Loading...
HomeMy WebLinkAboutRES2023-042 Recurring Basic Engineering with R&M CITY OF SEWARD,ALASKA Sponsored by: Bower RESOLUTION 2023-042 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO EXECUTE R&M ENGINEERING TASK ORDER NO. 2734.33, PROVIDING FOR RECURRING BASIC ENGINEERING SERVICES, AND APPROPRIATING FUNDS WHEREAS, the City of Seward has a need of various engineering, planning, and geomatics services on a monthly basis; and WHEREAS,the City of Seward does not have a staff engineer; and WHEREAS,the City of Seward has a number of ongoing projects in addition to recurring, regular work content that will be enhanced and facilitated through the provision of the monthly engineering services retainer; and WHEREAS, it is in the public interest to engage the services of an engineering firm with the required areas of expertise and experience in the various engineering, geotechnical, planning, and geomatics issues; and WHEREAS, Task Order 2734.25.03 will provide for short term professional assistance for work that is expected to be smaller in scope than a separate task would necessitate. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA that: Section I. The City Manager is authorized to execute task order No. 2734.33 with R&M Engineering for the establishment of a monthly fee for basic engineering services. Section 2. Funding in the amount of $40,000 is hereby appropriated from General Fund reserves account no. 01000-0000-3400 to Contracted Services account no. 01000-1122- 7009. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward,Alaska,this 10th day of April, 2023. THE CITY OF SEWARD,ALASKA Sue McClure,Mayor CITY OF SEWARD, ALASKA RESOLUTION 2023-042 AYES: Osenga, Calhoon, Wells, Barnwell, DeMoss, Finch, McClure NOES: None ABSENT: None ABSTAIN: None ATTEST: ren a . Ballo MC City Clean1.15 "4' ••` O S. SFAL 1 • r • (5°°GAF! .............. °••• .�: ,��*r OFALPS``A.__ City Council Agenda Statement Meeting Date: April 10, 2023 To: City Council From: Janette Bower, City Manager Subject: Resolution 2023-042: Authorizing the City Manager to Execute R&M Engineering Task Order No. 2734.33, Providing for Recurring Basic Engineering Services, and Appropriating Funds Background and justification: The City of Seward has a number of projects underway and planned for the near future and due to the lack of an in-house Engineering Department, the City relies upon the use of an external engineering firm, R&M Engineering. R&M Engineering has a long history of supporting the City of Seward in this capacity and has staffing to support all of the various engineering disciplines necessary to provide project support. In addition to large-scale project level support, the firm also provides technical assistance in smaller projects and planning functions. R&M Engineering has assisted in a number of instances such as filling staffing gaps such as This Engineering Services proposal is intended to appropriate funding into the operating budget to fulfill many of the recurring smaller scale assistance that comes up on a recurring basis. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: Strategic Plan: Other: Certification of Funds Total amount of funds listed in this legislation: $ 40,000 This legislation (✓): Creates revenue in the amount of: $ x Creates expenditure in amount of: $ 40,000 Creates a savings in the amount of: $ Has no fiscal impact Funds are (✓): Budgeted Line item(s): 01000-1122-7209 x Not budgeted Not applicable 122 Fund Balance Information Affected Fund (✓): x General SMIC Electric Wastewater Boat Harbor Parking F1 Water Healthcare Motor Pool Other Note: amounts are unaudited Fund Balance/Net position — restricted $ 2,608,220 Fund Balance/Net position — unrestricted/unassigned $ 6,873,540 Available Unrestricted Cash Balance: $ 9,582,031 Finance Signature: Attorney Review RxYes Attorney Signature: Not applicable Comments: Administration Recommendation xeApprove Resolution Other: 123 March 10, 2023 R&M No. 2734.33 Stephen Sowell Assistant City Manager City of Seward,Alaska 410 Adams St.,City Hall Building 6qL0 Seward,Alaska 99664 • RE: Task Order 33—Ongoing Monthly Professional Assistance Dear Mr. Sowell, CONSULTANTS,INC. R&M Consultants, Inc. (R&M)is pleased to submit this fee proposal to the City of Seward under our On-Call 9101 Vanguard Drive Engineering Services contract to provide Ongoing Monthly Professional Assistance. This proposed task Anchorage,Alaska 99507 order is in response to conversations with you concerning ongoing needs of the City of Seward for professional services on an on-call basis. phone:907.522.1707 fax:907.522.3403 We understand that you would like us to set up a task order for ongoing on-call services that include Engineering, Planning, and Geomatics (including GIS) in the amount of$5,000 per month. The task will be used for short-term professional assistance for work that is expected to be smaller in scope than a separate task would necessitate. It will provide an efficient avenue for the city to utilize professional services on an as-needed basis. We anticipate setting up the task on a fixed-price basis and bill the city$5,000 per month until the end of 2023.At that point,we can re-assess the monthly amount and adjust as necessary. Budgeted amounts that are not used each month will be accumulated and be available for additional service charges in subsequent months.The task will be ongoing but can be terminated at any time at the discretion of the city. Should you have any questions, please feel free to contact me at 646-9651. Sincerely, R&M CONSULTANTS, INC. (Signature) (Date) Dave Hale, PLS Accepted by the City of Seward Senior Land Surveyor Janette Bower,City Manager Z:\project\2734.00 C Seward On call Engineering Services\19-00 Contract\Estimates\T033 Monthly Professional Assistance\R&M CofS Monthly Professional Assistance Proposal.doc 126 Project Summary 3/8/2023 R&M Consultants, Inc. Task Project Order Task Order Number Budget Number Project Number and Task Descriptions Budget Total Remaining Project Number: 2734.01 C_Seward On Call Svcs: Misc Support Active but no current charges 1 TSK 01 Miscellaneous Support Services $ 20,000 Total for 2734.01 $ 20,000 $ 19,552 Project Number: 2734.07 C_Seward On Call Svcs: KL&G Float Assisting with Closeout as Requested 7.01 TSK 01 KL&G Float Design $ 102,312 7.02 TSK 02 USACE Permitting $ 22,455 7.03 TSK 03 Bidding Support $ 12,292 $ 137,059 7.04 TSK 04 Office Based Construction Support Svcs $ 58,045 7.05 TSK 05 Field Based Construction Support Svcs $ 57,036 Task 4-5 $ 115,081 Total for 2734.07 $ 252,140 $ 108,937 Project Number: 2734.08 C_Seward On-call Svcs:Williams Camp. Project Complete 8 TSK 01 Phase One Concept Design and Cost Est. $ 11,889 Total for 2734.08 $ 11,889 $ - Project Number: 2734.10 C_Seward On Call Svcs:WWT Lagoon Review Ongoing 10 TSK 01 Wastewater Treatment Lagoon-Scoping $ 27,363 Total for 2734.10 $ 27,363 $ 5,945 Project Number: 2734.11 C_Seward On Call Svcs: Shop Phase I ESA 11.01 TSK 01 Phase I ESA $ 5,252 11.02 TSK 02 Phase 11 LSI Field Activities $ 21,735 11.03 TSK 03 Phase 11 LSI Report $ 5,600 11.04 TSK 04 Shop Expanded Pll- S&A Plan $ 11,911 PO2655 TSK 05 Field Activities Limited Source Removal $ 27,447 TSK 06 Reporting Limited Source Removal $ 13,640 Total for 2734.11 $ 85,858 $ 2,162 Project Number: 2734.12 C_Seward On Call Svcs: Harbor CP Project Complete 12.01 TSK 01 Design $ 8,357 12.02 TSK 02 Bid Support $ 3,676 12.03 TSK 03 Construction Support $ 4,496 Total for 2734.12 $ 16,529 $ 1,752 Project Number: 2734.13 C_Seward On call Svcs:Animal Shelter 13 TSK 01 Engineering Support $ 5,000 Total for 2734.13 $ 5,000 $ 1,777 Project Number: 2734.14 C_Seward On call Svcs: Subdivision Dev. Active but No current charges 14 TSK 01 Scoping $ 5,000 Total for 2734.14 $ 5,000 $ 963 City of Seward On Call Term Engineering- Projects Summary 2023-03-08 127 Project Number: 2734.15 C_Seward On call Svcs: Planning Assist. Active but no current charges 15 TSK 01 Civil Assistance $ 21,239 TSK 01 Planning Assistance TSK 01 Survey Assistance Total for 2734.15 $ 21,239 $ (1,720) Project Number: 2734.16 C_Seward On Call Svcs: Grant Research Project Complete 16 TSK 01 Grant Research $ 3,816 Total for 2734.16 $ 3,816 $ 126 Project Number: 2734.17 C_SEWARD On Call Svcs: Campground Utili. Project Complete 17 TSK 01 Campground Utility Extensions Scoping $ 8,754 Total for 2734.17 $ 8,754 $ - Project Number: 2734.18 C_SEWARD On Call Svcs: Hemlock Subdivis. Project Complete. New Task to complete is Task 26 Geotech report was completed. 18.01 TSK 01 Hemlock Subdivision Concept Planning $ 19,471 18.02 TSK 02 Hemlock Subdivision Replat & Rezone $ 56,907 18.03 TSK 03 Hemlock Subdivision Development Cost Est $ 9,553 18.04 TSK 04 Geotechnical Investigation $ 29,855 Total for 2734.18 $ 115,786 $ 656 Project Number: 2734.19 C_SEWARD On-Call Svcs: SMIC Bench Devel. Project Complete. No current Charges 19.01 TSK 01 Phase I: Feasibility Study $ 23,051 19.02 TSK 02 Phase II: Boundary Survey ad Subdivision $ 92,787 19.03 TSK 03 Phase II: Re-Zone $ 7,558 Total for 2734.19 $ 123,396 $ 58,253 Project Number: 2734.20 C_Seward On-call Svcs: Public Works Fac. Project Complete 20.01 TSK 01 Geotechnical Investigation $ 71,591 Total for 2734.20 $ 71,591 $ 14,581 Project Number: 2734.21 C_Seward On-call Svcs: Utility Master Work Ongoing 21.01 TSK 01 Existing Utility Infrastructure Tech. $ 61,649 21.02 TSK 02 Socioeconomic Factors $ 17,687 21.03 TSK 03 Utility Master Plan $ 73,848 Total for 2734.21 $ 153,184 $ 89,005 Project Number: 2734.22 C_Seward Heat Loop Grant Assistance Project is complete. 22.01 TSK 01 Grant Assistance $ 4,830 22.02 TSK 02 Grant Completion $ 11,109 Total for 2734.22 $ 15,939 $ (35) Project Number: 2734.23 C_Seward Ft. Raymond Subdivision Replat and Design Survey are ongoing City of Seward On Call Term Engineering- Projects Summary 2023-03-08 128 23.01 TSK 01 Subdivision Replat $ 25,899 23.02 TSK 02 Design Survey $ 28,656 Total for 2734.23 $ 54,555 $ 2,501 Project Number: 2734.24 C_Seward Animal Shelter SI Project Complete per Ryan 24.01 TSK 01 Lab Unit Price Testing $ 2,790 24.02 TSK 02 Lab Hourly Services $ 15,449 24.03 TSK 03 Special Inspection Services $ 11,732 Total for 2734.24 $ 29,971 $ 4,568 Project Number: 2734.25 C_Seward New Public Works Facility Dimond Blvd. Geotech field and lab work is complete, report is in progress. Final Concept Report with Constrcution Cost Estimate will be submitted soon 25.01 TSK 01 Geotechnical Investigation $ 67,870 25.02 TSK 02 Public Works Building Scoping $ 62,131 Total for 2734.25 $ 130,001 $ 32,947 Project Number: 2734.26 C_Seward Hemlock Subdivision Replat Ongoing 26.01 TSK 01 Subdivision Replat Survey $ 25,084 23.02 TSK 02 Subdivision Replat Planning $ 8,901 Total for 2734.26 $ 33,985 $ 19,809 Project Number: 2734.27 C_Seward Ballaine Blvd Ongoing 27.01 TSK 01 Engineering $ 38,136 Total for 2734.27 $ 38,136 $ 28,220 Project Number: 2734.28 C_Seward Railway Ave Ongoing 28.01 TSK 01 Railway Ave Easements $ 28,184 Total for 2734.28 $ 28,184 $ 12,469 Project Number: 2734.29 C_Seward MP 25 Substation Ongoing 29.01 TSK 01 As-Built Boundary Survey $ 15,765 Total for 2734.29 $ 15,765 $ 15,765 Project Number: 2734.30 C_Seward SMIC SWPPP Support Ongoing 30.01 TSK 01 SWPPP Support $ 5,968 Total for 2734.30 $ 5,968 $ 5,322 City of Seward On Call Term Engineering- Projects Summary 2023-03-08 129