HomeMy WebLinkAboutRES2023-077 EPS Lawing Substation Refurbishment CITY OF SEWARD,ALASKA Sponsored by: Regis
RESOLUTION 2023-077
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A
CONTRACT WITH ELECTRIC POWER SYSTEMS, INC. (EPS) TO
PROVIDE ENGINEERING DESIGN SERVICES FOR THE
REFURBISHMENT AND VOLTAGE CAPACITY UPGRADE OF THE
LAWING SUBSTATION AT MILEPOST 25 OF THE SEWARD HIGHWAY
IN A NOT-TO-EXCEED AMOUNT OF $175,972 AND APPROPRIATING
FUNDS
WHEREAS, the refurbishment of the Lawing Substation is a component of the
Electric Department's overall transmission infrastructure rebuild project; and
WHEREAS, the refurbishment will also result in the substation's voltage capacity
being upgraded from its existing 69kV to 115k; and
WHEREAS, engineering design of the Lawing Substation is important to ensure the
completion of the substation construction stays within the timeline of the overall infrastructure
project; and
WHEREAS, EPS has provided engineeringdesign and maintenance support services
to the City's Electric Department for approximately 45 years; and
WHEREAS, the completion of this important. substation work, along with the
completion of the overall transmission infrastructure project, will help improve system
reliability for up to 40 years.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEWARD,ALASKA that:
Section 1. The City Manager is hereby authorized to enter into a contract with Electric
Power Systems, Inc. to provide engineering services for the refurbishment and voltage capacity
upgrade of the Lawing Substation.
Section 2. Funding in the not-to-exceed amount of$175,972 is hereby appropriated from
Electric Fund Unassigned reserves account 15000-0000-3710-0000-15340 and transferred to Fund
15340-0000-8103 Capital Equipment Expense account.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this the
10th day of July, 2023.
CITY OF SEWARD, ALASKA
RESOLUTION 2023-077
THE CITY OF SEWARD, ALASKA
Sue McClure, Mayor
AYES: Finch, Osenga, Calhoon, Demoss, McClure
NOES: None
ABSENT: Wells, Barnwell
ABSTAIN: None
ATTEST:
/'
Kris Peck
City Clerk
.•'��,0� �S E j,y"s••
(City Seal) ��.•,�-1 �Po� 'q�Q�•��
o
SE
AL
••, cS'T4 SHE 1, 'f,�Q`�
'Sill
�-OF N P•'s Ott
City Council Agenda Statement
Meeting Date: July 10, 2023
To: City Council
Through: Norm Regis,Acting City Manager
From: Rob Montgomery, General Manager Electric
Subject: Resolution 2023-077:Authorizing The City Manager To Enter Into A Contract With
Electric Power Systems, Inc. (EPS) To Provide Engineering Design Services For
The Refurbishment And Voltage Capacity Upgrade Of The Lawing Substation At
Milepost 25 Of The Seward Highway hi A Not-To-Exceed Amount Of$175,972
And Appropriating Funds
Background and justification:
This refurbishment and voltage upgrade project is a component of the larger transmission infrastructure
rebuild project currently underway. The work will include a nearly complete rebuild of the Lawing
Substation with new transformers, circuit breakers and related equipment. The substation's voltage
capacity will also be increased from 69kV to 115kV.
Since it's another key part of the overall infrastructure project, it's critical that this work stay on schedule.
EPS has provided the City with engineering design services and maintenance support for approximately
45 years.
Comprehensive and Strategic Plan Consistency Information
This legislation is consistent with(citation listed):
Comprehensive Plan: 3.7.1.4 "Continue to upgrade and expand utilities to meet existing needs and
encourage future development."
Strategic Plan:
Other:
Certification of Funds
Total amount of funds listed in this legislation: $ 175,972
This legislation(✓):
Creates revenue in the amount of $
x Creates expenditure in amount of $ 175,972
Creates a savings in the amount of $
Has no fiscal impact
Funds are (✓):
Budgeted Line item(s):
x Not budgeted 15340-0000-8103
Not applicable
Fund Balance Information
286
Affected Fund (✓):
General SMIC x Electric Wastewater
Boat Harbor Parking Water Healthcare
Motor Pool X Other 15340-000-8103
Note:amounts are unaudited
Available Fund Balance: $5,934,605
Finance Director Signature:
Attorney Review
RxYes Attorney Signature:
Not applicable Comments:
Administration Recommendation
x Approve Res.
Other:
287
3305 Arctic Blvd Suite 201
pleetrie Paver SystemsAnchorage, AID 99503
Consulting Engineers inc Ph: (907) 523-3101
Fax: (907)522-1182
Email: dbuss@epsinc.com
Attn: Rob Montgomery June 2, 2023
City of Seward
Subject: Lawing Substation Engineering Proposal
Dear Mr. Montgomery,
Electric Power Systems, Inc. ("EPS") is pleased to present the City of Seward ("Seward") with a proposal for
engineering services for the design to upgrade the Lawing Substation to 115kV, It is our understanding Seward desires to
upgrade the existing 69kV line to 115kV and replace the existing 20MVA 115/69/12.5kV transformer with a 115kV
pass-through. The 2.5MVA 12.5/25kV step up transformer will be replaced with a 4.6MVA 115/25kV transformer tapped
off the 115kV pass-through. The 20MVA transformer will be repurposed at the Spring Creek Substation. The following
summary and costs represent our understand i,ig of the scope of work for this project.
1.Preliminary Design
After a kickoff meeting with Seward, EPS will begin producing a detailed design of the substation. This task includes all
labor, materials, and other costs required to complete the preliminary design and create a package that will identify all
known equipment and material requirements. This preliminary design work will identify long lead equipment and
materials for construction of the substation. Design drawings will be completed to the point of material identification and
solicitation. We estimate these drawings will be 65%complete following this phase of the project.
2.Equipment Procurement Assistance
This task includes the preparation of specifications necessary to procure long lead items that will be Seward furnished. It
also includes providing engineer's estimates for owner-furnished materials and equipment, technical assistance during
bidding phases, technical evaluation of bids, and review of vendor calculations, shop drawings, and other submittals.
3. Final Design
Following Seward review of the preliminary design, and receipt of preliminary drawings from all long lead equipment
vendors, we will begin incorporating comments into a final design. The final design will provide sufficient detail for
construction, maintenance, operation of the substation and safe retirement of old equipment. Drawings will include
detailed material lists that specify quantities,and when applicable. an acceptable manufacturer and catalog number.
ELECTRIC POWER SYSTEMS, INC.
3305 Arctic Blvd., Suite 201 •Anchorage,AK 99503
Ph: (907)522.1953 Fax:(907) 2.1182 • Email: eps@epsinc.com
DELIVERABLES
Our understanding of the deliverables are as follows:
1. 65% design package includes design drawings for review and oversight by Seward.
2. Final design package to include construction ready drawings.
3. Construction drawings to include site development, foundation, raceway, lighting, grounding, fence,
getaways, station service, and auxiliary electrical systems to form complete substations as requested.
SCHEDULE
EPS can commence work on this project within three weeks of receiving a notice to proceed. Final construction
drawings will be provided within 3 months of final review of 65% design .
COST
We propose performing these services on a fee schedule basis using the enclosed fee schedule. We estimate our
not-to-exceed cost, including 20%contingency, for these services to be $175,972.
Below is a summary breakdown of costs:
TASK DESCRIPTION Subtotal TOTAL COST(with
contingency)
1 Preliminary Design $100:052 $ 120,063
2 Equipment Procurement Assistance $8,996 $ 10,796
3 Final Design $37,594 $45,113
TOTAL $ 146,642 $ 175,972
ELECTRIC POWER SYSTEMS, INC.
3305 Arctic Blvd., Suite 201 • Anchorage, AK 99503
Ph: (907)522.1953 • Fax: (907)2'b32.1182 • Email: eps@epsine.com
CLARIFICATIONS
We are providing the following clarifications based on our understanding of the scope of work. The following items are
not included in this proposal.
• Construction engineering.
• Permitting or right-of-way services.
• Construction management/supervision.
• Equipment settings, device software configuration, testing, and commissioning.
• Geotech and ground resistance testing were provided under separate contracts in October 2021.
Thank you for your consideration and feel free to contact me at(907) 523-3101 with any questions you may have.
Thank you,
-p
David Buss Rob Montgomery
Electric Power Systems, Inc. Electrical Utility Director
(907) 523-3101 City of Seward- Electric Department
ELECTRIC POWER SYSTEMS, INC.
3305 Arctic Blvd., Suite 201 •Anchorage,AK 99503
Ph: (907)522.1953 • Fax: (907) 2.11 82 • Email: eps@epsinc.coln