HomeMy WebLinkAbout09262022 City Council Special Meeting - SMIC Bench FeasibilitySeward City Council
Agenda Packet
Special City Council Meeting
Monday, September 26, 2022 at S: 30 p.m.
Council Chambers, City Hall
All public is invited to attend.
City of Seward
PO Box 167
Seward, Alaska 99664
AIA Sfw* 7fm...
June 16, 2022
Brenda Ballou, City Clerk
City of Seward
Re: September 26, Special Meeting
Madam Clerk,
City Manager's Office
Janette Bower, City Manager
Phone: 907-224-4012
Email: jbower@cityofseward.net
Please consider this my written request as required by Seward City Code 2.10.030 (a)(2) for a
special meeting on September 26, 2022, at 5:30 pm, for the following item:
Seward Marine Industrial Center (SMIC) Bench Draft Development Feasibility
Study (Note: action may be taken by the council following the Committee of the
Whole)
Please note the format is a special meeting with a committee of the whole.
Thank you,
Janette Bower, City Manager
SPECIAL MEETING NOTICE
Pursuant to Seward City Code 2.10.030 (2), this is to serve as the written notice
calling a City Council Special Meeting on Monday, September 26, 2022 at 5:30
p.m. for the purpose of:
Committee of the Whole: Seward Marine Industrial Center
(SMIC) Bench Draft Feasibility Study.
The meeting will commence in the City Council Chambers, City Hall, 410 Adams
Street, Seward. All interested persons are invited to attend the meetings.
All public is invited to attend.
Posted: Thursday, September 15, 2022
City Hall bulletin board
U.S. Post Office
Harbormaster's Building
Seward Community Library Museum
The City of Seward, Alaska
Special City Council Meeting
September 26, 2022 5:30 p.m. Council Chambers
Christy Terry
Mayor
Term Expires 2022
Sue McClure
Vice Mayor
Term Expires 2023
John Osenga
Council Member
Term Expires 2024
Liz DeMoss
Council Member
Term Expires 2023
Ristine Casagranda
Council Member
Term Expires 2022
Mike Calhoon
Council Member
Term Expires 2024
Randy Wells
Council Member
Term Expires 2022
Janette Bower
City Manager
Brenda Ballou
City Clerk
Brooks Chandler
City Attorney
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
4. CITIZEN COMMENTS ON ANY SUBJECT EXCEPT
THOSE ITEMS SCHEDULED FOR PUBLIC HEARING
[Those who have signed in will be given the first opportunity to speak. Time
is limited to 3 minutes per speaker and 36 minutes total speaking time for this
agenda item.]
5. APPROVAL OF AGENDA AND CONSENT AGENDA
[Approval of Consent Agenda passes all routine items indicated by asterisk
(*). Consent Agenda items are not considered separately unless a council
member so requests. In the event of such a request, the item is returned to
the Regular Agenda]
6. NEW BUSINESS
A. Other New Business Items
1. Committee of the Whole: Seward Marine Industrial Center
(SMIC) Bench Draft Development Feasibility Study.
7. CITIZEN COMMENTS
8. COUNCIL AND ADMINISTRATION COMMENTS &
RESPONSES TO CITIZEN COMMENTS
9. ADJOURNMENT
City of Seward, Alaska City Council Special Meeting Agenda
September 26, 2022 Page I
rmconsult.com
R&M CONSULTANTS, INC.
9101 Vanguard Drive
Anchorage, Alaska 99507
phone: 907.522.1707
fax: 907.522.3403
_ it ,"I
el
f T
4 J
or
" RPE
1
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 2
Table of Contents
Introduction............................................................................................................................................................................ 3
ExistingConditions Overview.............................................................................................................................................. 3
Opportunities& Constraints...................................................................................................................................................4
LandUse & Zoning..............................................................................................................................................................
4
IntendedLand Use..........................................................................................................................................................4
Zoning..............................................................................................................................................................................
4
DevelopmentRequirements...........................................................................................................................................
6
Required Public Improvements...................................................................................................................................... 7
Geotech............................................................................................................................................................................... 7
Access..................................................................................................................................................................................
8
Utilities..............................................................................................................................................................................
10
WaterSource................................................................................................................................................................
10
WaterTreatment..........................................................................................................................................................
10
WaterStorage...............................................................................................................................................................
10
Water Transmission & Distribution..............................................................................................................................
11
Sewer Collection, Treatment & Disposal......................................................................................................................
11
Electric and Communications.......................................................................................................................................
12
Total Order of Magnitude Utility Development Costs..................................................................................................
12
TsunamiCenter Site Potential..........................................................................................................................................
13
DevelopmentConcept..........................................................................................................................................................
13
Overview...........................................................................................................................................................................
13
ConceptDesign.................................................................................................................................................................
13
FeasibilitySummary..............................................................................................................................................................
15
Attachments
1. SMIC Bench Concept
2. SMIC Bench Concept Phase 1 Roadway Alignments
( .�l
VInnovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 3
Introduction
The City of Seward is exploring development opportunities for its vacant land to meet community needs and advance
their vision and goals. Part of their land inventory includes an 1,828.5-acre parcel on the east side of resurrection Bay
near the Seward Marine Industrial Center (SMIC). Fourth of July Creek and its tributaries created a natural northern and
southern divide of the parcel. The northern portion of the parcel has been identified as a potential development
opportunity and the City of Seward has authorized R&M Consultants, Inc. to assess its feasibility.
The following feasibility study provides an overview of the SMIC Bench property being considered for development,
identifies opportunities and constraints of the site, and presents development concepts based on the goals of the
project and municipal code requirements. Conclusions and recommendations made in this study are based on desktop
analysis conducted by certified surveyors, engineers and planners and are considered conceptual.
Existing Conditions Overview
Parcel ID: 14532003
Legal Description: Tract G, Fourth of July Creek Subdivision No. 2, according to Plat No. 98-04, Seward Recording
District, Alaska. Located within T 1S R 1E & 1W SEC 7, 8, 17, 18, 12, & 13
Physical Address: 700 Nash Road
The City of Seward is considering the development feasibility of the portion of the SMIC Bench property generally
adjacent to Nash Road, north of the Spring Creek Correctional Center, and west of Godwin Creek. Physical constraints
including steep slopes and the presence of intermittent or permanent streams are driving the feasibility study area
boundary (see cover image).
Size of Study Area: 833 acres, approximately (full parcel is 1,828.5 acres)
Zoning: Resource Management - partially developable lands subject to floodplains and steep slopes.
Land Use: Vacant land that is anecdotally used for recreation (recreation occurs north of the SMIC Bench
parcel on USDA Forest Service land for the Godwin Glacier Overlook trail).
Utilities: Utilities do not extend into SMIC Bench area. Water and sewer lines exist within a closed system
between the SMIC harbor and prison facilities; no sewer lines are present on Nash Road,
however, city water is available at the base of the mountain. Overhead electric lines are present
along Nash Road adjacent to the SMIC Bench study area, and underground lines are present on
the Spring Creek Correctional Center property.
1A
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 4
Opportunities & Constraints
Land Use & Zoning
Intended Land Use
The City of Seward is experiencing an ongoing housing shortage for seasonal and year-round residents and it is a priority
of the Community Development Department and City Council to identify areas for residential development. SMIC Bench
is being considered as a potential development site for a new residential neighborhood.
Depending on the feasibility of development and anticipated housing units, additional public or commercial land uses
could be desirable or needed within the SMIC Bench area. Non-residential uses may include parks and recreation, a
school or other institutional land uses, home occupation or other small commercial or office uses, restaurants or other
food establishments.
Access for recreation is anticipated to accompany any development of SMIC Bench, as public lands are adjacent to the
City' property and the topography, viewsheds and environment make it highly attractive for year-round recreational
pursuits. If access up the mountain to the bench can be established, the topography and amount of available city -owned
land would be supportive of a trail network. Development of a trail system should take into consideration access and
parking, wayfinding, maintenance, management, intended uses and sustainable design and construction of trails.
Establishment of a recreational trail system could increase the attractiveness and marketability of housing developments
at SMIC Bench and provide a new destination to be enjoyed by Seward residents.
Zoning
Zoning districts create the framework for regulating land use within the City of Seward. Each zoning districts has
allowable land uses and associated development requirements. SMIC Bench is zoned Resource Management (RM).
Resource Management - considered principally public
The RM district is defined by City of Seward Code Title 21.05.025(b)13. as lands which are generally undeveloped and
cannot be precisely zoned due to inadequate information on the extent of public services and utilities; the suitability of
the land to support commercial, residential, industrial or public uses; and other possible environmental considerations.
To effectively support the desired development at SMIC Bench, rezoning the area to one or more of the following zoning
districts may be considered based on the City's desired use and intensity of the land:
4&k
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 5
(1) Rural residential district (RR). Intended to provide for stable, quiet, low density (one or two dwelling units per
acre) detached single-family residential development, free from other uses except those which are both
compatible and convenient to residents of such a district including recreational, religious and educational
facilities of an appropriate scale and design complementary to the neighborhood character.
(2) Single-family residential district (R1). Intended to provide for stable and quiet low to medium density (one to
five dwelling units per acre) detached, single-family residential development, free from other uses except those
which are both compatible and convenient to residents of such a district.
(3) Two-family residential district (R2). Medium density (one to seven dwelling units per acre) transitional
housing area with a mix of single and two-family units, free from other uses except those which are both
compatible and convenient to residents of such a district.
(4) Multi -family residential district (R3). Intended to provide opportunities for a higher density residential setting
with a mix of housing units which are predominately multi -family units close to concentrations of public
services, employment and/or recreation. This district may provide a transition between more intensive districts
and lower density residential areas if sufficient screening and design features are provided to protect multi-
family residences from undesirable effects.
(5) Urban residential district (UR). Intended to allow an area of higher density mixed residential uses from
detached single-family housing to multi -family apartments in conjunction with compatible low impact
professional office uses in the area surrounding the downtown business district.
Residential development has been identified as the primary land use for a SMIC Bench development to address the
identified need for additional housing units. The preferred residential density (units per lot, lots per acre, etc.) will be
determined by market preferences and the anticipated availability and costs of utilities, roadways and lot development.
The following tables summarizes potential land uses allowed in applicable zoning districts.
Table 1. Summary of Residential Land Uses by Zoning District, per City of Seward Code 15.10.226
Residential Land Use
Zoning Districts
RM
RR
1111
R2
R3
UR
Apartment, efficiency or
accessory
Prohibited
Permitted
Permitted
Permitted
Permitted
Permitted
Apartment, studio
Conditional
Prohibited
Prohibited
Prohibited
Prohibited
Prohibited
Attached single-family
townhouse, row
Conditional
Prohibited
Prohibited
Prohibited
Prohibited
Conditional
Condominium
Conditional
Prohibited
Prohibited
Prohibited
Conditional
Conditional
Detached single-family
Conditional
Permitted
Permitted
Permitted
Permitted
Permitted
Group Home
Conditional
Permitted
Permitted
Permitted
Permitted
Permitted
Guest House
Conditional
I Permitted
Permitted
Prohibited
Prohibited
Prohibited
Two-family or duplex
Conditional
Prohibited
Prohibited
Permitted
Permitted
Permitted
Multi -family (3 or more)
Conditional
Prohibited
Prohibited
Prohibited
Conditional
Conditional
A�k
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 6
Table 2. Summary of Non -Residential Land Uses by Zoning District, per City of Seward Code 15.10.226
Zoning
Districts
RM
RR
1111
R2
R3
UR
Non -Residential Land Use
Grocery, convenience store
Prohibited
Permitted
Prohibited
Prohibited
Conditional
Conditional
Home occupation
Permitted
Permitted
Permitted
Permitted
Permitted
Permitted
Home rental on a nightly
Prohibited
Prohibited
Prohibited
Prohibited
Admin.
Admin.
basis
Lodging, B&B, rooms, duplex
Permitted/
Permitted/
Permitted/
Permitted/
Permitted/
prohibited
and accessory apartment
admin
admin
admin
admin
admin
Lodging, multifamily
Prohibited
Prohibited
Prohibited
Permitted
Permitted
Permitted
dwelling apartment
Office, home professional
Prohibited
Prohibited
Prohibited
Prohibited
Prohibited
Permitted
Planning Unit Development
Prohibited
Prohibited
Permitted
Permitted
Permitted
Prohibited
Playground, public tot lot
Permitted
Permitted
Permitted
Permitted
Permitted
Permitted
Restaurant, food service,
Conditional
Prohibited
Prohibited
Prohibited
Prohibited
Prohibited
catering, brew put
School, public/private
Prohibited
Conditional
Conditional
Conditional
Conditional
Conditional
elementary/secondary
Wind Energy Conservation
Permitted
Permitted
Permitted
Permitted
Permitted
Permitted
System
Development Requirements
City of Seward Land Use Code, Title 15, defines dimensional standards by zoning district that limit the range of possible
subdivision configurations. The following table provides the dimensional standards required by zoning district:
Table 3. Summary of City of Seward Code Table 15.10.222 Development Requirements
Zoning Districts
RM
RR
1111 & R2
R3
UR
Dimensional Requirements
Maximum Building Height (ft.)
34
34
34
34
34
Minimum Buildable Lot Size (ft.)
Varies 3,000
Varies 3,000
Varies 3,000
*Note 2.B, 2.E, 2.F.
20,000
20,000
to 7,000
to 9,000
to 9,000
Minimum Lot Width (ft.)
100
100
Varies 30 to
Varies 30 to
Varies 30 to
60
90
90
Minimum Front Yard Setback (ft.)
20
20
20
20
20
5 min. each
Minimum Side Yard Setback (ft.)
10
10
side with 15
10
5
total
Minimum Side Yard Setback Adjacent
to Street (ft.)
20
10
10
10
10
Minimum Rear Yard Setback (ft.)
10
10
10
10
10
Maximum Accessory Building Height
(ft.)
34
20
20
20
20
Maximum Lot Coverage (%) *Note 2G
100
30
35
40
40
jv�k
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 7
*Note 2E. Multiple -family developments (except studio apartments) with three or more units require a
minimum of 9,000 SF in the R3, UR, OR Districts and 20,000 SF in the RIM District
*Note 2F. Two -Family or duplex developments require a minimum of 6,000 SF in the R2, R3, UR, OR, AC and CB
Districts and 20,000 SF in the RIM District. Duplex developments within the Federal Addition Subdivision require
5,000 SF. All other development requirements of this chapter shall be met.
*Note 2.G. Multiple -Family, studio apartments in the OR, AC, CB, HC, I and RIM districts require a minimum of
9,000 SF. The total square footage required for lot setbacks shall be reserved as open area. All other
requirements set forth in this chapter shall be met.
Required Public Improvements
City of Seward Subdivision Code, Title 16 identified required public improvements that must meet identified minimum
standards for a subdivision to be approved by the City.
16.05.010 Required Public Improvements:
1. Streets: minimum requirements are a 50' width and gravel surface.
2. Telephone and electric lines: must be underground.
3. Water system: the subdivider shall provide the water system in accordance with the specifications established
by the city planning and zoning commission and affirmed by the city council. Fire hydrants shall be provided to
standards established by the American Waterworks Association and shall be a brand specified by the city. The
subdivider shall not be required to drill individual wells.
4. Sewer system: Where the city sewer system will service the area covered by the plat or proposed plat, the
subdivider shall provide the sewer system in compliance with all applicable state and federal health and
environmental laws and regulations.
5. Street lighting: Street lighting shall be installed in accordance with the requirements of the city.
In addition to the City of Seward Code, minimum standards contained in the Kenai Peninsula Borough Code under Title
20 must be met. Some requirements are more stringent in the KPB Code, and any deviation from the code requires a
waiver.
Geotech
Based on the review of available geotechnical reports', geologic maps2, and LIDAR data3, the surficial geology of the
subject site is expected to consist of thin soil deposits overlying bedrock. The thickness of soil deposits is expected to be
generally less than 5 feet, and exposed bedrock is likely present in many areas, particularly on the steeper slopes. In flat
areas bog deposits are expected consisting of saturated organic material and perched groundwater. The bedrock is
mapped as the Valdez Group, composed of interlayered sandstone and phyllite. Actual bore holes have not been drilled
on site to confirm the information gathered from existing sources.
' R&M consultants, Inc., Nash Road Extension Geologic Evaluation, November 1980.
2 Tysdal, R.G., and Case, J.E., Geologic Map of the Seward and Blying Sound Quadrangles, Alaska, USGS Map 1-1150, 1979.
3 https:Hgis.kpb.us/map/index.html?viewer=terrain
4&
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page S
Landslide risk at the subject site is considered low due to the thin soil and lack of evidence of past landslide activity.
Excavations for road construction and site development are likely to encounter bedrock and may require blasting. The
subject site is not expected to be suitable for conventional on -site wastewater disposal.
Access
The current access to the SMIC Bench area is via Nash Road, a paved road that extends around the east side of the bay
and into Seward. There are currently no roads that access the SMIC Bench area and this feasibility study addresses the
various issues and costs associated with constructing an access road up the mountain.
Two primary constraints have been identified for development in this area: the steepness of the terrain and the
presence of shallow bedrock. The slopes adjacent to Nash Road vary, but are consistently over 30 percent, with many
areas up to 80 percent. The Kenai Peninsula Borough Code Title 14 Streets and Sidewalks, Roads and Trails Chapter
14.06 Road Standards identifies the following construction requirements for roadways:
• 14.06.160 Road Construction Standards -Alignments:
A. Vertical alignment. Roads shall be constructed in a manner such that grades shall not exceed, at
any point, six percent on arterial roads and ten percent on all other roads, and no more than four
percent within 100 ft. of any intersection.
We have assumed that the access road to SMIC Bench would not be an arterial road and can be constructed to a
maximum of ten percent. Two potential alignments connecting Nash Road with the SMIC Bench have been identified
(see Figure 1). The main access alignment recommended accesses the northern portion of the developable bench area.
The alignment switches back to maintain the ten percent requirements and is approximately 6,000 feet long. Because of
the slopes along this alignment, no new lots can be created along the alignment until the top of SMIC Bench is reached.
Secondary access would be provided via a 7,600-foot-long road originating at Nash Road and extending to the southern
portion of the development. The road is designed to fit completely within the existing City of Seward tract so that no
additional agreements are required with other property owners to build and maintain the road.
The second impediment to construction is the shallow bedrock. Bedrock is good for stability, and dramatically decreases
the chances of landslides, however, it increases the cost of road and site construction because it needs to be blasted
rather than dug. It also precludes the use of traditional on -site sewer and water system that make the development of
individual lots simpler and cheaper (see Utilities section below). Steep slopes and shallow bedrock add significant costs
to road and utility construction for the project.
jwklIk
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 9
[ 'I. T-
IT 1
-4 T]
o .r
r
A
PLAT N!
SOUTH A:CESS ROAD '
7.643 LONG FROFA V ATER TAW
t�.
-
Figure 1. Conceptual Roadway Alignments from Nash Rd. to SMIC Bench Development
&�k
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 10
Utilities
Providing public water and sewer to homes on the SMIC bench requires construction of significant infrastructure relative
to the number of parcels being served. This section evaluates utility requirements in concept, including how
improvements can be constructed in phases while supporting the future full build -out.
Water Source
The SMIC Bench development depends on the development of a water source with adequate quality and capacity.
Based on the desktop geotechnical assessment of the bench study area, the high bedrock makes well development
expensive. Depending on source aquifer hydrology, groundwater production, and water quality, wells on the bench may
be entirely infeasible. The following solutions for providing the SMIC bench with water were considered:
1. Develop additional high production capacity public groundwater well(s) near existing city wells. Potential
impacts to existing groundwater wells served by shared aquifer would need to be evaluated further.
2. Develop high -capacity public groundwater well(s) on bench - capacity and water quality are likely not adequate
due to shallow bedrock and lack of water producing aquifers in bedrock. If a water source on the bench were
deemed viable, it could be more cost efficient, depending on the well depth required through bedrock. This
should be confirmed by geotechnical or hydrologic study.
3. Develop private groundwater wells on individual parcels. These are subject to the same challenges listed in #2
above.
4. Develop a surface water impoundment and water intake structure in nearby creek- not likely to be viable and
will be influenced by climate conditions. This would require a new WTP be constructed on the SMIC bench.
Booster pumps may also be required for source water transmission/distribution.
5. Connect to existing city water distribution network located at the bottom of the mountain south of Nash Road.
This option requires constructing pumping stations to pump the water up the mountain, and large storage
facilities on the SMIC Bench to store the water once on site.
Water Treatment
The existing water treatment plant (WTP) located near the correctional center serves a limited number of city customers
in the area. The WTP will require expansion, modernization, and improvements to support the additional water demand
presented by the SMIC bench. The WTP should be improved to increase output capacity and meet current water
treatment regulatory requirements. The existing WTP should be further evaluated for its condition and suitability for
expansion, improvement, or replacement.
Water Storage
Water storage tank(s) (WST) would likely need to be provided for the SMIC Bench development to serve anticipated
community peak demands, emergency storage, and fire flows for the area. The tanks should be placed at an elevation
which the system can provide minimum pressures to higher elevation homes. This may require dedicated access and a
WST site higher than the development, approximate elevation of 1,200'.
4wkllIk
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 11
Water use and storage requirements are estimated based on the following design criteria:
a. 3-bedroom residential homes
b. 100 gal/capita/day
c. School/commercial daily use (35k gpd)
d. 3 days emergency storage.
The water storage tank site can be developed to support the phased development. A smaller 0.5 million -gallon (mGal)
tank will be constructed for Phase 1, with future expansion area reserved for the full build -out 1.5 mGal water storage
tank.
Water Transmission & Distribution
Water must be supplied to the SMIC bench development to fill the WST and provide distribution system pressures. To
supply treated water from the source well/WTP (elevation 100'+) to the bench/WST (elevation 1,200+), a series of
booster stations supplying high-pressure transmission mains would be required. The booster pumps could be vault style
or in above -grade structures. A high-pressure transmission main would be constructed.
The SMIC Bench development parcel elevations range from approximately 700' to 1,050' which will likely require two or
more hydraulic pressure zones managed by city pressure reducing valve (PRV) stations to maintain service pressures
within the pressure range allowable by Uniform Plumbing Code (UPC) and the city code utility tariffs. Alternatively,
homes could be supplied with in -home PRVs or booster pumps, but limitations exist due to the elevation differences.
The following improvements will be required:
1. Booster Station and high-pressure transmission main from source wells/WTP to bench WST.
2. Intermediate booster stations for water transmission to SMIC bench along access road.
3. Pressure reducing valve stations to manage service pressures throughout bench development.
Sewer Collection, Treatment & Disposal
Due to the number of parcels, their density, topography, and size of the proposed parcels, on -site septic systems are not
practical or suitable for wastewater disposal. On site -treatment and disposal for each lot is limited by the presence of
groundwater, topography, and geotechnical conditions and must comply with minimum separation distances.
Installation per lot would be approximately $30,000, and ongoing electricity and maintenance costs will be incurred by
individual private property owners. Advanced on -site treatment systems (Advantex or similar) for individual parcels
could be considered as an interim solution but these are not the most cost-effective design for the full SMIC build -out.
A public sewer collection system maintained and operated by the city is recommended. Sewage would be collected at a
Wastewater Treatment Plant (WWTP). The WWTF would provide for the secondary treatment of wastewater via
mechanical processes. Final effluent disposal discharge quality parameters and wastewater effluent discharge receiving
waters should be evaluated further. A WWTP requires active and ongoing facility management and maintenance
including sludge disposal, electricity costs, replacement and servicing of parts, and presents additional energy costs to
the city.
Another alternative to the WWTP was considered. This alternative would pipe wastewater down the hill and discharge
into the existing city sewer lagoon. The lagoon would require expansion approximately doubling its footprint, and
AkIlk
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 12
associated improvements/upgrades. Due to the high-pressure sewer mains, wastewater pressure reducing stations are
required. In -line hydro turbines could be considered to recapture potential energy, generate electricity, and supply
power to the grid offsetting energy consumption by the booster stations.
The improvements presented carry additional O&M costs and responsibility for the city public works department. The
concept design goals and assumptions are subject to change as the site is investigated further and the project evolves.
Electric and Communications
Overhead electric is present along Nash Road adjacent to the SMIC Bench study area. Its capacity, condition, and
suitability for serving the full build -out of the SMIC bench is unknown. Roadway lighting and other amenities on the
SMIC bench may be considered. The City power utility is expected to provide conceptual costs and designs to provide
electrical and communications service to the SMIC bench.
Total Order of Magnitude Utility Development Costs
Table 4 summarizes an order of magnitude cost estimate for providing water and sewer service to 750 parcels in the
SMIC Bench "full build -out". The order of magnitude cost estimates should be updated as design assumptions evolve,
and more information becomes available. Annual O&M and energy costs for operation of the water and sewer facilities
are not included in this estimate and should be considered in a net present worth evaluation of project feasibility.
Table 4. Full Build -Out Utility Expansion Order of Magnitude Cost Estimate
SMIC Bench Feasibility Study - Utility Expansion - Order of Magnitude Cost Estimate
Full Build -Out
This cost estimate is a preliminary concept order of magnitude level of completion only. Estimator's
contingency is intended to cover engineering and construction requirements not readily apparent at
the concept level of evaluation, inflation, and escalation of construction costs.
Work Description
Unit
Quantity
I Unit Costl
Cost
Water Source, Treatment, Storage, Distribution
Water Source Well Development
Lump Sum
1
$250,000
S
250,000
Water Treatment Plant
Lump Sum
1
S5,000,000
S
5,000,000
Treated Water Storage Tank
Gallons
1.500,000
S4
S
5,250,000
Water Booster Station
Each
3
S1,000,000
S
3,000,000
Water Transmission Mains
Linear Foot
8,500
$325
S
2,762,500
Water Distribution Mains
Linear Foot
19,000
$250
S
4,750,000
Pressure Reducing Valve Station
Each
2
$450,000
S
900,000
Subtotal Water
$
21,912,500
Sewer Collection and Treatment
Gravity Sewer Collection System
Linear Foot
19,000
1 S275
S
5,225,000
Wastewater Treatment Facility
Lump Sum
1
1 S16.000,000
S
16,000,000
Subtotal Sewer
$
21,225,000
Electrical Service and Communications
Electric and Communications Service (Verify with Electric Utility)
Estimator's Contingency (25%)l
$
10,784,375
Total Order of Magnitude Estimated Cost
$
54,000,000
4*klIik
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 13
Tsunami Center Site Potential
The City of Seward is within a tsunami hazard zone. Currently there is no tsunami refuge location east of the Seward
Hwy, resulting in people at the correctional center, SMIC harbor area, and residential neighborhoods accessed via Nash
Road having to travel to the Seward Hwy and north to evacuate. If a significant earthquake event were to compromise
the bridge on Nash Road, access to the Seward Hwy would not be possible. The SMIC Bench study area is at an elevation
above the areas of potential impact for tsunami events and therefore presents an opportunity for a tsunami refuge
location. Preliminary research to identify grant funding opportunities to mitigate this hazard revealed that new road
construction intended to facilitate emergency evacuation was not an eligible use of funding through the existing hazard
mitigation programs.
Development Concept
Overview
The concept design shown in this report is a portion of Tract G, Fourth of July Creek Subdivision, Number 2, according to
Plat No. 98-04, Seward Recording District, Alaska. Contours were obtained from publicly available LiDAR data from the
Kenai Peninsula Borough GIS. The terrain within Tract G is very steep, which makes construction of an access road up the
mountain to reach the SMIC Bench challenging. In addition, the Kenai Peninsula Borough (KPB) code stipulates, in
14.06.080 - Road Construction Standards -Construction categories, that a road that serves greater than 50 lots is
designated as a Category IV road and cannot exceed 10% slope. Design concepts are based on all rights of way being 60
feet wide, with road slopes at, or less than, a 10% slope.
In addition to the steep slopes, the soils in the area are shallow, and most of the site is expected to be near -surface
bedrock. This means that all road construction will include a fair amount of blasting, which increases the overall
construction costs. The north access road that connects the proposed subdivision with Nash Road will need to be
approximately 6,000 feet long, with switch backs to accommodate the slope limits. A secondary access road will need to
be constructed to meet secondary access requirements for subdivisions over 30 lots. The estimated cost of the road
construction from Nash Road to the beginning of the proposed subdivision is $2,000 per linear feet of road. This does
not include water and sewer but does include ditches and lighting.
Individual lot development is also limited by steep slopes. In general, slopes up to 20% are developable, but slopes
between 20% and 30% require additional effort and money to develop. Slopes over 30% require specialty measures to
develop. The concept lots shown attempt to keep the slopes within individual lots at 20% or less, however, some lots are
in slopes that exceed this due to necessity.
Lot development is also hampered by the near -surface bedrock. This site condition inhibits the use of on -site sewer and
water. Instead, the water will need to be pumped up the hill and stored in tanks at the top. A specialized sewer
treatment system will also be required as typical leach fields do not work in bedrock.
Concept Design
The concept design features lots with a minimum area of 10,500 square feet. This size accommodates City of Seward
code requirements for single family, duplexes, and multi -family houses. In general, for this type of terrain, more lots are
needed to offset the high costs of road and utility construction. This design creates approximately 674 lots and requires
4&k
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 14
approximately 32,625 feet of local roads for access within the proposed subdivision. The cost of road construction is
expected to be less than the main access road at $1,000 per linear foot but will still require blasting and on -site gravel
production.
Another feature of this design is a 12-acre parcel that can be used for development of a Tsunami Evacuation Area,
parking for recreational trails, and potentially as an elementary school site in the future. Ten -foot -wide rights of way are
also dedicated throughout the proposed subdivision to allow foot and bicycle traffic to access the 12-acre site without
having to traverse completely around the subdivision using bike paths along the roads. These corridors would also
create more direct access to other trails that might be developed on the hillside around the subdivision. See attached
SMIC Bench Concept.
The main barrier to achieving a concept design that financially breaks even or makes a profit is the cost of the road and
utility construction. Within any given subdivision design, the lots along a section of the subdivision road that serves
those lots must pay for itself at a minimum. The construction will include the road itself, ditches, bike paths, lighting, and
underground electric, communication, and gas lines. These features are considered when generating a construction cost
for a linear foot of road. This makes the equation simpler when comparing costs of construction to the market value of
each lot created. At a minimum, the creation of a group of lots, served by a road corridor that includes all utilities and
drainage, would pay for itself when the lots are sold. If the road costs are more than other areas within a given market,
the market value of the lots must also increase proportionally, and it becomes a question of what the market will bear
regarding the appeal of the lots.
The concept design requires two access roads that begin at Nash Road, and extend to the top of the SMIC Bench.
Because of the steep slopes between the road and the bench, there can be no lot development until the top is reached.
Therefore, there is no offsetting lot sales available to pay for the construction of the 13,600 feet of road construction.
The estimated cost of this road construction is $27.410M, which does not include the water and sewer costs. The
interior subdivision roads on top of the bench are expected to cost $32.6M, bringing the total roads costs to $60M.
Water, sewer, electric, and communication line costs for the entire 674 lot development is expected to be
approximately $54M, driving costs upward to above $100M.
Table 5. Estimated Concept Development Cost Summary
Infrastructure Needed
Estimated Cost for Full
Included Contingencies
Concept Development
Road Construction from Nash Rd. to Bench
$27.41 million
20% ($5.48 million)
Interior Subdivision Roads
$32.6 million
20% ($6.52 million)
Water, Sewer, Electric, Communication Lines
$54 million
25% ($10.78 million)
Total Estimated Development Cost
$114 million
20% ($22.78 Million)
Price per Lot to break even on development
$169,155
costs (total costs/674 lots)
There are contingencies associated with each construction estimate. For example, the utilities estimate has a 25%
contingency that adds $10.78M to the final cost; the utility estimate is based on 750 housing units to account for two or
multi -family units on some of the proposed lots and ensure the water and wastewater systems would be right -sized for
the potential development. Final construction costs could potentially be lower depending on actual conditions within
the site, lowering the breakeven individual lot value.
4*kik
Innovating Today for Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 15
Feasibility Summary
The SMIC Bench provides a large, buildable space to expand housing for the City of Seward. The crux of development is
constructing access roads up the steep slopes to the bench and bringing utilities to the site. The expectation that the
entire site is shallow bedrock also increases the costs of development. Roads and ditches would need to be blasted, and
gravel crushed on -site for use as a leveling course. The bedrock also eliminates the option of on -site sewer and water for
each lot. Instead, the water must be pumped up the hill, or a community well would need to be established at the top of
the bench. In either case, a water storage system would also be required. On -site sewage systems would not be viable,
so a treatment system would need to be constructed that would meet the needs of the entire community. Estimated
costs for creating these systems is included in Tables 4 and 5. Utility Expansion Order of Magnitude Cost Estimate.
The last consideration is the cost to maintain the improvements. Roads must be plowed. Sewage systems must be
maintained. Water pumps and storage facilities require maintenance. With a subdivision such as this, it is imperative
that the access road be maintained in a usable state. Any disruption caused by landslides, avalanches, earthquakes, or
even on -going maintenance, would disrupt the entire community that resides in the subdivision.
The SMIC Bench site is one of the only large areas in Seward that can add a meaningful amount of housing inventory for
the city. Once the site is accessed, the bench offers over 240 acres of space to develop individual lots, a tsunami
evacuation area, a potential school site, and access to millions of acres of public recreational land. The views from the
bench would undoubtedly be stunning on a clear day, adding value to the created lots, and making the subdivision one
of the more desirable ones in the city.
For a subdivision of this size, a phased approach works best to avoid incurring the costs of constructing the entire
subdivision prior to selling a single lot. A connection will need to be made between the north and south access roads to
provide alternate access for the created lots. This connection would naturally fall along the south and west edges of the
subdivision, which feature lots likely to have the greatest appeal and views. The southern and western lots would be
expected to have a higher value once access and utilities are provided, and construction costs could be recovered more
quickly than lots on the interior. After dual access is constructed, the rest of the subdivision could be developed as
needed, and as more funding becomes available.
Additional benefits of phasing the development is that the SMIC Bench area becomes available sooner to the community
at large for recreational purposes. Once on the bench, multi -use trails can be established and be incorporated into
future phased development. Trails built to accommodate a multitude of nonmotorized recreational uses, including
cross-country skiing in the winter and mountain biking in the summer, could crisscross the bench resulting in trails with
breathtaking mountain views on one side and panoramic views of Resurrection Bay on the other. Local hiking trails
might be built to connect with established ridge trails to provide further access to millions of acres of recreational public
land and scenic vistas. The Bench Community, if constructed thoughtfully, could satisfy the need for housing while
creating miles of recreational opportunities for the citizens of Seward.
The SMIC Bench subdivision has been designed to support a potential mix of zoning and housing development types
including single family homes, single family with accessory dwelling units, duplexes, and multifamily developments to
provide for significant and flexible housing unit expansion. The opportunities offered through the development of SMIC
Bench are feasible and could help meet multiple high priority needs of the community and achieve identified goals of
the City of Seward. The cities' Comprehensive Plan and Strategic Plan both encourage development of new housing, and
the city and borough code support the proposed concept plan. The citizens of Seward are united in their love for the city
1
Innovating Todayfor Alaska's Tomorrow
City of Seward - SMIC Bench Draft Feasibility Study
June 2022
Page 16
and the outdoor space that surrounds it, but also understand that the city needs housing for people that live and work in
the city year-round. This subdivision addresses the community's needs and values by creating housing opportunities
surrounded by expansive nature, featuring panoramic views, and providing access to recreational opportunities
otherwise available to so few.
A&
Imrovating TodayforMaska's Tomorrow
1 / III NOTES
-
\ 1. CONTOURS WERE OBTAINED FROM THE I,ULA
PEN BOROUGH GIS, AND HAVE NOT BEEN FIELD
VERIFIED.
//J ` I 2. CONTOUR INTERVAL IS TEN FEET.
U.11 +,e6
a M16
a L7RL
p LL32—
— — I2go
yq
lit,7L,2 L1 L� � s 0 9 D L
-- — — L ---
J L 1I L D I LKsJzLH
G
D
OCK
I —LOCK 2py I
55
z BL
L
23 TRACTA
12ACRE SOOL/
aE
za9g TSUNAMI CECNTER SITE uL38
Lll Lio D0 K6 26La
CK 2T sa ryM OCK 7 L No
L 6 I . pE01CATEp 60 RIGHT-0F NHY (TYP) o
c
Lll
LDa �I j �LLJL �9L
` L
\
L\a7 La
I
OC 5 I. L'O K85 I L.: OCzs \ Ls4
21 2G II LO K9 � 9 Z La
LOCi' /4D
15 L L4 L 0 L 11D6 J 2 6 4 36 /
a
I
L41 L42 RL4L39 11 IL17 L11 Lll L14 L33 Lazy /-'� LocKJLa Lie, jc> L�L2
2 La
L
Lsc L
L47 L) �-� L71Ls ,G o,�•� ...
L
u L,
L L3R' s, Ld rF
�Lo K1
s
OCR
Laa ,a LT e Lae La7 Las L' .La \. L ���sa�a Lre +.,,,:
� �,� LaF o s 6,
L,e
La L2D
,•.� I L9 L,D Lz, Laa L
a
L ��
+Ip
14 L IT
\a I
Lai
L3,
r oEsia
42 N PROPOSED SMIC BENCH SUBDIVISION
L'I BOCK Ln
PLAT N 98-4 L A \ A 1,959 ACRE SUBDINSION OF TRACT G, FOURTH OF DULY
15
\ CREEK SUBDINSION, NUMBER 2. PER PLAT No. 98-09
�1 1 ! • \ 1 ) / % / I// I+ /l / \` LOCATED WITHIN TOWNSHIP 1 SOUTH, AND
—1�PROPOSEp SOUTH gCCESS " RANGES 1 EAST AND 1 WEST, SEWARD MERIDIAN, ALASKA
SEWARD RECORDING DISTRICT, THIRD JUDICIAL DISTRICT, STATE OF ALPSKP
9101 VDn9u.1. DLve. AnchoEa9e. Alaska. 995D7
PH (907) 522 1707 FAX (907) 522 3403
AECC 111
1 DCH 6D 200'l.
A,a I��� �II� �� 1 A , I I L�: � � .. .ED, xx P tt 2734.19 o Te O6nD/2024 9 ET. 1 of 1
TRACT
I
� '�
---------- L--=------
H,
TRAC-
-------------------
i
I
00
\
/
ORTH ACCESS ROAD
\ �-
\
6,062' LONG
$12.124M $2K PER FOOT
@
So
SOUTH ACCESS ROAD
7,643 LONG FROM WATER TANK
$15.286M @ $2K PER FOOT
/
\
20C / ,
v
b
AREAv�'°
! 833.14 AC
I PERIMETER i
26,299.55 FT F
j