30
$1,055.87
42.9%
235
1-1/2" to 2" Service
234,000
$1,228.32
$1,551.42
$323.10
26.3%
$1,241.62
$1,981.98
$740.36
59.6%
$2,469.94
$3,533.40
$1,063.46
43.1
236
1-1/2" to 2" Service
235,000
$1,233.30
$1,558.05
$324.75
26.3%
$1,244.15
$1,990.45
$746.30
60.0%
$2,477.45
$3,548.50
$1,071.05
43.2%
237
1-1/2" to 2" Service
236,000
$1,238.28
$1,564.68
$326.40
26.4%
$1,246.68
$1,998.92
$752.24
60.3%
$2,484.96
$3,563.60
$1,078.64
43.4%
238
1-1/2" to 2" Service
237,000
$1,243.26
$1,571.31
$328.05
26.4%
$1,249.21
$2,007.39
$758.18
60.7%
$2,492.47
$3,578.70
$1,086.23
43.6%
239
1-1/2" to 2" Service
238,000
$1,248.24
$1,577.94
$329.70
26.4%
$1,251.74
$2,015.86
$764.12
61.0%
$2,499.98
$3,593.80
$1,093.82
43.8%
240
1-1/2" to 2" Service
239,000
$1,253.22
$1,584.57
$331.35
26.4%
$1,254.27
$2,024.33
$770.06
61.4%
$2,507.49
$3,608.90
$1,101.41
43.9%
241
1-1/2" to 2" Service
240,000
$1,258.20
$1,591.20
$333.00
26.5%
$1,256.80
$2,032.80
$776.00
61.7%
$2,515.00
$3,624.00
$1,109.00
44.1
242
1-1/2" to 2" Service
241,000
$1,263.18
$1,597.83
$334.65
26.5%
$1,259.33
$2,041.27
$781.94
62.1 %
$2,522.51
$3,639.10
$1,116.59
44.3%
243
1-1/2" to 2" Service
242,000
$1,268.16
$1,604.46
$336.30
26.5%
$1,261.86
$2,049.74
$787.88
62.4%
$2,530.02
$3,654.20
$1,124.18
44.4%
244
1-1/2" to 2" Service
243,000
$1,273.14
$1,611.09
$337.95
26.5%
$1,264.39
$2,058.21
$793.82
62.8%
$2,537.53
$3,669.30
$1,131.77
44.6%
245
1-1/2" to 2" Service
244,000
$1,278.12
$1,617.72
$339.60
26.6 %
$1,266.92
$2,066.68
$799.76
63.1 %
$2,545.04
$3,684.40
$1,139.36
44.8%
246
1-1/2" to 2" Service
245,000
$1,283.10
$1,624.35
$341.25
26.6%
$1,269.45
$2,075.15
$805.70
63.5%
$2,552.55
$3,699.50
$1,146.95
44.9%
247
1-1/2" to 2" Service
246,000
$1,288.08
$1,630.98
$342.90
26.6 %
$1,271.98
$2,083.62
$811.64
63.8%
$2,560.06
$3,714.60
$1,154.54
45.1
248
1-1/2" to 2" Service
247,000
$1,293.06
$1,637.61
$344.55
26.6 %
$1,274.51
$2,092.09
$817.58
64.1 %
$2,567.57
$3,729.70
$1,162.13
45.3%
249
1-1/2" to 2" Service
248,000
$1,298.04
$1,644.24
$346.20
26.7%
$1,277.04
$2,100.56
$823.52
64.5%
$2,575.08
$3,744.80
$1,169.72
45.4%
250
1-1/2" to 2" Service
249,000
$1,303.02
$1,650.87
$347.85
26.7%
$1,279.57
$2,109.03
$829.46
64.8%
$2,582.59
$3,759.90
$1,177.31
45.6%
251
1-1/2" to 2" Service
250,000
$1,308.00
$1,657.50
$349.50
26.7%
$1,282.10
$2,117.50
$835.40
65.2%
$2,590.10
$3,775.00
$1,184.90
45.7%
252
1-1/2" to 2" Service
251,000
$1,312.98
$1,664.13
$351.15
26.7%
$1,284.63
$2,125.97
$841.34
65.5%
$2,597.61
$3,790.10
$1,192.49
45.9%
253
1-1/2" to 2" Service
252,000
$1,317.96
$1,670.76
$352.80
26.8%
$1,287.16
$2,134.44
$847.28
65.8%
$2,605.12
$3,805.20
$1,200.08
46.1
254
1-1/2" to 2" Service
253,000
$1,322.94
$1,677.39
$354.45
26.8%
$1,289.69
$2,142.91
$853.22
66.2%
$2,612.63
$3,820.30
$1,207.67
46.2%
255
1-1/2" to 2" Service
254,000
$1,327.92
$1,684.02
$356.10
26.8%
$1,292.22
$2,151.38
$859.16
66.5%
$2,620.14
$3,835.40
$1,215.26
46.4%
256
1-1/2" to 2" Service
255,000
$1,332.90
$1,690.65
$357.75
26.8%
$1,294.75
$2,159.85
$865.10
66.8%
$2,627.65
$3,850.50
$1,222.85
46.5%
257
1-1/2" to 2" Service
256,000
$1,337.88
$1,697.28
$359.40
26.9%
$1,297.28
$2,168.32
$871.04
67.1 %
$2,635.16
$3,865.60
$1,230.44
46.7%
258
1-1/2" to 2" Service
257,000
$1,342.86
$1,703.91
$361.05
26.9%
$1,299.81
$2,176.79
$876.98
67.5%
$2,642.67
$3,880.70
$1,238.03
46.8%
259
1-1/2" to 2" Service
258,000
$1,347.84
$1,710.54
$362.70
26.9%
$1,302.34
$2,185.26
$882.92
67.8%
$2,650.18
$3,895.80
$1,245.62
47.0%
260
1-1/2" to 2" Service
259,000
$1,352.82
$1,717.17
$364.35
26.9%
$1,304.87
$2,193.73
$888.86
68.1 %
$2,657.69
$3,910.90
$1,253.21
47.2%
261
1-1/2" to 2" Service
260,000
$1,357.80
$1,723.80
$366.00
27.0%
$1,307.40
$2,202.20
$894.80
68.4%
$2,665.20
$3,926.00
$1,260.80
47.3%
262
1-1/2" to 2" Service
261,000
$1,362.78
$1,730.43
$367.65
27.0%
$1,309.93
$2,210.67
$900.74
68.8%
$2,672.71
$3,941.10
$1,268.39
47.5%
263
1-1/2" to 2" Service
262,000
$1,367.76
$1,737.06
$369.30
27.0%
$1,312.46
$2,219.14
$906.68
69.1 %
$2,680.22
$3,956.20
$1,275.98
47.6%
264
1-1/2" to 2" Service
263,000
$1,372.74
$1,743.69
$370.95
27.0%
$1,314.99
$2,227.61
$912.62
69.4%
$2,687.73
$3,971.30
$1,283.57
47.8%
10
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
265
1-1/2" to 2" Service
264,000
$1,377.72
$1,750.32
$372.60
27.0%
$1,317.52
$2,236.08
$918.56
69.7%
$2,695.24
$3,986.40
$1,291.16
47.9%
266
1-1/2" to 2" Service
265,000
$1,382.70
$1,756.95
$374.25
27.1 %
$1,320.05
$2,244.55
$924.50
70.0%
$2,702.75
$4,001.50
$1,298.75
48.1
267
1-1/2" to 2" Service
266,000
$1,387.68
$1,763.58
$375.90
27.1 %
$1,322.58
$2,253.02
$930.44
70.4%
$2,710.26
$4,016.60
$1,306.34
48.2%
268
1-1/2" to 2" Service
267,000
$1,392.66
$1,770.21
$377.55
27.1 %
$1,325.11
$2,261.49
$936.38
70.7%
$2,717.77
$4,031.70
$1,313.93
48.3%
269
1-1/2" to 2" Service
268,000
$1,397.64
$1,776.84
$379.20
27.1 %
$1,327.64
$2,269.96
$942.32
71.0%
$2,725.28
$4,046.80
$1,321.52
48.5%
270
1-1/2" to 2" Service
269,000
$1,402.62
$1,783.47
$380.85
27.2%
$1,330.17
$2,278.43
$948.26
71.3%
$2,732.79
$4,061.90
$1,329.11
48.6%
271
1-1/2" to 2" Service
270,000
$1,407.60
$1,790.10
$382.50
27.2%
$1,332.70
$2,286.90
$954.20
71.6%
$2,740.30
$4,077.00
$1,336.70
48.8%
272
1-1/2" to 2" Service
271,000
$1,412.58
$1,796.73
$384.15
27.2%
$1,335.23
$2,295.37
$960.14
71.9%
$2,747.81
$4,092.10
$1,344.29
48.9%
273
1-1/2" to 2" Service
272,000
$1,417.56
$1,803.36
$385.80
27.2%
$1,337.76
$2,303.84
$966.08
72.2%
$2,755.32
$4,107.20
$1,351.88
49.1
274
1-1/2" to 2" Service
273,000
$1,422.54
$1,809.99
$387.45
27.2%
$1,340.29
$2,312.31
$972.02
72.5%
$2,762.83
$4,122.30
$1,359.47
49.2%
275
1-1/2" to 2" Service
274,000
$1,427.52
$1,816.62
$389.10
27.3%
$1,342.82
$2,320.78
$977.96
72.8%
$2,770.34
$4,137.40
$1,367.06
49.3%
276
1-1/2" to 2" Service
275,000
$1,432.50
$1,823.25
$390.75
27.3%
$1,345.35
$2,329.25
$983.90
73.1 %
$2,777.85
$4,152.50
$1,374.65
49.5%
277
1-1/2" to 2" Service
276,000
$1,437.48
$1,829.88
$392.40
27.3%
$1,347.88
$2,337.72
$989.84
73.4%
$2,785.36
$4,167.60
$1,382.24
49.6%
278
1-1/2" to 2" Service
277,000
$1,442.46
$1,836.51
$394.05
27.3%
$1,350.41
$2,346.19
$995.78
73.7%
$2,792.87
$4,182.70
$1,389.83
49.8%
279
1-1/2" to 2" Service
278,000
$1,447.44
$1,843.14
$395.70
27.3%
$1,352.94
$2,354.66
$1,001.72
74.0%
$2,800.38
$4,197.80
$1,397.42
49.9%
280
1-1/2" to 2" Service
279,000
$1,452.42
$1,849.77
$397.35
27.4%
$1,355.47
$2,363.13
$1,007.66
74.3%
$2,807.89
$4,212.90
$1,405.01
50.0%
281
1-1/2" to 2" Service
280,000
$1,457.40
$1,856.40
$399.00
27.4%
$1,358.00
$2,371.60
$1,013.60
74.6%
$2,815.40
$4,228.00
$1,412.60
50.2%
282
1-1/2" to 2" Service
281,000
$1,462.38
$1,863.03
$400.65
27.4%
$1,360.53
$2,380.07
$1,019.54
74.9%
$2,822.91
$4,243.10
$1,420.19
50.3%
283
1-1/2" to 2" Service
282,000
$1,467.36
$1,869.66
$402.30
27.4%
$1,363.06
$2,388.54
$1,025.48
75.2%
$2,830.42
$4,258.20
$1,427.78
50.4%
284
1-1/2" to 2" Service
283,000
$1,472.34
$1,876.29
$403.95
27.4%
$1,365.59
$2,397.01
$1,031.42
75.5%
$2,837.93
$4,273.30
$1,435.37
50.6%
285
1-1/2" to 2" Service
284,000
$1,477.32
$1,882.92
$405.60
27.5%
$1,368.12
$2,405.48
$1,037.36
75.8%
$2,845.44
$4,288.40
$1,442.96
50.7%
286
1-1/2" to 2" Service
285,000
$1,482.30
$1,889.55
$407.25
27.5%
$1,370.65
$2,413.95
$1,043.30
76.1 %
$2,852.95
$4,303.50
$1,450.55
50.8
287
1-1/2" to 2" Service
286,000
$1,487.28
$1,896.18
$408.90
27.5%
$1,373.18
$2,422.42
$1,049.24
76.4%
$2,860.46
$4,318.60
$1,458.14
51.0%
288
1-1/2" to 2" Service
287,000
$1,492.26
$1,902.81
$410.55
27.5%
$1,375.71
$2,430.89
$1,055.18
76.7%
$2,867.97
$4,333.70
$1,465.73
51.1
289
1-1/2" to 2" Service
288,000
$1,497.24
$1,909.44
$412.20
27.5%
$1,378.24
$2,439.36
$1,061.12
77.0%
$2,875.48
$4,348.80
$1,473.32
51.2%
290
1-1/2" to 2" Service
289,000
$1,502.22
$1,916.07
$413.85
27.5%
$1,380.77
$2,447.83
$1,067.06
77.3%
$2,882.99
$4,363.90
$1,480.91
51.4%
291
1-1/2" to 2" Service
290,000
$1,507.20
$1,922.70
$415.50
27.6%
$1,383.30
$2,456.30
$1,073.00
77.6%
$2,890.50
$4,379.00
$1,488.50
51.5%
292
1-1/2" to 2" Service
291,000
$1,512.18
$1,929.33
$417.15
27.6%
$1,385.83
$2,464.77
$1,078.94
77.9%
$2,898.01
$4,394.10
$1,496.09
51.6%
293
1-1/2" to 2" Service
292,000
$1,517.16
$1,935.96
$418.80
27.6%
$1,388.36
$2,473.24
$1,084.88
78.1 %
$2,905.52
$4,409.20
$1,503.68
51.8
294
1-1/2" to 2" Service
293,000
$1,522.14
$1,942.59
$420.45
27.6%
$1,390.89
$2,481.71
$1,090.82
78.4%
$2,913.03
$4,424.30
$1,511.27
51.9%
295
1-1/2" to 2" Service
294,000
$1,527.12
$1,949.22
$422.10
27.6%
$1,393.42
$2,490.18
$1,096.76
78.7%
$2,920.54
$4,439.40
$1,518.86
52.0%
296
1-1/2" to 2" Service
295,000
$1,532.10
$1,955.85
$423.75
27.7%
$1,395.95
$2,498.65
$1,102.70
79.0%
$2,928.05
$4,454.50
$1,526.45
52.1%
297
1-1/2" to 2" Service
296,000
$1,537.08
$1,962.48
$425.40
27.7%
$1,398.48
$2,507.12
$1,108.64
79.3%
$2,935.56
$4,469.60
$1,534.04
52.3%
298
1-1/2" to 2" Service
297,000
$1,542.06
$1,969.11
$427.05
27.7%
$1,401.01
$2,515.59
$1,114.58
79.6%
$2,943.07
$4,484.70
$1,541.63
52.4%
299
1-1/2" to 2" Service
298,000
$1,547.04
$1,975.74
$428.70
27.7%
$1,403.54
$2,524.06
$1,120.52
79.8%
$2,950.58
$4,499.80
$1,549.22
52.5%
300
1-1/2" to 2" Service
299,000
$1,552.02
$1,982.37
$430.35
27.7%
$1,406.07
$2,532.53
$1,126.46
80.1%
$2,958.09
$4,514.90
$1,556.81
52.6%
301
1-1/2" to 2" Service
300,000
$1,557.00
$1,989.00
$432.00
27.7%
$1,408.60
$2,541.00
$1,132.40
80.4%
$2,965.60
$4,530.00
$1,564.40
52.8%
302
1-1/2" to 2" Service
301,000
$1,561.98
$1,995.63
$433.65
27.8%
$1,411.13
$2,549.47
$1,138.34
80.7%
$2,973.11
$4,545.10
$1,571.99
52.9%
303
1-1/2" to 2" Service
302,000
$1,566.96
$2,002.26
$435.30
27.8%
$1,413.66
$2,557.94
$1,144.28
80.9%
$2,980.62
$4,560.20
$1,579.58
53.0%
304
1-1/2" to 2" Service
303,000
$1,571.94
$2,008.89
$436.95
27.8%
$1,416.19
$2,566.41
$1,150.22
81.2%
$2,988.13
$4,575.30
$1,587.17
53.1%
305
1-1/2" to 2" Service
304,000
$1,576.92
$2,015.52
$438.60
27.8%
$1,418.72
$2,574.88
$1,156.16
81.5%
$2,995.64
$4,590.40
$1,594.76
53.2%
306
1-1/2" to 2" Service
305,000
$1,581.90
$2,022.15
$440.25
27.8%
$1,421.25
$2,583.35
$1,162.10
81.8%
$3,003.15
$4,605.50
$1,602.35
53.4%
307
1-1/2" to 2" Service
306,000
$1,586.88
$2,028.78
$441.90
27.8%
$1,423.78
$2,591.82
$1,168.04
82.0%
$3,010.66
$4,620.60
$1,609.94
53.5%
308
1-1/2" to 2" Service
307,000
$1,591.86
$2,035.41
$443.55
27.9%
$1,426.31
$2,600.29
$1,173.98
82.3%
$3,018.17
$4,635.70
$1,617.53
53.6%
11
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
309
1-1/2" to 2" Service
308,000
$1,596.84
$2,042.04
$445.20
27.9%
$1,428.84
$2,608.76
$1,179.92
82.6%
$3,025.68
$4,650.80
$1,625.12
53.7%
310
1-1/2" to 2" Service
309,000
$1,601.82
$2,048.67
$446.85
27.9%
$1,431.37
$2,617.23
$1,185.86
82.8%
$3,033.19
$4,665.90
$1,632.71
53.8%
311
1-1/2" to 2" Service
310,000
$1,606.80
$2,055.30
$448.50
27.9%
$1,433.90
$2,625.70
$1,191.80
83.1%
$3,040.70
$4,681.00
$1,640.30
53.9%
312
1-1/2" to 2" Service
311,000
$1,611.78
$2,061.93
$450.15
27.9%
$1,436.43
$2,634.17
$1,197.74
83.4%
$3,048.21
$4,696.10
$1,647.89
54.1%
313
1-1/2" to 2" Service
312,000
$1,616.76
$2,068.56
$451.80
27.9%
$1,438.96
$2,642.64
$1,203.68
83.6%
$3,055.72
$4,711.20
$1,655.48
54.2%
314
1-1/2" to 2" Service
313,000
$1,621.74
$2,075.19
$453.45
28.0%
$1,441.49
$2,651.11
$1,209.62
83.9%
$3,063.23
$4,726.30
$1,663.07
54.3%
315
1-1/2" to 2" Service
314,000
$1,626.72
$2,081.82
$455.10
28.0%
$1,444.02
$2,659.58
$1,215.56
84.2%
$3,070.74
$4,741.40
$1,670.66
54.4%
316
1-1/2" to 2" Service
315,000
$1,631.70
$2,088.45
$456.75
28.0%
$1,446.55
$2,668.05
$1,221.50
84.4%
$3,078.25
$4,756.50
$1,678.25
54.5%
317
1-1/2" to 2" Service
316,000
$1,636.68
$2,095.08
$458.40
28.0%
$1,449.08
$2,676.52
$1,227.44
84.7%
$3,085.76
$4,771.60
$1,685.84
54.6%
318
1-1/2" to 2" Service
317,000
$1,641.66
$2,101.71
$460.05
28.0%
$1,451.61
$2,684.99
$1,233.38
85.0%
$3,093.27
$4,786.70
$1,693.43
54.7%
319
1-1/2" to 2" Service
318,000
$1,646.64
$2,108.34
$461.70
28.0%
$1,454.14
$2,693.46
$1,239.32
85.2%
$3,100.78
$4,801.80
$1,701.02
54.9%
320
1-1/2" to 2" Service
319,000
$1,651.62
$2,114.97
$463.35
28.1 %
$1,456.67
$2,701.93
$1,245.26
85.5%
$3,108.29
$4,816.90
$1,708.61
55.0
321
1-1/2" to 2" Service
320,000
$1,656.60
$2,121.60
$465.00
28.1 %
$1,459.20
$2,710.40
$1,251.20
85.7%
$3,115.80
$4,832.00
$1,716.20
55.1
322
1-1/2" to 2" Service
321,000
$1,661.58
$2,128.23
$466.65
28.1 %
$1,461.73
$2,718.87
$1,257.14
86.0%
$3,123.31
$4,847.10
$1,723.79
55.2
323
1-1/2" to 2" Service
322,000
$1,666.56
$2,134.86
$468.30
28.1 %
$1,464.26
$2,727.34
$1,263.08
86.3%
$3,130.82
$4,862.20
$1,731.38
55.3
324
1-1/2" to 2" Service
323,000
$1,671.54
$2,141.49
$469.95
28.1 %
$1,466.79
$2,735.81
$1,269.02
86.5%
$3,138.33
$4,877.30
$1,738.97
55.4
325
1-1/2" to 2" Service
324,000
$1,676.52
$2,148.12
$471.60
28.1 %
$1,469.32
$2,744.28
$1,274.96
86.8%
$3,145.84
$4,892.40
$1,746.56
55.5
326
1-1/2" to 2" Service
325,000
$1,681.50
$2,154.75
$473.25
28.1 %
$1,471.85
$2,752.75
$1,280.90
87.0%
$3,153.35
$4,907.50
$1,754.15
55.6
327
1-1/2" to 2" Service
326,000
$1,686.48
$2,161.38
$474.90
28.2%
$1,474.38
$2,761.22
$1,286.84
87.3%
$3,160.86
$4,922.60
$1,761.74
55.7%
328
1-1/2" to 2" Service
327,000
$1,691.46
$2,168.01
$476.55
28.2%
$1,476.91
$2,769.69
$1,292.78
87.5%
$3,168.37
$4,937.70
$1,769.33
55.8%
329
1-1/2" to 2" Service
328,000
$1,696.44
$2,174.64
$478.20
28.2%
$1,479.44
$2,778.16
$1,298.72
87.8%
$3,175.88
$4,952.80
$1,776.92
56.0%
330
1-1/2" to 2" Service
329,000
$1,701.42
$2,181.27
$479.85
28.2%
$1,481.97
$2,786.63
$1,304.66
88.0%
$3,183.39
$4,967.90
$1,784.51
56.1
331
1-1/2" to 2" Service
330,000
$1,706.40
$2,187.90
$481.50
28.2%
$1,484.50
$2,795.10
$1,310.60
88.3%
$3,190.90
$4,983.00
$1,792.10
56.2%
332
1-1/2" to 2" Service
331,000
$1,711.38
$2,194.53
$483.15
28.2%
$1,487.03
$2,803.57
$1,316.54
88.5%
$3,198.41
$4,998.10
$1,799.69
56.3%
333
1-1/2" to 2" Service
332,000
$1,716.36
$2,201.16
$484.80
28.2%
$1,489.56
$2,812.04
$1,322.48
88.8%
$3,205.92
$5,013.20
$1,807.28
56.4%
334
1-1/2" to 2" Service
333,000
$1,721.34
$2,207.79
$486.45
28.3%
$1,492.09
$2,820.51
$1,328.42
89.0%
$3,213.43
$5,028.30
$1,814.87
56.5%
335
1-1/2" to 2" Service
334,000
$1,726.32
$2,214.42
$488.10
28.3%
$1,494.62
$2,828.98
$1,334.36
89.3%
$3,220.94
$5,043.40
$1,822.46
56.6%
336
1-1/2" to 2" Service
335,000
$1,731.30
$2,221.05
$489.75
28.3%
$1,497.15
$2,837.45
$1,340.30
89.5%
$3,228.45
$5,058.50
$1,830.05
56.7%
337
1-1/2" to 2" Service
336,000
$1,736.28
$2,227.68
$491.40
28.3%
$1,499.68
$2,845.92
$1,346.24
89.8%
$3,235.96
$5,073.60
$1,837.64
56.8%
338
1-1/2" to 2" Service
337,000
$1,741.26
$2,234.31
$493.05
28.3%
$1,502.21
$2,854.39
$1,352.18
90.0%
$3,243.47
$5,088.70
$1,845.23
56.9%
339
1-1/2" to 2" Service
338,000
$1,746.24
$2,240.94
$494.70
28.3%
$1,504.74
$2,862.86
$1,358.12
90.3%
$3,250.98
$5,103.80
$1,852.82
57.0%
340
1-1/2" to 2" Service
339,000
$1,751.22
$2,247.57
$496.35
28.3%
$1,507.27
$2,871.33
$1,364.06
90.5%
$3,258.49
$5,118.90
$1,860.41
57.1
341
1-1/2" to 2" Service
340,000
$1,756.20
$2,254.20
$498.00
28.4%
$1,509.80
$2,879.80
$1,370.00
90.7%
$3,266.00
$5,134.00
$1,868.00
57.2%
342
1-1/2" to 2" Service
341,000
$1,761.18
$2,260.83
$499.65
28.4%
$1,512.33
$2,888.27
$1,375.94
91.0%
$3,273.51
$5,149.10
$1,875.59
57.3%
343
1-1/2" to 2" Service
342,000
$1,766.16
$2,267.46
$501.30
28.4%
$1,514.86
$2,896.74
$1,381.88
91.2%
$3,281.02
$5,164.20
$1,883.18
57.4%
344
1-1/2" to 2" Service
343,000
$1,771.14
$2,274.09
$502.95
28.4%
$1,517.39
$2,905.21
$1,387.82
91.5%
$3,288.53
$5,179.30
$1,890.77
57.5%
345
1-1/2" to 2" Service
344,000
$1,776.12
$2,280.72
$504.60
28.4%
$1,519.92
$2,913.68
$1,393.76
91.7%
$3,296.04
$5,194.40
$1,898.36
57.6%
346
1-1/2" to 2" Service
345,000
$1,781.10
$2,287.35
$506.25
28.4%
$1,522.45
$2,922.15
$1,399.70
91.9%
$3,303.55
$5,209.50
$1,905.95
57.7%
347
1-1/2" to 2" Service
346,000
$1,786.08
$2,293.98
$507.90
28.4%
$1,524.98
$2,930.62
$1,405.64
92.2%
$3,311.06
$5,224.60
$1,913.54
57.8%
348
1-1/2" to 2" Service
347,000
$1,791.06
$2,300.61
$509.55
28.4%
$1,527.51
$2,939.09
$1,411.58
92.4%
$3,318.57
$5,239.70
$1,921.13
57.9%
349
1-1/2" to 2" Service
348,000
$1,796.04
$2,307.24
$511.20
28.5%
$1,530.04
$2,947.56
$1,417.52
92.6%
$3,326.08
$5,254.80
$1,928.72
58.0%
350
1-1/2" to 2" Service
349,000
$1,801.02
$2,313.87
$512.85
28.5%
$1,532.57
$2,956.03
$1,423.46
92.9%
$3,333.59
$5,269.90
$1,936.31
58.1
351
1-1/2" to 2" Service
350,000
$1,806.00
$2,320.50
$514.50
28.5%
$1,535.10
$2,964.50
$1,429.40
93.1 %
$3,341.10
$5,285.00
$1,943.90
58.2
352
1-1/2" to 2" Service
351,000
$1,810.98
$2,327.13
$516.15
28.5%
$1,537.63
$2,972.97
$1,435.34
93.3%
$3,348.61
$5,300.10
$1,951.49
58.3%
12
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
353
1-1/2" to 2" Service
352,000
$1,815.96
$2,333.76
$517.80
28.5%
$1,540.16
$2,981.44
$1,441.28
93.6%
$3,356.12
$5,315.20
$1,959.08
58.4%
354
1-1/2" to 2" Service
353,000
$1,820.94
$2,340.39
$519.45
28.5%
$1,542.69
$2,989.91
$1,447.22
93.8%
$3,363.63
$5,330.30
$1,966.67
58.5%
355
1-1/2" to 2" Service
354,000
$1,825.92
$2,347.02
$521.10
28.5%
$1,545.22
$2,998.38
$1,453.16
94.0%
$3,371.14
$5,345.40
$1,974.26
58.6%
356
1-1/2" to 2" Service
355,000
$1,830.90
$2,353.65
$522.75
28.6%
$1,547.75
$3,006.85
$1,459.10
94.3%
$3,378.65
$5,360.50
$1,981.85
58.7%
357
1-1/2" to 2" Service
356,000
$1,835.88
$2,360.28
$524.40
28.6%
$1,550.28
$3,015.32
$1,465.04
94.5%
$3,386.16
$5,375.60
$1,989.44
58.8%
358
1-1/2" to 2" Service
357,000
$1,840.86
$2,366.91
$526.05
28.6%
$1,552.81
$3,023.79
$1,470.98
94.7%
$3,393.67
$5,390.70
$1,997.03
58.8%
359
1-1/2" to 2" Service
358,000
$1,845.84
$2,373.54
$527.70
28.6%
$1,555.34
$3,032.26
$1,476.92
95.0%
$3,401.18
$5,405.80
$2,004.62
58.9%
360
1-1/2" to 2" Service
359,000
$1,850.82
$2,380.17
$529.35
28.6%
$1,557.87
$3,040.73
$1,482.86
95.2%
$3,408.69
$5,420.90
$2,012.21
59.0%
361
1-1/2" to 2" Service
360,000
$1,855.80
$2,386.80
$531.00
28.6%
$1,560.40
$3,049.20
$1,488.80
95.4%
$3,416.20
$5,436.00
$2,019.80
59.1
362
1-1/2" to 2" Service
361,000
$1,860.78
$2,393.43
$532.65
28.6%
$1,562.93
$3,057.67
$1,494.74
95.6%
$3,423.71
$5,451.10
$2,027.39
59.2%
363
1-1/2" to 2" Service
362,000
$1,865.76
$2,400.06
$534.30
28.6%
$1,565.46
$3,066.14
$1,500.68
95.9%
$3,431.22
$5,466.20
$2,034.98
59.3%
364
1-1/2" to 2" Service
363,000
$1,870.74
$2,406.69
$535.95
28.6%
$1,567.99
$3,074.61
$1,506.62
96.1 %
$3,438.73
$5,481.30
$2,042.57
59.4
365
1-1/2" to 2" Service
364,000
$1,875.72
$2,413.32
$537.60
28.7%
$1,570.52
$3,083.08
$1,512.56
96.3%
$3,446.24
$5,496.40
$2,050.16
59.5%
366
1-1/2" to 2" Service
365,000
$1,880.70
$2,419.95
$539.25
28.7%
$1,573.05
$3,091.55
$1,518.50
96.5%
$3,453.75
$5,511.50
$2,057.75
59.6%
367
1-1/2" to 2" Service
366,000
$1,885.68
$2,426.58
$540.90
28.7%
$1,575.58
$3,100.02
$1,524.44
96.8%
$3,461.26
$5,526.60
$2,065.34
59.7%
368
1-1/2" to 2" Service
367,000
$1,890.66
$2,433.21
$542.55
28.7%
$1,578.11
$3,108.49
$1,530.38
97.0%
$3,468.77
$5,541.70
$2,072.93
59.8%
369
1-1/2" to 2" Service
368,000
$1,895.64
$2,439.84
$544.20
28.7%
$1,580.64
$3,116.96
$1,536.32
97.2%
$3,476.28
$5,556.80
$2,080.52
59.8%
370
1-1/2" to 2" Service
369,000
$1,900.62
$2,446.47
$545.85
28.7%
$1,583.17
$3,125.43
$1,542.26
97.4%
$3,483.79
$5,571.90
$2,088.11
59.9%
371
1-1/2" to 2" Service
370,000
$1,905.60
$2,453.10
$547.50
28.7%
$1,585.70
$3,133.90
$1,548.20
97.6%
$3,491.30
$5,587.00
$2,095.70
60.0%
372
1-1/2" to 2" Service
371,000
$1,910.58
$2,459.73
$549.15
28.7%
$1,588.23
$3,142.37
$1,554.14
97.9%
$3,498.81
$5,602.10
$2,103.29
60.1
373
1-1/2" to 2" Service
372,000
$1,915.56
$2,466.36
$550.80
28.8%
$1,590.76
$3,150.84
$1,560.08
98.1 %
$3,506.32
$5,617.20
$2,110.88
60.2
374
1-1/2" to 2" Service
373,000
$1,920.54
$2,472.99
$552.45
28.8%
$1,593.29
$3,159.31
$1,566.02
98.3%
$3,513.83
$5,632.30
$2,118.47
60.3%
375
1-1/2" to 2" Service
374,000
$1,925.52
$2,479.62
$554.10
28.8%
$1,595.82
$3,167.78
$1,571.96
98.5%
$3,521.34
$5,647.40
$2,126.06
60.4%
376
1-1/2" to 2" Service
375,000
$1,930.50
$2,486.25
$555.75
28.8%
$1,598.35
$3,176.25
$1,577.90
98.7%
$3,528.85
$5,662.50
$2,133.65
60.5%
377
1-1/2" to 2" Service
376,000
$1,935.48
$2,492.88
$557.40
28.8%
$1,600.88
$3,184.72
$1,583.84
98.9%
$3,536.36
$5,677.60
$2,141.24
60.5%
378
1-1/2" to 2" Service
377,000
$1,940.46
$2,499.51
$559.05
28.8%
$1,603.41
$3,193.19
$1,589.78
99.1 %
$3,543.87
$5,692.70
$2,148.83
60.6
379
1-1/2" to 2" Service
378,000
$1,945.44
$2,506.14
$560.70
28.8%
$1,605.94
$3,201.66
$1,595.72
99.4%
$3,551.38
$5,707.80
$2,156.42
60.7%
380
1-1/2" to 2" Service
379,000
$1,950.42
$2,512.77
$562.35
28.8%
$1,608.47
$3,210.13
$1,601.66
99.6%
$3,558.89
$5,722.90
$2,164.01
60.8%
381
1-1/2" to 2" Service
380,000
$1,955.40
$2,519.40
$564.00
28.8%
$1,611.00
$3,218.60
$1,607.60
99.8%
$3,566.40
$5,738.00
$2,171.60
60.9%
382
1-1/2" to 2" Service
381,000
$1,960.38
$2,526.03
$565.65
28.9%
$1,613.53
$3,227.07
$1,613.54
100.0%
$3,573.91
$5,753.10
$2,179.19
61.0%
383
1-1/2" to 2" Service
382,000
$1,965.36
$2,532.66
$567.30
28.9%
$1,616.06
$3,235.54
$1,619.48
100.2 %
$3,581.42
$5,768.20
$2,186.78
61.1
384
1-1/2" to 2" Service
383,000
$1,970.34
$2,539.29
$568.95
28.9%
$1,618.59
$3,244.01
$1,625.42
100.4 %
$3,588.93
$5,783.30
$2,194.37
61.1
385
1-1/2" to 2" Service
384,000
$1,975.32
$2,545.92
$570.60
28.9%
$1,621.12
$3,252.48
$1,631.36
100.6%
$3,596.44
$5,798.40
$2,201.96
61.2%
386
1-1/2" to 2" Service
385,000
$1,980.30
$2,552.55
$572.25
28.9%
$1,623.65
$3,260.95
$1,637.30
100.8%
$3,603.95
$5,813.50
$2,209.55
61.3%
387
1-1/2" to 2" Service
386,000
$1,985.28
$2,559.18
$573.90
28.9%
$1,626.18
$3,269.42
$1,643.24
101.0%
$3,611.46
$5,828.60
$2,217.14
61.4%
388
1-1/2" to 2" Service
387,000
$1,990.26
$2,565.81
$575.55
28.9%
$1,628.71
$3,277.89
$1,649.18
101.3%
$3,618.97
$5,843.70
$2,224.73
61.5%
389
1-1/2" to 2" Service
388,000
$1,995.24
$2,572.44
$577.20
28.9%
$1,631.24
$3,286.36
$1,655.12
101.5%
$3,626.48
$5,858.80
$2,232.32
61.6%
390
1-1/2" to 2" Service
389,000
$2,000.22
$2,579.07
$578.85
28.9%
$1,633.77
$3,294.83
$1,661.06
101.7%
$3,633.99
$5,873.90
$2,239.91
61.6%
391
1-1/2" to 2" Service
390,000
$2,005.20
$2,585.70
$580.50
28.9%
$1,636.30
$3,303.30
$1,667.00
101.9%
$3,641.50
$5,889.00
$2,247.50
61.7%
392
1-1/2" to 2" Service
391,000
$2,010.18
$2,592.33
$582.15
29.0%
$1,638.83
$3,311.77
$1,672.94
102.1 %
$3,649.01
$5,904.10
$2,255.09
61.8%
393
1-1/2" to 2" Service
392,000
$2,015.16
$2,598.96
$583.80
29.0%
$1,641.36
$3,320.24
$1,678.88
102.3%
$3,656.52
$5,919.20
$2,262.68
61.9%
394
1-1/2" to 2" Service
393,000
$2,020.14
$2,605.59
$585.45
29.0%
$1,643.89
$3,328.71
$1,684.82
102.5%
$3,664.03
$5,934.30
$2,270.27
62.0%
395
1-1/2" to 2" Service
394,000
$2,025.12
$2,612.22
$587.10
29.0%
$1,646.42
$3,337.18
$1,690.76
102.7%
$3,671.54
$5,949.40
$2,277.86
62.0%
396
1-1/2" to 2" Service
395,000
$2,030.10
$2,618.85
$588.75
29.0%
$1,648.95
$3,345.65
$1,696.70
102.9 %
$3,679.05
$5,964.50
$2,285.45
62.1
13
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percen
397
1-1/2" to 2" Service
396,000
$2,035.08
$2,625.48
$590.40
29.0%
$1,651.48
$3,354.12
$1,702.64
103.1 %
$3,686.56
$5,979.60
$2,293.04
62.2%
398
1-1/2" to 2" Service
397,000
$2,040.06
$2,632.11
$592.05
29.0%
$1,654.01
$3,362.59
$1,708.58
103.3%
$3,694.07
$5,994.70
$2,300.63
62.3%
399
1-1/2" to 2" Service
398,000
$2,045.04
$2,638.74
$593.70
29.0%
$1,656.54
$3,371.06
$1,714.52
103.5%
$3,701.58
$6,009.80
$2,308.22
62.4%
400
1-1/2" to 2" Service
399,000
$2,050.02
$2,645.37
$595.35
29.0%
$1,659.07
$3,379.53
$1,720.46
103.7%
$3,709.09
$6,024.90
$2,315.81
62.4%
401
1-1/2" to 2" Service
400,000
$2,055.00
$2,652.00
$597.00
29.1 %
$1,661.60
$3,388.00
$1,726.40
103.9 %
$3,716.60
$6,040.00
$2,323.40
62.5%
14
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
1
2-1/4" to 4" Service
0
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
2
2-1/4" to 4" Service
1,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
3
2-1/4" to 4" Service
2,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
4
2-1/4" to 4" Service
3,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
5
2-1/4" to 4" Service
4,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
6
2-1/4" to 4" Service
5,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
7
2-1/4" to 4" Service
6,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
8
2-1/4" to 4" Service
7,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
9
2-1/4" to 4" Service
8,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
10
2-1/4" to 4" Service
9,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
11
2-1/4" to 4" Service
10,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
12
2-1/4" to 4" Service
11,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
13
2-1/4" to 4" Service
12,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
14
2-1/4" to 4" Service
13,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
15
2-1/4" to 4" Service
14,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
16
2-1/4" to 4" Service
15,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
17
2-1/4" to 4" Service
16,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
18
2-1/4" to 4" Service
17,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
19
2-1/4" to 4" Service
18,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
20
2-1/4" to 4" Service
19,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
21
2-1/4" to 4" Service
20,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
22
2-1/4" to 4" Service
21,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
23
2-1/4" to 4" Service
22,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
24
2-1/4" to 4" Service
23,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
25
2-1/4" to 4" Service
24,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
26
2-1/4" to 4" Service
25,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
27
2-1/4" to 4" Service
26,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
28
2-1/4" to 4" Service
27,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
29
2-1/4" to 4" Service
28,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$242.99
$0.00
0.0 %
$491.69
$491.69
$0.00
0.0
30
2-1/4" to 4" Service
29,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$245.63
$2.64
1.1 %
$491.69
$494.33
$2.64
0.5
31
2-1/4" to 4" Service
30,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$254.10
$11.11
4.6 %
$491.69
$502.80
$11.11
2.3
32
2-1/4" to 4" Service
31,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$262.57
$19.58
8.1 %
$491.69
$511.27
$19.58
4.0
33
2-1/4" to 4" Service
32,000
$248.70
$248.70
$0.00
0.0 %
$242.99
$271.04
$28.05
11.5 %
$491.69
$519.74
$28.05
5.7
34
2-1/4" to 4" Service
33,000
$248.70
$248.70
$0.00
0.0 %
$243.15
$279.51
$36.36
15.0 %
$491.85
$528.21
$36.36
7.4
35
2-1/4" to 4" Service
34,000
$248.70
$248.70
$0.00
0.0 %
$250.00
$287.98
$37.98
15.2 %
$498.70
$536.68
$37.98
7.6
36
2-1/4" to 4" Service
35,000
$248.70
$248.70
$0.00
0.0 %
$256.85
$296.45
$39.60
15.4 %
$505.55
$545.15
$39.60
7.8
37
2-1/4" to 4" Service
36,000
$248.70
$248.70
$0.00
0.0 %
$263.70
$304.92
$41.22
15.6 %
$512.40
$553.62
$41.22
8.0
38
2-1/4" to 4" Service
37,000
$248.70
$248.70
$0.00
0.0 %
$270.55
$313.39
$42.84
15.8 %
$519.25
$562.09
$42.84
8.3
39
2-1/4" to 4" Service
38,000
$248.70
$251.94
$3.24
1.3 %
$277.40
$321.86
$44.46
16.0 %
$526.10
$573.80
$47.70
9.1
40
2-1/4" to 4" Service
39,000
$248.70
$258.57
$9.87
4.0 %
$284.25
$330.33
$46.08
16.2 %
$532.95
$588.90
$55.95
10.5
41
2-1/4" to 4" Service
40,000
$249.60
$265.20
$15.60
6.2 %
$291.10
$338.80
$47.70
16.4 %
$540.70
$604.00
$63.30
11.7
42
2-1/4" to 4" Service
41,000
$255.84
$271.83
$15.99
6.3 %
$297.95
$347.27
$49.32
16.6 %
$553.79
$619.10
$65.31
11.8
43
2-1/4" to 4" Service
42,000
$262.08
$278.46
$16.38
6.3 %
$304.80
$355.74
$50.94
16.7 %
$566.88
$634.20
$67.32
11.9
44
2-1/4" to 4" Service
43,000
$268.32
$285.09
$16.77
6.3 %
$311.65
$364.21
$52.56
16.9 %
$579.97
$649.30
$69.33
12.0
45
2-1/4" to 4" Service
44,000
$274.56
$291.72
$17.16
6.2 %
$318.50
$372.68
$54.18
17.0 %
$593.06
$664.40
$71.34
12.0
15
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
46
2-1/4" to 4" Service
45,000
$280.80
$298.35
$17.55
6.3 %
$325.35
$381.15
$55.80
17.2 %
$606.15
$679.50
$73.35
12.1
47
2-1/4" to 4" Service
46,000
$287.04
$304.98
$17.94
6.3 %
$332.20
$389.62
$57.42
17.3 %
$619.24
$694.60
$75.36
12.2
48
2-1/4" to 4" Service
47,000
$293.28
$311.61
$18.33
6.3 %
$339.05
$398.09
$59.04
17.4 %
$632.33
$709.70
$77.37
12.2
49
2-1/4" to 4" Service
48,000
$299.52
$318.24
$18.72
6.3 %
$345.90
$406.56
$60.66
17.5 %
$645.42
$724.80
$79.38
12.3
50
2-1/4" to 4" Service
49,000
$305.76
$324.87
$19.11
6.3 %
$352.75
$415.03
$62.28
17.7 %
$658.51
$739.90
$81.39
12.4
51
2-1/4" to 4" Service
50,000
$312.00
$331.50
$19.50
6.3 %
$359.60
$423.50
$63.90
17.8 %
$671.60
$755.00
$83.40
12.4
52
2-1/4" to 4" Service
51,000
$316.98
$338.13
$21.15
6.7 %
$365.28
$431.97
$66.69
18.3 %
$682.26
$770.10
$87.84
12.9
53
2-1/4" to 4" Service
52,000
$321.96
$344.76
$22.80
7.1 %
$370.96
$440.44
$69.48
18.7 %
$692.92
$785.20
$92.28
13.3
54
2-1/4" to 4" Service
53,000
$326.94
$351.39
$24.45
7.5 %
$376.64
$448.91
$72.27
19.2 %
$703.58
$800.30
$96.72
13.7
55
2-1/4" to 4" Service
54,000
$331.92
$358.02
$26.10
7.9 %
$382.32
$457.38
$75.06
19.6 %
$714.24
$815.40
$101.16
14.2
56
2-1/4" to 4" Service
55,000
$336.90
$364.65
$27.75
8.2 %
$388.00
$465.85
$77.85
20.1 %
$724.90
$830.50
$105.60
14.6
57
2-1/4" to 4" Service
56,000
$341.88
$371.28
$29.40
8.6 %
$393.68
$474.32
$80.64
20.5 %
$735.56
$845.60
$110.04
15.0
58
2-1/4" to 4" Service
57,000
$346.86
$377.91
$31.05
9.0 %
$399.36
$482.79
$83.43
20.9 %
$746.22
$860.70
$114.48
15.3
59
2-1/4" to 4" Service
58,000
$351.84
$384.54
$32.70
9.3 %
$405.04
$491.26
$86.22
21.3 %
$756.88
$875.80
$118.92
15.7
60
2-1/4" to 4" Service
59,000
$356.82
$391.17
$34.35
9.6 %
$410.72
$499.73
$89.01
21.7 %
$767.54
$890.90
$123.36
16.1
61
2-1/4" to 4" Service
60,000
$361.80
$397.80
$36.00
10.0 %
$416.40
$508.20
$91.80
22.0 %
$778.20
$906.00
$127.80
16.4
62
2-1/4" to 4" Service
61,000
$366.78
$404.43
$37.65
10.3 %
$422.08
$516.67
$94.59
22.4 %
$788.86
$921.10
$132.24
16.8
63
2-1/4" to 4" Service
62,000
$371.76
$411.06
$39.30
10.6 %
$427.76
$525.14
$97.38
22.8 %
$799.52
$936.20
$136.68
17.1
64
2-1/4" to 4" Service
63,000
$376.74
$417.69
$40.95
10.9 %
$433.44
$533.61
$100.17
23.1 %
$810.18
$951.30
$141.12
17.4
65
2-1/4" to 4" Service
64,000
$381.72
$424.32
$42.60
11.2 %
$439.12
$542.08
$102.96
23.4 %
$820.84
$966.40
$145.56
17.7
66
2-1/4" to 4" Service
65,000
$386.70
$430.95
$44.25
11.4 %
$444.80
$550.55
$105.75
23.8 %
$831.50
$981.50
$150.00
18.0
67
2-1/4" to 4" Service
66,000
$391.68
$437.58
$45.90
11.7 %
$450.48
$559.02
$108.54
24.1 %
$842.16
$996.60
$154.44
18.3
68
2-1/4" to 4" Service
67,000
$396.66
$444.21
$47.55
12.0 %
$456.16
$567.49
$111.33
24.4 %
$852.82
$1,011.70
$158.88
18.6
69
2-1/4" to 4" Service
68,000
$401.64
$450.84
$49.20
12.2 %
$461.84
$575.96
$114.12
24.7 %
$863.48
$1,026.80
$163.32
18.9
70
2-1/4" to 4" Service
69,000
$406.62
$457.47
$50.85
12.5 %
$467.52
$584.43
$116.91
25.0 %
$874.14
$1,041.90
$167.76
19.2
71
2-1/4" to 4" Service
70,000
$411.60
$464.10
$52.50
12.8 %
$473.20
$592.90
$119.70
25.3 %
$884.80
$1,057.00
$172.20
19.5
72
2-1/4" to 4" Service
71,000
$416.58
$470.73
$54.15
13.0 %
$478.88
$601.37
$122.49
25.6 %
$895.46
$1,072.10
$176.64
19.7
73
2-1/4" to 4" Service
72,000
$421.56
$477.36
$55.80
13.2 %
$484.56
$609.84
$125.28
25.9 %
$906.12
$1,087.20
$181.08
20.0
74
2-1/4" to 4" Service
73,000
$426.54
$483.99
$57.45
13.5 %
$490.24
$618.31
$128.07
26.1 %
$916.78
$1,102.30
$185.52
20.2
75
2-1/4" to 4" Service
74,000
$431.52
$490.62
$59.10
13.7 %
$495.92
$626.78
$130.86
26.4 %
$927.44
$1,117.40
$189.96
20.5
76
2-1/4" to 4" Service
75,000
$436.50
$497.25
$60.75
13.9 %
$501.60
$635.25
$133.65
26.6 %
$938.10
$1,132.50
$194.40
20.7
77
2-1/4" to 4" Service
76,000
$441.48
$503.88
$62.40
14.1 %
$507.28
$643.72
$136.44
26.9 %
$948.76
$1,147.60
$198.84
21.0
78
2-1/4" to 4" Service
77,000
$446.46
$510.51
$64.05
14.3 %
$512.96
$652.19
$139.23
27.1 %
$959.42
$1,162.70
$203.28
21.2
79
2-1/4" to 4" Service
78,000
$451.44
$517.14
$65.70
14.6 %
$518.64
$660.66
$142.02
27.4 %
$970.08
$1,177.80
$207.72
21.4
80
2-1/4" to 4" Service
79,000
$456.42
$523.77
$67.35
14.8 %
$524.32
$669.13
$144.81
27.6 %
$980.74
$1,192.90
$212.16
21.6
81
2-1/4" to 4" Service
80,000
$461.40
$530.40
$69.00
15.0 %
$530.00
$677.60
$147.60
27.8 %
$991.40
$1,208.00
$216.60
21.8
82
2-1/4" to 4" Service
81,000
$466.38
$537.03
$70.65
15.1 %
$535.68
$686.07
$150.39
28.1 %
$1,002.06
$1,223.10
$221.04
22.1
83
2-1/4" to 4" Service
82,000
$471.36
$543.66
$72.30
15.3 %
$541.36
$694.54
$153.18
28.3 %
$1,012.72
$1,238.20
$225.48
22.3
84
2-1/4" to 4" Service
83,000
$476.34
$550.29
$73.95
15.5 %
$547.04
$703.01
$155.97
28.5 %
$1,023.38
$1,253.30
$229.92
22.5
85
2-1/4" to 4" Service
84,000
$481.32
$556.92
$75.60
15.7 %
$552.72
$711.48
$158.76
28.7 %
$1,034.04
$1,268.40
$234.36
22.7
86
2-1/4" to 4" Service
85,000
$486.30
$563.55
$77.25
15.9 %
$558.40
$719.95
$161.55
28.9 %
$1,044.70
$1,283.50
$238.80
22.9
87
2-1/4" to 4" Service
86,000
$491.28
$570.18
$78.90
16.1%
$564.08
$728.42
$164.34
29.1%
$1,055.36
$1,298.60
$243.24
23.0%
88
2-1/4" to 4" Service
87,000
$496.26
$576.81
$80.55
16.2 %
$569.76
$736.89
$167.13
29.3 %
$1,066.02
$1,313.70
$247.68
23.2
89
2-1/4" to 4" Service
88,000
$501.24
$583.44
$82.20
16.4 %
$575.44
$745.36
$169.92
29.5 %
$1,076.68
$1,328.80
$252.12
23.4
90
2-1/4" to 4" Service
89,000
$506.22
$590.07
$83.85
16.6 %
$581.12
$753.83
$172.71
29.7 %
$1,087.34
$1,343.90
$256.56
23.6
16
Monthly Water Bill Sewer Bill Combined Bill
Line Usage Level Difference Difference Difference
No. Description in Gallons Existing Proposed Amount Percent Existing Proposed Amount Percent Existing Proposed Amount Percent
91 2-1/4" to 4" Service 90,000 $511.20 $596.70 $85.50 16.7 % $586.80 $762.30 $175.50 29.9 % $1,098.00 $1,359.00 $261.00 23.8
92 2-1/4" to 4" Service 91,000 $516.18 $603.33 $87.15 16.9% $592.48 $770.77 $178.29 30.1% $1,108.66 $1,374.10 $265.44 23.9%
93 2-1/4" to 4" Service 92,000 $521.16 $609.96 $88.80 17.0 % $598.16 $779.24 $181.08 30.3 % $1,119.32 $1,389.20 $269.88 24.1
94 2-1/4" to 4" Service 93,000 $526.14 $616.59 $90.45 17.2 % $603.84 $787.71 $183.87 30.5 % $1,129.98 $1,404.30 $274.32 24.3
95 2-1/4" to 4" Service 94,000 $531.12 $623.22 $92.10 17.3 % $609.52 $796.18 $186.66 30.6 % $1,140.64 $1,419.40 $278.76 24.4
96 2-1/4" to 4" Service 95,000 $536.10 $629.85 $93.75 17.5 % $615.20 $804.65 $189.45 30.8 % $1,151.30 $1,434.50 $283.20 24.6
97 2-1/4" to 4" Service 96,000 $541.08 $636.48 $95.40 17.6 % $620.88 $813.12 $192.24 31.0 % $1,161.96 $1,449.60 $287.64 24.8
98 2-1/4" to 4" Service 97,000 $546.06 $643.11 $97.05 17.8% $626.56 $821.59 $195.03 31.1% $1,172.62 $1,464.70 $292.08 24.9%
99 2-1/4" to 4" Service 98,000 $551.04 $649.74 $98.70 17.9 % $632.24 $830.06 $197.82 31.3 % $1,183.28 $1,479.80 $296.52 25.1
100 2-1/4" to 4" Service 99,000 $556.02 $656.37 $100.35 18.0 % $637.92 $838.53 $200.61 31.4 % $1,193.94 $1,494.90 $300.96 25.2
101 2-1/4" to 4" Service 100,000 $561.00 $663.00 $102.00 18.2 % $643.60 $847.00 $203.40 31.6 % $1,204.60 $1,510.00 $305.40 25.4
102 2-1/4" to 4" Service 101,000 $565.98 $669.63 $103.65 18.3 % $648.72 $855.47 $206.75 31.9 % $1,214.70 $1,525.10 $310.40 25.6
103 2-1/4" to 4" Service 102,000 $570.96 $676.26 $105.30 18.4 % $653.84 $863.94 $210.10 32.1 % $1,224.80 $1,540.20 $315.40 25.8
104 2-1/4" to 4" Service 103,000 $575.94 $682.89 $106.95 18.6 % $658.96 $872.41 $213.45 32.4 % $1,234.90 $1,555.30 $320.40 25.9
105 2-1/4" to 4" Service 104,000 $580.92 $689.52 $108.60 18.7 % $664.08 $880.88 $216.80 32.6 % $1,245.00 $1,570.40 $325.40 26.1
106 2-1/4" to 4" Service 105,000 $585.90 $696.15 $110.25 18.8 % $669.20 $889.35 $220.15 32.9 % $1,255.10 $1,585.50 $330.40 26.3
107 2-1/4" to 4" Service 106,000 $590.88 $702.78 $111.90 18.9 % $674.32 $897.82 $223.50 33.1 % $1,265.20 $1,600.60 $335.40 26.5
108 2-1/4" to 4" Service 107,000 $595.86 $709.41 $113.55 19.1 % $679.44 $906.29 $226.85 33.4 % $1,275.30 $1,615.70 $340.40 26.7
109 2-1/4" to 4" Service 108,000 $600.84 $716.04 $115.20 19.2 % $684.56 $914.76 $230.20 33.6 % $1,285.40 $1,630.80 $345.40 26.9
110 2-1/4" to 4" Service 109,000 $605.82 $722.67 $116.85 19.3 % $689.68 $923.23 $233.55 33.9 % $1,295.50 $1,645.90 $350.40 27.0
111 2-1/4" to 4" Service 110,000 $610.80 $729.30 $118.50 19.4 % $694.80 $931.70 $236.90 34.1 % $1,305.60 $1,661.00 $355.40 27.2
112 2-1/4" to 4" Service 111,000 $615.78 $735.93 $120.15 19.5 % $699.92 $940.17 $240.25 34.3 % $1,315.70 $1,676.10 $360.40 27.4
113 2-1/4" to 4" Service 112,000 $620.76 $742.56 $121.80 19.6 % $705.04 $948.64 $243.60 34.6 % $1,325.80 $1,691.20 $365.40 27.6
114 2-1/4" to 4" Service 113,000 $625.74 $749.19 $123.45 19.7 % $710.16 $957.11 $246.95 34.8 % $1,335.90 $1,706.30 $370.40 27.7
115 2-1/4" to 4" Service 114,000 $630.72 $755.82 $125.10 19.8 % $715.28 $965.58 $250.30 35.0 % $1,346.00 $1,721.40 $375.40 27.9
116 2-1/4" to 4" Service 115,000 $635.70 $762.45 $126.75 19.9 % $720.40 $974.05 $253.65 35.2 % $1,356.10 $1,736.50 $380.40 28.1
117 2-1/4" to 4" Service 116,000 $640.68 $769.08 $128.40 20.0 % $725.52 $982.52 $257.00 35.4 % $1,366.20 $1,751.60 $385.40 28.2
118 2-1/4" to 4" Service 117,000 $645.66 $775.71 $130.05 20.1 % $730.64 $990.99 $260.35 35.6 % $1,376.30 $1,766.70 $390.40 28.4
119 2-1/4" to 4" Service 118,000 $650.64 $782.34 $131.70 20.2 % $735.76 $999.46 $263.70 35.8 % $1,386.40 $1,781.80 $395.40 28.5
120 2-1/4" to 4" Service 119,000 $655.62 $788.97 $133.35 20.3 % $740.88 $1,007.93 $267.05 36.0 % $1,396.50 $1,796.90 $400.40 28.7
121 2-1/4" to 4" Service 120,000 $660.60 $795.60 $135.00 20.4 % $746.00 $1,016.40 $270.40 36.2 % $1,406.60 $1,812.00 $405.40 28.8
122 2-1/4" to 4" Service 121,000 $665.58 $802.23 $136.65 20.5 % $751.12 $1,024.87 $273.75 36.4 % $1,416.70 $1,827.10 $410.40 29.0
123 2-1/4" to 4" Service 122,000 $670.56 $808.86 $138.30 20.6 % $756.24 $1,033.34 $277.10 36.6 % $1,426.80 $1,842.20 $415.40 29.1
124 2-1/4" to 4" Service 123,000 $675.54 $815.49 $139.95 20.7 % $761.36 $1,041.81 $280.45 36.8 % $1,436.90 $1,857.30 $420.40 29.3
125 2-1/4" to 4" Service 124,000 $680.52 $822.12 $141.60 20.8 % $766.48 $1,050.28 $283.80 37.0 % $1,447.00 $1,872.40 $425.40 29.4
126 2-1/4" to 4" Service 125,000 $685.50 $828.75 $143.25 20.9 % $771.60 $1,058.75 $287.15 37.2 % $1,457.10 $1,887.50 $430.40 29.5
127 2-1/4" to 4" Service 126,000 $690.48 $835.38 $144.90 21.0 % $776.72 $1,067.22 $290.50 37.4 % $1,467.20 $1,902.60 $435.40 29.7
128 2-1/4" to 4" Service 127,000 $695.46 $842.01 $146.55 21.1% $781.84 $1,075.69 $293.85 37.6% $1,477.30 $1,917.70 $440.40 29.8%
129 2-1/4" to 4" Service 128,000 $700.44 $848.64 $148.20 21.2 % $786.96 $1,084.16 $297.20 37.8 % $1,487.40 $1,932.80 $445.40 29.9
130 2-1/4" to 4" Service 129,000 $705.42 $855.27 $149.85 21.2 % $792.08 $1,092.63 $300.55 37.9 % $1,497.50 $1,947.90 $450.40 30.1
131 2-1/4" to 4" Service 130,000 $710.40 $861.90 $151.50 21.3% $797.20 $1,101.10 $303.90 38.1% $1,507.60 $1,963.00 $455.40 30.2%
132 2-1/4" to 4" Service 131,000 $715.38 $868.53 $153.15 21.4% $802.32 $1,109.57 $307.25 38.3% $1,517.70 $1,978.10 $460.40 30.3%
133 2-1/4" to 4" Service 132,000 $720.36 $875.16 $154.80 21.5% $807.44 $1,118.04 $310.60 38.5% $1,527.80 $1,993.20 $465.40 30.5%
134 2-1/4" to 4" Service 133,000 $725.34 $881.79 $156.45 21.6% $812.56 $1,126.51 $313.95 38.6% $1,537.90 $2,008.30 $470.40 30.6%
135 2-1/4" to 4" Service 134,000 $730.32 $888.42 $158.10 21.6% $817.68 $1,134.98 $317.30 38.8% $1,548.00 $2,023.40 $475.40 30.7%
17
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
136
2-1/4" to 4" Service
135,000
$735.30
$895.05
$159.75
21.7%
$822.80
$1,143.45
$320.65
39.0%
$1,558.10
$2,038.50
$480.40
30.8%
137
2-1/4" to 4" Service
136,000
$740.28
$901.68
$161.40
21.8%
$827.92
$1,151.92
$324.00
39.1%
$1,568.20
$2,053.60
$485.40
31.0%
138
2-1/4" to 4" Service
137,000
$745.26
$908.31
$163.05
21.9 %
$833.04
$1,160.39
$327.35
39.3 %
$1,578.30
$2,068.70
$490.40
31.1
139
2-1/4" to 4" Service
138,000
$750.24
$914.94
$164.70
22.0%
$838.16
$1,168.86
$330.70
39.5%
$1,588.40
$2,083.80
$495.40
31.2%
140
2-1/4" to 4" Service
139,000
$755.22
$921.57
$166.35
22.0%
$843.28
$1,177.33
$334.05
39.6%
$1,598.50
$2,098.90
$500.40
31.3%
141
2-1/4" to 4" Service
140,000
$760.20
$928.20
$168.00
22.1%
$848.40
$1,185.80
$337.40
39.8%
$1,608.60
$2,114.00
$505.40
31.4%
142
2-1/4" to 4" Service
141,000
$765.18
$934.83
$169.65
22.2%
$853.52
$1,194.27
$340.75
39.9%
$1,618.70
$2,129.10
$510.40
31.5%
143
2-1/4" to 4" Service
142,000
$770.16
$941.46
$171.30
22.2%
$858.64
$1,202.74
$344.10
40.1%
$1,628.80
$2,144.20
$515.40
31.6%
144
2-1/4" to 4" Service
143,000
$775.14
$948.09
$172.95
22.3%
$863.76
$1,211.21
$347.45
40.2%
$1,638.90
$2,159.30
$520.40
31.8%
145
2-1/4" to 4" Service
144,000
$780.12
$954.72
$174.60
22.4%
$868.88
$1,219.68
$350.80
40.4%
$1,649.00
$2,174.40
$525.40
31.9%
146
2-1/4" to 4" Service
145,000
$785.10
$961.35
$176.25
22.4%
$874.00
$1,228.15
$354.15
40.5%
$1,659.10
$2,189.50
$530.40
32.0%
147
2-1/4" to 4" Service
146,000
$790.08
$967.98
$177.90
22.5 %
$879.12
$1,236.62
$357.50
40.7 %
$1,669.20
$2,204.60
$535.40
32.1
148
2-1/4" to 4" Service
147,000
$795.06
$974.61
$179.55
22.6 %
$884.24
$1,245.09
$360.85
40.8 %
$1,679.30
$2,219.70
$540.40
32.2
149
2-1/4" to 4" Service
148,000
$800.04
$981.24
$181.20
22.6 %
$889.36
$1,253.56
$364.20
41.0 %
$1,689.40
$2,234.80
$545.40
32.3
150
2-1/4" to 4" Service
149,000
$805.02
$987.87
$182.85
22.7%
$894.48
$1,262.03
$367.55
41.1%
$1,699.50
$2,249.90
$550.40
32.4%
151
2-1/4" to 4" Service
150,000
$810.00
$994.50
$184.50
22.8 %
$899.60
$1,270.50
$370.90
41.2 %
$1,709.60
$2,265.00
$555.40
32.5
152
2-1/4" to 4" Service
151,000
$814.98
$1,001.13
$186.15
22.8%
$904.72
$1,278.97
$374.25
41.4%
$1,719.70
$2,280.10
$560.40
32.6%
153
2-1/4" to 4" Service
152,000
$819.96
$1,007.76
$187.80
22.9%
$909.84
$1,287.44
$377.60
41.5%
$1,729.80
$2,295.20
$565.40
32.7%
154
2-1/4" to 4" Service
153,000
$824.94
$1,014.39
$189.45
23.0%
$914.96
$1,295.91
$380.95
41.6%
$1,739.90
$2,310.30
$570.40
32.8%
155
2-1/4" to 4" Service
154,000
$829.92
$1,021.02
$191.10
23.0%
$920.08
$1,304.38
$384.30
41.8%
$1,750.00
$2,325.40
$575.40
32.9%
156
2-1/4" to 4" Service
155,000
$834.90
$1,027.65
$192.75
23.1%
$925.20
$1,312.85
$387.65
41.9%
$1,760.10
$2,340.50
$580.40
33.0%
157
2-1/4" to 4" Service
156,000
$839.88
$1,034.28
$194.40
23.1 %
$930.32
$1,321.32
$391.00
42.0 %
$1,770.20
$2,355.60
$585.40
33.1
158
2-1/4" to 4" Service
157,000
$844.86
$1,040.91
$196.05
23.2%
$935.44
$1,329.79
$394.35
42.2%
$1,780.30
$2,370.70
$590.40
33.2%
159
2-1/4" to 4" Service
158,000
$849.84
$1,047.54
$197.70
23.3%
$940.56
$1,338.26
$397.70
42.3%
$1,790.40
$2,385.80
$595.40
33.3%
160
2-1/4" to 4" Service
159,000
$854.82
$1,054.17
$199.35
23.3%
$945.68
$1,346.73
$401.05
42.4%
$1,800.50
$2,400.90
$600.40
33.3%
161
2-1/4" to 4" Service
160,000
$859.80
$1,060.80
$201.00
23.4%
$950.80
$1,355.20
$404.40
42.5%
$1,810.60
$2,416.00
$605.40
33.4%
162
2-1/4" to 4" Service
161,000
$864.78
$1,067.43
$202.65
23.4%
$955.92
$1,363.67
$407.75
42.7%
$1,820.70
$2,431.10
$610.40
33.5%
163
2-1/4" to 4" Service
162,000
$869.76
$1,074.06
$204.30
23.5%
$961.04
$1,372.14
$411.10
42.8%
$1,830.80
$2,446.20
$615.40
33.6%
164
2-1/4" to 4" Service
163,000
$874.74
$1,080.69
$205.95
23.5%
$966.16
$1,380.61
$414.45
42.9%
$1,840.90
$2,461.30
$620.40
33.7%
165
2-1/4" to 4" Service
164,000
$879.72
$1,087.32
$207.60
23.6%
$971.28
$1,389.08
$417.80
43.0%
$1,851.00
$2,476.40
$625.40
33.8%
166
2-1/4" to 4" Service
165,000
$884.70
$1,093.95
$209.25
23.7%
$976.40
$1,397.55
$421.15
43.1%
$1,861.10
$2,491.50
$630.40
33.9%
167
2-1/4" to 4" Service
166,000
$889.68
$1,100.58
$210.90
23.7%
$981.52
$1,406.02
$424.50
43.2%
$1,871.20
$2,506.60
$635.40
34.0%
168
2-1/4" to 4" Service
167,000
$894.66
$1,107.21
$212.55
23.8%
$986.64
$1,414.49
$427.85
43.4%
$1,881.30
$2,521.70
$640.40
34.0%
169
2-1/4" to 4" Service
168,000
$899.64
$1,113.84
$214.20
23.8 %
$991.76
$1,422.96
$431.20
43.5 %
$1,891.40
$2,536.80
$645.40
34.1
170
2-1/4" to 4" Service
169,000
$904.62
$1,120.47
$215.85
23.9%
$996.88
$1,431.43
$434.55
43.6%
$1,901.50
$2,551.90
$650.40
34.2%
171
2-1/4" to 4" Service
170,000
$909.60
$1,127.10
$217.50
23.9%
$1,002.00
$1,439.90
$437.90
43.7%
$1,911.60
$2,567.00
$655.40
34.3%
172
2-1/4" to 4" Service
171,000
$914.58
$1,133.73
$219.15
24.0%
$1,007.12
$1,448.37
$441.25
43.8%
$1,921.70
$2,582.10
$660.40
34.4%
173
2-1/4" to 4" Service
172,000
$919.56
$1,140.36
$220.80
24.0%
$1,012.24
$1,456.84
$444.60
43.9%
$1,931.80
$2,597.20
$665.40
34.4%
174
2-1/4" to 4" Service
173,000
$924.54
$1,146.99
$222.45
24.1%
$1,017.36
$1,465.31
$447.95
44.0%
$1,941.90
$2,612.30
$670.40
34.5%
175
2-1/4" to 4" Service
174,000
$929.52
$1,153.62
$224.10
24.1%
$1,022.48
$1,473.78
$451.30
44.1%
$1,952.00
$2,627.40
$675.40
34.6%
176
2-1/4" to 4" Service
175,000
$934.50
$1,160.25
$225.75
24.2%
$1,027.60
$1,482.25
$454.65
44.2%
$1,962.10
$2,642.50
$680.40
34.7%
177
2-1/4" to 4" Service
176,000
$939.48
$1,166.88
$227.40
24.2%
$1,032.72
$1,490.72
$458.00
44.3%
$1,972.20
$2,657.60
$685.40
34.8%
178
2-1/4" to 4" Service
177,000
$944.46
$1,173.51
$229.05
24.3%
$1,037.84
$1,499.19
$461.35
44.5%
$1,982.30
$2,672.70
$690.40
34.8%
179
2-1/4" to 4" Service
178,000
$949.44
$1,180.14
$230.70
24.3%
$1,042.96
$1,507.66
$464.70
44.6%
$1,992.40
$2,687.80
$695.40
34.9%
180
2-1/4" to 4" Service
179,000
$954.42
$1,186.77
$232.35
24.3%
$1,048.08
$1,516.13
$468.05
44.7%
$2,002.50
$2,702.90
$700.40
35.0%
18
Monthly Water Bill Sewer Bill Combined Bill
Line Usage Level Difference Difference Difference
No. Description in Gallons Existing Proposed Amount Percent Existing Proposed Amount Percent Existing Proposed Amount Percent
181 2-1/4" to 4" Service 180,000 $959.40 $1,193.40 $234.00 24.4% $1,053.20 $1,524.60 $471.40 44.8% $2,012.60 $2,718.00 $705.40 35.0%
182 2-1/4" to 4" Service 181,000 $964.38 $1,200.03 $235.65 24.4 % $1,058.32 $1,533.07 $474.75 44.9 % $2,022.70 $2,733.10 $710.40 35.1
183 2-1/4" to 4" Service 182,000 $969.36 $1,206.66 $237.30 24.5 % $1,063.44 $1,541.54 $478.10 45.0 % $2,032.80 $2,748.20 $715.40 35.2
184 2-1/4" to 4" Service 183,000 $974.34 $1,213.29 $238.95 24.5% $1,068.56 $1,550.01 $481.45 45.1% $2,042.90 $2,763.30 $720.40 35.3%
185 2-1/4" to 4" Service 184,000 $979.32 $1,219.92 $240.60 24.6 % $1,073.68 $1,558.48 $484.80 45.2 % $2,053.00 $2,778.40 $725.40 35.3
186 2-1/4" to 4" Service 185,000 $984.30 $1,226.55 $242.25 24.6 % $1,078.80 $1,566.95 $488.15 45.2 % $2,063.10 $2,793.50 $730.40 35.4
187 2-1/4" to 4" Service 186,000 $989.28 $1,233.18 $243.90 24.7 % $1,083.92 $1,575.42 $491.50 45.3 % $2,073.20 $2,808.60 $735.40 35.5
188 2-1/4" to 4" Service 187,000 $994.26 $1,239.81 $245.55 24.7 % $1,089.04 $1,583.89 $494.85 45.4 % $2,083.30 $2,823.70 $740.40 35.5
189 2-1/4" to 4" Service 188,000 $999.24 $1,246.44 $247.20 24.7 % $1,094.16 $1,592.36 $498.20 45.5 % $2,093.40 $2,838.80 $745.40 35.6
190 2-1/4" to 4" Service 189,000 $1,004.22 $1,253.07 $248.85 24.8% $1,099.28 $1,600.83 $501.55 45.6% $2,103.50 $2,853.90 $750.40 35.7%
191 2-1/4" to 4" Service 190,000 $1,009.20 $1,259.70 $250.50 24.8% $1,104.40 $1,609.30 $504.90 45.7% $2,113.60 $2,869.00 $755.40 35.7%
192 2-1/4" to 4" Service 191,000 $1,014.18 $1,266.33 $252.15 24.9% $1,109.52 $1,617.77 $508.25 45.8% $2,123.70 $2,884.10 $760.40 35.8%
193 2-1/4" to 4" Service 192,000 $1,019.16 $1,272.96 $253.80 24.9% $1,114.64 $1,626.24 $511.60 45.9% $2,133.80 $2,899.20 $765.40 35.9%
194 2-1/4" to 4" Service 193,000 $1,024.14 $1,279.59 $255.45 24.9% $1,119.76 $1,634.71 $514.95 46.0% $2,143.90 $2,914.30 $770.40 35.9%
195 2-1/4" to 4" Service 194,000 $1,029.12 $1,286.22 $257.10 25.0% $1,124.88 $1,643.18 $518.30 46.1% $2,154.00 $2,929.40 $775.40 36.0%
196 2-1/4" to 4" Service 195,000 $1,034.10 $1,292.85 $258.75 25.0% $1,130.00 $1,651.65 $521.65 46.2% $2,164.10 $2,944.50 $780.40 36.1%
197 2-1/4" to 4" Service 196,000 $1,039.08 $1,299.48 $260.40 25.1% $1,135.12 $1,660.12 $525.00 46.3% $2,174.20 $2,959.60 $785.40 36.1%
198 2-1/4" to 4" Service 197,000 $1,044.06 $1,306.11 $262.05 25.1% $1,140.24 $1,668.59 $528.35 46.3% $2,184.30 $2,974.70 $790.40 36.2%
199 2-1/4" to 4" Service 198,000 $1,049.04 $1,312.74 $263.70 25.1% $1,145.36 $1,677.06 $531.70 46.4% $2,194.40 $2,989.80 $795.40 36.2%
200 2-1/4" to 4" Service 199,000 $1,054.02 $1,319.37 $265.35 25.2% $1,150.48 $1,685.53 $535.05 46.5% $2,204.50 $3,004.90 $800.40 36.3%
201 2-1/4" to 4" Service 200,000 $1,059.00 $1,326.00 $267.00 25.2% $1,155.60 $1,694.00 $538.40 46.6% $2,214.60 $3,020.00 $805.40 36.4%
202 2-1/4" to 4" Service 201,000 $1,063.98 $1,332.63 $268.65 25.2% $1,158.13 $1,702.47 $544.34 47.0% $2,222.11 $3,035.10 $812.99 36.6%
203 2-1/4" to 4" Service 202,000 $1,068.96 $1,339.26 $270.30 25.3% $1,160.66 $1,710.94 $550.28 47.4% $2,229.62 $3,050.20 $820.58 36.8%
204 2-1/4" to 4" Service 203,000 $1,073.94 $1,345.89 $271.95 25.3% $1,163.19 $1,719.41 $556.22 47.8% $2,237.13 $3,065.30 $828.17 37.0%
205 2-1/4" to 4" Service 204,000 $1,078.92 $1,352.52 $273.60 25.4% $1,165.72 $1,727.88 $562.16 48.2% $2,244.64 $3,080.40 $835.76 37.2%
206 2-1/4" to 4" Service 205,000 $1,083.90 $1,359.15 $275.25 25.4% $1,168.25 $1,736.35 $568.10 48.6% $2,252.15 $3,095.50 $843.35 37.4%
207 2-1/4" to 4" Service 206,000 $1,088.88 $1,365.78 $276.90 25.4% $1,170.78 $1,744.82 $574.04 49.0% $2,259.66 $3,110.60 $850.94 37.7%
208 2-1/4" to 4" Service 207,000 $1,093.86 $1,372.41 $278.55 25.5% $1,173.31 $1,753.29 $579.98 49.4% $2,267.17 $3,125.70 $858.53 37.9%
209 2-1/4" to 4" Service 208,000 $1,098.84 $1,379.04 $280.20 25.5% $1,175.84 $1,761.76 $585.92 49.8% $2,274.68 $3,140.80 $866.12 38.1%
210 2-1/4" to 4" Service 209,000 $1,103.82 $1,385.67 $281.85 25.5% $1,178.37 $1,770.23 $591.86 50.2% $2,282.19 $3,155.90 $873.71 38.3%
211 2-1/4" to 4" Service 210,000 $1,108.80 $1,392.30 $283.50 25.6% $1,180.90 $1,778.70 $597.80 50.6% $2,289.70 $3,171.00 $881.30 38.5%
212 2-1/4" to 4" Service 211,000 $1,113.78 $1,398.93 $285.15 25.6% $1,183.43 $1,787.17 $603.74 51.0% $2,297.21 $3,186.10 $888.89 38.7%
213 2-1/4" to 4" Service 212,000 $1,118.76 $1,405.56 $286.80 25.6% $1,185.96 $1,795.64 $609.68 51.4% $2,304.72 $3,201.20 $896.48 38.9%
214 2-1/4" to 4" Service 213,000 $1,123.74 $1,412.19 $288.45 25.7% $1,188.49 $1,804.11 $615.62 51.8% $2,312.23 $3,216.30 $904.07 39.1%
215 2-1/4" to 4" Service 214,000 $1,128.72 $1,418.82 $290.10 25.7% $1,191.02 $1,812.58 $621.56 52.2% $2,319.74 $3,231.40 $911.66 39.3%
216 2-1/4" to 4" Service 215,000 $1,133.70 $1,425.45 $291.75 25.7% $1,193.55 $1,821.05 $627.50 52.6% $2,327.25 $3,246.50 $919.25 39.5%
217 2-1/4" to 4" Service 216,000 $1,138.68 $1,432.08 $293.40 25.8% $1,196.08 $1,829.52 $633.44 53.0% $2,334.76 $3,261.60 $926.84 39.7%
218 2-1/4" to 4" Service 217,000 $1,143.66 $1,438.71 $295.05 25.8% $1,198.61 $1,837.99 $639.38 53.3% $2,342.27 $3,276.70 $934.43 39.9%
219 2-1/4" to 4" Service 218,000 $1,148.64 $1,445.34 $296.70 25.8% $1,201.14 $1,846.46 $645.32 53.7% $2,349.78 $3,291.80 $942.02 40.1%
220 2-1/4" to 4" Service 219,000 $1,153.62 $1,451.97 $298.35 25.9% $1,203.67 $1,854.93 $651.26 54.1% $2,357.29 $3,306.90 $949.61 40.3%
221 2-1/4" to 4" Service 220,000 $1,158.60 $1,458.60 $300.00 25.9% $1,206.20 $1,863.40 $657.20 54.5% $2,364.80 $3,322.00 $957.20 40.5%
222 2-1/4" to 4" Service 221,000 $1,163.58 $1,465.23 $301.65 25.9% $1,208.73 $1,871.87 $663.14 54.9% $2,372.31 $3,337.10 $964.79 40.7%
223 2-1/4" to 4" Service 222,000 $1,168.56 $1,471.86 $303.30 26.0% $1,211.26 $1,880.34 $669.08 55.2% $2,379.82 $3,352.20 $972.38 40.9%
224 2-1/4" to 4" Service 223,000 $1,173.54 $1,478.49 $304.95 26.0% $1,213.79 $1,888.81 $675.02 55.6% $2,387.33 $3,367.30 $979.97 41.0%
225 2-1/4" to 4" Service 224,000 $1,178.52 $1,485.12 $306.60 26.0% $1,216.32 $1,897.28 $680.96 56.0% $2,394.84 $3,382.40 $987.56 41.2%
19
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
226
2-1/4" to 4" Service
225,000
$1,183.50
$1,491.75
$308.25
26.0%
$1,218.85
$1,905.75
$686.90
56.4%
$2,402.35
$3,397.50
$995.15
41.4%
227
2-1/4" to 4" Service
226,000
$1,188.48
$1,498.38
$309.90
26.1%
$1,221.38
$1,914.22
$692.84
56.7%
$2,409.86
$3,412.60
$1,002.74
41.6%
228
2-1/4" to 4" Service
227,000
$1,193.46
$1,505.01
$311.55
26.1%
$1,223.91
$1,922.69
$698.78
57.1 %
$2,417.37
$3,427.70
$1,010.33
41.8
229
2-1/4" to 4" Service
228,000
$1,198.44
$1,511.64
$313.20
26.1%
$1,226.44
$1,931.16
$704.72
57.5%
$2,424.88
$3,442.80
$1,017.92
42.0%
230
2-1/4" to 4" Service
229,000
$1,203.42
$1,518.27
$314.85
26.2%
$1,228.97
$1,939.63
$710.66
57.8%
$2,432.39
$3,457.90
$1,025.51
42.2%
231
2-1/4" to 4" Service
230,000
$1,208.40
$1,524.90
$316.50
26.2%
$1,231.50
$1,948.10
$716.60
58.2%
$2,439.90
$3,473.00
$1,033.10
42.3%
232
2-1/4" to 4" Service
231,000
$1,213.38
$1,531.53
$318.15
26.2%
$1,234.03
$1,956.57
$722.54
58.6%
$2,447.41
$3,488.10
$1,040.69
42.5%
233
2-1/4" to 4" Service
232,000
$1,218.36
$1,538.16
$319.80
26.2%
$1,236.56
$1,965.04
$728.48
58.9%
$2,454.92
$3,503.20
$1,048.28
42.7%
234
2-1/4" to 4" Service
233,000
$1,223.34
$1,544.79
$321.45
26.3%
$1,239.09
$1,973.51
$734.42
59.3%
$2,462.43
$3,518.30
$1,055.87
42.9%
235
2-1/4" to 4" Service
234,000
$1,228.32
$1,551.42
$323.10
26.3%
$1,241.62
$1,981.98
$740.36
59.6%
$2,469.94
$3,533.40
$1,063.46
43.1%
236
2-1/4" to 4" Service
235,000
$1,233.30
$1,558.05
$324.75
26.3%
$1,244.15
$1,990.45
$746.30
60.0%
$2,477.45
$3,548.50
$1,071.05
43.2%
237
2-1/4" to 4" Service
236,000
$1,238.28
$1,564.68
$326.40
26.4%
$1,246.68
$1,998.92
$752.24
60.3%
$2,484.96
$3,563.60
$1,078.64
43.4%
238
2-1/4" to 4" Service
237,000
$1,243.26
$1,571.31
$328.05
26.4%
$1,249.21
$2,007.39
$758.18
60.7%
$2,492.47
$3,578.70
$1,086.23
43.6%
239
2-1/4" to 4" Service
238,000
$1,248.24
$1,577.94
$329.70
26.4%
$1,251.74
$2,015.86
$764.12
61.0%
$2,499.98
$3,593.80
$1,093.82
43.8%
240
2-1/4" to 4" Service
239,000
$1,253.22
$1,584.57
$331.35
26.4%
$1,254.27
$2,024.33
$770.06
61.4%
$2,507.49
$3,608.90
$1,101.41
43.9%
241
2-1/4" to 4" Service
240,000
$1,258.20
$1,591.20
$333.00
26.5%
$1,256.80
$2,032.80
$776.00
61.7%
$2,515.00
$3,624.00
$1,109.00
44.1%
242
2-1/4" to 4" Service
241,000
$1,263.18
$1,597.83
$334.65
26.5%
$1,259.33
$2,041.27
$781.94
62.1%
$2,522.51
$3,639.10
$1,116.59
44.3%
243
2-1/4" to 4" Service
242,000
$1,268.16
$1,604.46
$336.30
26.5%
$1,261.86
$2,049.74
$787.88
62.4%
$2,530.02
$3,654.20
$1,124.18
44.4%
244
2-1/4" to 4" Service
243,000
$1,273.14
$1,611.09
$337.95
26.5%
$1,264.39
$2,058.21
$793.82
62.8%
$2,537.53
$3,669.30
$1,131.77
44.6%
245
2-1/4" to 4" Service
244,000
$1,278.12
$1,617.72
$339.60
26.6%
$1,266.92
$2,066.68
$799.76
63.1%
$2,545.04
$3,684.40
$1,139.36
44.8%
246
2-1/4" to 4" Service
245,000
$1,283.10
$1,624.35
$341.25
26.6%
$1,269.45
$2,075.15
$805.70
63.5%
$2,552.55
$3,699.50
$1,146.95
44.9%
247
2-1/4" to 4" Service
246,000
$1,288.08
$1,630.98
$342.90
26.6%
$1,271.98
$2,083.62
$811.64
63.8%
$2,560.06
$3,714.60
$1,154.54
45.1%
248
2-1/4" to 4" Service
247,000
$1,293.06
$1,637.61
$344.55
26.6%
$1,274.51
$2,092.09
$817.58
64.1%
$2,567.57
$3,729.70
$1,162.13
45.3%
249
2-1/4" to 4" Service
248,000
$1,298.04
$1,644.24
$346.20
26.7%
$1,277.04
$2,100.56
$823.52
64.5%
$2,575.08
$3,744.80
$1,169.72
45.4%
250
2-1/4" to 4" Service
249,000
$1,303.02
$1,650.87
$347.85
26.7%
$1,279.57
$2,109.03
$829.46
64.8%
$2,582.59
$3,759.90
$1,177.31
45.6%
251
2-1/4" to 4" Service
250,000
$1,308.00
$1,657.50
$349.50
26.7%
$1,282.10
$2,117.50
$835.40
65.2%
$2,590.10
$3,775.00
$1,184.90
45.7%
252
2-1/4" to 4" Service
251,000
$1,312.98
$1,664.13
$351.15
26.7%
$1,284.63
$2,125.97
$841.34
65.5%
$2,597.61
$3,790.10
$1,192.49
45.9%
253
2-1/4" to 4" Service
252,000
$1,317.96
$1,670.76
$352.80
26.8%
$1,287.16
$2,134.44
$847.28
65.8%
$2,605.12
$3,805.20
$1,200.08
46.1%
254
2-1/4" to 4" Service
253,000
$1,322.94
$1,677.39
$354.45
26.8%
$1,289.69
$2,142.91
$853.22
66.2%
$2,612.63
$3,820.30
$1,207.67
46.2%
255
2-1/4" to 4" Service
254,000
$1,327.92
$1,684.02
$356.10
26.8%
$1,292.22
$2,151.38
$859.16
66.5%
$2,620.14
$3,835.40
$1,215.26
46.4%
256
2-1/4" to 4" Service
255,000
$1,332.90
$1,690.65
$357.75
26.8%
$1,294.75
$2,159.85
$865.10
66.8%
$2,627.65
$3,850.50
$1,222.85
46.5%
257
2-1/4" to 4" Service
256,000
$1,337.88
$1,697.28
$359.40
26.9%
$1,297.28
$2,168.32
$871.04
67.1%
$2,635.16
$3,865.60
$1,230.44
46.7%
258
2-1/4" to 4" Service
257,000
$1,342.86
$1,703.91
$361.05
26.9%
$1,299.81
$2,176.79
$876.98
67.5%
$2,642.67
$3,880.70
$1,238.03
46.8%
259
2-1/4" to 4" Service
258,000
$1,347.84
$1,710.54
$362.70
26.9%
$1,302.34
$2,185.26
$882.92
67.8%
$2,650.18
$3,895.80
$1,245.62
47.0%
260
2-1/4" to 4" Service
259,000
$1,352.82
$1,717.17
$364.35
26.9%
$1,304.87
$2,193.73
$888.86
68.1 %
$2,657.69
$3,910.90
$1,253.21
47.2
261
2-1/4" to 4" Service
260,000
$1,357.80
$1,723.80
$366.00
27.0%
$1,307.40
$2,202.20
$894.80
68.4%
$2,665.20
$3,926.00
$1,260.80
47.3%
262
2-1/4" to 4" Service
261,000
$1,362.78
$1,730.43
$367.65
27.0%
$1,309.93
$2,210.67
$900.74
68.8%
$2,672.71
$3,941.10
$1,268.39
47.5%
263
2-1/4" to 4" Service
262,000
$1,367.76
$1,737.06
$369.30
27.0%
$1,312.46
$2,219.14
$906.68
69.1 %
$2,680.22
$3,956.20
$1,275.98
47.6
264
2-1/4" to 4" Service
263,000
$1,372.74
$1,743.69
$370.95
27.0%
$1,314.99
$2,227.61
$912.62
69.4%
$2,687.73
$3,971.30
$1,283.57
47.8%
265
2-1/4" to 4" Service
264,000
$1,377.72
$1,750.32
$372.60
27.0%
$1,317.52
$2,236.08
$918.56
69.7%
$2,695.24
$3,986.40
$1,291.16
47.9%
266
2-1/4" to 4" Service
265,000
$1,382.70
$1,756.95
$374.25
27.1%
$1,320.05
$2,244.55
$924.50
70.0%
$2,702.75
$4,001.50
$1,298.75
48.1%
267
2-1/4" to 4" Service
266,000
$1,387.68
$1,763.58
$375.90
27.1 %
$1,322.58
$2,253.02
$930.44
70.4 %
$2,710.26
$4,016.60
$1,306.34
48.2
268
2-1/4" to 4" Service
267,000
$1,392.66
$1,770.21
$377.55
27.1 %
$1,325.11
$2,261.49
$936.38
70.7 %
$2,717.77
$4,031.70
$1,313.93
48.3
269
2-1/4" to 4" Service
268,000
$1,397.64
$1,776.84
$379.20
27.1 %
$1,327.64
$2,269.96
$942.32
71.0 %
$2,725.28
$4,046.80
$1,321.52
48.5
270
2-1/4" to 4" Service
269,000
$1,402.62
$1,783.47
$380.85
27.2%
$1,330.17
$2,278.43
$948.26
71.3%
$2,732.79
$4,061.90
$1,329.11
48.6%
20
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
271
2-1/4" to 4" Service
270,000
$1,407.60
$1,790.10
$382.50
27.2%
$1,332.70
$2,286.90
$954.20
71.6%
$2,740.30
$4,077.00
$1,336.70
48.8%
272
2-1/4" to 4" Service
271,000
$1,412.58
$1,796.73
$384.15
27.2%
$1,335.23
$2,295.37
$960.14
71.9%
$2,747.81
$4,092.10
$1,344.29
48.9%
273
2-1/4" to 4" Service
272,000
$1,417.56
$1,803.36
$385.80
27.2%
$1,337.76
$2,303.84
$966.08
72.2%
$2,755.32
$4,107.20
$1,351.88
49.1%
274
2-1/4" to 4" Service
273,000
$1,422.54
$1,809.99
$387.45
27.2%
$1,340.29
$2,312.31
$972.02
72.5%
$2,762.83
$4,122.30
$1,359.47
49.2%
275
2-1/4" to 4" Service
274,000
$1,427.52
$1,816.62
$389.10
27.3%
$1,342.82
$2,320.78
$977.96
72.8%
$2,770.34
$4,137.40
$1,367.06
49.3%
276
2-1/4" to 4" Service
275,000
$1,432.50
$1,823.25
$390.75
27.3%
$1,345.35
$2,329.25
$983.90
73.1%
$2,777.85
$4,152.50
$1,374.65
49.5%
277
2-1/4" to 4" Service
276,000
$1,437.48
$1,829.88
$392.40
27.3%
$1,347.88
$2,337.72
$989.84
73.4%
$2,785.36
$4,167.60
$1,382.24
49.6%
278
2-1/4" to 4" Service
277,000
$1,442.46
$1,836.51
$394.05
27.3%
$1,350.41
$2,346.19
$995.78
73.7%
$2,792.87
$4,182.70
$1,389.83
49.8%
279
2-1/4" to 4" Service
278,000
$1,447.44
$1,843.14
$395.70
27.3%
$1,352.94
$2,354.66
$1,001.72
74.0%
$2,800.38
$4,197.80
$1,397.42
49.9%
280
2-1/4" to 4" Service
279,000
$1,452.42
$1,849.77
$397.35
27.4%
$1,355.47
$2,363.13
$1,007.66
74.3%
$2,807.89
$4,212.90
$1,405.01
50.0%
281
2-1/4" to 4" Service
280,000
$1,457.40
$1,856.40
$399.00
27.4%
$1,358.00
$2,371.60
$1,013.60
74.6%
$2,815.40
$4,228.00
$1,412.60
50.2%
282
2-1/4" to 4" Service
281,000
$1,462.38
$1,863.03
$400.65
27.4%
$1,360.53
$2,380.07
$1,019.54
74.9%
$2,822.91
$4,243.10
$1,420.19
50.3%
283
2-1/4" to 4" Service
282,000
$1,467.36
$1,869.66
$402.30
27.4%
$1,363.06
$2,388.54
$1,025.48
75.2%
$2,830.42
$4,258.20
$1,427.78
50.4%
284
2-1/4" to 4" Service
283,000
$1,472.34
$1,876.29
$403.95
27.4%
$1,365.59
$2,397.01
$1,031.42
75.5%
$2,837.93
$4,273.30
$1,435.37
50.6%
285
2-1/4" to 4" Service
284,000
$1,477.32
$1,882.92
$405.60
27.5%
$1,368.12
$2,405.48
$1,037.36
75.8%
$2,845.44
$4,288.40
$1,442.96
50.7%
286
2-1/4" to 4" Service
285,000
$1,482.30
$1,889.55
$407.25
27.5%
$1,370.65
$2,413.95
$1,043.30
76.1 %
$2,852.95
$4,303.50
$1,450.55
50.8
287
2-1/4" to 4" Service
286,000
$1,487.28
$1,896.18
$408.90
27.5%
$1,373.18
$2,422.42
$1,049.24
76.4%
$2,860.46
$4,318.60
$1,458.14
51.0%
288
2-1/4" to 4" Service
287,000
$1,492.26
$1,902.81
$410.55
27.5%
$1,375.71
$2,430.89
$1,055.18
76.7%
$2,867.97
$4,333.70
$1,465.73
51.1%
289
2-1/4" to 4" Service
288,000
$1,497.24
$1,909.44
$412.20
27.5%
$1,378.24
$2,439.36
$1,061.12
77.0%
$2,875.48
$4,348.80
$1,473.32
51.2%
290
2-1/4" to 4" Service
289,000
$1,502.22
$1,916.07
$413.85
27.5%
$1,380.77
$2,447.83
$1,067.06
77.3%
$2,882.99
$4,363.90
$1,480.91
51.4%
291
2-1/4" to 4" Service
290,000
$1,507.20
$1,922.70
$415.50
27.6%
$1,383.30
$2,456.30
$1,073.00
77.6%
$2,890.50
$4,379.00
$1,488.50
51.5%
292
2-1/4" to 4" Service
291,000
$1,512.18
$1,929.33
$417.15
27.6%
$1,385.83
$2,464.77
$1,078.94
77.9%
$2,898.01
$4,394.10
$1,496.09
51.6%
293
2-1/4" to 4" Service
292,000
$1,517.16
$1,935.96
$418.80
27.6%
$1,388.36
$2,473.24
$1,084.88
78.1 %
$2,905.52
$4,409.20
$1,503.68
51.8
294
2-1/4" to 4" Service
293,000
$1,522.14
$1,942.59
$420.45
27.6%
$1,390.89
$2,481.71
$1,090.82
78.4%
$2,913.03
$4,424.30
$1,511.27
51.9%
295
2-1/4" to 4" Service
294,000
$1,527.12
$1,949.22
$422.10
27.6%
$1,393.42
$2,490.18
$1,096.76
78.7%
$2,920.54
$4,439.40
$1,518.86
52.0%
296
2-1/4" to 4" Service
295,000
$1,532.10
$1,955.85
$423.75
27.7%
$1,395.95
$2,498.65
$1,102.70
79.0%
$2,928.05
$4,454.50
$1,526.45
52.1%
297
2-1/4" to 4" Service
296,000
$1,537.08
$1,962.48
$425.40
27.7%
$1,398.48
$2,507.12
$1,108.64
79.3%
$2,935.56
$4,469.60
$1,534.04
52.3%
298
2-1/4" to 4" Service
297,000
$1,542.06
$1,969.11
$427.05
27.7%
$1,401.01
$2,515.59
$1,114.58
79.6%
$2,943.07
$4,484.70
$1,541.63
52.4%
299
2-1/4" to 4" Service
298,000
$1,547.04
$1,975.74
$428.70
27.7%
$1,403.54
$2,524.06
$1,120.52
79.8%
$2,950.58
$4,499.80
$1,549.22
52.5%
300
2-1/4" to 4" Service
299,000
$1,552.02
$1,982.37
$430.35
27.7%
$1,406.07
$2,532.53
$1,126.46
80.1%
$2,958.09
$4,514.90
$1,556.81
52.6%
301
2-1/4" to 4" Service
300,000
$1,557.00
$1,989.00
$432.00
27.7%
$1,408.60
$2,541.00
$1,132.40
80.4%
$2,965.60
$4,530.00
$1,564.40
52.8%
302
2-1/4" to 4" Service
301,000
$1,561.98
$1,995.63
$433.65
27.8%
$1,411.13
$2,549.47
$1,138.34
80.7%
$2,973.11
$4,545.10
$1,571.99
52.9%
303
2-1/4" to 4" Service
302,000
$1,566.96
$2,002.26
$435.30
27.8%
$1,413.66
$2,557.94
$1,144.28
80.9%
$2,980.62
$4,560.20
$1,579.58
53.0%
304
2-1/4" to 4" Service
303,000
$1,571.94
$2,008.89
$436.95
27.8%
$1,416.19
$2,566.41
$1,150.22
81.2%
$2,988.13
$4,575.30
$1,587.17
53.1%
305
2-1/4" to 4" Service
304,000
$1,576.92
$2,015.52
$438.60
27.8%
$1,418.72
$2,574.88
$1,156.16
81.5%
$2,995.64
$4,590.40
$1,594.76
53.2%
306
2-1/4" to 4" Service
305,000
$1,581.90
$2,022.15
$440.25
27.8%
$1,421.25
$2,583.35
$1,162.10
81.8%
$3,003.15
$4,605.50
$1,602.35
53.4%
307
2-1/4" to 4" Service
306,000
$1,586.88
$2,028.78
$441.90
27.8%
$1,423.78
$2,591.82
$1,168.04
82.0%
$3,010.66
$4,620.60
$1,609.94
53.5%
308
2-1/4" to 4" Service
307,000
$1,591.86
$2,035.41
$443.55
27.9%
$1,426.31
$2,600.29
$1,173.98
82.3%
$3,018.17
$4,635.70
$1,617.53
53.6%
309
2-1/4" to 4" Service
308,000
$1,596.84
$2,042.04
$445.20
27.9%
$1,428.84
$2,608.76
$1,179.92
82.6%
$3,025.68
$4,650.80
$1,625.12
53.7%
310
2-1/4" to 4" Service
309,000
$1,601.82
$2,048.67
$446.85
27.9%
$1,431.37
$2,617.23
$1,185.86
82.8%
$3,033.19
$4,665.90
$1,632.71
53.8%
311
2-1/4" to 4" Service
310,000
$1,606.80
$2,055.30
$448.50
27.9%
$1,433.90
$2,625.70
$1,191.80
83.1%
$3,040.70
$4,681.00
$1,640.30
53.9%
312
2-1/4" to 4" Service
311,000
$1,611.78
$2,061.93
$450.15
27.9%
$1,436.43
$2,634.17
$1,197.74
83.4%
$3,048.21
$4,696.10
$1,647.89
54.1%
313
2-1/4" to 4" Service
312,000
$1,616.76
$2,068.56
$451.80
27.9%
$1,438.96
$2,642.64
$1,203.68
83.6%
$3,055.72
$4,711.20
$1,655.48
54.2%
314
2-1/4" to 4" Service
313,000
$1,621.74
$2,075.19
$453.45
28.0%
$1,441.49
$2,651.11
$1,209.62
83.9%
$3,063.23
$4,726.30
$1,663.07
54.3%
315
2-1/4" to 4" Service
314,000
$1,626.72
$2,081.82
$455.10
28.0%
$1,444.02
$2,659.58
$1,215.56
84.2%
$3,070.74
$4,741.40
$1,670.66
54.4%
21
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
316
2-1/4" to 4" Service
315,000
$1,631.70
$2,088.45
$456.75
28.0%
$1,446.55
$2,668.05
$1,221.50
84.4%
$3,078.25
$4,756.50
$1,678.25
54.5%
317
2-1/4" to 4" Service
316,000
$1,636.68
$2,095.08
$458.40
28.0%
$1,449.08
$2,676.52
$1,227.44
84.7%
$3,085.76
$4,771.60
$1,685.84
54.6%
318
2-1/4" to 4" Service
317,000
$1,641.66
$2,101.71
$460.05
28.0%
$1,451.61
$2,684.99
$1,233.38
85.0%
$3,093.27
$4,786.70
$1,693.43
54.7%
319
2-1/4" to 4" Service
318,000
$1,646.64
$2,108.34
$461.70
28.0%
$1,454.14
$2,693.46
$1,239.32
85.2%
$3,100.78
$4,801.80
$1,701.02
54.9%
320
2-1/4" to 4" Service
319,000
$1,651.62
$2,114.97
$463.35
28.1%
$1,456.67
$2,701.93
$1,245.26
85.5%
$3,108.29
$4,816.90
$1,708.61
55.0%
321
2-1/4" to 4" Service
320,000
$1,656.60
$2,121.60
$465.00
28.1%
$1,459.20
$2,710.40
$1,251.20
85.7%
$3,115.80
$4,832.00
$1,716.20
55.1%
322
2-1/4" to 4" Service
321,000
$1,661.58
$2,128.23
$466.65
28.1%
$1,461.73
$2,718.87
$1,257.14
86.0%
$3,123.31
$4,847.10
$1,723.79
55.2%
323
2-1/4" to 4" Service
322,000
$1,666.56
$2,134.86
$468.30
28.1%
$1,464.26
$2,727.34
$1,263.08
86.3%
$3,130.82
$4,862.20
$1,731.38
55.3%
324
2-1/4" to 4" Service
323,000
$1,671.54
$2,141.49
$469.95
28.1%
$1,466.79
$2,735.81
$1,269.02
86.5%
$3,138.33
$4,877.30
$1,738.97
55.4%
325
2-1/4" to 4" Service
324,000
$1,676.52
$2,148.12
$471.60
28.1%
$1,469.32
$2,744.28
$1,274.96
86.8%
$3,145.84
$4,892.40
$1,746.56
55.5%
326
2-1/4" to 4" Service
325,000
$1,681.50
$2,154.75
$473.25
28.1%
$1,471.85
$2,752.75
$1,280.90
87.0%
$3,153.35
$4,907.50
$1,754.15
55.6%
327
2-1/4" to 4" Service
326,000
$1,686.48
$2,161.38
$474.90
28.2%
$1,474.38
$2,761.22
$1,286.84
87.3%
$3,160.86
$4,922.60
$1,761.74
55.7%
328
2-1/4" to 4" Service
327,000
$1,691.46
$2,168.01
$476.55
28.2%
$1,476.91
$2,769.69
$1,292.78
87.5%
$3,168.37
$4,937.70
$1,769.33
55.8%
329
2-1/4" to 4" Service
328,000
$1,696.44
$2,174.64
$478.20
28.2%
$1,479.44
$2,778.16
$1,298.72
87.8%
$3,175.88
$4,952.80
$1,776.92
56.0%
330
2-1/4" to 4" Service
329,000
$1,701.42
$2,181.27
$479.85
28.2%
$1,481.97
$2,786.63
$1,304.66
88.0%
$3,183.39
$4,967.90
$1,784.51
56.1%
331
2-1/4" to 4" Service
330,000
$1,706.40
$2,187.90
$481.50
28.2%
$1,484.50
$2,795.10
$1,310.60
88.3%
$3,190.90
$4,983.00
$1,792.10
56.2%
332
2-1/4" to 4" Service
331,000
$1,711.38
$2,194.53
$483.15
28.2%
$1,487.03
$2,803.57
$1,316.54
88.5%
$3,198.41
$4,998.10
$1,799.69
56.3%
333
2-1/4" to 4" Service
332,000
$1,716.36
$2,201.16
$484.80
28.2%
$1,489.56
$2,812.04
$1,322.48
88.8%
$3,205.92
$5,013.20
$1,807.28
56.4%
334
2-1/4" to 4" Service
333,000
$1,721.34
$2,207.79
$486.45
28.3%
$1,492.09
$2,820.51
$1,328.42
89.0%
$3,213.43
$5,028.30
$1,814.87
56.5%
335
2-1/4" to 4" Service
334,000
$1,726.32
$2,214.42
$488.10
28.3%
$1,494.62
$2,828.98
$1,334.36
89.3%
$3,220.94
$5,043.40
$1,822.46
56.6%
336
2-1/4" to 4" Service
335,000
$1,731.30
$2,221.05
$489.75
28.3%
$1,497.15
$2,837.45
$1,340.30
89.5%
$3,228.45
$5,058.50
$1,830.05
56.7%
337
2-1/4" to 4" Service
336,000
$1,736.28
$2,227.68
$491.40
28.3%
$1,499.68
$2,845.92
$1,346.24
89.8%
$3,235.96
$5,073.60
$1,837.64
56.8%
338
2-1/4" to 4" Service
337,000
$1,741.26
$2,234.31
$493.05
28.3%
$1,502.21
$2,854.39
$1,352.18
90.0%
$3,243.47
$5,088.70
$1,845.23
56.9%
339
2-1/4" to 4" Service
338,000
$1,746.24
$2,240.94
$494.70
28.3%
$1,504.74
$2,862.86
$1,358.12
90.3%
$3,250.98
$5,103.80
$1,852.82
57.0%
340
2-1/4" to 4" Service
339,000
$1,751.22
$2,247.57
$496.35
28.3%
$1,507.27
$2,871.33
$1,364.06
90.5%
$3,258.49
$5,118.90
$1,860.41
57.1%
341
2-1/4" to 4" Service
340,000
$1,756.20
$2,254.20
$498.00
28.4%
$1,509.80
$2,879.80
$1,370.00
90.7%
$3,266.00
$5,134.00
$1,868.00
57.2%
342
2-1/4" to 4" Service
341,000
$1,761.18
$2,260.83
$499.65
28.4%
$1,512.33
$2,888.27
$1,375.94
91.0%
$3,273.51
$5,149.10
$1,875.59
57.3%
343
2-1/4" to 4" Service
342,000
$1,766.16
$2,267.46
$501.30
28.4%
$1,514.86
$2,896.74
$1,381.88
91.2%
$3,281.02
$5,164.20
$1,883.18
57.4%
344
2-1/4" to 4" Service
343,000
$1,771.14
$2,274.09
$502.95
28.4%
$1,517.39
$2,905.21
$1,387.82
91.5%
$3,288.53
$5,179.30
$1,890.77
57.5%
345
2-1/4" to 4" Service
344,000
$1,776.12
$2,280.72
$504.60
28.4%
$1,519.92
$2,913.68
$1,393.76
91.7%
$3,296.04
$5,194.40
$1,898.36
57.6%
346
2-1/4" to 4" Service
345,000
$1,781.10
$2,287.35
$506.25
28.4%
$1,522.45
$2,922.15
$1,399.70
91.9%
$3,303.55
$5,209.50
$1,905.95
57.7%
347
2-1/4" to 4" Service
346,000
$1,786.08
$2,293.98
$507.90
28.4%
$1,524.98
$2,930.62
$1,405.64
92.2%
$3,311.06
$5,224.60
$1,913.54
57.8%
348
2-1/4" to 4" Service
347,000
$1,791.06
$2,300.61
$509.55
28.4%
$1,527.51
$2,939.09
$1,411.58
92.4%
$3,318.57
$5,239.70
$1,921.13
57.9%
349
2-1/4" to 4" Service
348,000
$1,796.04
$2,307.24
$511.20
28.5%
$1,530.04
$2,947.56
$1,417.52
92.6%
$3,326.08
$5,254.80
$1,928.72
58.0%
350
2-1/4" to 4" Service
349,000
$1,801.02
$2,313.87
$512.85
28.5%
$1,532.57
$2,956.03
$1,423.46
92.9%
$3,333.59
$5,269.90
$1,936.31
58.1%
351
2-1/4" to 4" Service
350,000
$1,806.00
$2,320.50
$514.50
28.5%
$1,535.10
$2,964.50
$1,429.40
93.1 %
$3,341.10
$5,285.00
$1,943.90
58.2
352
2-1/4" to 4" Service
351,000
$1,810.98
$2,327.13
$516.15
28.5%
$1,537.63
$2,972.97
$1,435.34
93.3%
$3,348.61
$5,300.10
$1,951.49
58.3%
353
2-1/4" to 4" Service
352,000
$1,815.96
$2,333.76
$517.80
28.5%
$1,540.16
$2,981.44
$1,441.28
93.6%
$3,356.12
$5,315.20
$1,959.08
58.4%
354
2-1/4" to 4" Service
353,000
$1,820.94
$2,340.39
$519.45
28.5%
$1,542.69
$2,989.91
$1,447.22
93.8%
$3,363.63
$5,330.30
$1,966.67
58.5%
355
2-1/4" to 4" Service
354,000
$1,825.92
$2,347.02
$521.10
28.5%
$1,545.22
$2,998.38
$1,453.16
94.0%
$3,371.14
$5,345.40
$1,974.26
58.6%
356
2-1/4" to 4" Service
355,000
$1,830.90
$2,353.65
$522.75
28.6%
$1,547.75
$3,006.85
$1,459.10
94.3%
$3,378.65
$5,360.50
$1,981.85
58.7%
357
2-1/4" to 4" Service
356,000
$1,835.88
$2,360.28
$524.40
28.6%
$1,550.28
$3,015.32
$1,465.04
94.5%
$3,386.16
$5,375.60
$1,989.44
58.8%
358
2-1/4" to 4" Service
357,000
$1,840.86
$2,366.91
$526.05
28.6%
$1,552.81
$3,023.79
$1,470.98
94.7%
$3,393.67
$5,390.70
$1,997.03
58.8%
359
2-1/4" to 4" Service
358,000
$1,845.84
$2,373.54
$527.70
28.6%
$1,555.34
$3,032.26
$1,476.92
95.0%
$3,401.18
$5,405.80
$2,004.62
58.9%
360
2-1/4" to 4" Service
359,000
$1,850.82
$2,380.17
$529.35
28.6%
$1,557.87
$3,040.73
$1,482.86
95.2%
$3,408.69
$5,420.90
$2,012.21
59.0%
22
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
361
2-1/4" to 4" Service
360,000
$1,855.80
$2,386.80
$531.00
28.6%
$1,560.40
$3,049.20
$1,488.80
95.4%
$3,416.20
$5,436.00
$2,019.80
59.1%
362
2-1/4" to 4" Service
361,000
$1,860.78
$2,393.43
$532.65
28.6%
$1,562.93
$3,057.67
$1,494.74
95.6%
$3,423.71
$5,451.10
$2,027.39
59.2%
363
2-1/4" to 4" Service
362,000
$1,865.76
$2,400.06
$534.30
28.6%
$1,565.46
$3,066.14
$1,500.68
95.9%
$3,431.22
$5,466.20
$2,034.98
59.3%
364
2-1/4" to 4" Service
363,000
$1,870.74
$2,406.69
$535.95
28.6%
$1,567.99
$3,074.61
$1,506.62
96.1 %
$3,438.73
$5,481.30
$2,042.57
59.4
365
2-1/4" to 4" Service
364,000
$1,875.72
$2,413.32
$537.60
28.7%
$1,570.52
$3,083.08
$1,512.56
96.3%
$3,446.24
$5,496.40
$2,050.16
59.5%
366
2-1/4" to 4" Service
365,000
$1,880.70
$2,419.95
$539.25
28.7%
$1,573.05
$3,091.55
$1,518.50
96.5%
$3,453.75
$5,511.50
$2,057.75
59.6%
367
2-1/4" to 4" Service
366,000
$1,885.68
$2,426.58
$540.90
28.7%
$1,575.58
$3,100.02
$1,524.44
96.8%
$3,461.26
$5,526.60
$2,065.34
59.7%
368
2-1/4" to 4" Service
367,000
$1,890.66
$2,433.21
$542.55
28.7%
$1,578.11
$3,108.49
$1,530.38
97.0%
$3,468.77
$5,541.70
$2,072.93
59.8%
369
2-1/4" to 4" Service
368,000
$1,895.64
$2,439.84
$544.20
28.7%
$1,580.64
$3,116.96
$1,536.32
97.2%
$3,476.28
$5,556.80
$2,080.52
59.8%
370
2-1/4" to 4" Service
369,000
$1,900.62
$2,446.47
$545.85
28.7%
$1,583.17
$3,125.43
$1,542.26
97.4%
$3,483.79
$5,571.90
$2,088.11
59.9%
371
2-1/4" to 4" Service
370,000
$1,905.60
$2,453.10
$547.50
28.7%
$1,585.70
$3,133.90
$1,548.20
97.6%
$3,491.30
$5,587.00
$2,095.70
60.0%
372
2-1/4" to 4" Service
371,000
$1,910.58
$2,459.73
$549.15
28.7%
$1,588.23
$3,142.37
$1,554.14
97.9%
$3,498.81
$5,602.10
$2,103.29
60.1%
373
2-1/4" to 4" Service
372,000
$1,915.56
$2,466.36
$550.80
28.8%
$1,590.76
$3,150.84
$1,560.08
98.1%
$3,506.32
$5,617.20
$2,110.88
60.2%
374
2-1/4" to 4" Service
373,000
$1,920.54
$2,472.99
$552.45
28.8%
$1,593.29
$3,159.31
$1,566.02
98.3%
$3,513.83
$5,632.30
$2,118.47
60.3%
375
2-1/4" to 4" Service
374,000
$1,925.52
$2,479.62
$554.10
28.8%
$1,595.82
$3,167.78
$1,571.96
98.5%
$3,521.34
$5,647.40
$2,126.06
60.4%
376
2-1/4" to 4" Service
375,000
$1,930.50
$2,486.25
$555.75
28.8%
$1,598.35
$3,176.25
$1,577.90
98.7%
$3,528.85
$5,662.50
$2,133.65
60.5%
377
2-1/4" to 4" Service
376,000
$1,935.48
$2,492.88
$557.40
28.8%
$1,600.88
$3,184.72
$1,583.84
98.9%
$3,536.36
$5,677.60
$2,141.24
60.5%
378
2-1/4" to 4" Service
377,000
$1,940.46
$2,499.51
$559.05
28.8%
$1,603.41
$3,193.19
$1,589.78
99.1%
$3,543.87
$5,692.70
$2,148.83
60.6%
379
2-1/4" to 4" Service
378,000
$1,945.44
$2,506.14
$560.70
28.8%
$1,605.94
$3,201.66
$1,595.72
99.4%
$3,551.38
$5,707.80
$2,156.42
60.7%
380
2-1/4" to 4" Service
379,000
$1,950.42
$2,512.77
$562.35
28.8%
$1,608.47
$3,210.13
$1,601.66
99.6%
$3,558.89
$5,722.90
$2,164.01
60.8%
381
2-1/4" to 4" Service
380,000
$1,955.40
$2,519.40
$564.00
28.8%
$1,611.00
$3,218.60
$1,607.60
99.8%
$3,566.40
$5,738.00
$2,171.60
60.9%
382
2-1/4" to 4" Service
381,000
$1,960.38
$2,526.03
$565.65
28.9%
$1,613.53
$3,227.07
$1,613.54
100.0%
$3,573.91
$5,753.10
$2,179.19
61.0%
383
2-1/4" to 4" Service
382,000
$1,965.36
$2,532.66
$567.30
28.9%
$1,616.06
$3,235.54
$1,619.48
100.2%
$3,581.42
$5,768.20
$2,186.78
61.1%
384
2-1/4" to 4" Service
383,000
$1,970.34
$2,539.29
$568.95
28.9%
$1,618.59
$3,244.01
$1,625.42
100.4%
$3,588.93
$5,783.30
$2,194.37
61.1%
385
2-1/4" to 4" Service
384,000
$1,975.32
$2,545.92
$570.60
28.9%
$1,621.12
$3,252.48
$1,631.36
100.6%
$3,596.44
$5,798.40
$2,201.96
61.2%
386
2-1/4" to 4" Service
385,000
$1,980.30
$2,552.55
$572.25
28.9%
$1,623.65
$3,260.95
$1,637.30
100.8%
$3,603.95
$5,813.50
$2,209.55
61.3%
387
2-1/4" to 4" Service
386,000
$1,985.28
$2,559.18
$573.90
28.9%
$1,626.18
$3,269.42
$1,643.24
101.0%
$3,611.46
$5,828.60
$2,217.14
61.4%
388
2-1/4" to 4" Service
387,000
$1,990.26
$2,565.81
$575.55
28.9%
$1,628.71
$3,277.89
$1,649.18
101.3%
$3,618.97
$5,843.70
$2,224.73
61.5%
389
2-1/4" to 4" Service
388,000
$1,995.24
$2,572.44
$577.20
28.9%
$1,631.24
$3,286.36
$1,655.12
101.5%
$3,626.48
$5,858.80
$2,232.32
61.6%
390
2-1/4" to 4" Service
389,000
$2,000.22
$2,579.07
$578.85
28.9%
$1,633.77
$3,294.83
$1,661.06
101.7%
$3,633.99
$5,873.90
$2,239.91
61.6%
391
2-1/4" to 4" Service
390,000
$2,005.20
$2,585.70
$580.50
28.9%
$1,636.30
$3,303.30
$1,667.00
101.9%
$3,641.50
$5,889.00
$2,247.50
61.7%
392
2-1/4" to 4" Service
391,000
$2,010.18
$2,592.33
$582.15
29.0%
$1,638.83
$3,311.77
$1,672.94
102.1 %
$3,649.01
$5,904.10
$2,255.09
61.8
393
2-1/4" to 4" Service
392,000
$2,015.16
$2,598.96
$583.80
29.0%
$1,641.36
$3,320.24
$1,678.88
102.3%
$3,656.52
$5,919.20
$2,262.68
61.9%
394
2-1/4" to 4" Service
393,000
$2,020.14
$2,605.59
$585.45
29.0%
$1,643.89
$3,328.71
$1,684.82
102.5%
$3,664.03
$5,934.30
$2,270.27
62.0%
395
2-1/4" to 4" Service
394,000
$2,025.12
$2,612.22
$587.10
29.0%
$1,646.42
$3,337.18
$1,690.76
102.7 %
$3,671.54
$5,949.40
$2,277.86
62.0
396
2-1/4" to 4" Service
395,000
$2,030.10
$2,618.85
$588.75
29.0%
$1,648.95
$3,345.65
$1,696.70
102.9%
$3,679.05
$5,964.50
$2,285.45
62.1%
397
2-1/4" to 4" Service
396,000
$2,035.08
$2,625.48
$590.40
29.0%
$1,651.48
$3,354.12
$1,702.64
103.1 %
$3,686.56
$5,979.60
$2,293.04
62.2
398
2-1/4" to 4" Service
397,000
$2,040.06
$2,632.11
$592.05
29.0%
$1,654.01
$3,362.59
$1,708.58
103.3%
$3,694.07
$5,994.70
$2,300.63
62.3%
399
2-1/4" to 4" Service
398,000
$2,045.04
$2,638.74
$593.70
29.0%
$1,656.54
$3,371.06
$1,714.52
103.5%
$3,701.58
$6,009.80
$2,308.22
62.4%
400
2-1/4" to 4" Service
399,000
$2,050.02
$2,645.37
$595.35
29.0%
$1,659.07
$3,379.53
$1,720.46
103.7%
$3,709.09
$6,024.90
$2,315.81
62.4%
401
2-1/4" to 4" Service
400,000
$2,055.00
$2,652.00
$597.00
29.1 %
$1,661.60
$3,388.00
$1,726.40
103.9 %
$3,716.60
$6,040.00
$2,323.40
62.5
23
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
1
Over 4" Service
0
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
2
Over 4" Service
1,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
3
Over 4" Service
2,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
4
Over 4" Service
3,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
5
Over 4" Service
4,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
6
Over 4" Service
5,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
7
Over 4" Service
6,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
8
Over 4" Service
7,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
9
Over 4" Service
8,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
10
Over 4" Service
9,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
11
Over 4" Service
10,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
12
Over 4" Service
11,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
13
Over 4" Service
12,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
14
Over 4" Service
13,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
15
Over 4" Service
14,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
16
Over 4" Service
15,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
17
Over 4" Service
16,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
18
Over 4" Service
17,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
19
Over 4" Service
18,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
20
Over 4" Service
19,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
21
Over 4" Service
20,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
22
Over 4" Service
21,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
23
Over 4" Service
22,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
24
Over 4" Service
23,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
25
Over 4" Service
24,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
26
Over 4" Service
25,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
27
Over 4" Service
26,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
28
Over 4" Service
27,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
29
Over 4" Service
28,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
30
Over 4" Service
29,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
31
Over 4" Service
30,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
32
Over 4" Service
31,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
33
Over 4" Service
32,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
34
Over 4" Service
33,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
35
Over 4" Service
34,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
36
Over 4" Service
35,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
37
Over 4" Service
36,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
24
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
38
Over 4" Service
37,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
39
Over 4" Service
38,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
40
Over 4" Service
39,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
41
Over 4" Service
40,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
42
Over 4" Service
41,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
43
Over 4" Service
42,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
44
Over 4" Service
43,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
45
Over 4" Service
44,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
46
Over 4" Service
45,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
47
Over 4" Service
46,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
48
Over 4" Service
47,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
49
Over 4" Service
48,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
50
Over 4" Service
49,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
51
Over 4" Service
50,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
52
Over 4" Service
51,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
53
Over 4" Service
52,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
54
Over 4" Service
53,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
55
Over 4" Service
54,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
56
Over 4" Service
55,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
57
Over 4" Service
56,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
58
Over 4" Service
57,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
59
Over 4" Service
58,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
60
Over 4" Service
59,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
61
Over 4" Service
60,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
62
Over 4" Service
61,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
63
Over 4" Service
62,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
64
Over 4" Service
63,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
65
Over 4" Service
64,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
66
Over 4" Service
65,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
67
Over 4" Service
66,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
68
Over 4" Service
67,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
69
Over 4" Service
68,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
70
Over 4" Service
69,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
71
Over 4" Service
70,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
72
Over 4" Service
71,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
73
Over 4" Service
72,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
74
Over 4" Service
73,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
25
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
75
Over 4" Service
74,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
76
Over 4" Service
75,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
77
Over 4" Service
76,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
78
Over 4" Service
77,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
79
Over 4" Service
78,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
80
Over 4" Service
79,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
81
Over 4" Service
80,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
82
Over 4" Service
81,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
83
Over 4" Service
82,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
84
Over 4" Service
83,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
85
Over 4" Service
84,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
86
Over 4" Service
85,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
87
Over 4" Service
86,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
88
Over 4" Service
87,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
89
Over 4" Service
88,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
90
Over 4" Service
89,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
91
Over 4" Service
90,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
92
Over 4" Service
91,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
93
Over 4" Service
92,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
94
Over 4" Service
93,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
95
Over 4" Service
94,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
96
Over 4" Service
95,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
97
Over 4" Service
96,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
98
Over 4" Service
97,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
99
Over 4" Service
98,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
100
Over 4" Service
99,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
101
Over 4" Service
100,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
102
Over 4" Service
101,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
103
Over 4" Service
102,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
104
Over 4" Service
103,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
105
Over 4" Service
104,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
106
Over 4" Service
105,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
107
Over 4" Service
106,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
108
Over 4" Service
107,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
109
Over 4" Service
108,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
110
Over 4" Service
109,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
111
Over 4" Service
110,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
26
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
112
Over 4" Service
111,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
113
Over 4" Service
112,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
114
Over 4" Service
113,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
115
Over 4" Service
114,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
116
Over 4" Service
115,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
117
Over 4" Service
116,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
118
Over 4" Service
117,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
119
Over 4" Service
118,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
120
Over 4" Service
119,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
121
Over 4" Service
120,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
122
Over 4" Service
121,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
123
Over 4" Service
122,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
124
Over 4" Service
123,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
125
Over 4" Service
124,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
126
Over 4" Service
125,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
127
Over 4" Service
126,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
128
Over 4" Service
127,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
129
Over 4" Service
128,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
130
Over 4" Service
129,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
131
Over 4" Service
130,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
132
Over 4" Service
131,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
133
Over 4" Service
132,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
134
Over 4" Service
133,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
135
Over 4" Service
134,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
136
Over 4" Service
135,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
137
Over 4" Service
136,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
138
Over 4" Service
137,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
139
Over 4" Service
138,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
140
Over 4" Service
139,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
141
Over 4" Service
140,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
142
Over 4" Service
141,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
143
Over 4" Service
142,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
144
Over 4" Service
143,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,214.88
$0.00
0.0%
$2,458.16
$2,458.16
$0.00
0.0%
145
Over 4" Service
144,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,219.68
$4.80
0.4%
$2,458.16
$2,462.96
$4.80
0.2%
146
Over 4" Service
145,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,228.15
$13.27
1.1%
$2,458.16
$2,471.43
$13.27
0.5%
147
Over 4" Service
146,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,236.62
$21.74
1.8%
$2,458.16
$2,479.90
$21.74
0.9%
148
Over 4" Service
147,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,245.09
$30.21
2.5%
$2,458.16
$2,488.37
$30.21
1.2%
27
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
149
Over 4" Service
148,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,253.56
$38.68
3.2%
$2,458.16
$2,496.84
$38.68
1.6%
150
Over 4" Service
149,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,262.03
$47.15
3.9%
$2,458.16
$2,505.31
$47.15
1.9%
151
Over 4" Service
150,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,270.50
$55.62
4.6%
$2,458.16
$2,513.78
$55.62
2.3%
152
Over 4" Service
151,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,278.97
$64.09
5.3%
$2,458.16
$2,522.25
$64.09
2.6%
153
Over 4" Service
152,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,287.44
$72.56
6.0%
$2,458.16
$2,530.72
$72.56
3.0%
154
Over 4" Service
153,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,295.91
$81.03
6.7%
$2,458.16
$2,539.19
$81.03
3.3%
155
Over 4" Service
154,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,304.38
$89.50
7.4%
$2,458.16
$2,547.66
$89.50
3.6%
156
Over 4" Service
155,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,312.85
$97.97
8.1%
$2,458.16
$2,556.13
$97.97
4.0%
157
Over 4" Service
156,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,321.32
$106.44
8.8%
$2,458.16
$2,564.60
$106.44
4.3%
158
Over 4" Service
157,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,329.79
$114.91
9.5%
$2,458.16
$2,573.07
$114.91
4.7%
159
Over 4" Service
158,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,338.26
$123.38
10.2%
$2,458.16
$2,581.54
$123.38
5.0%
160
Over 4" Service
159,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,346.73
$131.85
10.9%
$2,458.16
$2,590.01
$131.85
5.4%
161
Over 4" Service
160,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,355.20
$140.32
11.6%
$2,458.16
$2,598.48
$140.32
5.7%
162
Over 4" Service
161,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,363.67
$148.79
12.2%
$2,458.16
$2,606.95
$148.79
6.1%
163
Over 4" Service
162,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,372.14
$157.26
12.9%
$2,458.16
$2,615.42
$157.26
6.4%
164
Over 4" Service
163,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,380.61
$165.73
13.6%
$2,458.16
$2,623.89
$165.73
6.7%
165
Over 4" Service
164,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,389.08
$174.20
14.3%
$2,458.16
$2,632.36
$174.20
7.1%
166
Over 4" Service
165,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,397.55
$182.67
15.0%
$2,458.16
$2,640.83
$182.67
7.4%
167
Over 4" Service
166,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,406.02
$191.14
15.7%
$2,458.16
$2,649.30
$191.14
7.8%
168
Over 4" Service
167,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,414.49
$199.61
16.4%
$2,458.16
$2,657.77
$199.61
8.1%
169
Over 4" Service
168,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,422.96
$208.08
17.1%
$2,458.16
$2,666.24
$208.08
8.5%
170
Over 4" Service
169,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,431.43
$216.55
17.8%
$2,458.16
$2,674.71
$216.55
8.8%
171
Over 4" Service
170,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,439.90
$225.02
18.5%
$2,458.16
$2,683.18
$225.02
9.2%
172
Over 4" Service
171,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,448.37
$233.49
19.2%
$2,458.16
$2,691.65
$233.49
9.5%
173
Over 4" Service
172,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,456.84
$241.96
19.9%
$2,458.16
$2,700.12
$241.96
9.8%
174
Over 4" Service
173,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,465.31
$250.43
20.6%
$2,458.16
$2,708.59
$250.43
10.2%
175
Over 4" Service
174,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,473.78
$258.90
21.3%
$2,458.16
$2,717.06
$258.90
10.5%
176
Over 4" Service
175,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,482.25
$267.37
22.0%
$2,458.16
$2,725.53
$267.37
10.9%
177
Over 4" Service
176,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,490.72
$275.84
22.7%
$2,458.16
$2,734.00
$275.84
11.2%
178
Over 4" Service
177,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,499.19
$284.31
23.4%
$2,458.16
$2,742.47
$284.31
11.6%
179
Over 4" Service
178,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,507.66
$292.78
24.1%
$2,458.16
$2,750.94
$292.78
11.9%
180
Over 4" Service
179,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,516.13
$301.25
24.8%
$2,458.16
$2,759.41
$301.25
12.3%
181
Over 4" Service
180,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,524.60
$309.72
25.5%
$2,458.16
$2,767.88
$309.72
12.6%
182
Over 4" Service
181,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,533.07
$318.19
26.2%
$2,458.16
$2,776.35
$318.19
12.9%
183
Over 4" Service
182,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,541.54
$326.66
26.9%
$2,458.16
$2,784.82
$326.66
13.3%
184
Over 4" Service
183,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,550.01
$335.13
27.6%
$2,458.16
$2,793.29
$335.13
13.6%
185
Over 4" Service
184,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,558.48
$343.60
28.3%
$2,458.16
$2,801.76
$343.60
14.0%
28
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
186
Over 4" Service
185,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,566.95
$352.07
29.0%
$2,458.16
$2,810.23
$352.07
14.3%
187
Over 4" Service
186,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,575.42
$360.54
29.7%
$2,458.16
$2,818.70
$360.54
14.7%
188
Over 4" Service
187,000
$1,243.28
$1,243.28
$0.00
0.0%
$1,214.88
$1,583.89
$369.01
30.4%
$2,458.16
$2,827.17
$369.01
15.0%
189
Over 4" Service
188,000
$1,243.28
$1,246.44
$3.16
0.3%
$1,214.88
$1,592.36
$377.48
31.1%
$2,458.16
$2,838.80
$380.64
15.5%
190
Over 4" Service
189,000
$1,243.28
$1,253.07
$9.79
0.8%
$1,214.88
$1,600.83
$385.95
31.8%
$2,458.16
$2,853.90
$395.74
16.1%
191
Over 4" Service
190,000
$1,243.28
$1,259.70
$16.42
1.3%
$1,214.88
$1,609.30
$394.42
32.5%
$2,458.16
$2,869.00
$410.84
16.7%
192
Over 4" Service
191,000
$1,243.28
$1,266.33
$23.05
1.9%
$1,214.88
$1,617.77
$402.89
33.2%
$2,458.16
$2,884.10
$425.94
17.3%
193
Over 4" Service
192,000
$1,243.28
$1,272.96
$29.68
2.4%
$1,214.88
$1,626.24
$411.36
33.9%
$2,458.16
$2,899.20
$441.04
17.9%
194
Over 4" Service
193,000
$1,243.28
$1,279.59
$36.31
2.9%
$1,214.88
$1,634.71
$419.83
34.6%
$2,458.16
$2,914.30
$456.14
18.6%
195
Over 4" Service
194,000
$1,243.28
$1,286.22
$42.94
3.5%
$1,214.88
$1,643.18
$428.30
35.3%
$2,458.16
$2,929.40
$471.24
19.2%
196
Over 4" Service
195,000
$1,243.28
$1,292.85
$49.57
4.0%
$1,214.88
$1,651.65
$436.77
36.0%
$2,458.16
$2,944.50
$486.34
19.8%
197
Over 4" Service
196,000
$1,243.28
$1,299.48
$56.20
4.5%
$1,214.88
$1,660.12
$445.24
36.6%
$2,458.16
$2,959.60
$501.44
20.4%
198
Over 4" Service
197,000
$1,243.28
$1,306.11
$62.83
5.1%
$1,214.88
$1,668.59
$453.71
37.3%
$2,458.16
$2,974.70
$516.54
21.0%
199
Over 4" Service
198,000
$1,243.28
$1,312.74
$69.46
5.6%
$1,214.88
$1,677.06
$462.18
38.0%
$2,458.16
$2,989.80
$531.64
21.6%
200
Over 4" Service
199,000
$1,243.28
$1,319.37
$76.09
6.1%
$1,214.88
$1,685.53
$470.65
38.7%
$2,458.16
$3,004.90
$546.74
22.2%
201
Over 4" Service
200,000
$1,243.28
$1,326.00
$82.72
6.7%
$1,214.88
$1,694.00
$479.12
39.4%
$2,458.16
$3,020.00
$561.84
22.9%
202
Over 4" Service
201,000
$1,243.28
$1,332.63
$89.35
7.2%
$1,214.88
$1,702.47
$487.59
40.1%
$2,458.16
$3,035.10
$576.94
23.5%
203
Over 4" Service
202,000
$1,243.28
$1,339.26
$95.98
7.7%
$1,214.88
$1,710.94
$496.06
40.8%
$2,458.16
$3,050.20
$592.04
24.1%
204
Over 4" Service
203,000
$1,243.28
$1,345.89
$102.61
8.3%
$1,214.88
$1,719.41
$504.53
41.5%
$2,458.16
$3,065.30
$607.14
24.7%
205
Over 4" Service
204,000
$1,243.28
$1,352.52
$109.24
8.8%
$1,214.88
$1,727.88
$513.00
42.2%
$2,458.16
$3,080.40
$622.24
25.3%
206
Over 4" Service
205,000
$1,243.28
$1,359.15
$115.87
9.3%
$1,214.88
$1,736.35
$521.47
42.9%
$2,458.16
$3,095.50
$637.34
25.9%
207
Over 4" Service
206,000
$1,243.28
$1,365.78
$122.50
9.9%
$1,214.88
$1,744.82
$529.94
43.6%
$2,458.16
$3,110.60
$652.44
26.5%
208
Over 4" Service
207,000
$1,243.28
$1,372.41
$129.13
10.4%
$1,214.88
$1,753.29
$538.41
44.3%
$2,458.16
$3,125.70
$667.54
27.2%
209
Over 4" Service
208,000
$1,243.28
$1,379.04
$135.76
10.9%
$1,214.88
$1,761.76
$546.88
45.0%
$2,458.16
$3,140.80
$682.64
27.8%
210
Over 4" Service
209,000
$1,243.28
$1,385.67
$142.39
11.5%
$1,214.88
$1,770.23
$555.35
45.7%
$2,458.16
$3,155.90
$697.74
28.4%
211
Over 4" Service
210,000
$1,243.28
$1,392.30
$149.02
12.0%
$1,214.88
$1,778.70
$563.82
46.4%
$2,458.16
$3,171.00
$712.84
29.0%
212
Over 4" Service
211,000
$1,243.28
$1,398.93
$155.65
12.5%
$1,214.88
$1,787.17
$572.29
47.1%
$2,458.16
$3,186.10
$727.94
29.6%
213
Over 4" Service
212,000
$1,243.28
$1,405.56
$162.28
13.1%
$1,214.88
$1,795.64
$580.76
47.8%
$2,458.16
$3,201.20
$743.04
30.2%
214
Over 4" Service
213,000
$1,243.28
$1,412.19
$168.91
13.6%
$1,214.88
$1,804.11
$589.23
48.5%
$2,458.16
$3,216.30
$758.14
30.8%
215
Over 4" Service
214,000
$1,243.28
$1,418.82
$175.54
14.1%
$1,214.88
$1,812.58
$597.70
49.2%
$2,458.16
$3,231.40
$773.24
31.5%
216
Over 4" Service
215,000
$1,243.28
$1,425.45
$182.17
14.7%
$1,214.88
$1,821.05
$606.17
49.9%
$2,458.16
$3,246.50
$788.34
32.1%
217
Over 4" Service
216,000
$1,243.28
$1,432.08
$188.80
15.2%
$1,214.88
$1,829.52
$614.64
50.6%
$2,458.16
$3,261.60
$803.44
32.7%
218
Over 4" Service
217,000
$1,243.28
$1,438.71
$195.43
15.7%
$1,214.88
$1,837.99
$623.11
51.3%
$2,458.16
$3,276.70
$818.54
33.3%
219
Over 4" Service
218,000
$1,243.28
$1,445.34
$202.06
16.3%
$1,214.88
$1,846.46
$631.58
52.0%
$2,458.16
$3,291.80
$833.64
33.9%
220
Over 4" Service
219,000
$1,243.28
$1,451.97
$208.69
16.8%
$1,214.88
$1,854.93
$640.05
52.7%
$2,458.16
$3,306.90
$848.74
34.5%
221
Over 4" Service
220,000
$1,243.28
$1,458.60
$215.32
17.3%
$1,214.88
$1,863.40
$648.52
53.4%
$2,458.16
$3,322.00
$863.84
35.1%
222
Over 4" Service
221,000
$1,243.28
$1,465.23
$221.95
17.9%
$1,214.88
$1,871.87
$656.99
54.1%
$2,458.16
$3,337.10
$878.94
35.8%
29
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
223
Over 4" Service
222,000
$1,243.28
$1,471.86
$228.58
18.4%
$1,214.88
$1,880.34
$665.46
54.8%
$2,458.16
$3,352.20
$894.04
36.4%
224
Over 4" Service
223,000
$1,243.28
$1,478.49
$235.21
18.9%
$1,214.88
$1,888.81
$673.93
55.5%
$2,458.16
$3,367.30
$909.14
37.0%
225
Over 4" Service
224,000
$1,243.28
$1,485.12
$241.84
19.5%
$1,216.32
$1,897.28
$680.96
56.0%
$2,459.60
$3,382.40
$922.80
37.5%
226
Over 4" Service
225,000
$1,243.28
$1,491.75
$248.47
20.0%
$1,218.85
$1,905.75
$686.90
56.4%
$2,462.13
$3,397.50
$935.37
38.0%
227
Over 4" Service
226,000
$1,243.28
$1,498.38
$255.10
20.5%
$1,221.38
$1,914.22
$692.84
56.7%
$2,464.66
$3,412.60
$947.94
38.5%
228
Over 4" Service
227,000
$1,243.28
$1,505.01
$261.73
21.1%
$1,223.91
$1,922.69
$698.78
57.1%
$2,467.19
$3,427.70
$960.51
38.9%
229
Over 4" Service
228,000
$1,243.28
$1,511.64
$268.36
21.6%
$1,226.44
$1,931.16
$704.72
57.5%
$2,469.72
$3,442.80
$973.08
39.4%
230
Over 4" Service
229,000
$1,243.28
$1,518.27
$274.99
22.1%
$1,228.97
$1,939.63
$710.66
57.8%
$2,472.25
$3,457.90
$985.65
39.9%
231
Over 4" Service
230,000
$1,243.28
$1,524.90
$281.62
22.7%
$1,231.50
$1,948.10
$716.60
58.2%
$2,474.78
$3,473.00
$998.22
40.3%
232
Over 4" Service
231,000
$1,243.28
$1,531.53
$288.25
23.2%
$1,234.03
$1,956.57
$722.54
58.6%
$2,477.31
$3,488.10
$1,010.79
40.8%
233
Over 4" Service
232,000
$1,243.28
$1,538.16
$294.88
23.7%
$1,236.56
$1,965.04
$728.48
58.9%
$2,479.84
$3,503.20
$1,023.36
41.3%
234
Over 4" Service
233,000
$1,243.28
$1,544.79
$301.51
24.3%
$1,239.09
$1,973.51
$734.42
59.3%
$2,482.37
$3,518.30
$1,035.93
41.7%
235
Over 4" Service
234,000
$1,243.28
$1,551.42
$308.14
24.8%
$1,241.62
$1,981.98
$740.36
59.6%
$2,484.90
$3,533.40
$1,048.50
42.2%
236
Over 4" Service
235,000
$1,243.28
$1,558.05
$314.77
25.3%
$1,244.15
$1,990.45
$746.30
60.0%
$2,487.43
$3,548.50
$1,061.07
42.7%
237
Over 4" Service
236,000
$1,243.28
$1,564.68
$321.40
25.9%
$1,246.68
$1,998.92
$752.24
60.3%
$2,489.96
$3,563.60
$1,073.64
43.1%
238
Over 4" Service
237,000
$1,243.28
$1,571.31
$328.03
26.4%
$1,249.21
$2,007.39
$758.18
60.7%
$2,492.49
$3,578.70
$1,086.21
43.6%
239
Over 4" Service
238,000
$1,248.24
$1,577.94
$329.70
26.4%
$1,251.74
$2,015.86
$764.12
61.0%
$2,499.98
$3,593.80
$1,093.82
43.8%
240
Over 4" Service
239,000
$1,253.22
$1,584.57
$331.35
26.4%
$1,254.27
$2,024.33
$770.06
61.4%
$2,507.49
$3,608.90
$1,101.41
43.9%
241
Over 4" Service
240,000
$1,258.20
$1,591.20
$333.00
26.5%
$1,256.80
$2,032.80
$776.00
61.7%
$2,515.00
$3,624.00
$1,109.00
44.1%
242
Over 4" Service
241,000
$1,263.18
$1,597.83
$334.65
26.5%
$1,259.33
$2,041.27
$781.94
62.1%
$2,522.51
$3,639.10
$1,116.59
44.3%
243
Over 4" Service
242,000
$1,268.16
$1,604.46
$336.30
26.5%
$1,261.86
$2,049.74
$787.88
62.4%
$2,530.02
$3,654.20
$1,124.18
44.4%
244
Over 4" Service
243,000
$1,273.14
$1,611.09
$337.95
26.5%
$1,264.39
$2,058.21
$793.82
62.8%
$2,537.53
$3,669.30
$1,131.77
44.6%
245
Over 4" Service
244,000
$1,278.12
$1,617.72
$339.60
26.6%
$1,266.92
$2,066.68
$799.76
63.1%
$2,545.04
$3,684.40
$1,139.36
44.8%
246
Over 4" Service
245,000
$1,283.10
$1,624.35
$341.25
26.6%
$1,269.45
$2,075.15
$805.70
63.5%
$2,552.55
$3,699.50
$1,146.95
44.9%
247
Over 4" Service
246,000
$1,288.08
$1,630.98
$342.90
26.6%
$1,271.98
$2,083.62
$811.64
63.8%
$2,560.06
$3,714.60
$1,154.54
45.1%
248
Over 4" Service
247,000
$1,293.06
$1,637.61
$344.55
26.6%
$1,274.51
$2,092.09
$817.58
64.1%
$2,567.57
$3,729.70
$1,162.13
45.3%
249
Over 4" Service
248,000
$1,298.04
$1,644.24
$346.20
26.7%
$1,277.04
$2,100.56
$823.52
64.5%
$2,575.08
$3,744.80
$1,169.72
45.4%
250
Over 4" Service
249,000
$1,303.02
$1,650.87
$347.85
26.7%
$1,279.57
$2,109.03
$829.46
64.8%
$2,582.59
$3,759.90
$1,177.31
45.6%
251
Over 4" Service
250,000
$1,308.00
$1,657.50
$349.50
26.7%
$1,282.10
$2,117.50
$835.40
65.2%
$2,590.10
$3,775.00
$1,184.90
45.7%
252
Over 4" Service
251,000
$1,312.98
$1,664.13
$351.15
26.7%
$1,284.63
$2,125.97
$841.34
65.5%
$2,597.61
$3,790.10
$1,192.49
45.9%
253
Over 4" Service
252,000
$1,317.96
$1,670.76
$352.80
26.8%
$1,287.16
$2,134.44
$847.28
65.8%
$2,605.12
$3,805.20
$1,200.08
46.1%
254
Over 4" Service
253,000
$1,322.94
$1,677.39
$354.45
26.8%
$1,289.69
$2,142.91
$853.22
66.2%
$2,612.63
$3,820.30
$1,207.67
46.2%
255
Over 4" Service
254,000
$1,327.92
$1,684.02
$356.10
26.8%
$1,292.22
$2,151.38
$859.16
66.5%
$2,620.14
$3,835.40
$1,215.26
46.4%
256
Over 4" Service
255,000
$1,332.90
$1,690.65
$357.75
26.8%
$1,294.75
$2,159.85
$865.10
66.8%
$2,627.65
$3,850.50
$1,222.85
46.5%
257
Over 4" Service
256,000
$1,337.88
$1,697.28
$359.40
26.9%
$1,297.28
$2,168.32
$871.04
67.1%
$2,635.16
$3,865.60
$1,230.44
46.7%
258
Over 4" Service
257,000
$1,342.86
$1,703.91
$361.05
26.9%
$1,299.81
$2,176.79
$876.98
67.5%
$2,642.67
$3,880.70
$1,238.03
46.8%
259
Over 4" Service
258,000
$1,347.84
$1,710.54
$362.70
26.9%
$1,302.34
$2,185.26
$882.92
67.8%
$2,650.18
$3,895.80
$1,245.62
47.0%
30
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
260
Over 4" Service
259,000
$1,352.82
$1,717.17
$364.35
26.9%
$1,304.87
$2,193.73
$888.86
68.1%
$2,657.69
$3,910.90
$1,253.21
47.2%
261
Over 4" Service
260,000
$1,357.80
$1,723.80
$366.00
27.0%
$1,307.40
$2,202.20
$894.80
68.4%
$2,665.20
$3,926.00
$1,260.80
47.3%
262
Over 4" Service
261,000
$1,362.78
$1,730.43
$367.65
27.0%
$1,309.93
$2,210.67
$900.74
68.8%
$2,672.71
$3,941.10
$1,268.39
47.5%
263
Over 4" Service
262,000
$1,367.76
$1,737.06
$369.30
27.0%
$1,312.46
$2,219.14
$906.68
69.1%
$2,680.22
$3,956.20
$1,275.98
47.6%
264
Over 4" Service
263,000
$1,372.74
$1,743.69
$370.95
27.0%
$1,314.99
$2,227.61
$912.62
69.4%
$2,687.73
$3,971.30
$1,283.57
47.8%
265
Over 4" Service
264,000
$1,377.72
$1,750.32
$372.60
27.0%
$1,317.52
$2,236.08
$918.56
69.7%
$2,695.24
$3,986.40
$1,291.16
47.9%
266
Over 4" Service
265,000
$1,382.70
$1,756.95
$374.25
27.1%
$1,320.05
$2,244.55
$924.50
70.0%
$2,702.75
$4,001.50
$1,298.75
48.1%
267
Over 4" Service
266,000
$1,387.68
$1,763.58
$375.90
27.1%
$1,322.58
$2,253.02
$930.44
70.4%
$2,710.26
$4,016.60
$1,306.34
48.2%
268
Over 4" Service
267,000
$1,392.66
$1,770.21
$377.55
27.1%
$1,325.11
$2,261.49
$936.38
70.7%
$2,717.77
$4,031.70
$1,313.93
48.3%
269
Over 4" Service
268,000
$1,397.64
$1,776.84
$379.20
27.1%
$1,327.64
$2,269.96
$942.32
71.0%
$2,725.28
$4,046.80
$1,321.52
48.5%
270
Over 4" Service
269,000
$1,402.62
$1,783.47
$380.85
27.2%
$1,330.17
$2,278.43
$948.26
71.3%
$2,732.79
$4,061.90
$1,329.11
48.6%
271
Over 4" Service
270,000
$1,407.60
$1,790.10
$382.50
27.2%
$1,332.70
$2,286.90
$954.20
71.6%
$2,740.30
$4,077.00
$1,336.70
48.8%
272
Over 4" Service
271,000
$1,412.58
$1,796.73
$384.15
27.2%
$1,335.23
$2,295.37
$960.14
71.9%
$2,747.81
$4,092.10
$1,344.29
48.9%
273
Over 4" Service
272,000
$1,417.56
$1,803.36
$385.80
27.2%
$1,337.76
$2,303.84
$966.08
72.2%
$2,755.32
$4,107.20
$1,351.88
49.1%
274
Over 4" Service
273,000
$1,422.54
$1,809.99
$387.45
27.2%
$1,340.29
$2,312.31
$972.02
72.5%
$2,762.83
$4,122.30
$1,359.47
49.2%
275
Over 4" Service
274,000
$1,427.52
$1,816.62
$389.10
27.3%
$1,342.82
$2,320.78
$977.96
72.8%
$2,770.34
$4,137.40
$1,367.06
49.3%
276
Over 4" Service
275,000
$1,432.50
$1,823.25
$390.75
27.3%
$1,345.35
$2,329.25
$983.90
73.1%
$2,777.85
$4,152.50
$1,374.65
49.5%
277
Over 4" Service
276,000
$1,437.48
$1,829.88
$392.40
27.3%
$1,347.88
$2,337.72
$989.84
73.4%
$2,785.36
$4,167.60
$1,382.24
49.6%
278
Over 4" Service
277,000
$1,442.46
$1,836.51
$394.05
27.3%
$1,350.41
$2,346.19
$995.78
73.7%
$2,792.87
$4,182.70
$1,389.83
49.8%
279
Over 4" Service
278,000
$1,447.44
$1,843.14
$395.70
27.3%
$1,352.94
$2,354.66
$1,001.72
74.0%
$2,800.38
$4,197.80
$1,397.42
49.9%
280
Over 4" Service
279,000
$1,452.42
$1,849.77
$397.35
27.4%
$1,355.47
$2,363.13
$1,007.66
74.3%
$2,807.89
$4,212.90
$1,405.01
50.0%
281
Over 4" Service
280,000
$1,457.40
$1,856.40
$399.00
27.4%
$1,358.00
$2,371.60
$1,013.60
74.6%
$2,815.40
$4,228.00
$1,412.60
50.2%
282
Over 4" Service
281,000
$1,462.38
$1,863.03
$400.65
27.4%
$1,360.53
$2,380.07
$1,019.54
74.9%
$2,822.91
$4,243.10
$1,420.19
50.3%
283
Over 4" Service
282,000
$1,467.36
$1,869.66
$402.30
27.4%
$1,363.06
$2,388.54
$1,025.48
75.2%
$2,830.42
$4,258.20
$1,427.78
50.4%
284
Over 4" Service
283,000
$1,472.34
$1,876.29
$403.95
27.4%
$1,365.59
$2,397.01
$1,031.42
75.5%
$2,837.93
$4,273.30
$1,435.37
50.6%
285
Over 4" Service
284,000
$1,477.32
$1,882.92
$405.60
27.5%
$1,368.12
$2,405.48
$1,037.36
75.8%
$2,845.44
$4,288.40
$1,442.96
50.7%
286
Over 4" Service
285,000
$1,482.30
$1,889.55
$407.25
27.5%
$1,370.65
$2,413.95
$1,043.30
76.1%
$2,852.95
$4,303.50
$1,450.55
50.8%
287
Over 4" Service
286,000
$1,487.28
$1,896.18
$408.90
27.5%
$1,373.18
$2,422.42
$1,049.24
76.4%
$2,860.46
$4,318.60
$1,458.14
51.0%
288
Over 4" Service
287,000
$1,492.26
$1,902.81
$410.55
27.5%
$1,375.71
$2,430.89
$1,055.18
76.7%
$2,867.97
$4,333.70
$1,465.73
51.1%
289
Over 4" Service
288,000
$1,497.24
$1,909.44
$412.20
27.5%
$1,378.24
$2,439.36
$1,061.12
77.0%
$2,875.48
$4,348.80
$1,473.32
51.2%
290
Over 4" Service
289,000
$1,502.22
$1,916.07
$413.85
27.5%
$1,380.77
$2,447.83
$1,067.06
77.3%
$2,882.99
$4,363.90
$1,480.91
51.4%
291
Over 4" Service
290,000
$1,507.20
$1,922.70
$415.50
27.6%
$1,383.30
$2,456.30
$1,073.00
77.6%
$2,890.50
$4,379.00
$1,488.50
51.5%
292
Over 4" Service
291,000
$1,512.18
$1,929.33
$417.15
27.6%
$1,385.83
$2,464.77
$1,078.94
77.9%
$2,898.01
$4,394.10
$1,496.09
51.6%
293
Over 4" Service
292,000
$1,517.16
$1,935.96
$418.80
27.6%
$1,388.36
$2,473.24
$1,084.88
78.1%
$2,905.52
$4,409.20
$1,503.68
51.8%
294
Over 4" Service
293,000
$1,522.14
$1,942.59
$420.45
27.6%
$1,390.89
$2,481.71
$1,090.82
78.4%
$2,913.03
$4,424.30
$1,511.27
51.9%
295
Over 4" Service
294,000
$1,527.12
$1,949.22
$422.10
27.6%
$1,393.42
$2,490.18
$1,096.76
78.7%
$2,920.54
$4,439.40
$1,518.86
52.0%
296
Over 4" Service
295,000
$1,532.10
$1,955.85
$423.75
27.7%
$1,395.95
$2,498.65
$1,102.70
79.0%
$2,928.05
$4,454.50
$1,526.45
52.1%
31
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
297
Over 4" Service
296,000
$1,537.08
$1,962.48
$425.40
27.7%
$1,398.48
$2,507.12
$1,108.64
79.3%
$2,935.56
$4,469.60
$1,534.04
52.3%
298
Over 4" Service
297,000
$1,542.06
$1,969.11
$427.05
27.7%
$1,401.01
$2,515.59
$1,114.58
79.6%
$2,943.07
$4,484.70
$1,541.63
52.4%
299
Over 4" Service
298,000
$1,547.04
$1,975.74
$428.70
27.7%
$1,403.54
$2,524.06
$1,120.52
79.8%
$2,950.58
$4,499.80
$1,549.22
52.5%
300
Over 4" Service
299,000
$1,552.02
$1,982.37
$430.35
27.7%
$1,406.07
$2,532.53
$1,126.46
80.1%
$2,958.09
$4,514.90
$1,556.81
52.6%
301
Over 4" Service
300,000
$1,557.00
$1,989.00
$432.00
27.7%
$1,408.60
$2,541.00
$1,132.40
80.4%
$2,965.60
$4,530.00
$1,564.40
52.8%
302
Over 4" Service
301,000
$1,561.98
$1,995.63
$433.65
27.8%
$1,411.13
$2,549.47
$1,138.34
80.7%
$2,973.11
$4,545.10
$1,571.99
52.9%
303
Over 4" Service
302,000
$1,566.96
$2,002.26
$435.30
27.8%
$1,413.66
$2,557.94
$1,144.28
80.9%
$2,980.62
$4,560.20
$1,579.58
53.0%
304
Over 4" Service
303,000
$1,571.94
$2,008.89
$436.95
27.8%
$1,416.19
$2,566.41
$1,150.22
81.2%
$2,988.13
$4,575.30
$1,587.17
53.1%
305
Over 4" Service
304,000
$1,576.92
$2,015.52
$438.60
27.8%
$1,418.72
$2,574.88
$1,156.16
81.5%
$2,995.64
$4,590.40
$1,594.76
53.2%
306
Over 4" Service
305,000
$1,581.90
$2,022.15
$440.25
27.8%
$1,421.25
$2,583.35
$1,162.10
81.8%
$3,003.15
$4,605.50
$1,602.35
53.4%
307
Over 4" Service
306,000
$1,586.88
$2,028.78
$441.90
27.8%
$1,423.78
$2,591.82
$1,168.04
82.0%
$3,010.66
$4,620.60
$1,609.94
53.5%
308
Over 4" Service
307,000
$1,591.86
$2,035.41
$443.55
27.9%
$1,426.31
$2,600.29
$1,173.98
82.3%
$3,018.17
$4,635.70
$1,617.53
53.6%
309
Over 4" Service
308,000
$1,596.84
$2,042.04
$445.20
27.9%
$1,428.84
$2,608.76
$1,179.92
82.6%
$3,025.68
$4,650.80
$1,625.12
53.7%
310
Over 4" Service
309,000
$1,601.82
$2,048.67
$446.85
27.9%
$1,431.37
$2,617.23
$1,185.86
82.8%
$3,033.19
$4,665.90
$1,632.71
53.8%
311
Over 4" Service
310,000
$1,606.80
$2,055.30
$448.50
27.9%
$1,433.90
$2,625.70
$1,191.80
83.1%
$3,040.70
$4,681.00
$1,640.30
53.9%
312
Over 4" Service
311,000
$1,611.78
$2,061.93
$450.15
27.9%
$1,436.43
$2,634.17
$1,197.74
83.4%
$3,048.21
$4,696.10
$1,647.89
54.1%
313
Over 4" Service
312,000
$1,616.76
$2,068.56
$451.80
27.9%
$1,438.96
$2,642.64
$1,203.68
83.6%
$3,055.72
$4,711.20
$1,655.48
54.2%
314
Over 4" Service
313,000
$1,621.74
$2,075.19
$453.45
28.0%
$1,441.49
$2,651.11
$1,209.62
83.9%
$3,063.23
$4,726.30
$1,663.07
54.3%
315
Over 4" Service
314,000
$1,626.72
$2,081.82
$455.10
28.0%
$1,444.02
$2,659.58
$1,215.56
84.2%
$3,070.74
$4,741.40
$1,670.66
54.4%
316
Over 4" Service
315,000
$1,631.70
$2,088.45
$456.75
28.0%
$1,446.55
$2,668.05
$1,221.50
84.4%
$3,078.25
$4,756.50
$1,678.25
54.5%
317
Over 4" Service
316,000
$1,636.68
$2,095.08
$458.40
28.0%
$1,449.08
$2,676.52
$1,227.44
84.7%
$3,085.76
$4,771.60
$1,685.84
54.6%
318
Over 4" Service
317,000
$1,641.66
$2,101.71
$460.05
28.0%
$1,451.61
$2,684.99
$1,233.38
85.0%
$3,093.27
$4,786.70
$1,693.43
54.7%
319
Over 4" Service
318,000
$1,646.64
$2,108.34
$461.70
28.0%
$1,454.14
$2,693.46
$1,239.32
85.2%
$3,100.78
$4,801.80
$1,701.02
54.9%
320
Over 4" Service
319,000
$1,651.62
$2,114.97
$463.35
28.1%
$1,456.67
$2,701.93
$1,245.26
85.5%
$3,108.29
$4,816.90
$1,708.61
55.0%
321
Over 4" Service
320,000
$1,656.60
$2,121.60
$465.00
28.1%
$1,459.20
$2,710.40
$1,251.20
85.7%
$3,115.80
$4,832.00
$1,716.20
55.1%
322
Over 4" Service
321,000
$1,661.58
$2,128.23
$466.65
28.1%
$1,461.73
$2,718.87
$1,257.14
86.0%
$3,123.31
$4,847.10
$1,723.79
55.2%
323
Over 4" Service
322,000
$1,666.56
$2,134.86
$468.30
28.1%
$1,464.26
$2,727.34
$1,263.08
86.3%
$3,130.82
$4,862.20
$1,731.38
55.3%
324
Over 4" Service
323,000
$1,671.54
$2,141.49
$469.95
28.1%
$1,466.79
$2,735.81
$1,269.02
86.5%
$3,138.33
$4,877.30
$1,738.97
55.4%
325
Over 4" Service
324,000
$1,676.52
$2,148.12
$471.60
28.1%
$1,469.32
$2,744.28
$1,274.96
86.8%
$3,145.84
$4,892.40
$1,746.56
55.5%
326
Over 4" Service
325,000
$1,681.50
$2,154.75
$473.25
28.1%
$1,471.85
$2,752.75
$1,280.90
87.0%
$3,153.35
$4,907.50
$1,754.15
55.6%
327
Over 4" Service
326,000
$1,686.48
$2,161.38
$474.90
28.2%
$1,474.38
$2,761.22
$1,286.84
87.3%
$3,160.86
$4,922.60
$1,761.74
55.7%
328
Over 4" Service
327,000
$1,691.46
$2,168.01
$476.55
28.2%
$1,476.91
$2,769.69
$1,292.78
87.5%
$3,168.37
$4,937.70
$1,769.33
55.8%
329
Over 4" Service
328,000
$1,696.44
$2,174.64
$478.20
28.2%
$1,479.44
$2,778.16
$1,298.72
87.8%
$3,175.88
$4,952.80
$1,776.92
56.0%
330
Over 4" Service
329,000
$1,701.42
$2,181.27
$479.85
28.2%
$1,481.97
$2,786.63
$1,304.66
88.0%
$3,183.39
$4,967.90
$1,784.51
56.1%
331
Over 4" Service
330,000
$1,706.40
$2,187.90
$481.50
28.2%
$1,484.50
$2,795.10
$1,310.60
88.3%
$3,190.90
$4,983.00
$1,792.10
56.2%
332
Over 4" Service
331,000
$1,711.38
$2,194.53
$483.15
28.2%
$1,487.03
$2,803.57
$1,316.54
88.5%
$3,198.41
$4,998.10
$1,799.69
56.3%
333
Over 4" Service
332,000
$1,716.36
$2,201.16
$484.80
28.2%
$1,489.56
$2,812.04
$1,322.48
88.8%
$3,205.92
$5,013.20
$1,807.28
56.4%
32
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
334
Over 4" Service
333,000
$1,721.34
$2,207.79
$486.45
28.3%
$1,492.09
$2,820.51
$1,328.42
89.0%
$3,213.43
$5,028.30
$1,814.87
56.5%
335
Over 4" Service
334,000
$1,726.32
$2,214.42
$488.10
28.3%
$1,494.62
$2,828.98
$1,334.36
89.3%
$3,220.94
$5,043.40
$1,822.46
56.6%
336
Over 4" Service
335,000
$1,731.30
$2,221.05
$489.75
28.3%
$1,497.15
$2,837.45
$1,340.30
89.5%
$3,228.45
$5,058.50
$1,830.05
56.7%
337
Over 4" Service
336,000
$1,736.28
$2,227.68
$491.40
28.3%
$1,499.68
$2,845.92
$1,346.24
89.8%
$3,235.96
$5,073.60
$1,837.64
56.8%
338
Over 4" Service
337,000
$1,741.26
$2,234.31
$493.05
28.3%
$1,502.21
$2,854.39
$1,352.18
90.0%
$3,243.47
$5,088.70
$1,845.23
56.9%
339
Over 4" Service
338,000
$1,746.24
$2,240.94
$494.70
28.3%
$1,504.74
$2,862.86
$1,358.12
90.3%
$3,250.98
$5,103.80
$1,852.82
57.0%
340
Over 4" Service
339,000
$1,751.22
$2,247.57
$496.35
28.3%
$1,507.27
$2,871.33
$1,364.06
90.5%
$3,258.49
$5,118.90
$1,860.41
57.1%
341
Over 4" Service
340,000
$1,756.20
$2,254.20
$498.00
28.4%
$1,509.80
$2,879.80
$1,370.00
90.7%
$3,266.00
$5,134.00
$1,868.00
57.2%
342
Over 4" Service
341,000
$1,761.18
$2,260.83
$499.65
28.4%
$1,512.33
$2,888.27
$1,375.94
91.0%
$3,273.51
$5,149.10
$1,875.59
57.3%
343
Over 4" Service
342,000
$1,766.16
$2,267.46
$501.30
28.4%
$1,514.86
$2,896.74
$1,381.88
91.2%
$3,281.02
$5,164.20
$1,883.18
57.4%
344
Over 4" Service
343,000
$1,771.14
$2,274.09
$502.95
28.4%
$1,517.39
$2,905.21
$1,387.82
91.5%
$3,288.53
$5,179.30
$1,890.77
57.5%
345
Over 4" Service
344,000
$1,776.12
$2,280.72
$504.60
28.4%
$1,519.92
$2,913.68
$1,393.76
91.7%
$3,296.04
$5,194.40
$1,898.36
57.6%
346
Over 4" Service
345,000
$1,781.10
$2,287.35
$506.25
28.4%
$1,522.45
$2,922.15
$1,399.70
91.9%
$3,303.55
$5,209.50
$1,905.95
57.7%
347
Over 4" Service
346,000
$1,786.08
$2,293.98
$507.90
28.4%
$1,524.98
$2,930.62
$1,405.64
92.2%
$3,311.06
$5,224.60
$1,913.54
57.8%
348
Over 4" Service
347,000
$1,791.06
$2,300.61
$509.55
28.4%
$1,527.51
$2,939.09
$1,411.58
92.4%
$3,318.57
$5,239.70
$1,921.13
57.9%
349
Over 4" Service
348,000
$1,796.04
$2,307.24
$511.20
28.5%
$1,530.04
$2,947.56
$1,417.52
92.6%
$3,326.08
$5,254.80
$1,928.72
58.0%
350
Over 4" Service
349,000
$1,801.02
$2,313.87
$512.85
28.5%
$1,532.57
$2,956.03
$1,423.46
92.9%
$3,333.59
$5,269.90
$1,936.31
58.1%
351
Over 4" Service
350,000
$1,806.00
$2,320.50
$514.50
28.5%
$1,535.10
$2,964.50
$1,429.40
93.1%
$3,341.10
$5,285.00
$1,943.90
58.2%
352
Over 4" Service
351,000
$1,810.98
$2,327.13
$516.15
28.5%
$1,537.63
$2,972.97
$1,435.34
93.3%
$3,348.61
$5,300.10
$1,951.49
58.3%
353
Over 4" Service
352,000
$1,815.96
$2,333.76
$517.80
28.5%
$1,540.16
$2,981.44
$1,441.28
93.6%
$3,356.12
$5,315.20
$1,959.08
58.4%
354
Over 4" Service
353,000
$1,820.94
$2,340.39
$519.45
28.5%
$1,542.69
$2,989.91
$1,447.22
93.8%
$3,363.63
$5,330.30
$1,966.67
58.5%
355
Over 4" Service
354,000
$1,825.92
$2,347.02
$521.10
28.5%
$1,545.22
$2,998.38
$1,453.16
94.0%
$3,371.14
$5,345.40
$1,974.26
58.6%
356
Over 4" Service
355,000
$1,830.90
$2,353.65
$522.75
28.6%
$1,547.75
$3,006.85
$1,459.10
94.3%
$3,378.65
$5,360.50
$1,981.85
58.7%
357
Over 4" Service
356,000
$1,835.88
$2,360.28
$524.40
28.6%
$1,550.28
$3,015.32
$1,465.04
94.5%
$3,386.16
$5,375.60
$1,989.44
58.8%
358
Over 4" Service
357,000
$1,840.86
$2,366.91
$526.05
28.6%
$1,552.81
$3,023.79
$1,470.98
94.7%
$3,393.67
$5,390.70
$1,997.03
58.8%
359
Over 4" Service
358,000
$1,845.84
$2,373.54
$527.70
28.6%
$1,555.34
$3,032.26
$1,476.92
95.0%
$3,401.18
$5,405.80
$2,004.62
58.9%
360
Over 4" Service
359,000
$1,850.82
$2,380.17
$529.35
28.6%
$1,557.87
$3,040.73
$1,482.86
95.2%
$3,408.69
$5,420.90
$2,012.21
59.0%
361
Over 4" Service
360,000
$1,855.80
$2,386.80
$531.00
28.6%
$1,560.40
$3,049.20
$1,488.80
95.4%
$3,416.20
$5,436.00
$2,019.80
59.1%
362
Over 4" Service
361,000
$1,860.78
$2,393.43
$532.65
28.6%
$1,562.93
$3,057.67
$1,494.74
95.6%
$3,423.71
$5,451.10
$2,027.39
59.2%
363
Over 4" Service
362,000
$1,865.76
$2,400.06
$534.30
28.6%
$1,565.46
$3,066.14
$1,500.68
95.9%
$3,431.22
$5,466.20
$2,034.98
59.3%
364
Over 4" Service
363,000
$1,870.74
$2,406.69
$535.95
28.6%
$1,567.99
$3,074.61
$1,506.62
96.1%
$3,438.73
$5,481.30
$2,042.57
59.4%
365
Over 4" Service
364,000
$1,875.72
$2,413.32
$537.60
28.7%
$1,570.52
$3,083.08
$1,512.56
96.3%
$3,446.24
$5,496.40
$2,050.16
59.5%
366
Over 4" Service
365,000
$1,880.70
$2,419.95
$539.25
28.7%
$1,573.05
$3,091.55
$1,518.50
96.5%
$3,453.75
$5,511.50
$2,057.75
59.6%
367
Over 4" Service
366,000
$1,885.68
$2,426.58
$540.90
28.7%
$1,575.58
$3,100.02
$1,524.44
96.8%
$3,461.26
$5,526.60
$2,065.34
59.7%
368
Over 4" Service
367,000
$1,890.66
$2,433.21
$542.55
28.7%
$1,578.11
$3,108.49
$1,530.38
97.0%
$3,468.77
$5,541.70
$2,072.93
59.8%
369
Over 4" Service
368,000
$1,895.64
$2,439.84
$544.20
28.7%
$1,580.64
$3,116.96
$1,536.32
97.2%
$3,476.28
$5,556.80
$2,080.52
59.8%
370
Over 4" Service
369,000
$1,900.62
$2,446.47
$545.85
28.7%
$1,583.17
$3,125.43
$1,542.26
97.4%
$3,483.79
$5,571.90
$2,088.11
59.9%
33
Line
No.
Description
Monthly
Usage Level
in Gallons
Existing
Water Bill
Difference
Proposed Amount Percent
Existing
Sewer Bill
Difference
Proposed Amount Percent
Existing
Combined Bill
Difference
Proposed Amount Percent
371
Over 4" Service
370,000
$1,905.60
$2,453.10
$547.50
28.7%
$1,585.70
$3,133.90
$1,548.20
97.6%
$3,491.30
$5,587.00
$2,095.70
60.0%
372
Over 4" Service
371,000
$1,910.58
$2,459.73
$549.15
28.7%
$1,588.23
$3,142.37
$1,554.14
97.9%
$3,498.81
$5,602.10
$2,103.29
60.1%
373
Over 4" Service
372,000
$1,915.56
$2,466.36
$550.80
28.8%
$1,590.76
$3,150.84
$1,560.08
98.1%
$3,506.32
$5,617.20
$2,110.88
60.2%
374
Over 4" Service
373,000
$1,920.54
$2,472.99
$552.45
28.8%
$1,593.29
$3,159.31
$1,566.02
98.3%
$3,513.83
$5,632.30
$2,118.47
60.3%
375
Over 4" Service
374,000
$1,925.52
$2,479.62
$554.10
28.8%
$1,595.82
$3,167.78
$1,571.96
98.5%
$3,521.34
$5,647.40
$2,126.06
60.4%
376
Over 4" Service
375,000
$1,930.50
$2,486.25
$555.75
28.8%
$1,598.35
$3,176.25
$1,577.90
98.7%
$3,528.85
$5,662.50
$2,133.65
60.5%
377
Over 4" Service
376,000
$1,935.48
$2,492.88
$557.40
28.8%
$1,600.88
$3,184.72
$1,583.84
98.9%
$3,536.36
$5,677.60
$2,141.24
60.5%
378
Over 4" Service
377,000
$1,940.46
$2,499.51
$559.05
28.8%
$1,603.41
$3,193.19
$1,589.78
99.1%
$3,543.87
$5,692.70
$2,148.83
60.6%
379
Over 4" Service
378,000
$1,945.44
$2,506.14
$560.70
28.8%
$1,605.94
$3,201.66
$1,595.72
99.4%
$3,551.38
$5,707.80
$2,156.42
60.7%
380
Over 4" Service
379,000
$1,950.42
$2,512.77
$562.35
28.8%
$1,608.47
$3,210.13
$1,601.66
99.6%
$3,558.89
$5,722.90
$2,164.01
60.8%
381
Over 4" Service
380,000
$1,955.40
$2,519.40
$564.00
28.8%
$1,611.00
$3,218.60
$1,607.60
99.8%
$3,566.40
$5,738.00
$2,171.60
60.9%
382
Over 4" Service
381,000
$1,960.38
$2,526.03
$565.65
28.9%
$1,613.53
$3,227.07
$1,613.54
100.0%
$3,573.91
$5,753.10
$2,179.19
61.0%
383
Over 4" Service
382,000
$1,965.36
$2,532.66
$567.30
28.9%
$1,616.06
$3,235.54
$1,619.48
100.2%
$3,581.42
$5,768.20
$2,186.78
61.1%
384
Over 4" Service
383,000
$1,970.34
$2,539.29
$568.95
28.9%
$1,618.59
$3,244.01
$1,625.42
100.4%
$3,588.93
$5,783.30
$2,194.37
61.1%
385
Over 4" Service
384,000
$1,975.32
$2,545.92
$570.60
28.9%
$1,621.12
$3,252.48
$1,631.36
100.6%
$3,596.44
$5,798.40
$2,201.96
61.2%
386
Over 4" Service
385,000
$1,980.30
$2,552.55
$572.25
28.9%
$1,623.65
$3,260.95
$1,637.30
100.8%
$3,603.95
$5,813.50
$2,209.55
61.3%
387
Over 4" Service
386,000
$1,985.28
$2,559.18
$573.90
28.9%
$1,626.18
$3,269.42
$1,643.24
101.0%
$3,611.46
$5,828.60
$2,217.14
61.4%
388
Over 4" Service
387,000
$1,990.26
$2,565.81
$575.55
28.9%
$1,628.71
$3,277.89
$1,649.18
101.3%
$3,618.97
$5,843.70
$2,224.73
61.5%
389
Over 4" Service
388,000
$1,995.24
$2,572.44
$577.20
28.9%
$1,631.24
$3,286.36
$1,655.12
101.5%
$3,626.48
$5,858.80
$2,232.32
61.6%
390
Over 4" Service
389,000
$2,000.22
$2,579.07
$578.85
28.9%
$1,633.77
$3,294.83
$1,661.06
101.7%
$3,633.99
$5,873.90
$2,239.91
61.6%
391
Over 4" Service
390,000
$2,005.20
$2,585.70
$580.50
28.9%
$1,636.30
$3,303.30
$1,667.00
101.9%
$3,641.50
$5,889.00
$2,247.50
61.7%
392
Over 4" Service
391,000
$2,010.18
$2,592.33
$582.15
29.0%
$1,638.83
$3,311.77
$1,672.94
102.1%
$3,649.01
$5,904.10
$2,255.09
61.8%
393
Over 4" Service
392,000
$2,015.16
$2,598.96
$583.80
29.0%
$1,641.36
$3,320.24
$1,678.88
102.3%
$3,656.52
$5,919.20
$2,262.68
61.9%
394
Over 4" Service
393,000
$2,020.14
$2,605.59
$585.45
29.0%
$1,643.89
$3,328.71
$1,684.82
102.5%
$3,664.03
$5,934.30
$2,270.27
62.0%
395
Over 4" Service
394,000
$2,025.12
$2,612.22
$587.10
29.0%
$1,646.42
$3,337.18
$1,690.76
102.7%
$3,671.54
$5,949.40
$2,277.86
62.0%
396
Over 4" Service
395,000
$2,030.10
$2,618.85
$588.75
29.0%
$1,648.95
$3,345.65
$1,696.70
102.9%
$3,679.05
$5,964.50
$2,285.45
62.1%
397
Over 4" Service
396,000
$2,035.08
$2,625.48
$590.40
29.0%
$1,651.48
$3,354.12
$1,702.64
103.1%
$3,686.56
$5,979.60
$2,293.04
62.2%
398
Over 4" Service
397,000
$2,040.06
$2,632.11
$592.05
29.0%
$1,654.01
$3,362.59
$1,708.58
103.3%
$3,694.07
$5,994.70
$2,300.63
62.3%
399
Over 4" Service
398,000
$2,045.04
$2,638.74
$593.70
29.0%
$1,656.54
$3,371.06
$1,714.52
103.5%
$3,701.58
$6,009.80
$2,308.22
62.4%
400
Over 4" Service
399,000
$2,050.02
$2,645.37
$595.35
29.0%
$1,659.07
$3,379.53
$1,720.46
103.7%
$3,709.09
$6,024.90
$2,315.81
62.4%
401
Over 4" Service
400,000
$2,055.00
$2,652.00
$597.00
29.1%
$1,661.60
$3,388.00
$1,726.40
103.9%
$3,716.60
$6,040.00
$2,323.40
62.5%
34
DRAFT
City of Seward, Alaska
Tariff for Water Rates, Charges, and Fees
2021 to 2025
1. DEFINITIONS
Equivalent Residential Unit (ERU): A unit of measure used to express the amount of water
consumed by a typical full-time single family residence. All unmetered water customers shall
be assigned a minimum of one (1) ERU.
Living Unit: A unit that has — or has plumbing for — a kitchen sink, toilet, bathing unit (e.g.,
bathtub or shower), and either laundry units or access to common laundry units in the building.
All living units shall be considered one (1) ERU.
2. UNMETERED CUSTOMERS
Customers eligible to be unmetered include:
• Single-family residential customers; and
• Duplexes, apartments, bed and breakfasts, and townhouses with no more than two (2) living units.
All customers not in the above classifications must be metered. Hotels, motels, and similar
transient accommodations are considered commercial establishments and must be metered.
Residential and commercial customers that have a heat pump system using City water must be
metered. The costs of metering new construction required to be metered will be paid by the
customer. All new meter installations must be inspected, approved, and documented by the
City water department.
Customers required to be metered but are currently unmetered can take advantage of a cost
savings program offered by the City. When such customers contact the City finance department
to initiate the transition to metered service, the City will provide the meter and meter reader.
If these customers install the meters and meter readers provided by the City, pass City
inspection, and produce a valid receipt to the City finance department, they will be reimbursed
by the City as follows:
• Meter installations initiated through December 31, 2021: Up to $300 of the meter installation costs
within reasonable limits established by the Public Works Director or his/her designee.
Meter installations initiated from January 1, 2022 to December 31, 2022: Up to $200 of the meter
installation costs within reasonable limits established by the Public Works Director or his/her
designee.
Meter installations initiated from January 1, 2023 to December 31, 2023: Up to $150 of the meter
installation costs within reasonable limits established by the Public Works Director or his/her
City of Seward Water Rate Tariff Page 1 of 14
35
DRAFT
designee.
Meter installations initiated from January 1, 2024 to December 31, 2024: Up to $100 of the meter
installation costs within reasonable limits established by the Public Works Director or his/her
designee.
The Public Works Director or his/her designee has the authority to determine the applicable
reimbursement given the terms and conditions of the cost savings program as well as a
customer's specific circumstances.
Prior to switching over to metered service, unmetered customers required to be metered will
be charged per ERU in accordance with: i) the ERU determination methodology in effect prior
to the adoption of this tariff that is summarized in Exhibit 3; and ii) the rates per ERU shown
in the footnote in Exhibit 1. Customers required to be metered that have not switched to
metered service by December 31, 2024 shall be fined $500 per ERU per year unless the utility
manager determines that certain circumstances exist that necessitate an extension.
The accounts may be paid by individual occupants or owners of multiple units. When the entire
water service to a multiplex or apartment building with two (2) living units is billed to one
account, the charge will be based on total number of living units in the building whether or not
occupied.
The multi -year schedule of rates for unmetered customers is in Exhibit 1.
All unmetered customers not required to be metered by the City may elect to install water
meters at their own expense, after which the customers will be charged metered rates. When
considering whether to incur the costs of a installing a water meter, customers are encouraged
to consider that a future water and sewer rate study may impact either or both unmetered and
metered rates.
3. METERED CUSTOMERS
Meters must include readouts at a location acceptable to the City to allow for accurate meter
readings. Remote readers are required. If a customer has multiple metered services, each
metered service will be computed as a separate bill.
The cost of initial installation of a meter in a new facility will be paid by the customer. The
cost of maintenance, repair and replacement of all meters will be at customer expense. The
customer will provide a meter, and the user will pay the cost of installation, where an existing
service is converted to meter and the commercial use/activities of the user have not changed.
If the meter is required due to changed usage, the customer will pay all costs, including the
cost of the meter. Customers are responsible for changing any batteries required for the meter
and meter reader to work properly. Failure to repair or replace a faulty meter or to address a
meter operating deficiency will result in the billing department estimating the meter reading.
If the customer fails to replace a faulty meter or address a meter operating deficiency within
90 days of being informed of the need to address the issue, the City may, at its expense, replace
City of Seward Water Rate Tariff Page 2 of 14
36
DRAFT
the meter or address the operating deficiency and charge the customer as a work order, at
double the costs incurred by the City, to encourage customers to repair, replace, and maintain
their own equipment. In all cases, the City will specify and/or approve the type of meter and
its installation.
If a customer is required by the City to switch from unmetered to metered service, the customer
may be eligible to receive a reimbursement from the City for the meter and installation costs.
The amount of the reimbursement is in accordance with the parameters established in the
"Unmetered Customers" section of this rate tariff.
The multi -year schedule of rates for metered customers is in Exhibit 1.
4. SPECIAL RATES. CHARGES. AND FEES
Special rates, charges, and fees include charges for service not included in the rates for
unmetered and metered customers covered in previous sections of this tariff and in Exhibit 1.
The special rates, charges, and fees are in Exhibit 2.
5. ANNUAL RATE ADJUSTMENTS
In the absence of a formal study recommendation or action by the city council, the water rates,
charges, and fees in Exhibits 1 and 2 shall be automatically adjusted — without a public hearing
— in accordance with the annual increase provisions contained in the exhibits. These automatic
increases for inflationary effects on the costs of operations shall be effective for all bills
rendered on or after January 1st of each year. The first increases under these provisions shall
become effective on January 1, 2026 unless an earlier effective date is specified in Exhibits 1
and 2.
6. CONTRACTUAL RATES
The City may negotiate or renegotiate a special service contract with a customer if there are
unique conditions or circumstances of providing service to the customer that warrant special
considerations. Such contracts will set or amend a rate which will ensure that the customer
pays its full share of the utility's fixed and variable operating and maintenance costs. All special
contracts and renegotiations of existing special contracts shall be approved by a resolution of
the City Council.
EXHIBITS
Exhibit 1: Schedule of Monthly Water User Rates (Page 4 of 14)
Exhibit 2: Water System Special Rates, Charges, and Fees (Starts on Page 5 of 14)
Exhibit 3: ERU Determination Methodology for Unmetered Customers Required to Be Metered
That Have Not Yet Switched Over to Metered Service (Starts on Page 10 of 14)
City of Seward Water Rate Tariff Page 3 of 14
37
Exhibit 1
City of Seward, Alaska
Schedule of Monthly Water User Rates
Effective Effective Effective
Line As Soon January 15, January 15,
No. Description As Practical 2022 2023
1 Monthly Charge Per Living Unit $ 49.55 $ 54.51 $
METERED CUSTOMERS
Minimum Monthly Charge
2 1" Water Meter or Smaller
$ 39.78
$ 43.76 $
3 Greater Than 1" Up to 2" Water Meter
49.35
54.29
4 Greater Than 2" Up to 4" Water Meter
248.70
273.57
5 Greater Than 4" Water Meter
1,243.28
1,367.61
Charge for Consumption Per 1,000 Gallons - Usage Less Than 1 Million Gallons
Per Month
6 All Gallons
$ 6.63
$ 7.29 $
Charge for Consumption Per 1,000 Gallons - Usage of 1 Million Gallons Per Month or Higher
7 All Gallons
$ 4.97
$ 5.47 $
DRAFT
Effective Effective Annual Increase
January 15, January 15, Reference
2024 2025 After 2025
59.96 $ 65.95 $ 72.55 [A]
48.13
$ 52.95
$ 58.24
[A]
59.71
65.68
72.25
[A]
300.93
331.02
364.12
[A]
1,504.37
1,654.81
1,820.29
[A]
8.02
$ 8.82
$ 9.71
[A]
6.02
$ 6.62
$ 7.28
[A]
[*] Any unmetered customers that are required by the City to be metered based on the customer classifications shall be charged the following monthly rates per ERU
until switched over to metered service. The number of ERU's for such customers shall be determined by the ERU determination methodology in effect prior to
the adoption of this tariff.
Effective Effective Effective Effective Effective
As Soon January 15, January 15, January 15, January 15,
As Practical 2022 2023 2024 2025
Rate Per ERU for Unmetered Customers Required to Be
Metered By the City But Not Yet Switched Over to
Metered Service $ 53.86 $ 59.24 $ 65.17 $ 71.68 $ 78.85
ANNUAL INCREASE REFERENCES:
[A] In the absence of a formal study recommendation or action by the city council, the rates and fees herein provided shall be automatically increased for
inflationary effects on the costs of operations - without a public hearing - effective for all bills rendered on or after January 15th of each year. The
percentage increase, if any, shall be the average of the five (5) previous published years' annual increases in the Urban Alaska Consumer Price Index,
all urban consumers, not seasonally adjusted (the "CPI") (Series ID: CUURS49GSAO accessed via https://data.bls.gov/cgi-bin/srgate) as published
by the United States Department of Labor, Bureau of Labor Statistics. For example, if the previous five years' annual increases in the CPI were
1.4%, 3.0%, 0.5%, 0.4%, and 0.5%, the average increase of 1.2% would be applied to the rates.
38
City of Seward Water Rate Tariff Page 4 of 14
Exhibit 2
City of Seward, Alaska
Water System Special Rates, Charges, and Fees
Line
No. Description
1. Fire Hydrant Use Permit: From May 1 to August 31 a Fire Hydrant Tapping Fee:
Permit may be issued. Fire Hydrants will be turned on and off by PLUS daily fee:
Water Department Personnel. If the City determines that a meter and PLUS weekly fee:
a backflow preventer are required, these will also be installed by
Water Department personnel. This rate is set for contractors or other
temporary water users, but not for bulk water service to ships or
tanker trucks serving ships or industries, as set herein:
2. Water Service Inspection Fee (Performed by City):
3. Water Turn -On or Turn Off (per visit excluding new service and new
account name): No charge for the first turn -on for new service or
new account.
4. Seasonal Turn -On / Turn -Off: can apply to summer or winter; only
performed during regular business hours. If during non -business
hours, charge is $150 instead of $50.
First Turn -On and/or Turn -Off:
All Other Turn-Ons or Turn -Offs:
During Business Hours:
During Non -Business Hours:
Seasonal Turn -On:
Seasonal Turn -Off
Annual
Effective Increase
As Soon As Practical Reference
$100 N/A
$50 plus metered usage N/A
$300 plus metered usage N/A
$150 N/A
No Charge
$50 N/A
$150 N/A
$50 for turn -on plus must
pay applicable infrastructure
charges for number of
months in which account is
inactive
$50 for turn-off plus must
pay applicable infrastructure
charges for number of
months in which account is
inactive
City of Seward Water Rate Tariff 39 Page 5 of 14
Exhibit 2
City of Seward, Alaska
Water System Special Rates, Charges, and Fees
Line
No. Description
5. Infrastructure Charges for Inactive Accounts: help to recover the
City's fixed costs of providing service while customer's service is
inactive upon a seasonal turn-off; charged monthly:
Infrastructure Charges for Inactive Accounts: (cont.)
Unmetered Residental Per Living Unit
Unmetered Nonresidential Per ERU
Metered: 1" Water Meter or Smaller
Metered: Greater Than 1" Up to 2" Water Meter
Metered: Greater Than 2" Up to 4" Water Meter
Metered: Greater Than 4" Water Meter
Unmetered Residental Per Living Unit
Unmetered Nonresidential Per ERU
Metered: 1" Water Meter or Smaller
Metered: Greater Than 1" Up to 2" Water Meter
Metered: Greater Than 2" Up to 4" Water Meter
Metered: Greater Than 4" Water Meter
DRAFT
Effective
As Soon As Practical
2021 Monthly Rates
$39.78
39.78
39.78
49.35
248.70
1,243.28
2022 Monthly Rates
$43.76
43.76
43.76
54.29
273.57
1,367.61
Annual
Increase
Reference
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Infrastructure Charges for Inactive Accounts: (cont.)
2023 Monthly Rates
Unmetered Residental Per Living Unit
$48.13
N/A
Unmetered Nonresidential Per ERU
48.13
N/A
Metered: 1" Water Meter or Smaller
48.13
N/A
Metered: Greater Than 1" Up to 2" Water Meter
59.71
N/A
Metered: Greater Than 2" Up to 4" Water Meter
300.93
N/A
Metered: Greater Than 4" Water Meter
1,504.37
N/A
City of Seward Water Rate Tariff 40 Page 6 of 14
Exhibit 2 DRAFT
City of Seward, Alaska
Water System Special Rates, Charges, and Fees
Annual
Line Effective Increase
No. Description As Soon As Practical Reference
Infrastructure Charges for Inactive Accounts: (cont.) 2024 Monthly Rates
Unmetered Residental Per Living Unit
$52.95
N/A
Unmetered Nonresidential Per ERU
52.95
N/A
Metered: 1" Water Meter or Smaller
52.95
N/A
Metered: Greater Than 1" Up to 2" Water Meter
65.68
N/A
Metered: Greater Than 2" Up to 4" Water Meter
331.02
N/A
Metered: Greater Than 4" Water Meter
1,654.81
N/A
Infrastructure Charges for Inactive Accounts: (cont.)
2025 Monthly Rates
Unmetered Residental Per Living Unit
$58.24
[A]
Unmetered Nonresidential Per ERU
58.24
[A]
Metered: 1" Water Meter or Smaller
58.24
[A]
Metered: Greater Than 1" Up to 2" Water Meter
72.25
[A]
Metered: Greater Than 2" Up to 4" Water Meter
364.12
[A]
Metered: Greater Than 4" Water Meter
1,820.29
[A]
6. Unauthorized Use of City Equipment (including fire hydrants, key
$1,000 plus cost of repair of
N/A
boxes, turn -on and/or turn-off):
damage
7. Restoration of Water Service (including repair of damage by owner
Actual cost, including City
or contractor to City facilities):
overhead, labor, materials,
and equipment
8. Locate Service: First Locate:
No Charge
Each Additional Locate on Property:
$170
N/A
Large projects requiring several locates will be under a special
contract and may require an additional fee.
City of Seward Water Rate Tariff 41 Page 7 of 14
Line
No. Description
9. Thaw Wire:
10. Security Deposit:
Unmetered Customers
Metered Customers
11. Contractor Work:
Exhibit 2
City of Seward, Alaska
Water System Special Rates, Charges, and Fees
Effective
As Soon As Practical
DRAFT
Annual
Increase
Reference
Locate between May 1 and October 31: No Charge
Locate between November 1 and April 30: $170 N/A
Per Section 14.01.030 of City Code of Ordinances. Based on two (2)
months fixed charges or such other amount as may be established by
resolution.
Two (2) months fixed charges for Unmetered Customers multiplied
by a factor of three (3)
Weekly Fire Hydrant Usage Deposit: $300; customer is N/A
responsible for repairs to
damage
Any contractor tapping into a city main, or otherwise working on a N/A
City water line, must be properly licensed to perform the work and
must also provide a $5,000.00 bond or equivalent cash guarantee
payable to the City.
City of Seward Water Rate Tariff 42 Page 8 of 14
Exhibit 2
City of Seward, Alaska
Water System Special Rates, Charges, and Fees
Annual
Line Effective Increase
No. Description As Soon As Practical Reference
12. Ship Water (Water furnished to temporarily moored vessels): Less than 1,000 gallons from Seward Boat Harbor facilities not
requiring city assistance or the use of fire hydrants: No Charge
All service not included above:
2021 Rates
Base Charge (during regular business hours): $111.69 [B]
Base Charge (outside regular business hours): 223.38 [B]
PLUS charge per 1,000 gallons for all water used: 10.40 [B]
Note: Customer will be responsible for actual charges related to all
work and materials required to provide water to vessel. The Point of
delivery for potable water supplied by the City shall be at the
customer side of the meter / backflow preventer, and the customer is
responsible for water quality from the delivery point to the vessel.
13. Delinquent Account Charges Interest rate: 10% per annum N/A
Monthly late fee: $5 N/A
For customers receiving more than one service (e.g., electric, water, and sewer service), the delinquent account charges apply to the
combined bill and not to each service.
ANNUAL INCREASE REFERENCES:
N/A No annual increases.
[A] After 2025, infrastructure charges for inactive accounts shall be automatically adjusted on an annual basis by the same percentage increases, if any, as the
City's monthly water base infrastructure charges.
[B] After 2021, ship water base and usage charges shall be automatically adjusted on an annual basis by 10% for 2022 to 2025. After 2025, the ship water base
and usage charges shall be automatically adjusted by the same percentage increases as the City's commercial water base infrastructure charges.
City of Seward Water Rate Tariff 43 Page 9 of 14
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
For more details, reference the water rate tariff in effect prior to the adoption of this rate tariff.
GROUP A - RESIDENTIAL
BASIS FOR MONTHLY FEE
Category/Description of Unit Charge
Living unit with plumbing for laundry, or common laundry facility 1 ERU
available on premises
Living unit without plumbing for laundry and no common laundry 0.75 ERU
available for use by the occupant
Rental apartment unit not occupied by owner when billed as a
multiple unit of 3 or more apartments served from a single water 0.75 ERU
service. (No credit will be given for unoccupied units.)
Duplex in one building treated as two residences served from a single 2 ERU
water service
GROUP B - SMALL GENERAL SERVICE
BASIS FOR MONTHLY FEE
Category/Description of Unit Charge
Hotels and motels not including bars and restaurants:
Basic charge per building 1.0 ERU
PLUS each guest room 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
City of Seward Water Rate Tariff Page 10 of 14
44
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Office Building/Mall with offices and retail stores and businesses not including
restaurants, bars, food markets:
Basic charge per building 1.0 ERU
PLUS each office/activity 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
Single Office/retail shop/professional activity not in office building, per each office
or activity
1.0 ERU
Barber, beauty, animal grooming shop:
Basic charge 1.0 ERU
PLUS charge per chair/tub 0.75 ERU
Libraries, public offices, professional offices, and similar activities:
Basic charge per building 1.0 ERU
PLUS each office/activity 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
Doctors' offices, including medical clinics, emergency first aid station, dentists' offices
and similar activities:
Basic charge per facility
PLUS per each examination room, dental chair or similar unit
PLUS per each office
Warehouses:
Basic charge per building
PLUS each pair of restrooms or showers exceeding one pair
City of Seward Water Rate Tariff
1.0 ERU
0.5 ERU
0.3 ERU
1.0 ERU
0.3 ERU
Page l l of 14
N6
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Churches, theaters, assembly halls, clubs, fraternal clubs:
Basic charge per building
PLUS each pair of restrooms exceeding one pair
PLUS, for food/bar service, add charge for restaurant or bar
Public restrooms in parks and similar activities, per each pair of
restrooms
Boardwalk shops with sewage, per shop
Camping & RV Parks:
Per spigot
Per camper/motorhome hookup
Private schools, day care centers
Basic charge
PLUS per each 15 students or for children in excess of 25
Public baths and showers:
Basic charge
PLUS per each bath or shower in excess of two
GROUP C - LARGE GENERAL SERVICE
BASIS FOR MONTHLY FEE
Category/Description of Unit
Food/grocery markets:
Basic charge
PLUS per water-cooled refrigeration unit
PLUS per butcher/meat packing unit
PLUS per bakery
PLUS per snack bar/Deli
City of Seward Water Rate Tariff
1.0 ERU
0.3 ERU
1.0 ERU
0.5 ERU
0.5 ERU
0.2 ERU
2.0 ERU
0.5 ERU
2.0 ERU
0.5 ERU
Charge
3.0 ERU
3.0 ERU
1.0 ERU
1.0 ERU
0.5 ERU
Page 12 of 14
e11
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Restaurants and/or bars (A unit may be defined as a combination
restaurant/bar if operated together or separate units if restaurant
and bar are operated separately.) This category includes all drink
and food service activities, including full service restaurants,
hospital kitchens, dormitories, dining halls, school cafeterias, etc.:
Basic charge per unit
PLUS per every 8 seats in excess of 8 seats
Snack Bar - no seating
Garage/gas stations and retail, manufacturing and repair shops not using
water for processing:
Basic charge
PLUS per pair of restrooms exceeding one pair
PLUS per each shower
PLUS per each wash bay
Public schools, if non -metered, excluding swimming pools or food
service:
Basic charge
Elementary School
Jr. High School
High School
PLUS swimming pool
PLUS charge for food service based on rate for restaurants
Hospital & Nursing Homes, if un-metered, excluding food service:
Basic charge
PLUS charge for food service based on rate for restaurants
City of Seward Water Rate Tariff
2.0 ERU
0.5 ERU
0.5 ERU
2.0 ERU
0.3 ERU
0.3 ERU
1.0 ERU
7.0 ERU
7.0 ERU
8.0 ERU
15.0 ERU
6.0 ERU
Page 13 of 14
47
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Laundry (self service or commercial units), un-metered [new laundries
will be metered]:
Basic charge
PLUS per each laundry unit of 12 pounds or less capacity
PLUS per each laundry unit larger than 12 pounds capacity
City of Seward Water Rate Tariff
2.0 ERU
1.0 ERU
2.0 ERU
Page 14 of 14
48
DRAFT
City of Seward, Alaska
Tariff for Sewer Rates, Charges, and Fees
2021 to 2025
1. DEFINITIONS
Equivalent Residential Unit (ERU): A unit of measure used to express the amount of sewer
flow by a typical full-time single family residence. All unmetered sewer customers shall be
assigned a minimum of one (1) ERU.
Living Unit: A unit that has — or has plumbing for — a kitchen sink, toilet, bathing unit (e.g.,
bathtub or shower), and either laundry units or access to common laundry units in the building.
All living units shall be considered one (1) ERU.
2. UNMETERED CUSTOMERS
Customers eligible to be unmetered include:
• Single-family residential customers; and
• Duplexes, apartments, bed and breakfasts, and townhouses with no more than two (2) living units.
All customers not in the above classifications must be metered. Hotels, motels, and similar
transient accommodations are considered commercial establishments and must be metered.
Residential and commercial customers that have a heat pump system using City water must be
metered. The costs of metering new construction required to be metered will be paid by the
customer. All new meter installations must be inspected, approved, and documented by the
City water department.
Customers required to be metered but are currently unmetered can take advantage of a cost
savings program offered by the City. Reference the City's "Tariff for Water Rates, Charges,
and Fees 2021 to 2025" for the terms and conditions of this program.
Prior to switching over to metered service, unmetered customers required to be metered will
be charged per ERU in accordance with: i) the ERU determination methodology in effect prior
to the adoption of this tariff that is summarized in Exhibit 3; and ii) the rates per ERU shown
in the footnote in Exhibit 1.
The accounts may be paid by individual occupants or owners of multiple units. When the entire
sewer service to a multiplex or apartment building with two (2) living units is billed to one
account, the charge will be based on total number of living units in the building whether or not
occupied.
The multi -year schedule of rates for unmetered customers is in Exhibit 1.
City of Seward Sewer Rate Tariff Page 1 of 14
49
DRAFT
All unmetered customers not required to be metered by the City may elect to install water
meters at their own expense, after which the customers will be charged metered rates. When
considering whether to incur the costs of a installing a water meter, customers are encouraged
to consider that a future water and sewer rate study may impact either or both unmetered and
metered rates.
3. METERED CUSTOMERS
Sewer customers with metered service shall be charged based upon the quantity of metered
water, except that those customers having a sewer meter shall be charged for the quantity of
sewage actually metered. Meters must include readouts at a location acceptable to the City to
allow for accurate meter readings. Remote readers are required. If a customer has multiple
metered services, each metered service will be computed as a separate bill.
The cost of initial installation of a meter in a new facility will be paid by the customer. The
cost of maintenance, repair and replacement of all meters will be at customer expense. The
customer will provide a meter, and the user will pay the cost of installation, where an existing
service is converted to meter and the commercial use/activities of the user have not changed.
If the meter is required due to changed usage, the customer will pay all costs, including the
cost of the meter. Customers are responsible for changing any batteries required for the meter
and meter reader to work properly. Failure to repair or replace a faulty meter or to address a
meter operating deficiency will result in the billing department estimating the meter reading.
If the customer fails to replace a faulty meter or address a meter operating deficiency within
90 days of being informed of the need to address the issue, the City may, at its expense, replace
the meter or address the operating deficiency and charge the customer as a work order, at
double the costs incurred by the City, to encourage customers to repair, replace, and maintain
their own equipment. In all cases, the City will specify and/or approve the type of meter and
its installation.
If a customer is required by the City to switch from unmetered to metered service, the customer
may be eligible to receive a reimbursement from the City for the meter and installation costs.
The amount of the reimbursement is in accordance with the parameters established in the
"Unmetered Customers" section of this rate tariff.
The multi -year schedule of rates for metered customers is in Exhibit 1.
4. SPECIAL RATES. CHARGES. AND FEES
Special rates, charges, and fees include charges for service not included in the rates for
unmetered and metered customers covered in previous sections of this tariff and in Exhibit 1.
The special rates, charges, and fees are in Exhibit 2.
5. ANNUAL RATE ADJUSTMENTS
In the absence of a formal study recommendation or action by the city council, the sewer rates,
charges, and fees in Exhibits 1 and 2 shall be automatically adjusted — without a public hearing
City of Seward Sewer Rate Tariff Page 2 of 14
50
DRAFT
— in accordance with the annual increase provisions contained in the exhibits. These automatic
increases for inflationary effects on the costs of operations shall be effective for all bills
rendered on or after January 1st of each year. The first increases under these provisions shall
become effective on January 1, 2026 unless an earlier effective date is specified in Exhibits 1
and 2.
6. CONTRACTUAL RATES
The City may negotiate or renegotiate a special service contract with a customer if there are
unique conditions or circumstances of providing service to the customer that warrant special
considerations. Such contracts will set or amend a rate which will ensure that the customer
pays its full share of the utility's fixed and variable operating and maintenance costs. All special
contracts and renegotiations of existing special contracts shall be approved by a resolution of
the City Council.
EXHIBITS
Exhibit 1: Schedule of Monthly Sewer Rates (Page 4 of 14)
Exhibit 2: Sewer System Special Rates, Charges, and Fees (Starts on Page 5 of 14)
Exhibit 3: ERU Determination Methodology for Unmetered Customers Required to Be Metered
That Have Not Yet Switched Over to Metered Service (Starts on Page 10 of 14)
City of Seward Sewer Rate Tariff Page 3 of 14
51
Line
No. Descrinti
UNMETERED CUSTOMERS N
1 Monthly Charge Per Living Unit
METERED CUSTOMERS
Minimum Monthly Charge
2 1" Water Meter or Smaller
3 Greater Than 1" Up to 2" Water Meter
4 Greater Than 2" Up to 4" Water Meter
5 Greater Than 4" Water Meter
Charge for Consumption Per 1,000 Gallons
Exhibit 1
City of Seward, Alaska
Schedule of Monthly Sewer Rates
Effective Effective Effective Effective
As Soon January 15, January 15, January 15,
As Practical 2022 2023 2024
DRAFT
Effective Annual Increase
January 15, Reference
2025 After 2025
$ 68.27 $ 71.00 $ 73.84 $ 76.79 $ 79.86 [A]
$ 58.25 $
60.58 $
63.00 $
65.52 $
68.14
[A]
96.37
100.22
104.23
108.40
112.74
[A]
242.99
252.71
262.82
273.33
284.26
[A]
1,214.88
1,263.48
1,314.02
1,366.58
1,421.24
[A]
6 All Gallons $ 8.47 $ 8.81 $ 9.16 $ 9.53 $ 9.91 [A]
[*] Any unmetered customers that are required by the City to be metered based on the customer classifications shall be charged the following monthly rates per ERU
until switched over to metered service. The number of ERU's for such customers shall be determined by the ERU determination methodology in effect prior to
the adoption of this tariff.
Effective Effective Effective Effective Effective
As Soon January 15, January 15, January 15, January 15,
As Practical 2022 2023 2024 2025
Rate Per ERU for Unmetered Customers Required to Be
Metered By the City But Not Yet Switched Over to
Metered Service $ 70.16 $ 72.97 $ 75.89 $ 78.93 $ 82.09
ANNUAL INCREASE REFERENCES:
[A] In the absence of a formal study recommendation or action by the city council, the rates and fees herein provided shall be automatically increased for
inflationary effects on the costs of operations - without a public hearing - effective for all bills rendered on or after January 15th of each year. The
percentage increase, if any, shall be the average of the five (5) previous published years' annual increases in the Urban Alaska Consumer Price Index,
all urban consumers, not seasonally adjusted (the "CPI") (Series ID: CUURS49GSAO accessed via https:Hdata.bls.gov/cgi-bin/srgate) as published
by the United States Department of Labor, Bureau of Labor Statistics. For example, if the previous five years' annual increases in the CPI were
1.4%, 3.0%, 0.5%, 0.4%, and 0.5%, the average increase of 1.2% would be applied to the rates.
52
City of Seward Sewer Rate Tariff Page 4 of 14
Exhibit 2
City of Seward, Alaska
Sewer System Special Rates, Charges, and Fees
Line
No.
DRAFT
Annual
Effective Increase
As Soon As Practical Reference
1. Users generating sewage with a BOD and SS loading in excess of 250 Specified rate in rate tables times a factor of the actual BOD and SS
mg/liter upon a determination by the Public Works Director or his/her loading (in mg/liter) divided by 250 mg/liter, plus the cost of testing
designee that the concentration and characteristics of the sewage will
not cause a detrimental effect upon the sewer system and/or treatment
plant.
[BOD = "Biological Oxygen Demand" and SS = "Suspended Solids"]
2. Tank Truck Operators: Applies to vehicles transporting fresh sewage
from portable or chemical toilets or from approved vessels docked for
an extended period of time (provided the Public Works Director or
his/her designee determines the waste will not be detrimental to the
sewer system and/or treatment plant). Tank trunk operators must have a
contract with the City prior to discharging waste into the City's sewer
system and must keep an accurate log sheet of all discharges and submit
the log sheet with payment monthly.
NOTE:
Per Section 14.20.060 of the City Code of Ordinances, it is unlawful to
discharge into the City's sewer system, septic tank waste or any waste
containing toxic or other materials that could cause the City's discharge
to violate the EPA or DEC discharge permit.
3. Recreational Vehicle - Wastewater Dump Site Use
Flat Fee ver truck tank capacity:
Up to 500 gallon tank
Over 500 up to 1,000 gallon tank
Over 1,000 up to 1,500 gallon tank
Over 1,500 up to 3,000 gallon tank
Flat Fee ver dump:
$50.00
N/A
100.00
N/A
150.00
N/A
300.00
N/A
Included in daily RV, N/A
camper, or trailer permit fee
City of Seward Sewer Rate Tariff 53 Page 5 of 14
Line
No.
Exhibit 2
City of Seward, Alaska
Sewer System Special Rates, Charges, and Fees
Effective
As Soon As Practical
DRAFT
Annual
Increase
Reference
Public and Private Campground Operators - Charges to Collect and Per day per RV, camper, or trailer
Submit to City for Sewer Service: permit, not including tent campers $1.50 N/A
[Operators must maintain sufficient records to compute a monthly
payment, and such records shall be made available to the City upon
request.]
4. Ship's Sewage: Cruise ship sewage is not accepted by the City. Sewage from other
vessels is not accepted without special permission from the Public
Works Director or his/her designee. Any accepted sewage shall be
billed at the effective metered customer rates or other applicable rates
as determined by the Public Works Director or his/her designee.
5. Sewer Service Inspection Fee (Performed by City): $150
N/A
6. Infrastructure Charges for Inactive Accounts: help to recover the City's
fixed costs of providing service while customer's service is inactive
upon a seasonal turn-off; charged monthly: 2021 Monthly Rates
Unmetered Residental Per Living Unit $58.25
N/A
Unmetered Nonresidential Per ERU 58.25
N/A
Metered: 1" Water Meter or Smaller 58.25
N/A
Metered: Greater Than 1" Up to 2" Water Meter 96.37
N/A
Metered: Greater Than 2" Up to 4" Water Meter 242.99
N/A
Metered: Greater Than 4" Water Meter 1,214.88
N/A
City of Seward Sewer Rate Tariff 54 Page 6 of 14
Line
No.
Exhibit 2
City of Seward, Alaska
Sewer System Special Rates, Charges, and Fees
Infrastructure Charges for Inactive Accounts: (cont.)
Infrastructure Charges for Inactive Accounts: (cont.)
Infrastructure Charges for Inactive Accounts: (cont.)
Unmetered Residental Per Living Unit
Unmetered Nonresidential Per ERU
Metered: 1" Water Meter or Smaller
Metered: Greater Than 1" Up to 2" Water Meter
Metered: Greater Than 2" Up to 4" Water Meter
Metered: Greater Than 4" Water Meter
Unmetered Residental Per Living Unit
Unmetered Nonresidential Per ERU
Metered: 1" Water Meter or Smaller
Metered: Greater Than 1" Up to 2" Water Meter
Metered: Greater Than 2" Up to 4" Water Meter
Metered: Greater Than 4" Water Meter
Unmetered Residental Per Living Unit
Unmetered Nonresidential Per ERU
Metered: 1" Water Meter or Smaller
Metered: Greater Than 1" Up to 2" Water Meter
Metered: Greater Than 2" Up to 4" Water Meter
Metered: Greater Than 4" Water Meter
DRAFT
Effective
As Soon As Practical
2022 Monthly Rates
$60.58
60.58
60.58
100.22
252.71
1,263.48
2023 Monthly Rates
$63.00
63.00
63.00
104.23
262.82
1,314.02
2024 Monthly Rates
$65.52
65.52
65.52
108.40
273.33
1,366.58
Annual
Increase
Reference
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
City of Seward Sewer Rate Tariff 55 Page 7 of 14
Line
No.
Exhibit 2
City of Seward, Alaska
Sewer System Special Rates, Charges, and Fees
Infrastructure Charges for Inactive Accounts: (cont.)
DRAFT
Effective
As Soon As Practical
2025 Monthly Rates
Unmetered Residental Per Living Unit
$68.14
Unmetered Nonresidential Per ERU
68.14
Metered: 1" Water Meter or Smaller
68.14
Metered: Greater Than 1" Up to 2" Water Meter
112.74
Metered: Greater Than 2" Up to 4" Water Meter
284.26
Metered: Greater Than 4" Water Meter
1,421.24
7. Unauthorized Connection or Discharge into the City Sewer System:
8. Restoration of Sewer Service and Repair of Damage by Owner or
Contractor to City Facilities:
9. Locate Sewer Main:
10. Security Deposit:
Unmetered Customers
Metered Customers
Per Occurrence: $1,000
PLUS Cost of repair, restoration or cleanup by the City
PLUS State and/or Federal penalties and charges levied against the
City or individuals
Actual cost, including city overhead, administration, labor, materials
and equipment
First Locate: No Charge
Each Additional Locate on Property: $170
Large projects requiring several locates will be under a special contract
and may require an additional fee.
Per Section 14.01.030 of City Code of Ordinances. Based on two (2)
months fixed charges or such other amount as may be established by
resolution.
Two (2) months fixed charges for Unmetered Customers multiplied by
a factor of three (3)
Annual
Increase
Reference
[A]
[A]
[A]
[A]
[A]
[A]
N/A
N/A
City of Seward Sewer Rate Tariff 56 Page 8 of 14
Line
No.
11. Contractor Work:
12. Sewage Meter:
Exhibit 2
City of Seward, Alaska
Sewer System Special Rates, Charges, and Fees
DRAFT
Annual
Effective Increase
As Soon As Practical Reference
Any contractor tapping into a city sewer main, or otherwise working N/A
on a City sewer main, must be properly licensed to perform the work
and must also provide a $5,000.00 bond or equivalent cash guarantee
payable to the City.
Computed from the quantity of metered water delivered to the same
activity unless a sewage meter has been installed. Sewage meters
approved by the City may be installed at the user's expense.
13. Delinquent Account Charges Interest rate: 10% per annum N/A
Monthly late fee: $5 N/A
For customers receiving more than one service (e.g., electric, water, and sewer service), the delinquent account charges apply to the
combined bill and not to each service.
ANNUAL INCREASE REFERENCES:
N/A No annual increases.
[A] After 2025, infrastructure charges for inactive accounts shall be automatically adjusted on an annual basis by the same percentage increases, if any, as the City's
monthly sewer base infrastructure charges.
City of Seward Sewer Rate Tariff 57 Page 9 of 14
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
For more details, reference the water rate tariff in effect prior to the adoption of this rate tariff.
GROUP A - RESIDENTIAL
BASIS FOR MONTHLY FEE
Category/Description of Unit Charge
Living unit with plumbing for laundry, or common laundry facility 1 ERU
available on premises
Living unit without plumbing for laundry and no common laundry 0.75 ERU
available for use by the occupant
Rental apartment unit not occupied by owner when billed as a
multiple unit of 3 or more apartments served from a single water 0.75 ERU
service. (No credit will be given for unoccupied units.)
Duplex in one building treated as two residences served from a single 2 ERU
water service
GROUP B - SMALL GENERAL SERVICE
BASIS FOR MONTHLY FEE
Category/Description of Unit Charge
Hotels and motels not including bars and restaurants:
Basic charge per building 1.0 ERU
PLUS each guest room 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
City of Seward Sewer Rate Tariff Page 10 of 14
58
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Office Building/Mall with offices and retail stores and businesses not including
restaurants, bars, food markets:
Basic charge per building 1.0 ERU
PLUS each office/activity 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
Single Office/retail shop/professional activity not in office building, per each office
or activity
1.0 ERU
Barber, beauty, animal grooming shop:
Basic charge 1.0 ERU
PLUS charge per chair/tub 0.75 ERU
Libraries, public offices, professional offices, and similar activities:
Basic charge per building 1.0 ERU
PLUS each office/activity 0.3 ERU
PLUS each pair of public restrooms in excess of one pair 0.3 ERU
Doctors' offices, including medical clinics, emergency first aid station, dentists' offices
and similar activities:
Basic charge per facility
PLUS per each examination room, dental chair or similar unit
PLUS per each office
Warehouses:
Basic charge per building
PLUS each pair of restrooms or showers exceeding one pair
City of Seward Sewer Rate Tariff
1.0 ERU
0.5 ERU
0.3 ERU
1.0 ERU
0.3 ERU
Page l l of 14
6T]
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Churches, theaters, assembly halls, clubs, fraternal clubs:
Basic charge per building
PLUS each pair of restrooms exceeding one pair
PLUS, for food/bar service, add charge for restaurant or bar
Public restrooms in parks and similar activities, per each pair of
restrooms
Boardwalk shops with sewage, per shop
Camping & RV Parks:
Per spigot
Per camper/motorhome hookup
Private schools, day care centers
Basic charge
PLUS per each 15 students or for children in excess of 25
Public baths and showers:
Basic charge
PLUS per each bath or shower in excess of two
GROUP C - LARGE GENERAL SERVICE
BASIS FOR MONTHLY FEE
Category/Description of Unit
Food/grocery markets:
Basic charge
PLUS per water-cooled refrigeration unit
PLUS per butcher/meat packing unit
PLUS per bakery
PLUS per snack bar/Deli
City of Seward Sewer Rate Tariff
1.0 ERU
0.3 ERU
1.0 ERU
0.5 ERU
0.5 ERU
0.2 ERU
2.0 ERU
0.5 ERU
2.0 ERU
0.5 ERU
Charge
3.0 ERU
3.0 ERU
1.0 ERU
1.0 ERU
0.5 ERU
Page 12 of 14
C:311
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Restaurants and/or bars (A unit may be defined as a combination
restaurant/bar if operated together or separate units if restaurant
and bar are operated separately.) This category includes all drink
and food service activities, including full service restaurants,
hospital kitchens, dormitories, dining halls, school cafeterias, etc.:
Basic charge per unit
PLUS per every 8 seats in excess of 8 seats
Snack Bar - no seating
Garage/gas stations and retail, manufacturing and repair shops not using
water for processing:
Basic charge
PLUS per pair of restrooms exceeding one pair
PLUS per each shower
PLUS per each wash bay
Public schools, if non -metered, excluding swimming pools or food
service:
Basic charge
Elementary School
Jr. High School
High School
PLUS swimming pool
PLUS charge for food service based on rate for restaurants
Hospital & Nursing Homes, if un-metered, excluding food service:
Basic charge
PLUS charge for food service based on rate for restaurants
City of Seward Sewer Rate Tariff
2.0 ERU
0.5 ERU
0.5 ERU
2.0 ERU
0.3 ERU
0.3 ERU
1.0 ERU
7.0 ERU
7.0 ERU
8.0 ERU
15.0 ERU
6.0 ERU
Page 13 of 14
Exhibit 3
City of Seward, Alaska
DRAFT
ERU Determination Methodolo2y for Unmetered Customers Required to
Be Metered That Have Not Yet Switched Over to Metered Service
Laundry (self service or commercial units), un-metered [new laundries
will be metered]:
Basic charge
PLUS per each laundry unit of 12 pounds or less capacity
PLUS per each laundry unit larger than 12 pounds capacity
City of Seward Sewer Rate Tariff
2.0 ERU
1.0 ERU
2.0 ERU
Page 14 of 14
I.%
Water Rates and Charges - 2021
Rates for Water by Class of Service
ANNUAL RATE ADJUSTMENT. The rates and fees herein provided are adjusted 1.6% beginning the first
billing cycle of the 2019 calendar year. The rates thereafter will be adjusted annually beginning the first billing o
each calendar year to reflect an average of the five previous published years' annual increases in the Consumer
Price Index, All Items, 1982-84100 for all Urban Consumers, Anchorage, Alaska Area ("CPI') as published by
the United States Department of Labor, Bureau of Labor Statistics. (For example, 2019 rates reflected an increase
based on the average CPI for 2011-2015.
Note: * ERU = Equivalent Residential Unit ($48.96)
GROUP A - RESIDENTIAL
Group A includes all residential customers living in single family or multiple family living units. Multiple family
units include multi-plexes, apartments and townhouses, but exclude hotels, motels and similar transient
accommodations. The accounts may be paid by individual occupants or owners of multiple units. When the entire
water service to a multiplex or apartment building is billed to one account, the charge will be based on total
number of living units in the building whether or not occupied. Living units are considered to be complete with
kitchens, baths and plumbing for laundry units. No adjustment is made for the size of the unit, numbers of
amenities or the size of the family occupying the unit. A 25% reduction is permitted for units that are not plumbed
for laundry units provided a common laundry unit is not available in the building or apartment complex for
apartment occupants. There will be no reduction if a common laundry facility is available. All commercial
residential customers may elect to install, at their own expense, water meters, to be charged Group D metered
commercial water and sewer rates. Customers electing to convert to metered rates are encouraged to consider that
a pending Water and Sewer Rate Study may impact either or both ERU rates and metered rates, when deciding
whether to invest in the costs of installing a water meter.
BASIS FOR MONTHLY FEE
Category/Description of Unit
Charge
Living unit with plumbing for laundry, or common laundry facility
1 ERU
available on premises
Living unit without plumbing for laundry and no common laundry
0.75 ERU
available for use by the occupant
Rental apartment unit not occupied by owner when billed as a
multiple unit of 3 or more apartments served from a single water
0.75 ERU
service. (No credit will be given for unoccupied units.)
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Page 3-1
63
Duplex in one building treated as two residences served from a single 2 ERU
water service
GROUP B - SMALL GENERAL SERVICE
Group B includes commercial enterprises where the use of water is incidental to the commercial activity and is
primarily limited to domestic and janitorial use. This class of service includes such businesses as hotels, motels,
professional office buildings, barber shops, warehouses, libraries, public offices, churches and theaters, etc. Where
a building, mall or group of facilities is served from a single service, the bill will be based on the total number of
facilities to be served, and no credit will be given for vacant facilities. Group B customers may elect to install, at
their own expense, water meters, to be eligible for Group D metered commercial water and sewer rates. Customers
electing to convert are encouraged to consider that a pending Water and Sewer Rate Study may impact either or
both ERU rates and metered rates, when deciding whether to invest in the costs of installing a water meter.
BASIS FOR MONTHLY FEE
Category/Description of Unit
Hotels and motels not including bars and restaurants:
Basic charge per building
PLUS each guest room
PLUS each pair of public restrooms in excess of one pair
Office Building/Mall with offices and retail stores and businesses not
restaurants, bars, food markets:
Basic charge per building
PLUS each office/activity
PLUS each pair of public restrooms in excess of one pair
Single Office/retail shop/professional activity not in office building,
each office or activity
Barber, beauty, animal grooming shop:
Basic charge
PLUS charge per chair/tub
Libraries, public offices, professional offices, and similar activities:
Basic charge per building
PLUS each office/activity
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Charge
1.0 ERU
0.3 ERU
0.3 ERU
including
1.0 ERU
0.3 ERU
0.3 ERU
per
1.0 ERU
1.0 ERU
0.75 ERU
1.0 ERU
0.3 ERU
Page 3-2
64
PLUS each pair of public restrooms in excess of one pair
Doctors' offices, including medical clinics, emergency first aid sta
offices and similar activities:
Basic charge per facility
PLUS per each examination room, dental chair or similar unit
PLUS per each office
0.3 ERU
ists'
1.0 ERU
0.5 ERU
0.3 ERU
Warehouses:
1.0 ERU
Basic charge per building
0.3 ERU
PLUS each pair of restrooms or showers exceeding one pair
Churches, theaters, assembly halls, clubs, fraternal clubs:
Basic charge per building
1.0 ERU
PLUS each pair of restrooms exceeding one pair
0.3 ERU
PLUS, for food/bar service, add charge for restaurant or bar
Public restrooms in parks and similar activities, per each pair of
1.0 ERU
restrooms
Boardwalk shops with sewage, per shop
0.5 ERU
Camping & RV Parks:
Per spigot
0.5 ERU
Per camp er/motorhome hookup
0.2 ERU
Private schools, day care centers
2.0 ERU
Basic charge
0.5 ERU
PLUS per each 15 students or for children in excess of 25
Public baths and showers:
Basic charge
2.0 ERU
PLUS per each bath or shower in excess of two
0.5 ERU
NOTE: Only one basic charge will be assessed per building where different activities occupy the
same building. This does not exclude residential charges for living units within the
same building.
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Page 3-3
M
GROUP C - LARGE GENERAL SERVICE
Group C includes commercial enterprises where water usage is greater than in Small General services and/or
water is used for food preparation or other activities, but not for industrial processing. These activities will be
metered when newly constructed or when remodeling and/or repairs makes installation of meters feasible. When
a building, mall or group of facilities is served from a single service, the bill will be based on the total number of
facilities served, and no credit will be given for vacant facilities. Group C customers with meters will be charged
Group D metered commercial water and sewer rates. Customers wishing to convert to metered rates are
encouraged to consider that a pending Water and Sewer Rate Study may impact either or both ERU rates and
metered rates, when deciding whether to invest in the costs of installing a water meter.
BASIS FOR MONTHLY FEE
Category/Description of Unit
Charge
Food/grocery markets:
Basic charge
3.0 ERU
PLUS per water-cooled refrigeration unit
3.0 ERU
PLUS per butcher/meat packing unit
1.0 ERU
PLUS per bakery
1.0 ERU
PLUS per snack bar/Deli
0.5 ERU
Restaurants and/or bars (A unit may be defined as a combination
restaurant/bar if operated together or separate units if restaurant
and bar are operated separately.) This category includes all drink
and food service activities, including full service restaurants,
hospital kitchens, dormitories, dining halls, school cafeterias, etc.:
Basic charge per unit
2.0 ERU
PLUS per every 8 seats in excess of 8 seats
0.5 ERU
Snack Bar - no seating
0.5 ERU
Garage/gas stations and retail, manufacturing and repair shops not using
water for processing:
Basic charge
2.0 ERU
PLUS per pair of restrooms exceeding one pair
0.3 ERU
PLUS per each shower
0.3 ERU
PLUS per each wash bay
1.0 ERU
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Page 3-4
Public schools, if non -metered, excluding swimming pools or food
service:
Basic charge
Elementary School
Jr. High School
7.0 ERU
High School
7.0 ERU
PLUS swimming pool
8.0 ERU
PLUS charge for food service based on rate for restaurants
15.0 ERU
(Pg. 3-4)
Hospital & Nursing Homes, if un-metered, excluding food service:
Basic charge
6.0 ERU
PLUS charge for food service based on rate for restaurants
(Pg. 3-4)
Laundry (self service or commercial units), un-metered [new laundries
will be metered]:
Basic charge
2.0 ERU
PLUS per each laundry unit of 12 pounds or less capacity
1.0 ERU
PLUS per each laundry unit larger than 12 pounds capacity
2.0 ERU
GROUP D - METERED COMMERCIAL & INDUSTRIAL SERVICE
Group D includes metered commercial and industrial enterprises (non-commercial residential Group A customers
are not currently eligible for metered rates). All new commercial activities shall be metered, and existing facilities
will be converted to meters when remodeling and repairs make installation of a meter feasible. Meters must
include readouts at a location acceptable to the City, to allow for accurate meter readings. Remote readers are
required.
The cost of initial installation of a meter in a new facility will be paid by the customer. The cost of maintenance,
repair and replacement of all meters will be at customer expense. The customer will provide a meter, and the user
will pay the cost of installation, where an existing service is converted to meter and the commercial use/activities
of the user have not changed. If the meter is required due to changed usage, the customer will pay all costs,
including the cost of the meter. Failure to repair or replace a faulty meter will result in the billing department
estimating the meter reading or returning the customer to non -metered billing at the utility's discretion, until such
time as the meter is replaced. If the customer fails to replace a faulty meter within 90 days of being informed of
the need to replace the meter, the City may, at its expense, replace the meter and charge the customer as a work
order, at double the costs incurred to replace the faulty meter, to encourage customers to repair and replace their
own equipment. In all cases, the City will specify and/or approve the type of meter and its installation.
A commercial customer in any Group may request to be converted to meter rates. If the customer request is
approved to convert to meter rates, the customer will install a meter at the customer's expense, and thereafter
charges will be based on metered usage. A customer cannot convert from metered to fixed rate billing.
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Page 3-5
BASIS FOR MONTHLY FEE Minimum Charge for Each Metered Service
Service Size
Minimum Monthly Charge
3/4" - 1" Service
$24.65
1-1/2" - 2" Service
$49.35
2-1/4" - 4" Service
$248.70
Over 4" Service
$1,243.28
Note: The minimum charge per metered service does not include fire sprinkler service.
Charge for Consumption
Consumption per Month per
Meter
Charge per 1,000 Gallons
First 50,000 Gallons
$6.24
Next 500,000 Gallons
$4.98
Next 1,000,000 Gallons
$3.81
Next 2,000,000 Gallons
$3.12
All Additional Gallons
$1.59
The consumption metered on several metered services serving the same owner will not be combined to calculate
the monthly bill. Each will be computed as a separate bill.
The City may negotiate or renegotiate special contracts with a user that consumes in excess of 20 million gallons
of water per calendar year. Such contracts will set or amend a rate which will assure that the user pays its full
share of the utility's fixed and variable operating and maintenance costs. All special contracts and renegotiations
of existing special contracts shall be approved by resolution of the City Council.
City of Seward Water Tariff — Revised per Annual Rate Adjustment.
Page 3-6
68
GROUP E - SPECIAL RATES AND FEES
Group E includes charges for other categories of service not included in Groups A through D.
1. Equivalent Residential Unit (ERU) $49.55
2. Fire Hydrant Use Permit: From May 1 to
August 31 a Fire Hydrant Permit may be
Fire Hydrants will be turned on
and off by Water or Fire Department
Personnel. If the City determines that a
meter and a backflow preventer are
required, these will also be installed by
Water Department personnel. This rate is
set for contractors or other temporary water
users, but not for bulk water service to ships
or tanker trucks serving ships or
industries, as follows:
3. Water Service Connection Fee (done by
City):
Water Service Connection Fee (done by
Contractor):
4. Water Service Inspection Fee (for service
installed by others):
Tapping Fee $102.76
PLUS daily fee: $51.38 issued.
PLUS weekly fee: $308.26
Up to 1" service not longer than 60 feet, one-time
charge of $2,877.02
In excess of 60 feet - actual cost, but not less than
$2,929.65
PLUS cost of paving and curb replacement.
$172.94 connection fee PLUS cost of paving and
curb replacement.
$102.76
City of Seward Water Tariff — Revised per Annual Rate Adjustment. Page 3-7
69
5. Water Turn -On or Turn -Off (per visit, First turn -on and/or turn-off: No Charge excluding new
service and new account name): No charge for the first turn -on for All other turn-ons or turn-offs:
new service or new account. During business hours: $51.38
During non -business hours: $154.42
Seasonal turn-on/turn-off will be charged as
"Seasonal turn-ons or turn-offs" (including new account name or same
account name; waived if <2 months between turn-off and turn -on; only one
Seasonal turn -on: $172.94 waived charge per account per 12-month
Seasonal turn-off: $172.94 period; Seasonal can apply to summer or winter)
6. Unauthorized Use of City Equipment $1,027.53
(including fire hydrants, key boxes, turn- on
and/or turn-off):
7. Restoration of Water Service (including Actual cost, including city overhead, repair of
damage by owner or contractor labor, materials and equipment. to city facilities)
8. Locate Service: Locate between May 1 and Oct. 31 - no charge
Locate between Nov. 1 and April 30 - $154.12
Large projects requiring several locates will be
under a special agreement with the water
utility and may include an additional fee.
9. Thaw Wire: Locate between May 1 and Oct. 31 - no charge
Locate between Nov. 1 and April 30 - $154.12
10. Security Deposit: Domestic (Single Fam. & Duplex) $51.38
Commercial & Multiple Dwellings: $154.12
City of Seward Water Tariff — Revised per Annual Rate Adjustment. Page 3-8
70
Fire Hydrant usage: $308.26
11. Contractor Work: Any contractor tapping into a city main, or otherwise working on a city
water line, must be properly licensed to perform the work and must also provide a
$5,000.00 bond or equivalent cash guarantee payable to the city.
12. Ship Water Less than 1,000 gallons from Seward Boat Harbor
(Water furnished to temporarily moored facilities not requiring city assistance or the use of
vessels): fire hydrants: No Charge
All service not included above:
Basic Charge (during regular business hours):
$102.76
Basic Charge (outside regular business hours)@
$205.51
PLUS $9.56 per 1000 gallons for all water used.
Note: Customer will be responsible for actual
charges related to all work and materials required
to provide water to vessel. The Point of delivery
for potable water supplied by the City shall be at
the customer side of the meter/backflow
preventer, and the customer is responsible for
water quality from the delivery point to the vessel.
City of Seward Water Tariff — Revised per Annual Rate Adjustment. Page 3-9
71
Sewer Rates and Charges - 2021
Rates for Sewer by Class of Service
ANNUAL RATE ADJUSTMENT: The rates and fees herein provided are adjusted 1.16% beginning the first billing
cycle of the 2020 calendar year. The rates thereafter will be adjusted annually beginning the first billing of each
calendar year to reflect an average of the five previous published years' annual increase in the Consumer Price Index,
All Items, 1982-84=100 for all Urban Consumers, Anchorage, Alaska Area ("CPI") as published by the United States
Department of Labor, Bureau of Labor Statistics. (For example, 2020 rates reflect an increase based on the average
CPI for 2012-2016.)
GROUP A - RESIDENTIAL
Group A includes all residential customers living in single family or multiple family living units. Multiple family
units include multi-plexes, apartments and townhouses, but excludes hotels, motels and similar transient
accommodations. All commercial residential customers with a water meter are eligible for Group D metered
commercial sewer rates. Customers wishing to convert to metered rates are encouraged to consider that a pending
Water and Sewer Rate Study may impact either or both ERU rates and metered rates, when deciding whether to
invest in the costs of installing a water meter.
GROUP B — SMALL GENERAL SERVICE
Group B includes commercial enterprises where the use of water is incidental to the commercial activity and is
primarily limited to domestic and janitorial use. This class of service includes such businesses as hotels, motels,
professional office buildings, barber shops, warehouses, libraries, public offices, churches and theaters, etc. Group
B customers with water meters are eligible for Group D metered commercial sewer rates. Customers wishing to
convert to metered rates are encouraged to consider that a pending Water and Sewer Rate Study may impact either
or both ERU rates and metered rates, when deciding whether to invest in the costs of installing a water meter.
GROUP C - LARGE GENERAL SERVICE
Group C includes commercial enterprises where water usage is greater than in Small General Service and/or water
is used for food preparation or other activities, but not for industrial processing. Group C customers with meters
are eligible for Group D metered commercial sewer rates. Customers wishing to convert to metered rates are
encouraged to consider that a pending Water and Sewer Rate Study may impact either or both ERU rates and
metered rates, when deciding whether to invest in the costs of installing a water meter.
GROUP D - METERED COMMERCIAL & INDUSTRIAL SERVICE
City of Seward Sewer Tariff -Per 2018 Budget, Effective January 15, 2018 and Resolution 2018-030. Page 4-1
72
Group D includes metered commercial and industrial enterprises (non-commercial residential Group A customers
are not currently eligible for metered rates).
BASIS FOR MONTHLY FEES AND CHARGES
GROUPS A - D
NON -METERED SERVICES
Non -metered sewer users in Groups A, B and C shall be charged at the rate of $68.27 per ERU per month, not
including tax, when the water service and sewer service serve the same activities. If the activities serviced by the
sewer services are different than those served by the water service, a water charge shall be computed based on the
activities served by the sewer. The sewer rate shall then be computed at 1.2 times the established water charge.
METERED SERVICES
Users with metered service (Group D shall be charged for sewer service according to the rates listed below. The
charge shall be based upon the quantity of metered water, except that those users having a sewer meter shall be
charged for the quantity of sewage actually metered. The quantity of sewage will be adjusted if a significant
amount of wastewater is not discharged into the city sewer system.
Minimum Charge for Each Metered Service
Service Size
Minimum Monthly Charge
3/4" - V water service
$58.25
1-1/2" - 2" water service
$96.37
2-1/4" - 4" water service
$242.99
Over 4" water service
$1,214.88
Charge for Consumption
Gallons of Sewage Discharged per Month
Charge per 1,000 Gallons
Groups A, B & C
Group D
First 10,000 Gallons
$8.56
$8.56
Next 40,000 Gallons
$6.85
$6.85
Next 50,000 Gallons
$5.68
$5.68
Next 100,000 Gallons
$5.12
$5.12
All Additional Gallons
$2.53
$2.53
City of Seward Sewer Tariff -Per 2018 Budget, Effective January 15, 2018 and Resolution 2018-030. Page 4-2
73
GROUP E - SPECIAL RATES AND FEES
Group E includes charges for other categories of service not included in Groups A through D.
1. Users generating sewage with a BOD plant [BOD ABiological Oxygen Demand@
and SS loading in excess of mg/1 (upon a and SS ASuspended Solids@]
deter- mination by the utility manager that Specified rate in rate tables times a factor of the
the concentration and characteristics of the
sewage will not cause a detrimental effect
upon the sewer system and/or treatment
2. Tank Truck Operators: Fresh sewage, or
waste from portable or chemical toilets,
provided the utility manager determines the
waste will not be detrimental to the sewer
system and/or treatment plant.
NOTE:
It is prohibited to discharge into the
city=s sewer system, septic tank waste or
any waste containing toxic or other
materials that could cause the city=s
discharge to violate the EPA or DEC
discharge permit.
Recreational Vehicles: Individual RV
owners utilizing city -owned or approved
dump sites
Public and private campground operators
[Operators must maintain sufficient records to
compute a monthly payment, and such records shall
be made available to the city upon request.]
4. Ship's Sewage:
Sewer Service Connection Fee:
6. Sewer Service Inspection Fee: This fee
shall be charged for services installed by
anyone other than the city.
actual BOD and SS loading divided by 250, plus
the cost of testing
Per thousand gallons
No fee
$66.27
$1.12 per day Per RV, camper or trailer permit, not
including tent campers.
Not accepted
Installed at property owner=s expense. Any work
performed by the city will be charged at total cost,
including labor, overhead, administration, materials
and equipment PLUS a $159.97 connection fee.
$127.97
City of Seward Sewer Tariff -Per 2018 Budget, Effective January 15, 2018 and Resolution 2018-030. Page 4-3
74
7.Unauthorized Connection or Discharge into the
City Sewer System: Per Occurrence
$1,004.04
PLUS Cost of repair, restoration or cleanup by city
PLUS State and/or federal penalties & charges
levied against the city or individuals
9. Locate Sewer Main:
8. Restoration of Sewer Service and Repair of
Damage by Owner or Contractor to City
Facilities:
Actual cost, including city overhead, adminis-
tration, labor, materials and equipment
First Locate: No Charge
Each Additional Locate: $100.39
Large projects requiring several locates will be
under a special contract and may require a fee.
10. Security Deposit: If a water security deposit was paid,
no additional deposit will be required. If no water
deposit was paid, the following deposits will be charged.
11. Contractor Work: Any contractor tapping
guarantee into a city sewer main, or otherwise working
on a city sewer main, must be properly licensed to
perform the work and must provide:
Domestic: $50.20
(Single Family & Duplex)
Commercial: $150.61
Multi -Family: $150.61
$5000.00 Bond or equivalent cash
payable to the city.
12. Sewer System Delivery Charge (includes Sewer System Delivery Charge: $51.19 monthly
new account name or same account name). A
Sewer System Delivery Charge of $50 per month
will be applied to any service that has their water turned off.
13. Sewage Meter:
14. Delinquent Account Charges:
Computed from the quantity of metered water
delivered to the same activity unless a sewage meter
has been installed. Sewage meters approved by the
city may be installed at the user(s) expense.
Interest Rate: 10.7%
Monthly Late Fee: $5.89
City of Seward Sewer Tariff -Per 2018 Budget, Effective January 15, 2018 and Resolution 2018-030. Page 4-4
75