Loading...
HomeMy WebLinkAbout06072021 City Council Work Session LAYDOWN - Sidewalk RepairsLAYDOWN for work session re: NCL Funds on June 7, 2021 Seward - Sidewalk Repairs and Additions -Projects Priority Project Location/Sid From To Plan Cost 6/7/2021 High 5th Ave -cracks, red brick inlay failure West Washington St 427' Adams St Remove/Replace $ 85,400.00 High 4th Ave ramps at Fire Station (Electric Vault) East In front of doors 90' Fire Station Repair $ 18,000.00 High Adams -Liberty theatre, bank North 3rd Ave 230' 4th Ave Repair $ 46,000.00 High Adams Street by City Hall North 4th Ave, 221' 5th Ave Repair $ 44,200.00 High 5th Ave -SW cracks at City Hall West Adams, 300' 300' north Repair $ 60,000.00 High 5th Ave Retaining Wall by CH West C/H corner, 150' parking entrance Repair $ 30,000.00 High Connect 4th Ave sidewalk Visitor Safety West Jefferson St 630' Madison St New $ 126,000.00 High Railway Handicap ramps South, North 4th Ave Railway Repair $ 6,000.00 Med 4th Ave East side East Washington 500' Adams St Repair $ 100,000.00 Total: $ 515,600.00 Other: High Railway Ave (Handicap ramp) DOT Project South 3rd Ave intersection DOT Mile 0-8 State DOT project Completed Sidewalk Projects 13 Handicap ramps on 4th and 5th Various Various 2017 Paving project Repair DOT 4th Ave // Adams Street (Kawabe Park) South 4th Ave 180' West to Alley Remove/Replace $ 34,850.00 City Hall Handicap ramp and Upper Sidewalk West back of buiding Alley and upper walkway. $ 80,630.00 Railway Ave (Seaview walk and driveway) North 3rd Ave, 84' alley Replace $ 24,975.00 Adams Street by Annex (with below) North 5th Ave, 75' + 6th Ave Repair 4th Ave by Alehouse (with above) West Brn & Hkns, 175' Generations Repair $ 145,500.00 Total: $ 285,955.00 Seward Sidewalk Repairs and Additions -Projects June 7,2021 ma 5t" Ave Red brick and cracks by hotel and Cookery Page 1 of 5 ds Seward Sidewalk Repairs and Additions -Projects June 7,2021 1 401111111104-- 4t" Ave Fire Hall ramps, cracks and light vault Page 2 of 5 ds Seward Sidewalk Repairs and Additions -Projects June 7,2021 Adams by Liberty Theatre and Bank Adams along City Hall and GO Page 3 of 5 ds Seward Sidewalk Repairs and Additions -Projects June 7,2021 5th Ave sidewalk cracks 5t" Ave retaining wall at City Hall Page 4 of 5 ds Seward Sidewalk Repairs and Additions -Projects June 7,2021 4t" Ave sidewalk connection -Visitor safety Page 5 of 5 ds