Loading...
HomeMy WebLinkAboutRes2022-020 R&M Task Order - Water & Sewer Expansion Plan Sponsored by: Bower CITY OF SEWARD,ALASKA RESOLUTION 2022-020 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO EXECUTE TASK ORDER #2734.182 WITH R&M ENGINEERING FOR THE DEVELOPMENT OF A PLAN TO EXPAND CITY WATER AND SEWER INFRASTRUCTURE FOR THE PURPOSE OF DEVELOPING THE HEMLOCK SUBDIVISION IN THE AMOUNT NOT TO EXCEED $9,553 AND APPROPRIATING FUNDS WHEREAS, the City of Seward in in need of affordable, year-round housing for its current and future residents; and WHEREAS, the Seward Comprehensive Plan specifically indicates the need to expand housing in the City; and WHEREAS, the current lack of housing is a primary barrier to further economic development in Seward; and WHEREAS, the citizens of Seward consistently cite the lack of housing as an impediment to increasing their quality of life in Seward; and WHEREAS,on December 13, 2021, the Seward City Council approved resolution 2021- 143 which authorized the City Manager to work with R&M Engineering on the creation of a design for the Hemlock Subdivision; and WHEREAS,the proposed Hemlock Subdivision will include 40 single family homes; and WHEREAS, Task Order #2734.182 will generate the list of, and cost associated with requirements for expansion of City water and sewer infrastructure which are necessary for the creation of the Hemlock Subdivision. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA that: Section 1. The City Manager is authorized to execute task order #2734.182 with R&M Engineering for the creation of a utility expansion plan. Section 2. Funding in the amount of$9,553 is hereby appropriated from General Fund Unassigned Fund Balance account no. 01000-0000-3400 to Community Development Contracted Services account no. 01000-1122-7009 within the 2022 operating budget. Section 3. This resolution shall take effect immediately upon adoption. CITY OF SEWARD,ALASKA RESOLUTION 2022-020 PASSED AND APPROVED by the City Council of the City of Seward, Alaska,this 14th day of February,2022. T I 0 SEWARD isty Terr , Mayor AYES: Wells, DeMoss, Calhoon, McClure, Osenga, Terry NOES: None ABSENT: Casagranda ABSTAIN: None ATTEST: Brenda J. Ball u, MMC City Clerk (City Seal) 44 OF sFy;•,, • G .•GORPO����QO • ' SEAL . . --._ r tP),' / .` �1 4t�••....i.y••• �.•,, •ems 4 FOFAp�S City Council Agenda Statement r Meeting Date: February 14, 2022 � To: City Council Through: Janette Bower, City Manager From: Stephen Sowell, Assistant City Manager Agenda Item: Resolution 2022-020: Authorizing the City Manager to Execute Task Order #2734.182 With R&M Engineering for the Development of a Plan to Expand City Water and Sewer Infrastructure for the Purpose of Developing the Hemlock Subdivision in an Amount not to Exceed $9,553 and Appropriating Funds Background and justification: Given the year-round housing shortage that currently exists in Seward, the City is undertaking available opportunities to explore options for housing expansion and development which would in turn remove barriers to further economic development. The City owns a number of parcels which are viable options for subdivision development. One of the prominent opportunities is located on the south side of Hemlock Street. On December 13, 2021, Seward City Council approved resolution 2021-143; which authorized the City Manager to execute a task order with R&M Engineering to create a concept design for the Hemlock Subdivision. That subdivision design concept has been created and the next step in the process is to expand utilities to the future subdivision. Task order #2734.182 will provide the plan for expansion of water and sewer infrastructure which is required for the development of the proposed 40 homes in the Hemlock Subdivision. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive 3.2 Land Use, 3.2.1 Promote Residential Development, 3.3 Housing, 3.3.1 Plan: Encourage Development of new housing in Seward, 3.3.1.1 Support a range of new housing choices Strategic Plan: Other: Certification of Funds Total amount of funds listed in this legislation: $ 9,553 This legislation (✓): Creates revenue in the amount of: $ x Creates expenditure in amount of: $ 9,553 Creates a savings in the amount of: $ Has no fiscal impact Funds are (✓): Budgeted Line item(s): x Not budgeted Not applicable Finance Signature: ,,S �Ua'AZ> Attorney Review✓ Administration Recommendation RxYes x Adopt Resolution Not applicable Other: January 28, 2022 R&M No. 2734.00 Stephen Sowell Assistant City Manager City of Seward,Alaska 410 Adams St., City Hall Building Ll Dk Seward,Alaska 99664 • RE: Hemlock Subdivision—Development Cost Estimates Dear Mr. Sowell, CONSULTANTS,INC. R&M Consultants, Inc. (R&M) has based this response on the information provided by you via e-mail and 9101 Vanguard Drive during our meeting on January 21, 2022. We have reviewed the materials provided to us and have Anchorage,Alaska 99507 prepared the following cost estimate for your review and comment. phone:907.522.1707 Cost Estimates—Subdivision Development fax:907.522.3403 Development of construction cost estimates for the full subdivision development will require concept design for proposed subdivision, including layout of the underground pipe systems along Hemlock Avenue and within the new subdivision. Development construction cost estimates will include estimated costs for design, roadway reconstruction along Hemlock Avenue and other associated costs for complete installation. We will review record information and any previous bidding data provided by the City to plan for connection of the new pipe systems connecting near the intersection of Hemlock Avenue and Dimond Boulevard. The water main extension will loop extend down Hemlock Avenue and loop through the proposed subdivision. The gravity sewer main will connect to the existing lift station and parallel the water main on Hemlock Avenue, extending utility main stubs along the proposed roadway adequate for service connections to each lot. The need for an additional sewer lift station will be evaluated in the concept design and included in the construction cost estimate, if required. Construction cost estimates will include estimated construction costs for utilities mains and services stubbed to the parcel lot lines. Deliverables: ■ Concept Development Design—Hemlock Avenue and Subdivision ■ Construction Cost Estimate— Hemlock Avenue (includes full utility construction) ■ Construction Cost Estimate— Hemlock Subdivision Development (includes full utility construction) Schedule: R&M can prepare deliverables within four weeks from receiving NTP and the record information from the City of Seward. Cost Estimate: Based on the scope and our understanding of the project, we propose a Time & Materials Fee amount $9,553. We have attached a detailed breakdown of our estimated costs for your review. Should you have any questions or require additional information, please feel free to contact me at 646- 9603. Sincerel R CONS LTANTS, INC. onald R. Porter, PE Utility Group Manager Attachment:Cost Estimate Z:\project\2734.00 C Seward On call Engineering Services\19-00 Contra ct\Esti m ates\TOxx Hemlock Development Cost Estimates\R&M City of Seward Hemlock Subd Development Cost Estimating.doc ive R&M CONSULTANTS, INC. 2122 F ontgStreetD#r150•Fa rbank9s,,AK 99701.907 452?2707 Subdivision Development Cost Estimating FIRM: R&M Consultants, Inc. CLIENT: City of Seward Project: Hemlock Subd Task: 01 Project No: 2734.00 Date: Jan 27, 2022 LABOR HOURS PER JOB CLASSIFICATION SUB-TASK SUB-TASK DESCRIPTION Utility Senior Utility Utility Group Project Project Staff Manager Engineer Engineer Engineer Project Management 2 1 Existing System Evaluation Record drawings research and review 1 2 4 2 Develop Concept Road-Utility Design 1 1 4 4 3 Cost Estimates 2 1 Roadway 4 2 Drainage 4 2 Water 4 2 Sewer 4 2 Lift Station 4 2 Electric 2 2 4 Estimate Assembly 2 QA/QC 2 1 2 Draft 1 1 Review Meeting 1 Final 1 1 TOTAL LABOR HOURS 8 4 32 24 0 0 0 LABOR RATES ($/HR) $205.20 $159.60 $148.20 $105.45 LABOR COSTS ($) $1,641.60 $638.40 $4,742.40 $2,530.80 $0.00 $0.00 $0.00 EXPENSES COMMENTS: DESCRIPTION QUANTITY UNIT PRICE MARKUP TOTAL 1.City of Seward will provide all PRICE PRICE available record drawings and historical Misc. Field Supplies $ $ $ bid pricing. R&M Vehicle $ $ $ 2. Site visits are excluded. Per Diem $ $ $ TOTAL EXPENSES $ - SUB-CONTRACTORS TASK DESCRIPTION FIRM TOTAL PRICE TOTAL LABOR $ 9,553 TOTAL EXPENSES $ - SUBCONTRACTORS $ - SUBCONTRACTORS MARK-UP $ - TOTAL SUB- $ - TOTAL T&M COST $ 9,553 1/28/2022 City of Seward Hemlock Subd Development Cost Estimating 1 of 1 EMIOC�AVENUF \ \ 2 I 25 ►►?ei — co 24 39 � V � � 3 — 26 23 29 38 22 k=50� \ 11A1 — N 21 37 27 /36 �� 28 20� 29 � � 6 - 19 _ 35 30 7 — 31 — 18 31 8 cm) 17 - 32� — 16 ' 9 NO ACCESS ESMT. N 15 TYPICAL SETBACK LINE F- — 80, 0 E 11 �E-1 �E F YPICAL HOUSE L �/ PLAT No. 87-12 / REMAINDER -,7 LOT 12A / LENGTH OF ROAD CENTERLINE: 1,297 FT. PREPARED BY:R&M CONSULTANTS, INC.9101 VANGUARD DR.ANCHORAGE,AK.99507 PH:(907)522-1707 AECC111 SETBACKS FINAL CONCEPT FRONT=20' LOT 12A, FORT RAYMOND SUBDIVISION, REPLAT No. 1 (PLAT 87-12) SIDE=5'OR 10' ZONING: R1, SINGLE FAMILY RESIDENTIAL REAR= 10' AVERAGE LOT SIZE: <6,000 SQ. FT AVERAGE HOUSE SIZE:SINGLE FAMILY=2,100 SQ. FT FOOTPRINT DATE: 01-25-22 ' "Y �i $ 3 5e`'•e ��3 � y� �` �; � I!i pia I ' I 1133tl1$ I �+�-133Y1b` \ S � bg0.f�lE° v c rR qq $ yR wiz W13 I ' �N33YDY3A3 \` � C4 Ib°9 Gd1.46 4 " � (a)p,o99)f6'bS93,OZ,DE.bBW �,4V� fD 6Ff '3,fOLF.bBN 8 E' d�'ap Wj FZ'W � �DI tl 7!N1w�' NJOfNiH' (fff9d f/9651 � I°i 1 b I .G66f9 i /rbD I� D9 Xl Ly GDs g I I <a i ,xig e I � I / I i i k ! I 1 �BI vi !• J 1 / I - �8 8 �°�?•^� zi I I _____ 77,, \_�— ?fw fG'Ob 3�i OZOEZ'3•bF,/D.baN .M'� j y�yyy.BDt-I ^•� 4/69`3.bF,/D.bBN I ?s �� I . m ,bs E6E 3,bF:/fbBN� � / I�'" -_ql Z 'ai v ry ,��• . lad' X n $` i tiry Pry V o Q j�` 4 Z 3 e Ae El ' ,visLD � uBfBr� Fp 4 rye' F c i u Oro a t� w WEl W ilk cv / 'A! vwLrp 'zst a ic✓euuBW 3so/D-- w .P w w m AIRPCIR+T RD� s t I {M �r 4 O u ru �a f i � O O M M cr M M M R] f] f4U� fl O O fl fl D O O O O O ^ n a � 6 fl fl 7� 7r Y Y Y L L L L Z Z J ••'' _ H V7 uV U) j Cry 7 � O L itiici y = = 3 = � V1 to VI il / » \ - / 6P / � ( . � \ . � \ \ >yy � _ /\IL . « | | � | � | | | | | | � | \ � | \ * / 4 ) \ k / d � : � \ / , o = � � [ City of Seward Estimate F.O. Box 167 ' • wo417s Seward, AK 99664 Estimate Date:01/26/2022 Phone 907-224-4073 � Agent: .c To: Tel: New Hemlock Subdivision Fax: Item Code Quantity UM Price Extended Amount LABORI 4.00 Hourly 66.06 264.24 Labor Engineer-Field LAB0R2 120.00 Hourly 86.86 10,423.20 Labor Crew- Lineman LABOR2.1 40.00 Hourly 99.64 3,985.60 Labor Crew-Foreman 4504 4.00 Hourly 20.00 80.00 Pickup Truck #537 4.00 Hourly 20.00 80.00 Pickup Truck #524 12.00 Hourly 100.00 1,200.00 Bucket Truck-Large #535 12.00 Hourly 75.00 900.00 Digger.' Derrick #519 40.00 Hourly 75.00 3,000.00 Excavator-Volvo ECR #525 20.00 Hourly 65.00 1,300.00 Loader-Volvo L90 #517 8.00 Hourly 15.00 120.00 Equipment Trailer #506 8.00 Hourly 15.00 120.00 Reel Trailer 55063 700.00 Foot 3.25 2,275.00 2" PVC- 10'pieces (Part number: Schedule 40- 10'Pieces) 55040 80.00 Each 4.41 352.80 2"-24R 90D PVC Preacher Collars 30.00 Each 5.20 156.00 Estimate Date:01 '26'2022 To: New Hemlock Subdivision Page 1 of Item Cade Quantity UM Price Extended Amount Bell End-2" (Part number:Cantex#5144008) 75047 900.00 Foot 2.45 2,205.00 4/0 USE Triplex-"Sweetbriar" 40035 5.00 Each 2,000,00 I0,000.00 25KVA (Underground: Single Phase 7.2/ 12.5kV I20/240V) 40037 5.00 Each 2,163.00 10,815,00 50KVA (Underground: Single Phase 7.2/ 12.5kV 120/240V) 16003 10.00 Each 495.00 4,950.00 UM 1-7CT 15037 8.00 Each 195.00 1,560.00 Secondary Pedestal -Heavy Duty (Part number: Pencell#AGNS-14HP) 75001 400.00 Foot 2.35 940.00 42 220 Mil Concentric Neutral Jacketed Sub Total: 54,726.84 OH: 7,497.58 Quote Total in USD currency: 62,224.42 Deposit: 62,774.42 Balance Due: 0.00 Estimate Date:01'26.2022 To: New Hemlock Subdivision Page 2 of 2 City of Seward General Fund Unassigned Fund Balance Information 2021 Unaudited Ending Balance (2021 Beginning Balance): $ 4,853,258.57 2022 Appropriations Resolution 2022-003 R&M Task Order 21-00 SMIC Bench $ 123,395.00 Resolution 2022-XXX R&M Task Order 2734 Gillespie Property $ 71,591.00 Resolution 2022-XXX R&M Task Order 2734 Hemlock Replat $ 56,907.00 Resolution 2022-XXX R&M Task Order 2734 Hemlock W/S Infrastructure $ 9,553.00 Total 2022 appropriations: $ 261,446.00 Unaudited ending estimated balance: $ 4,591,812.57 Unaudited