HomeMy WebLinkAbout05242021 City Council Work Session Packet - CIP PrioritizationSeward City Council
Work Session Packet
Topic: Discuss Capital Improvement Plan (CIP)
Prioritization
May 24, 2021
City Council Chambers Beginning at 5:00 p.m.
TEMPORARY PROCESS FOR CITIZEN COMMENTS
AT MAY 24, 2021 CITY COUNCIL WORK SESSION
The Seward City Council will hold a Work Session on Monday, May 24, 2021. Because the City
of Seward is currently experiencing a declared public health emergency due to Coronavirus
Disease 2019 (COVID-19), alternate methods for providing comments has been created.
CITIZEN COMMENTS
1. WRITTEN comments can be emailed to clerkgcityofseward.net. Identify whether you want
your comments forwarded to council immediately, read aloud at the work session, or both.
2. TELEPHONIC comments can be made by sending an email request to
clerkgcityofseward.net. Be sure to include the phone number you wished to be called.
Questions? Call the city clerk at 224-4045.
How To Virtually ATTEND The Meeting
1. The meeting will be Live Streamed on the city's YouTube page. Log onto YouTube and type
"City of Seward Alaska" into the search bar.
2. Listen on the radio. Tune to KIBH-FM 91.7
3. Watch on television. Tune into GCI Cable Channel 9.
CITY COUNCIL WORK SESSION
Monday, May 24, 2021 at 5:00 p.m.
TOPIC: Discuss Capital Improvement Plan (CIP) Prioritization
City Council
Survey Questions.............................................................. Pg. 2
SurveyResults................................................................ Pg. 12
SurveyRoll Up................................................................ Pg. 13
Department Heads
SurveyRoll Up.............................................................. Pg. 16
Council Member'
CIP Survey Results
City of Seward — May 10t", 2021
CI P Priorities Survey
o Survey asked council members to rank CIP projects for each fund by
priority
o Results presented show highest ranked projects from each fund
o Results are based on completed surveys received by 5/10/21
o Complete survey results and comments can be found in the packet
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
Yes No
Are you in favor of the current
proposal by administration for the
4
new animal shelter?
General Fund Top Priority
Relocation of Publ
Works Building
20%
Campgrounds:
Additional utility sites
on waterfront
20%
New Animal Shelter
60%
ElectricF
T-Line replacement Nash
m
20%
Seward marine terminal
electrical upgrades for
cruise ships
20%
Fort Raymond substation
fence upgrade
60%
Public Works - Water
Distribuition piping
upgrades (ductile
iron pipe)
20%
Gateway tank roof
20%
Replace Lowell
Canyon 200k gallon
tank with 500kgallon
tank
40%
ew water meter
program - with auto -
readers
20%
Public Works - Wastewater
SMIC lower lift station
construction
20%
Wastewater lagoon
sludge removal
60%
Replace infrastructure
past useful life
20%
Harbor
Replace anodes o
concrete floats
20%
NE boat launch ramp
60%
Replace K & L and
remainder of G floats
20%
SMIC
Addition of fire
hydrants
Improve drainage and
fence storage area
20%
10
North dock paving
Addi ionat I power
stalls
20%
City owned boat
yard roads
20%
Questions
or
Comments
Council Members CIP Survey Results
Baclaan DeMoss
Osenga
Terry McClure Seese Casagranda
No
Yes
Yes
Yes
Yes
would love to move
Comment
The current version is
forward as quickly as
Must proceed with
good. Lets get it done
possible
this
Campgrounds:
General Fund
1
Additional utility sites
Relocation of Public
on waterfront
Works building
New animal shelter
New animal shelter
New animal shelter
2
Community Rec
Lagoon boardwalk
Center Construction
New animal shelter
Lowell Creek Tunnel
Lowell Creek Tunnel
rebuild
3
Community Rec
Mobile & Portable
Relocation of Public
Parks & Rec Building
Heat Loop Project
center construction
Radios for ALMR
Works Building
Demo
Lowell Tunnel needs a
full court press before
I rated my decisions
it fails and we have an
on items that could
emergency on our
improve the livelihood
hands. Animal shelter
of citizens, while also
low hanging fruit
Comment
being revenue
ready to move
generators. I rated
forward. Moving City
lowell creek tunnel
Shop finally has good
last as we are moving
support and
forward with the new
momentum with
project.
I
I
JCouncil.
Seward marine
Electric Fund
Fort Raymond
terminal electical
Fort Raymond
Fort Raymond
substation Fence
upgrades for cruise
T-Line Replace Nash
Substation Fence
substation fence
Upgrade
ships
Rd
upgrade
upgrade
Ships aren't asking for
electrical upgrades at
docks, but would be
another large user if
we make them
connect. Fence at ft
Comment
raymond needs to get
I really only have an
done before someone
opinion about #1 & #2
gets hurt. Then also
(#2 choice was
look at quality of
downtown alleys
infrastrure and
underground)
number of customers.
Water
Replace Lowell
New water meter
Distribuition Piping
Replace Lowell
Canyon 200k tank
program - with auto-
upgrades (ductile iron
Canyon 200K tank
with 500k tank
readers
Gateway Tank Roof
pipe)
with 500K tank
Wastewater
Watewater Lagoon
Replace infrastructure
Wastewater Lagoon
SMIC lower lift station
Wastewater lagoon
sludge removal
past userful life (75K)
sludge removal
construction
sludge removal
Comment
Not very well versed
on these projects.
Harbor
Replace K&L and
Replace anodes on
remainder of G float
concrete floats
NE Boat Launch Ramp
NE Boat Launch Ramp
Ne Boat launch ramp
SMIC
Pave City owned boat Additional power Improve drainage and Addtion of fire
North Dock Paving yard roads stalls fence storage area hydrants
Comment
iK
Please rank the list of General Fund projects from highest priority to
lowest priority.
18
16
14
12
10
8
6
4
2
0
,`a
`te p° °Q oca \5 `ce t° Qa m t° Qo °° t �a Q
P° eKa oc Qz `too P° �Q�O °c `c �aJ�O ° �a`� G C �cpo gee ooQ
�\,
e a°� oa at e� �Q e ea
v
Please rank the list of Electric enterprise fund projects from highest
priority to lowest.
10 T—
8
7
6
5
4
1111111111111111
3
2
fu
0 IIIIIIIIIIIIIIIII
1
Convert T-Line Downtown Gateway Lake Drive Old Mill #3 Radiator Woodland
transmission Replace Nash Alleys (2nd, Upper and (Stoney Hoods Hills
line to 115 kV Rd 3rd, 4th and Lower Creek)
5th)
Underground
13
1111111111111111,
1111111111111111,
1111111111111111,
1111111111111111,
lililililililililililililililill
Fort
1111111111111111,
1111111111111111,
1111111111111111, 1111111111111111,
1111111111111111, 1111111111111111,
lililililililililililililililill IIIIIIIIIIIIIIIII.
Security Seward
Raymond
Upgrades to Marine
Substation
substations Terminal
Fence
electric
Upgrade
upgrades for
cruise ships
■ Score
II Score
8
6
5
4
3
2
1
0
Please rank the list of Water enterprise fund projects from highest
priority to lowest priority.
Replace Lowell Distribution Replace 10" and Replace 10" and Gateway Tank Abandon wells Hypochlorite Replace water New Water
Canyon 200K Piping upgrades 14" AC water 14" AC water Roof at Fort Raymond Generator - lines - Elm Street Meter Program -
gallon Tank with (ductile iron line between line between SMIC Pump with auto-
500K gallon tank pipe) Phoenix and Sea Phoenix and Sea House - readers
Lion Lion Construction
Please rank the list of Wastewater enterprise fund projects from
highest priority to lowest priority.
6
5
4
3
2
1
0
ae
aye \aoe �No
14
■ Score
■ Score
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
Please rank the list of Harbor enterprise fund projects from highest
priority to lowest priority.
Replace K&L and remainder NE Boat Launch Ramp 50 Ton wash down pad 5 Ton crane 1-dock Replace anodes on concrete
of G Float floats
Please rank the list of SMIC enterprise fund projects from highest
priority to lowest priority.
Improve Drainage and North dock paving Pave City owned boat Additional power stalls Additional restroom Addition of Fire
Fence Storage Area yard roads Hydrants
15
■ Score
■ Score
Department Head CIP Survey Results
Va arie
Alan
Norm
Dustin
Tyler Jackie Rob Clinton Doug Sam
General Fu
Mobile and
P & R
Lowell Creek
Lowell Creek
Public Safety
Lowell Creek
1
Animal Shelter
Animal Shelter
Portable Radios
Warehouse/Office
Animal Shelter
Animal Shelter
Tunnel
Tunnel
Building
Tunnel
for ALMR
/Rec Center
Mobile and
Mobile and
Lowell Creek
Community Rec
Public Safety
2
Tunnel
Relocation of PW
Relocation of PW
Animal Shelter
Center
Building
Portable Radios
Portable Radios
Relocation of PW
Relocation of PW
ALMR
for ALMR
Campgrounds:
Wellington
Mobile and
Wellington
Fire Hydrant
Fire Hydrant
Additional utility
3
Pavilion
Portable Radios
Animal Shelter
Relocation of PW
Pavilion
Relocation of PW
Upgrades PH 1
Upgrades P H 1
Animal Shelter
sites on the
ALMR
waterfront
Department Head Top General Fund CIP Project
Public Safety Building
10%
Lowel Creek
30
Mobile and Protable Rad
ALMR
10%
Parks & Rec
house/office/rec center
10%