Loading...
HomeMy WebLinkAboutRES2023-052 Electric Power Constructors Contract Sponsored by: Bower CITY OF SEWARD,ALASKA RESOLUTION 2023-052 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH ELECTRIC POWER CONSTRUCTORS, INC. (EPC) IN A NOT-TO-EXCEED AMOUNT OF $3,595,106.62 TO REPLACE AGING EQUIPMENT AND UPGRADE THE VOLTAGE CAPACITY TO 115KV AT THE FORT RAYMOND SUBSTATION, AND APPROPRIATING FUNDS WHEREAS, Seward's Electric Department and its engineering contractor, Dryden & LaRue, issued a detailed "Invitation to Bid" on March 22, 2023, to identify potential contractors to refurbish and upgrade the Fort Raymond Substation; and WHEREAS, Electric Power Constructors, Inc. (EPC) provided the sole bid for the project; and WHEREAS, EPC's bid outlined a comprehensive plan for completing the construction work on schedule and within budget; and WHEREAS, the scope of work for the project includes the pouring of concrete foundations, replacement of two large transformers, installation of new circuit switchers and a circuit breaker, and the installation of related equipment and hardware; and WHEREAS, these substation upgrades are necessary due to the aging transformers and related equipment within the substation; and WHEREAS, this critical substation construction work is part of a larger infrastructure project planned over the next three to four years to ensure'ongoing reliability of Seward's electric system. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA that: Section 1. The City Manager is hereby authorized to enter into a contract with Electric Power Constructors for$3,595,106.62 to refurbish the Fort Raymond Substation and upgrade the voltage capacity to 115kV. Section 2. Funding is hereby appropriated for the project from the designated Electric Reserves, account 15351-0000-8103 to the extent that bond funds are available upon payment. Additional funding will be provided by a transfer from the Electric Fund reserves account 15000- 0000-3710 to 15351-0000-3700 as needed. CITY OF SEWARD, ALASKA RESOLUTION 2023-052 Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 8tn day of May, 2023. THE CITY OF SEWARD, ALASKA cP r42-, Sue McClure, Mayor AYES: Barnwell, Osenga, Calhoon, DeMoss, McClure NOES: Wells, Finch ABSENT: None ABSTAIN: None ATTEST: imp City Clerk Kris P-ec K (City Seal) .•,♦� `� �FS ' ? —.-- Oft SEAL • :=OF ALPS so* City Council Agenda Statement Meeting Date: May 8, 2023 t! To: City Council Through: Janette Bower, City Manager From: Rob Montgomery, General Manager Electric Subject: Resolution 2023-052: Authorizing the City Manager to Enter into a Contract with Electric Power Constructors, Inc. (EPC) in a not-to-exceed Amount of $3,595,106.62 to Replace Aging Equipment and Upgrade the Voltage Capacity to 115kV at the Fort Raymond Substation Background and justification: The Electric Department and the engineering contractor, Dryden & LaRue, conducted a detailed "Invitation to Bid" (ITB) to identify potential contracts to refurbish the Fort Raymond Substation and upgrade the voltage capacity of the substation to 115kV. EPC provided the only bid for the project, but that bid did provide a comprehensive plan for completing the work on time and within budget. The Scope of Work for the project is to replace, rebuild, and upgrade Seward's Fort Raymond Substation to 115kV, replace the 15kV reclosers, and add two new feeders at the 15kV bus. The intent is to relocate the existing transformer NKR-2 and associated transrupter (south power transformer at Fort Raymond) to a temporary location east of the 15kV bus so it can provide power for the City of Seward during the substation upgrade to 115kV.The plans for the temporary work will be issued as a future addendum. Transformer NKR-1 and its associated transrupter will be removed from the site after NKR-2 is operational. Foundations for the two new transformers must be installed 1.5 months prior to the transformers being set by Virginia Transformer by July 19, 2023. 115kV Bus Replacement, Circuit Switchers, Group Operated Switches, Circuit Breaker, and Respective Foundations: 115kV Circuit Switchers are scheduled to arrive in September 2023. 15kV Recloser Replacement and Addition of Two New Feeders: Reclosers are scheduled to arrive in October 2023. The substation upgrades at Fort Raymond are necessary due to the aging transformers and related equipment within the substation. The critical work is part of the larger infrastructure project planned over the next three to four years to ensure ongoing reliability of Seward's electric system. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 3.7.1.4"Continue to upgrade and expand utilities to meet existing needs and encourage future development." Strategic Plan: Other: 86 Certification of Funds Total amount of funds listed in this legislation: $ 3,595,106.62 This legislation (✓): Creates revenue in the amount of: $ ✓ Creates expenditure in amount of: $ 3,595,106.62 Creates a savings in the amount of: $ Has no fiscal impact Funds are (✓): Budgeted Line item(s): ✓ Not budgeted Not applicable Fund Balance Information Affected Fund (✓): General SMIC Electric Wastewater Boat Harbor Parking F1 Wat F1 Healthcare Motor Pool Other Revenue Bond 15351-000-8103 ✓ Funding Note: amounts are unaudited Fund Balance/Net position — restricted $ 3,995,271 Finance Director Signature: Attorney Review Yes Attorney Signature: ✓ Not applicable Comments: Administration Recommendation ✓ Approve Res. Other: 87