HomeMy WebLinkAbout09172017 Planning & Zoning Work Session Laydown LION
IUU
p
P
U
Q
� 14" DIP 10" DIP
1011 DIP
Y
Z
W
2
H
O
O
Y
Z �
W
2
O
Legend
Main
Abandoned Main cp
• Pedestal
Overhead Circuit "v
Transmission Line
• Fiber_Optic_Manhole Rly
Fiber_Optic_Line
• GCI Power Supply
Parcels 0�
® 179
Manholes
0 Service Connections
Clean Outs
Pressurized Mains ,w
ASPE
FORT RAYMOND SUB /� 9/25/2017 Work session
REPLAT NO 1 LOT 7A Drawn By:
Due to different data sources property lines and aerial 0 ss 170 340 Feet
imagery do not overlay correctly. Map is to be used for #
orientation and reference purposes only. snapping Assistance by Alaska neap company, LLC