HomeMy WebLinkAboutRes2022-118 R&M Task Order for Survey & Topography Sponsored by: Bower
CITY OF SEWARD,ALASKA
RESOLUTION 2022-118
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO EXECUTE R&M
ENGINEERING TASK ORDER NO. 2734.23.1, COMPLETING
REQUIRED SURVEY AND TOPOGRAPHIC EXAMINATION FOR THE
NEW PUBLIC WORKS FACILITY,AND APPROPRIATING FUNDS
WHEREAS, during the August 8, 2022 Special Meeting, the City Council passed the
following motion: "Select the Fort Raymond Property as the site for the new Public Works
Facility"; and
WHEREAS,City Council approved Resolution 2022-094 on October 10,2022, directing
the city manager to proceed with the Public Works Facility Project at the Fort Raymond Property
and approving R&M Engineering task related to geotechnical services; and
WHEREAS, Resolution 2022-106 authorized the City Manager to approve a task order
with R&M Engineering which provided for the preliminary design work and engineer's estimate
of the new facility; and
WHEREAS,the project kickoff meeting was held on November 8, 2022,in Seward; and
WHEREAS,the next step in the project is completion of a design and utility survey; and
WHEREAS; Task Order 2734.23.1 will generate the topographic base map for
engineering design and the creation of a survey control sheet for use during construction.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITYOF SEWARD,ALASKA that:
Section 1. The City Manager is authorized to execute task order R&M No. 2734.23.1
with R&M Engineering for the completion of survey and topographic work to be conducted at the
future Public Works Shop site.
Section 2. Funding in the amount of$28,656 is hereby appropriated from General
Fund reserves account no. 01000-0000-3400 to Contracted Services account no. 01000-1122-
7009-0090 New City Shop expense code.
Section 3. This resolution is effective upon adoption
PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 28th
day of November, 2022.
CITY OF SEWARD,ALASKA
RESOLUTION 2022-118
THE CITY OF SEWARD, ALASKA
°CQ u,r[
Sue McClure, Mayor
AYES: DeMoss, Calhoon, Wells, Finch, Barnwell, McClure
NOES: None
ABSENT: Osenga
ABSTAIN: None
ATTEST:
Brenda J. Ballo , MC
City Clerk
(City Seal)
atri, *PS
o
SE
•
�OFAI. 57,
City Council Agenda Statement
Meeting Date: November 28, 2022
To: City Council
From: Janette Bower, City Manager
Agenda Item: Resolution 2022-118: Authorizing the City Manager to Execute R&M
Engineering Task Order No. 2734.23.1, Completing Required Survey and
Topographic Examination for the New Public Works Facility, and
Appropriating Funds
Background and justification:
On October 10, 2022, the City Council approved Resolution 2022-094 directing the city manager to
proceed with the Public Works Facility Project at the Fort Raymond Property and approving R&M
Engineering task related to geotechnical services. R&M was on site the first week of November to
complete the drilling and the report is forthcoming.
Resolution 2022-106 authorized the City Manager to approve a task order with R&M Engineering
which provided for the preliminary design work and engineer's estimate of the new facility. The
project kickoff meeting was held on November 8 in Seward. By February 2023,the project should be
at 15% design.
The next step in the project is completion of a design and utility survey, which this task order
(2734.23.1) provides for.
Deliverables from Task Order 2734.23.1 include:
• Topographic Base map for Engineering Design
• Survey Control sheet for use during construction
Comprehensive and Strategic Plan Consistency Information
This legislation is consistent with (citation listed):
Comprehensive Plan: 2.2.10 Enable a more viable property use at the site of the existing Public
Works Facility. 3.3.1 Encourage development of new housing in Seward.
Strategic Plan:
Other:
Certification of Funds
Total amount of funds listed in this legislation: $ 28,656
This legislation (✓):
Creates revenue in the amount of: $
✓ Creates expenditure in amount of: $ 28,656
Creates a savings in the amount of: $
Has no fiscal impact
Funds are (✓):
Budgeted Line item(s): 01000-1122-7009-0090 Contracted Services
✓ Not budgeted
Not applicable
46
Fund Balance Information
Affected Fund (✓):
✓ General SMIC Electric Wastewater
Boat Harbor Parking F1 Water F1 Healthcare
Motor Pool Other
Note:amounts are unaudited 9/30/22
Fund Balance/Net position — restricted $ 2,575,000
Fund Balance/Net position — unrestricted/unassigned $ 7,776,797
Available Unrestricted Cash Balance: $ 10,025,076
15,
Finance Signature:
Attorney Review
Yes Attorney Signature:
✓ Not applicable Comments:
Administration Recommendation
e✓ Adopt Resolution
Other:
47
November 10, 2022 R&M No. 2734.23.1
Stephen Sowell
Assistant City Manager
City of Seward,Alaska
410 Adams St.,City Hall Building
Seward,Alaska 99664
RE: Design and Utility Survey of Lot 7A-1, Fort Raymond Subdivision
Dear Mr. Sowell,
CONSULTANTS,INC.
R&M Consultants, Inc. (R&M) has based this response on the information provided by you during a
9101 Vanguard Drive meeting on November 8, 2022. We have reviewed the materials provided to us and have prepared the
Anchorage,Alaska 99 507 following cost estimate for your review and comment.
phone: Design and Utility Survey
fax:907.522.3403 We understand that you would us to perform a design and utility survey of Lot 7A-1, Fort Raymond
Subdivision, Replat No. 1, 2022 Addition (Plat No. 2022-12), located in Seward, Alaska. The area to be
surveyed is approximately 7.7 acres and may be covered with some snow and ice. We expect the site to be
mostly snow-free, making the location of near-ground objects more efficient. In the event of heavy
snowfall,the time required to survey the site may increase,or the schedule may need to be revised.
The survey will consist of collecting all ground topography, planimetric features, and above and below
ground utility information. Prior to mobilizing to the site, R&M will coordinate with the City of Seward to
obtain utility locates for underground utilities. Accessible utility features will be as-built to determine
underground pipe inverts for use during the engineering design phase of the project. All data collected will
be shown in relation to the property boundary and existing easements and may be used to determine the
final position of the new property line for the platting action for the proposed public works building.
Deliverables:
■ Topographic Basemap for Engineering Design
■ Survey Control Sheet for use during Construction
Schedule:We can begin work within two weeks of receiving a Notice-to-Proceed (NTP).
Cost Estimate: Based on the scope and our understanding of the project, we propose a Time & Materials
Fee amount $28,656. We have attached a detailed breakdown of our estimated costs for your review.
Should you have any questions or require additional information, please feel free to contact me at 646-
9651.
Sincerely,
R&M CONSULTANTS, INC.
r'
Dave Hale, PLS
Attachment: Cost Estimate
Z:\project\2734.00 C Seward On call Engineering Services\19-00 Contract\Estimates\T023 Ft Raymond Replat\Addnl Design
Survey Est\R&M City of Seward Ft Raymond Design Survey Proposal.doc
49
uard Drive
Anchorage,AK 99507-
R&M CONSULTANTS, INC. 1212Fr nt9Strreet#150'•Fai banks,AK99701.907.45 5270
Surveying and Mapping Services Cost Estimate
FIRM: R&M Consultants, Inc. CLIENT: City of Seward
Project Name: Public Works Building Design Survey Project No: 2734.23.1 Date: November 10,2022
LABOR HOURS PER JOB CLASSIFICATION
Senior 2-Person 2-Person
SUB-TASK SUB-TASK DESCRIPTION Survey Land Party Survey Survey Planning Staff Planner
Manager Surveyor Chief(OT) Manager
(PLS) Crew Crew(OT)
1 Project/Contract Management 2 4
2 Office Tasks
2.1 Download and Adjustments 4
2.2 Data Import and Processing 8
2.3 Utilites Research and Reduction 4
2.4 Topographic Basemap 24
2.5 Survey Control Sheet for Construction 16
2.6 Preliminary Deliverables 4
2.7 Professional Review 6
2.8 Final Deliverrables 4
3 Field Tasks
3.1 Travel to/from Seward 8
3.2 Site Control 4 2
33 Design Survey of7.7Acres 12 4
3.4 Utility coordination and survey 4 2
3.4 Additional Utility Requests 4
TOTAL LABOR HOURS 2 70 4 32 8 0 0
LABOR RATES ($/HR) $241.08 $186.55 $159.6o $272.65 $408.98 $165.30 $111.15
LABOR COSTS ($) $482.16 $13,058.50 $638.40 $8,724.80 $3,271.80 $0.00 $0.00
EXPENSES COMMENTS:
DESCRIPTION QUANTITY UNIT PRICE MARKUP TOTAL This estimate is for a design and utility
PRICE PRICE survey of approximately 7.7 acres located
Field Supplies 1 $ 100.00 $ 100.00 $ $ ioo.00 within Lot 7A-1, Fort Raymond Subd.,
R&M Vehicle 4 $ 95.00 $ 380.00 $ $ 380.00 Replat No.1,2022 Addn., Plat No.2022-12.
Per Diem 8 $ 250.00 $ 2,000.00 $ $ 2,000.00
Moderate winter conditions are assumed.
TOTAL EXPENSES $ 2,480
SUB-CONTRACTORS
TASK DESCRIPTION FIRM TOTAL
PRICE
TOTAL LABOR $ 26,176
TOTAL EXPENSES $ 2,480
SUBCONTRACTORS $ -
SUBCONTRACTORS MARK-UP $ -
TOTAL SUB- $ - TOTAL T&M COST $ 28,656