Loading...
HomeMy WebLinkAboutRES2023-101 Water Main Repair Sponsored by: Regis CITY OF SEWARD,ALASKA RESOLUTION 2023-101 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO APPROVE THE EMERGENCY REPAIR OF THE FIRE DEPARTMENT WATER MAIN LINE IN THE AMOUNT OF$39,400 AND APPROPRIATING FUNDS WHEREAS,several leaks have been forming recently on the main water line inside the fire hall; and WHEREAS,the valve at the street and inside the station are not operable for any service or repairs; and WHEREAS,there is no other option to make repairs to the existing plumbing without substantial water line and valve replacements; and WHEREAS,the water main needs to be dug up,a hot tap placed on the main water line and new line run into the basement of the fire hall; and 111 WHEREAS,the original 2"main is inadequate for the needs of the building or any future commercial property needs, and the 6" water line is less expensive than 4"pipe to hot tap; and WHEREAS, also included is installing a new valve inside the fire hall, along with plumbing repairs to the leaking 2" galvanized pipe from the basement and•up into the apparatus bay; and WHEREAS, as an emergency repair, Metco has submitted a quote for the project in the amount of$39,400.00 including the repair to the street and sidewalk after replacing the water main at the Fire Department. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA,that: Section 1.The City Council hereby authorizes the City Manager to approve the emergency repair of the Fire Department by METCO Alaska of the water main line in the amount of$39,400. Section 2.Funding in the amount of$23,900 is hereby appropriated from the General Fund Reserved Account no. 01000-0000-3400 to Buildings Expense Account 01000-1350-8102. Section 3.Funding in the amount of$15,500 is hereby appropriated from the General Fund Reserved Account no. 01000-0000-3400 to the Infrastructure Expense Account 01000-1350-8101. CITY OF SEWARD,ALASKA RESOLUTION 2023-101 Section 4. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward,Alaska, this 28th day of August 2023. THE CITY OF SEWARD,ALASKA 14,-.4htl\er IL Sue cClure, Mayor AYES: Wells, Finch, Barnwell, McClure NOES: None ABSENT: DeMoss, Calhoon, Osenga ABSTAIN: None ATTEST: Kris Peck City Clerk .t'•••OF`S'E 117 (City Seal) .01P q SEAL • •.,,,cS'jq�NE�.��P�Q, City Council Agenda Statement Meeting Date: August 28, 2023 To: City Council Through: Norm Regis,Acting City Manager From: Clinton Crites,Fire Chief Subject: Resolution 2023-101: Authorizing The City Manager To Approve The Emergency Repair Of The Fire Department Water Main Line In The Amount Of$39,400 And Appropriating Funds Background and justification: The Seward Fire Department Station was built in 1963 and has original plumbing throughout the building and to the street water main. The volunteers and staff use the water at the station for drinking, showering, sanitation, laundry, filling apparatus, and cleaning. On 08-07-2023 one of our firefighters came into work to discover a main galvanized water line had burst and was flooding the apparatus bay and down into our basement into the building permit and fire records room. Many boxes of legal records had to be dried out and scanned to try to preserve their history,and the water cleanup of the station required many people and hours to complete. We have a temporary fix to the leak;however,it is believed the repair will not last long and other rust spots are beginning to show signs of other future leaks to occur. The two main shut offs for the water to the station are original valves and cannot be turned off They are both stuck open and in case of a major leak, the only option would be to shut down water to the entire Fourth Ave downtown district until the same scope of work can be completed. There are no other options than to replace the valves so further repair work can be completed. Multiple contractors were contacted to inquire about fixing the water lines, but only one of them sent in a quote for the job. To fix the water main involves some major excavating of the street in front of the station and underground work. The main water line and associated valves to the station will be replaced and interior pipe replacement can occur, including the repair to the street and sidewalk after replacing the water main at the Fire Department. This project has been reviewed by Metco and is the only company that supplied us with a quote for this job. Metco has parts on hand and is ready to begin immediate work. We ask that the amount quoted be approved to fix the essential water main into the building. This is an emergency situation as the rusting pipes could continue to break causing major flooding and water damage to the station. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with(citation listed): Comprehensive Plan: Vol 12.2.9,Vol II 13.1 Strategic Plan: Page 13 124 Other: Certification of Funds Total amount of funds listed in this legislation: $ 39,400.00 This legislation(✓): Creates revenue in the amount of: $ X Creates expenditure in amount of: $ 39,400.00 Creates a savings in the amount of: $ Has no fiscal impact Funds are (✓): Budgeted Line item(s): X Not budgeted Not applicable Fund Balance Information Affected Fund(✓): X General SMIC Electric Wastewater Boat Harbor Parking Water Healthcare Motor Pool Other Note: amounts are unaudited Available Fund Balance $ 9,782,039 Finance Director Signature: .5444- Attorney Review RYes Attorney Signature: X Not applicable Comments: Administration Recommendation eAdopt Res. Other: 125