Loading...
HomeMy WebLinkAboutRES2023-008 R&M Task Order for Water Sewer At Public Works1 1 1 Sponsored by: Bower CITY OF SEWARD, ALASKA RESOLUTION 2023-008 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO APPROVE R&M ENGINEERING TASK ORDER 2734.27.01 FOR ENGINEERING SERVICES TO DESIGN WATER AND SEWER MAIN EXTENSIONS ON BALLAINE BOULEVARD, AND APPROPRIATING FUNDS WHEREAS, since 1984, the relocation of the Public Works Facility has been discussed by City Staff, the Planning and Zoning Commission, the Seward City Council, and the entire Seward community; and WHEREAS, the current Public Works Facility is beyond its useful life; and WHEREAS, the project to construct a new Public Works Facility is underway; and WHEREAS, the Municipal Land Use Plan has identified the parcel where the current Public Works Facility is located as desirable for residential development; and WHEREAS, lack of residential housing is a recognized barrier to growth in Seward; and WHEREAS, R&M Task Order 2734.27.01 will provide the construction documents, an Engineer's cost estimate, and an Alaska Department of Environmental Conservation (ADEC) Engineering Plan for extending water and sewer mains which will be required for residential development at the current Public Works Shop facility on Ballaine Boulevard. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA that: Section 1. The City Manager is authorized to approve R&M Task Order 2734.27.01 with R&M Engineering for the completion of engineering services to expand the water and sewer mains at the current Public Works Shop facility on Ballaine Boulevard. Section 2. Funding in the amount of $19,068 is hereby appropriated from 17100- 0000-8101-0090 Water Fund ARPA New City Shop Expenses and $19,068 from the 18100- 0000-8101-0090 Sewer Fund ARPA New City Shop Expenses. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 9th day of January, 2023. CITY OF SEWARD, ALASKA RESOLUTION 2023-008 THE CITY OF SEWARD, ALASKA Sue McClure, Mayor AYES: Osenga, DeMoss, Calhoon, Wells, Finch, Barnwell, McClure NOES: None ABSENT: None ABSTAIN: None ATTEST: renda J. Ball , MMC City Clerk (City :G` OF SE14 �',s,• I. ��� ooRPok Y74,'i �0 is •• a SEAL •z :.: e *es OF ALPS ,.�. 1 1 1 City Council Agenda Statement Meeting Date: January 9, 2023 To: City Council Through: Janette Bower, City Manager From: Doug Schoessler, Public Works Director Subject: Resolution 2023-008: Authorizing the City Manager to Approve R&M Engineering Task Order 2734.27.01 for Engineering Services to Design Water and Sewer Main Extensions on Ballaine Boulevard, and Appropriating Funds Background and justification: As the City continues the project to construct a new Public Works Facility; it is important to begin the process of setting the stage for conversion of the existing shop location to residential development. In order to accommodate residential development after the old shop facility is removed, the City needs to extend the water and sewer mains in the area. Funding for this utility expansion will be through American Rescue Plan Act (ARPA) funding which has been designated for water and sewer projects. This resolution authorizes the City Manager to approve R&M Engineering Task Order 2734.27.01, which will provide the design and cost estimate for the water and sewer main extensions at the current shop facility. Specific deliverables from the task order will include: 1. Construction documents -water and sewer main extensions 2. Construction cost estimate 3. ADEC Engineering Plan Review and Authority to construct Application Package Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 2.2.10 Enable a more viable property use at the site of the existing Public Works Facility. 3.3.1 Encourage development of new housing in Seward. Strategic Plan: Other: Certification of Funds Total amount of funds listed in this legislation: $ 38,136 Th s legislation (✓): Creates revenue in the amount of: Creates expenditure in amount of: Creates a savings in the amount of: Has no fiscal impact x $ $ 38,136 $ 68 Funds are (✓): Budgeted Line item(s): Not budgeted Not applicable x Fund Balance Information Affected Fund (✓): General Boat Harbor Motor Pool X SMIC Electric Wastewater Parking Water Healthcare Other ARPA Grant Funds Fund Balance/Net position — restricted Fund Balance/Net position — unrestricted/unassigned Available Unrestricted Cash Balance: x Yes Note: amounts are unaudited Finance Director Signature: Attorney Review Attorney Signature: Not applicable Comments: 41- 9zAteogo Administration Recommendation x Adopt Resolution Other: 69 December 2, 2022 R&M Project #2734.27.01 rmconsult.com R&M CONSULTANTS, INC. 9101 Vanguard Drive Anchorage, Alaska 99507 phone: 907.522.1707 fax: 907.522.3403 Janette Bower - City Manager City of Seward 410 Adams Street Seward, Alaska 99664 RE: On -Call Engineering Services Contract Task Order (#27.01) Ballaine Boulevard Water & Sewer Extension Design Dear Ms. Bower, We are pleased to submit this scope & fee proposal to the City of Seward (City) under our On -Call Engineering Services contract for the design of water and sewer main extensions along Ballaine Boulevard. The water and sewer mains will support future redevelopment of the parcel currently occupied by the City's existing Public Works Facility. R&M Consultants will provide Civil Engineering and Permitting services. Design will include the water and sewer main extensions and roadway restoration. Permitting activities will include Alaska Department of Environmental Conservation (ADEC) Authority to Construct. Our proposed Time and Expense (T&E) fee estimate for the services described above is enclosed. Design and permitting will be expedited to utilize available 2023 ARPA funding, excluding review periods out of our control by ADEC and DOT&PF. Deliverables: a) Construction Documents — Water and Sewer Main Extensions b) Construction Cost Estimate c) ADEC Engineering Plan Review & Authority to Construct Application Package Notes and Exclusions: i. Assistance during bidding & construction services to be added by future task order 2. Topographic survey to be provided by R&M under a separate task order 3. Relocation design of other utilities is not included. 4. Project General Conditions tem plate(s) to be provided by City of Seward. Please let us know if you have any questions or require additional information. Sincerely, Accepted by the City of Seward R,&M CON SULTANTS,,.LN — Janette Bower, City Manager ' 4 Donald R. Porter, PE Utility Group Manager (Signature) (Date) Enclosure: Detailed R&M Fee proposal breakdown 71 ve , AK 99507 • R&M CONSULTANTS, INC. 2102E ontVanguard StrreetD#150'•Farbanks AK99701.907452.5 70 Engineering Cost Estimate FIRM: R&M Consultants, Inc. CLIENT: City of Seward Task: 27.01 Ballaine Blvd Water & Sewer Extension Design Project No: 2734.27 12/02/22 LABOR HOURS PER JOB CLASSIFICATION Utilities Utilities Utilities SUB -TASK SUB -TASK DESCRIPTION Group Project Staff Manager Engineer Engineer (Prof 5) (Prof 3) (Eng 2) Enviro Enviro. Manager Specialist (Prof 4) (ES 4) Project Management and Coordination 8 a) Construction Documents 4 Existing Conditions and Record Drawing Review 2 4 Site Visit 8 8 Cover Sheet, Legend, Index, Notes 2 4 Sheet Specifications 4 4 Sanitary Sewer P&P 8 16 Water Main P&P 8 16 Water & Sewer Details 4 8 Road Restoration Details 2 8 65% Review Meeting & Review Comments 2 6 4 95% Design Submittal 2 8 8 100% Issued for Construction Deliverables 4 8 8 b) Construction Cost Estimate 2 8 12 c) ADEC Approval to Construct (ATC) Permit Engineers' Letter and ADEC Checklists 4 16 24 4 12 Coordination with ADEC, Reviews, ATC Letter 2 8 4 2 4 TOTAL LABOR HOURS 28 92 128 6 16 LABOR RATES ($/HR) $213.75 $159.60 $99.75 $173.85 $133.95 LABOR COSTS ($) $5,985 $14,683 $12,768 $1,043 $2,143 EXPENSES DESCRIPTION QUANTITY UNIT PRICE PRICE MARKUP TOTAL PRICE Miscellaneous Field Supplies 1 $ 150.00 $ 150.00 $ $ 150.00 R&M Vehicle Milage (see notes) 256 $ 0.75 $ 192.00 $ $ 192.00 ADEC Plan Review (Water) 1 $ 386.00 $ 386.00 $ $ 386.00 ADEC Plan Review (Wastewater) 1 $ 785.00 $ 785.00 $ $ 785.00 $ - $ $ - $ $ TOTAL EXPENSES $ 1,513 SUBCONTRACTORS SU B- TAS K DESCRIPTION FIRM TOTAL PRICE COMMENTS: 1. See Cover Letter for Scope and Exclusions 2. ADEC permit fees for water/sewer per ADEC 3. Assume 1 site visit during design TOTAL LABOR TOTAL EXPENSES $ 36,623 $ 1,513 SUBCONTRACTORS SUBCONTRACTORS MARK-UP TOTAL $ TOTAL T&E COST $ 38,136 12/2/2022 TO 27.01 R&M Fee Proposal - Ballaine Water Sewer Design 2022-12-02 1 of 1 73