CITY OF SEWARD, ALASKA
RESOLUTION 2004-81
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ISSUE A CHANGE
ORDER FOR AN AMOUNT NOT TO EXCEED $63,000 TO PENINSULA
CONSTRUCTION, INC. FOR AN ADDITIONAL 700 FEET OF 10 INCH
WATER MAIN FOR THE NORTH SEWARD WATER SYSTEM
IMPROVEMENT PROJECT AND APPROPRIATE FUNDS IN THE
AMOUNT OF $63,000
WHEREAS, Peninsula Construction, Inc. is right on schedule with the North
Seward Water System Improvements Project with no cost over runs anticipated;
and
WHEREAS, the City of Seward has received a $396,600 grant from ADEC, along
with the City's matching portion of$169,950; and
WHEREAS, Peninsula Construction, Inc. was awarded this project with a bid of
$348,382.49; and
WHEREAS, a proposed 700 feet of 10 inch Water Main on Hemlock Street from
Afognak Avenue to Oak Street is recommended, and has already been designed
(original route); and
WHEREAS, ADEC has accepted this additional work as a change order to the
original "Approval to Construct" certificate; and
WHEREAS, CRW Engineering (project engineers) ADEC, and city staff feel that
increased fire flows to the middle school warrant this additional infrastructure
construction; and
WHEREAS, this work will form a "loop" which is always the preferred method of
water main installation; and
WHEREAS, Peninsula Construction, Inc. has agreed to do this additional work at
the same unit price that they have in their original bid; and
WHEREAS, the cost of this additional work will be $63,000, which would
include a 15% Construction Contingency and 10% Construction Administration;
and
WHEREAS, the Water Department will also recover dollars spent on the design
of the original project route due to ADEC's policy of paying only for one design of
a project.
CITY OF SEWARD, ALASKA
RESOLUTION 2004-81
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEWARD, ALASKA, that:
Section 1. The city manager is hereby authorized to issue a change order for an
amount not to exceed $63,000 to Peninsula Construction, Inc. for an additional
700 feet of 10 inch Water Main for the North Seward Water System
Improvements Project.
Section 2. Council appropriate an additional $63,000 from funds available in the
Gateway/Forest Acres Water System grant project 704-7042-5390.
Section 3. This resolution shall take effect immediately upon its adoption.
PASSED AND APRROVED by the City Council of the City of Seward, Alaska,
this 26th day of July, 2004.
THE CITY OF SEWARD, ALASKA
-1~ V~'MayO'
AYES:
NOES:
ABSENT:
ATTEST:
Dunham, Branson, Valdatta, Amberg, Clark, Anderson, Shafer
None
None
None
(City Seal)
",nll"""
....'~' Or SE~ ""'"
..... ~~ ........,::.t-9. "
$ c} ....:o?-pofltq~'., <:) -:.
~ .. ~ ~.A..-:'
.., -s ____ v . ..
...-- . ..
· :SEAL~"
.. . ..-
:.: : :
'J\ --- !:
.. . . "-
.. -.. "'lI. ~q,,".f ~ ,:
~ d};.'.,I\t~ 1 \~"" ~.~
'~.:.(1')o, '.,...,1," ~t;:J. ....
-"'I. .,~ OF p..\,.~~.'.I'
...."'..1..'"
Council Agenda Statement
Meeting Date: July 26, 2004
Through: Phil Shealy, City Manager
Through: W.C. Casey, Director of Public Works
From: Saundra Fletcher, Admin. Assistant Public Works
Subject: North Seward Water System Improvements Project
______________________________________________________________________
BACKGROUND & JUSTIFICATION:
To date, Peninsula Construction, Inc. is right on schedule with the North Seward Water
System Improvements Project with no cost over runs anticipated. The City of Seward
has received a $396,600 grant from ADEC, along with the City’s matching
portion of $169,950.00 for this project. (Resolution 2002-087) Peninsula Construction,
Inc. was awarded this project with a bid of $348,382.49. (Resolution 2004-54)
A proposed 700 feet of 10 inch Water Main on Hemlock Street from Afognak Avenue to
Oak Street is recommended, and has already been designed (original route). ADEC
has accepted this additional work as a change order to the original “Approval to
Construct” certificate. CRW Engineering (project engineers), ADEC, and city staff feel
that increased fire flows to the middle school warrant this additional infrastructure
construction. This work will form a “loop” which is always the preferred method of water
main installation.
Peninsula Construction, Inc. has agreed to do this additional work at the same unit price
that they have in their original bid. The cost of this additional work will be $63,000,
which would include a 15% Construction Contingency and 10% Construction
Administration.
The Water Department will also recover dollars spent on the design of the original
project route due to ADEC’s policy of paying only for one design of a project.
CONSISTENCY CHECKLIST:
Yes No
1. Comprehensive Plan _X_ ___
2. Strategic Plan _X_ ___
3. Other ___ ___
4. Not applicable ___ ___
FISCAL NOTE:
Funding for the additional 700 feet of 10 inch water main pipe is available in the grant
fund 704-7042-5390. Funding for this project has provided as follows: $99,200 in State
DEC grant funds, $297,400 in federal EPA funds, and a City match of $169,950 from
the Water Enterprise Fund.
Approved by Finance Department:_________________________________
______________________________________________________________________
RECOMMENDATION:
Council approve Resolution 2004-____, authorizing the city manager to issue a change
order for an amount not to exceed $63,000 to be paid to Peninsula Construction, Inc. for
an additional 700 feet of 10 inch water main for the North Seward Water System
Improvement Project, and appropriate funds in the amount of $63,000.