HomeMy WebLinkAboutRes2021-114 CITY OF SEWARD,ALASKA Sponsored by: Bower RESOLUTION 2021-114 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONSTRUCTION CONTRACT WITH HARRIS SAND AND GRAVEL, INC., IN AN AMOUNT NOT TO EXCEED $2,933,257.50 WHICH INCLUDES A 10% CONTINGENCY FOR THE G, K, & L-FLOAT REPLACEMENT PROJECT AT THE SEWARD BOAT HARBOR WHEREAS,the City of Seward hired R&M Engineering to inspect the northwest portion of the original boat harbor in November,2019; and WHEREAS, the report written in December, 2019 found that the docks that were constructed in the 1970s were beyond their service life; and WHEREAS,the report recommended that the replacement of G, K and L-Float should be the harbor's top priority; and WHEREAS, the Council approved Resolution 2021-080 to enter into a grant agreement with the State of Alaska Department of Transportation Harbor Facility Matching Grant program in the amount of$1,729,988; and WHEREAS,the City developed a scope of work with the assistance of R&M Consultants, Inc. and advertised a competitive bid package according to SCC 6.10.210 and SCC 6.10.215; and WHEREAS, six bids were received by the required deadline of 3:30 p.m. on September 10,2021; and WHEREAS,the City and R&M Consultants, Inc. reviewed all bids and concluded Harris Sand and Gravel Inc. was the lowest, most qualified,and responsive bidder with a bid amount of $2,666,597.73; and WHEREAS, R&M recommends a 10% contingency for this project in the amount of $266,659.77; and WHEREAS,the not to exceed construction cost will be$2,933,257.50. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA that: Section 1. The City Manager is hereby authorized to enter into a construction contract with Hanis Sand and Gravel Inc., with an amount not-to-exceed $2,933,257.50, in substantially the form as attached hereto,for the replacement of G,K and L-Float at the Seward Boat Harbor. CITY OF SEWARD,ALASKA RESOLUTION 2021-114 Section 2. Funding is appropriated through Resolution 2021-113 presented with the same Council meeting dated 9/27/21. Section 3.This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 27th day of September, 2021. TH TY F SE ARD, ALASKA risty Terry,M or AYES: McClure, Seese, Osenga, DeMoss, Casagranda, Terry NOES: None ABSENT: Baclaan ABSTAIN: None ATTEST: renda J. al o , M C City Cleric..••' '•••••., .•`.t OF SEiyq (City43t� p Itqp .,Q '. Fp: • . SEAL = • . • • v ---- d ti• F OF A\P •`" ............ .. City Council Agenda Statement Meeting Date: September 27, 2021 To: City Council Through: Janette Bower, City Manager From: Norm Regis, Harbormaster Agenda Item: Resolution 2021-114: Authorizing the City Manager to Enter into a Construction Contract with Harris Sand and Gravel, Inc., in an Amount not to Exceed $2,933,257.50 which Includes a 10% Contingency for the G, K, &L- Float Replacement Project at the Seward Boat Harbor Background and justification: In November 2019, inspection of the Seward Small Boat Harbor included a visual inspection of the facilities in the northwest harbor including the floating docks G, K and L Floats.The Final Inspection Report issued in December 2019 states, "The floating docks in this section of the harbor were constructed in the 1970's and are at or beyond their service life and should be replaced. The City worked with R & M Consultants to draft and finalize a competitive bid package based on the City's standard construction agreement, the scope of work and the availability of funds. This project was advertised according to SCC 6.10.210 and SCC 6.10.215. Six bids were received by the City by the deadline of 3:30 p.m. on September 10, 2021. The City and R&M reviewed all bids and concluded Harris Sand and Gravel was the lowest, most qualified and responsive bidder with a total bid amount of $2,666,597.73. It is common practice to have a 10% contingency for unforeseen issues, a 10% contingency of $266,659.77 is requested, for a total amount not to exceed is $2,933,257.50. The project consists of all new timber floats with polyethylene encased floatation tubs. 10 foot wide main floats. 14 each 4'x 32' fingers (27 slips) on the south side of K float. 460 feet of linear moorage on the north side of K float. 400 feet of linear moorage on L float. 245 feet of linear moorage on the west side of G float, new utilities and safety improvements, and removing the creosote treated pilings and replacing with 33 16-inch galvanized steel pilings, new potable water lines and new firefighting connections. The bid tabulation follows: G, K & L-Float Replacement Project Engineers Harris Sand & Western Turnagain Brice Inc. Kiewit Heko Services Estimate Gravel Marine Marine Bid $3,459,975 2 666 597.73 $3,203,600 $3,596 520 3 799 680 $4,082,900 6 232 400 Consistency checklist: Comprehensive Plan: Create a thriving port of Seward through harbor improvements, infrastructure expansion, and implementation of management plans. (Page 23) Strategic Plan: Complete the renovation of the Seward Boat Harbor. (Page 7) Other: Inspection Report December 2019 Fiscal note: Finance Department approval: Funding was approved in Resolution 2021-113. Attorney Review: Yes X❑ No ❑ Not applicable ❑ Recommendation City Council approve Resolution 2021-114. SECTION 00500-CONTRACT CITY OF SEWARD, ALASKA City of Seward Small Boat Harbor G,K,L Dock Replacement Project [PROJECT NAME AND NUMBER] CONTRACT("Contract"), between the City of Seward,Alaska, herein called the City, acting by and through its City Manager, and upon signing;this document shall serve as the notice to proceed, and Harris Sand&Gravel,Inc. Company Name 260 Airport Rd-PO Box 6-Valdez,AK 99686 Company Address(Street or PO Box, City, State, Zip) a/an ❑ Individual ❑Partnership ❑Joint Venture ❑Sole Proprietorship ®Corporation incorporated under the laws of the State of Alaska , its successors and assigns, herein called the Contractor, is effective the date of the signature of the City Manager on this document. The Contractor, for and in consideration of the payment or payments herein specified and agreed to by the City, hereby covenants and agrees to furnish and deliver all the materials and to do and perform all the work and labor required in the construction of the above-referenced project as bid by the Contractor, which bid and prices named, together with the Contract Documents (as hereinafter defined) are made a part of this Contract and accepted as such. It is distinctly understood and agreed that no claim for additional work or materials, done or furnished by the Contractor and not specifically herein provided for, will be allowed by the City, nor shall the Contractor do any work or furnish any material not covered by this Contract, unless such work or materials is ordered in writing by the City. In no event shall the City be liable for any materials furnished or used, or for any work or labor done, unless the materials, work, or labor are required by the Contract or on written order furnished by the City. Any such work or materials which may be done or furnished by the Contractor without written order first being given shall be at the Contractor's own risk, cost, and expense and the Contractor hereby covenants and agrees to make no claim for compensation for work or materials done or furnished without such written order. Notwithstanding the foregoing, payment under this Contract shall not exceed Hundred Million Six undred Sixty Six Thousand Five Hundred Ninety Seven and dollars ($L,666,597.73) for all base items, additional work, Seventy Three Cen and change orders. The Contractor further covenants and agrees that all materials shall be furnished and delivered and all work and labor shall be done and performed, in every respect,to the satisfaction of the City, on or before: April 30th,2022 or within N/A calendar days following the date of notice to proceed. It is expressly understood and agreed that in case of the failure on the part of the Contractor, for any reason, except with the written consent of the City, to complete the furnishing and delivery of materials and the doing and performance of the work before the aforesaid date, the City shall have the right to deduct from any money due or which may become due the Contractor, or if no money shall be due, the City shall have the right to recover One Thousand dollars ($ 1,000.00 ) per day for each calendar day elapsing between the time stipulated for the completion and the actual date of completion in accordance with the terms hereof; such deduction to be made, or sum to be recovered, not as a penalty but as liquidated damages. Provided, however, that upon receipt of written notice from the Contractor of the existence of causes over which the Contractor has no control and which must delay furnishing of materials or the completion of the work, the Contracting Officer may, at his or her discretion, extend the period specified for the furnishing of materials or the completion of the work, and in such case the Contractor shall become liable for liquidated damages for delays commencing from the date on which the extended period expires. The bonds given by the Contractor in the sum of$2,666,597.73 Payment Bond, and $ 2,666,597.73 Seward Harbor G,K,L Dock Replacement Project CONTRACT Page 00500-1 SECTION 00500-CONTRACT Performance Bond, to secure the proper compliance with the terms and provisions of this Contract, are submitted herewith and made a part hereof. The Contractor further covenants and agrees that the entire construction will be done under the administration of and to the complete satisfaction of the City subject to the inspection at all times and approval by any regulatory agency of the Local, State, or Federal Government of the United States of America, and in accordance with the laws of the State of Alaska and the City of Seward. For purposes of this Contract, Contracting Officer means or any other person designated by the City Manager. The Contractor is an independent contractor and not an employee or agent of the City. Contract Documents shall have the meaning ascribed by the General Conditions of the Construction Contract, and include but are not limited to this Contract, the General Conditions of the Construction Contract,the Supplementary Conditions, and the following listed documents: (1) ; (2) IN WITNESS WHEREOF the parties hereto have executed this Contract and agree to its terms and conditions. CONTRACTOR HARRIS SAND&GRAVEL,INC. Com ppff TAame Sig a re of Authorized Com resentative BILL HARRIS-PRESIDENT Typed Name and Title 09/15/2021 Date CITY OF SEWARD Signature of City Manager Typed Name Date City Clerk (ATTEST) Seward Harbor G,K,L Dock Replacement Project CONTRACT Page 00500-2