Loading...
HomeMy WebLinkAbout11012023 PACAB Meeting Packet Port & Commerce Advisory Board Agenda Packet Q. 1993 Regular Meeting November 1 , 2023 City Council Chambers 12.00 p.m. 1 1963 1965 2005 The City of Seward,Alaska An-AmF.�.e 3.i PORT AND COMMERCE ADVISORY BOARD r MEETING AGENDA City Council Chambers, 410 Adams Street Please silence all cell phones and devices during the meeting Chair Bruce Jaffa Board Member Dwayne Atwood Assistant City Manager Jason Vice Chair Lynda Paquette Board Member Tom Miller Bickling Board Member Benjamin Smith Board Member Melissa Schutter Harbormaster Norm Regis Board Member Frederick Woelkers City Clerk Kris Peck November 1,2023 at 12:00 p.m. 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL 4. CITIZEN COMMENTS ON ANY SUBJECT (Those who have signed in will be given the first opportunity to speak. Time is limited to 3 minutes per speaker and 36 minutes total time for this agenda item.) 5. APPROVAL OF AGENDA AND CONSENT AGENDA(Approval of Consent Agenda passes all routine items listed under Item 7. Consent Agenda items are not considered separately unless a board member requests. In the event ofsuch a request, the item is returned to the Regular Agenda. Marked with *.) 6. SPECIAL ORDERS, PRESENTATIONS,AND REPORTS A. Proclamations and Awards-None B. City Administration Report..................................................................Pg, 4 C. Other Reports and Announcements 1) Alaska Railroad Report..................................................................Pg. 6 D. Presentations (Presentations are limited to ten minutes each, excluding Q&A, and are limited to two per meeting unless increased by council.) 1) Presentation-None 7. CONSENT AGENDA A. Minutes of Preceding Meeting...............................................................Pg. 7 1)*Approve October 4, 2023 Port and Commerce Meeting Minutes B. Resolutions 1)*Resolution 2023-004, Recommending The City Council Approval Of The 2023 Seward Boat Harbor Plan.........................................................................................Pg. 10 2 C. Other Items-None 8. UNFINISHED BUSINESS-None 9. NEW BUSINESS A. Resolutions-None B. Other New Business 1) Discuss Work Session Topics for Council to Prioritize..............................Pg. 43 10. INFORMATIONAL ITEMS AND REPORTS (No action required.) A. Reminder of Meetings 1) Regular Meeting on December 6, 2023 B. Other Items-None 11. CITIZEN COMMENTS (There is no sign in for this comment period. Time is limited to five(5) minutes per speaker.) 12. BOARD AND ADMINISTRATION COMMENTS AND RESPONSES TO CITIZEN COMMENTS 13. ADJOURNMENT 3 Assistant City Manager Jason Bickling Emergency Operations Plan: Chief Crites and I are developing and implementing a plan to make sure the city staff are prepared for all potential types of emergencies and fulfilling their roles in the NIMS/ICS Systems. It has been difficult to make sure everyone is trained and proficient with regular turnover and many positions open. This will include monthly meetings, training, tabletop exercises, and partner coordination activities. We will include the council to be part of those as it makes sense. We are also in the process of updating the City Facility Emergency Action plans for each city building to make sure our staff have up to date protocols and procedures in place to keep themselves and visitors safe for multiple types of emergencies, should they occur. Public Safety Needs Assessment: The study team was here October 121" and 131" to finalize their information gathering to make building and site determinations. That finalized study will be coming before you in the coming months. Legislative Priorities / Congressionally Designated Spending Brochure: Working on collecting photos, creating narratives, and finalizing cost estimates to send to the designer. We are hoping to have these printed in early November. Library: Kat and I went and did a tour of the library to understand the ongoing issues they are having with their HVAC system firsthand. We are working on getting the engineering done so that we can put it out to RFP to be fixed next summer. Public Works Facility: We are still working towards the 65% design on the Public Works Facility. Heat Loop Project: We had a number of kickoff meetings for the Heat Loop Project Grant Award on October 12t" and 13t". We had a national one with about a dozen other communities from around the US that were awarded the grant as well. We heard briefly from each other about the overall projects and specific requirement criteria of community engagement and work force development. We also had a meeting with NREL, one of our partners, to schedule the data collection for the planning/design of the project. They will be here from Nov 1 st — 3rd to place monitoring equipment in drill sites and to do building walkthroughs. On this council agenda will be the acceptance of the grant funds. Also on this agenda is the Heat Loop Ad hoc Committee as a discussion item. They will be giving an update as well and this will be an opportunity to renew the committee for the coming year. KPEDD: Kat and I met with Tim Dillion and discussed some infrastructure projects that may be eligible for grant opportunities for communities that were at one time in the coal industry. There are some city projects that may be a good fit for the application and would meet their requirements. 4 PACAB Harbor Harbormaster Norm Regis ➢ The 50-ton and 330-ton Travelift have slowed down for winter storage; the SMIC yard is starting to fill up. ➢ We are continuing to train several new harborworkers on the maintaining and operating the Travelifts and harbor operations. ➢ We are working on the SMIC yard drainage to keep water flowing into the ditches. ➢ We are working on the beach access parking lot located at the South end of SMIC. ➢ Some people like that we are still working with some COVID protocol in mind while continuing to do boat lifts and public contact in the Seward Harbor office. ➢ We will continue the cleanup at the old Raibow dump area, just a few more items to deal with and we can lease the property out again. ➢ The harbor office is closed on Sundays for the fall and winter schedule. ➢ The harbor has hired a new Harborworker II; he has started training on the travelift and harbor operations. ➢ The harbor has hired a new harbor office staff, she has started and is currently being trained. ➢ We are continuing to work with the Director from the Pacific Northwest &Alaska Maritime Administration U.S.DOT on finding a suitable grant for the washdown pad project. ➢ We are waiting on funding for the 5-ton crane on I-Dock, Corp Permit has been approved ➢ We are working with a Kenai Peninsula title company on the land acquisition for the Coast Guard land across the bay. ➢ Updated FRC timeline: • Seward FRC Homeport(FY2019 MASI /$1.OM:Anticipated FY2024 MASI /$42M): Scope: Acquire real property and complete NEPA for future FRC homeport. Status: CEU Juneau obligated funds on 25 Aug 2023 to purchase a 1.5 acre parcel at the Seward Marine Industrial Center(SMIC) for future waterfront improvements. Schedule Mar 2024: RFP package to contracting. Apr 2024: Design/Build solicitation released. Sep 2024: Contract award. Protected Construction Completion Date (CCD):September 2026 Notes: Construction pends funds appropriation which is anticipated in FY2024. 5 AL,A A RAILROAD Port Activity Update November 1, 2023 THE ALASKA RAILROAD'S MISSION -- Through excellent customer service and sound business management practices, provide safe, efficient, and economical transportation and real estate services that support and grow economic development opportunities for the State of Alaska. Port Traffic • The port is currently transitioning to winter barge / tug operations and off-season yard storage. Vessel activity included 167 non-cruise dockings through October 18. • Local longshore crews will offload five shipments of pipe and one 25 million pound shipment of proppant (frac sand) between mid-October and mid-December. All of the products are bound for the North Slope. • The rail mainline will close January 15 for bridge projects at Trail River and Falls Creek. • The cruise dock continues to undergo repairs, such as drainage grate replacement and vegetation removal. Many piling are in need of service and work will begin this winter. • An invitation to bid was released in September to remove derelict coal handling equipment and conveyor belts from the coal dock. The dock loading arm will also be removed, if funding allows. • Public use of the terminal building is been arranged for the winter. Activities include senior walking on Monday through Thursday, youth archery, and special events such as the Halloween Carnival and Christmas Fair. Other Items • The Seward Passenger Dock project was recently put on hold as we continue to research the best possible functionality of this important long-term investment. Market pressures have necessitated a review and strategic pause, considered necessary to guarantee that the cruise-critical passenger dock and terminal is successful in meeting the needs of the railroad, anchor tenants, the community, and under conditions favorable for ARRC in exercising its bonding authority as approved by the Alaska State Legislature. Dwayne Atwood,Accredited Maritime Port Executive Seward Port Manager 907-265-2696 office / 907-362-6038 mobile mailing:PO Box 95, Seward,AK 99664 physical:913 Port Avenue web:www.AlaskaRailrood.com 6 CALL TO ORDER The October 4, 2023, regular meeting of the Port and Commerce Advisory Board was called to order at 12:00 p.m. by Chair Bruce Jaffa. OPENING CEREMONY Harbormaster Norm Regis led the Pledge of Allegiance to the flag. ROLL CALL There were present: Bruce Jaffa,presiding; and Lynda Paquette Benjamin Smith Fred Woelkers Dwayne Atwood Tom Miller comprising a quorum of the Board; and Jason Bickling, Assistant City Manager Norm Regis, Harbormaster Jodi Kurtz, Deputy City Clerk Excused—None Absent—None Vacant One CITIZEN COMMENTS -None APPROVAL OF AGENDA AND CONSENT AGENDA Motion Approval of Agenda and Consent Agenda Paquette pointed out two typos on the agenda in regard to spelling and the meeting time. Motion Passed Unanimous The clerk read the following approved consent agenda items: Approval of September 6, 2023 PACAB Regular Meeting Minutes SPECIAL ORDERS,PRESENTATIONS AND REPORTS Administration Report Assistant City Manager Jason Bickling summarized his written report in the packet which included updates on the Heat Loop Ad Hoc Committee. Jaffa noted that the Heat Loop Ad Hoc Committee would need to be renewed for 2024 by city council. PACAB discussed rescheduling their next regular work session to October 25, 2023 due to the Alaska Day Holiday. Harbormaster Norm Regis summarized his written report in the packet. He noted there would be an upcoming presentation on trawling and the negative impacts of scraping the ocean floor. Police Chief Alan Nickell provided an update on the Seward Community Jail situation and the new process of transporting detainees to other facilities. Other Reports and Announcements Alaska Railroad Report. Port Operations Manager Dwayne Atwood summarized from his written report in the packet. Atwood noted the first cruise ship next year would arrive on April 22, 2024. Paquette wished the Chamber of Commerce would collaborate with local businesses to accommodate the cruise ship schedule by being open during the shoulder seasons of April and October. Jaffa asked if a Chamber of Commerce representative could provide regular reports to PACAB as they had done in the past. NEW BUSINESS Other New Business Discuss Seward Boat Harbor Plan 2023 Regis reviewed the harbor plan and noted the plan was valuable at conferences and for grants applicants. PACAB discussed how the harbor tracks boat launch activity. INFORMATIONAL ITEMS AND REPORTS— Reminder of Meetings - Regular PACAB Meeting on November 1, 2023. 8 BOARD AND ADMINISTRATION COMMENTS & RESPONSE TO CITIZEN COMMENTS Miller said the harbor looked amazing and noted how much it has been improved. Woelkers noted he was involved in litigation in regard to the election that just took place. He wondered if it would affect his status as a PACAB member. Atwood agreed that more could be done to accommodate visitors during the shoulder seasons in April and October. Smith agreed that the Seward had a first-rate boat harbor and congratulated the harbor staff for their efforts. Regis recalled his trip to Ketchikan last week and said the businesses there opened when the cruise ships arrived and locked up as soon as they left. Regis noted the Seward Boat Harbor had made a lot of progress over the years to become what it is today. Paquette noted the Northeast Boat Launch Ramp was very nice. She was happy to see a new PACAB applicant and hoped for a full board at the next meeting. Jaffa said city harbor department had a great staff and complimented Regis on his leadership. On another topic, Jaffa was disappointed by the overall disjointed operation of the road construction this summer on the Seward Highway. ADJOURNMENT The meeting was adjourned at 12:54 p.m. Jodi Kurtz Bruce Jaffa Deputy City Clerk Chair (City Seal) 9 Port and Commerce Agenda Statement Meeting Date: November 1,2023 To: Port and Commerce Advisory Board From: Norm Regis, Harbormaster Subject: Resolution 2023-004 Recommending City Council Approval Of The 2023 Seward Boat Harbor Plan Background and justification: Since April 2013, the Port and Commerce Advisory Board(PACAB)has been working with city staff to develop an updated plan for the Seward Small Boat Harbor. The most recent plan, the Small Boat Harbor Area Planning and Development Guide, was approved by the Seward City Council by City Council Resolution 2003-032 on April 28, 2003. Since 2003, numerous improvements have been completed and the time is right to plan for more changes and improvements to the harbor. The new plan is intended to serve policy makers and advisers as a general information source and as a tool for prioritization and funding justification for the development and upgrade of the Seward Small Boat Harbor. Previous plans have not included upland commercial and transportation interests or concerns; this plan proposed to adopt a more all-inclusive view incorporating those elements as well. As part of the development of the proposed new plan, the PACAB has conducted public meetings that have been occasionally well-attended by interested citizens and harbor users. There has also been media coverage on certain topics. The new plan lists the projects that have been already accomplished. The plan incorporates lessons learned during previous construction projects. With very little consultant assistance, the plan describes possible future projects, both in the near-term and in the long-term. After adoption, the plan will from time to time need revision and updates as needs and opportunities appear, and as projects identified as priorities are completed. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 3.5.1 Maintain a thriving port of Seward through harbor improvements, infrastructure expansion, and implementation of management plans. 10 Strategic Plan: We are a community that promotes economic diversity, encourage growth of year-round businesses, desires environmentally responsible industry, and seeks jobs that promote a higher standard of living. Other: Certification of Funds Total amount of funds listed in this $ 0 legislation: This legislation (✓): Creates revenue in the amount of: $ Creates expenditure in amount of: $ Creates a savings in the amount of: $ ✓ Has no fiscal impact Funds are (✓): Budgeted Line item(s): Not budgeted ✓ Not applicable Fund Balance Information Affected Fund (✓): General SMIC Electric Wastewater Boat Harbor Parking F1 Water F1 Healthcare Motor Pool Other Note: amounts are unaudited Available Fund Balance $ Finance Director Signature: Attorney Review Yes Attorney Signature: ✓ Not Comments: applicable 11 Administration Recommendation ✓ Adopt Resolution Other: 12 Sponsored by: Regis CITY OF SEWARD,ALASKA PORT AND COMMERCE ADVISORY BOARD RESOLUTION 2023-004 A RESOLUTION OF THE SEWARD PORT AND COMMERCE ADVISORY BOARD (PACAB) RECOMMENDING THE CITY COUNCIL APPROVAL OF THE 2023 SEWARD BOAT HARBOR PLAN WHEREAS, the City Council of the City of Seward approved the Seward Small Boat Harbor Area Planning and Development Guide on April 28, 2003; and WHEREAS, the Port and Commerce Advisory Board (PACAB) reviewed the plan at its October 4, 2023 regular meeting; and WHEREAS, the proposed new plan lists completed projects, projects that have not yet been completed, and new projects; and WHEREAS,public input has been solicited, received, and included in the proposed new plan; and NOW, THEREFORE,BE IT RESOLVED by the Port and Commerce Advisory Board that: Section 1. PACAB strongly recommends approval of the 2023 Seward Boat Harbor Plan. Section 2. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the Port and Commerce Advisory Board this 1st day of November, 2023. THE CITY OF SEWARD,ALASKA Bruce Jaffa, Chair 13 AYES: NOES: ABSENT: ABSTAIN: VACANT: ATTEST: Kris Peck City Clerk, CMC (City Seal) 14 Seward Boat Harbor Plan November 1, 2023 Prepared for The Port and Commerce Advisory Board of The City of Seward, Alaska 15 Seward Boat Harbor Plan Summary This document is intended to serve policy makers and advisers as a general information source and as a tool for prioritization and funding justification for the development and upgrade of the Seward Boat Harbor. In its final adopted form, the plan will have been through the public process at different steps, including meetings before the Port and Commerce Advisory Board and the Seward City Council. After adoption, the plan will from time to time need revision and updates as needs and opportunities appear, and as projects identified as priorities are completed. In the decade since the previous plan was adopted, much has been accomplished in the Harbor. The eastward expansion added slips to help meet demand for users on the wait list, and added developable uplands south of the harbor. The improvements at I and T docks provided needed structural improvements. The Boat Lift has been replaced, a new dock constructed, and the adjacent uplands improved. The fuel dock and X-Float have been redone, and a new Z-float constructed along the relocated eastern breakwater. D-Float has been replaced, A, B, C, S, G, K and L-float has been replaced along with the North East and South Launch Ramps. The Harbormaster Office public restrooms and showers have been updated. The City Code Chapter addressing Harbor uses has been rewritten through several public hearing at Port and Commerce Advisory Board and City Council meetings. Capital projects awaiting funding further detailed within this plan include, a washdown pad by the 50 ton boatlift, electric services on X-Float, slip build out along Z-float, and location and construction of a 5 ton public crane on I-dock, a new harbormasters office and the South Harbor uplands development. Previous plans have not included upland commercial and transportation interests or concerns; this plan proposed to adopt a more all-inclusive view incorporating those elements as well. 2 16 TABLE OF CONTENTS 1.0 Introduction................................................................................................................... 4 1.1 General...................................................................................................................... 4 1.2 Plan Approach........................................................................................................... 5 2.0 Regional Description .................................................................................................... 6 2.1 Brief History ............................................................................................................. 6 2.2 Location .................................................................................................................... 7 2.3 Climate...................................................................................................................... 7 2.4 Winds........................................................................................................................ 8 2.5 Tides.......................................................................................................................... 8 2.6 Waves........................................................................................................................ 8 2.7 Ice.............................................................................................................................. 9 2.8 Land Use and Ownership.......................................................................................... 9 3. 0 Existing Harbor Facilities............................................................................................ 9 3.1 The Boat Harbor ...................................................................................................... 9 3.2 Seward Marine Industrial Center(SMIC)............................................................... 12 4.0 The Development Plan................................................................................................ 12 4.1 Economic Evaluation and Harbor statistics............................................................ 12 4.2 Corps of Engineers Role......................................................................................... 15 4.3 Development Criteria ............................................................................................. 15 4.4 Float System Layout............................................................................................... 16 4.5 Float System Utilities........................................................................20 4.6 Gangways and Trestles........................................................................................... 21 4.7 Launch Ramps ........................................................................................................ 22 4.8 Parking Areas.......................................................................................................... 22 4.9 TraveLift® and Maintenance Area......................................................................... 23 4.10 Public Crane.............................................................................. 23 4.11 Wash Down Facility ........................................................................23 4.12 Drive Down Float................................................................................................. 23 4.13 Tidal Grid.............................................................................................................. 23 4.14 Fish Cleaning Facilities......................................................................................... 24 4.15 Restroom Facilities ............................................................................................... 24 4.16 ADA Accessible Fishing Pier............................................................................... 24 4.17 Harbormaster's Office and Shop .......................................................................... 24 5.0 Accessibility................................................................................................................ 25 5.1 Background........................................................................... ........25 5.2 Accessible Routes...........................................................................25 5.3 Boat Slips.....................................................................................25 5.4 Upland Facilities.............................................................................26 6.0 Plan Implementation...........................................................................26 3 17 Appendices Appendix A Drawings: Z Float Laterals J, U V, and W Floats) Appendix B City of Seward, Alaska, Resolution 2022-008 4 18 1.0 Introduction 1.1 General The Seward Boat Harbor (see next page) is a significant aspect of the overall commercial and economic picture of the City of Seward. The existing harbor was constructed immediately following the 1964 earthquake and had minimal upgrades until 1998. At that time,the harbor was owned by the State of Alaska,but operated by the City. In June 1998 the Seward City Council authorized the City Manager to negotiate a transfer of the harbor and all of the associated improvements from the State of Alaska to the City of Seward. The deal was approved by the City Council on February 8, 1999 including a $3.1 Million payment to the City for maintenance. This was a onetime payment associated with the transfer of the facility and not part of the Harbor Facility Grant Program. At the time the deal was made,the City knew that the$3.1 Million payment was insufficient to make necessary improvements. The City has used various ways to fund harbor improvements: bond borrowing, special user fees (such as the Capital Repair and Replacement fee and Passenger Facility fee), federal appropriations, and state grants. During the years 2005-2007 the City sold approximately $8 Million in bonds to fund harbor improvements. As of December2021, approximately $1.8 Million in borrowed principal remains to be repaid. In 2006,the Alaska Legislature established a new 50150 matching grant program called the Harbor Facility Grant Program, (Reference Alaska Statute AS 29.60.800) handled by the State of Alaska Department of Transportation and Public Facilities. The grant program was established in order to provide financial assistance to municipal or regional housing authority owned harbor facilities. This grant program is funded on an annual basis at the discretion of the Alaska Legislature and consists of two tiers, Tier I and II. The first tier has priority and consists of major maintenance and repair of a harbor facility that was previously owned by the state and now is locally owned. The second tier consists of all other harbor facilities and those harbor facilities which have already received a Tier I grant. A harbor facility may only receive one Tier I grant but is eligible for multiple Tier 11 grants. Seward used the Tier II approach to replace D Float in 2013-2014. The B, C, S, and a portion of G Float Replacement grant application was submitted as a Tier I project and was completed in 2016, G, K and the remainder of G-float utilized the Tier II grant and was completed in 2022. The development plan provides the present view for the future harbor. Most features will be implemented at some time in the future as need,priority and funding dictate. 1.2 Plan Approach 5 19 This updates and revises the 2018 Seward Boat Harbor Plan. The Port and Commerce Advisory Board (PACAB) worked with City staff to revise and update this new plan. Discussion of the plan by PACAB was advertised in the local media. Public comment was solicited at the PACAB meetings. 2.0 Regional Description SEWARD BOAT HARBOR Pp _ii Fiy. .i7`e 'scrn.�.-wr_u�x•..::ti. �pNNEI -.•u--'ac "y' �. co LEGEND ..� u.,,yt.:*' ;Fcwtieo ;, ren�['�.+�wrsr+,rtn +wmrwxr A, sy,:susa- . rn,urowwr.xawx+ 2.1 Brief History Russian fur trader and explorer Alexander Baranof named Resurrection Bay in 1792. While sailing from Kodiak to Yakutat, he found unexpected shelter in this bay from a storm. He named the bay Resurrection because it was the Russian Sunday of the Resurrection. The City of Seward was named for U.S. Secretary of State William Seward, 1861-69, who negotiated the purchase of Alaska from Russia during the Lincoln administration. In the 1890s, Capt. Frank Lowell arrived with his family. In 1903, John and Frank Ballaine and a group of settlers arrived to begin construction of a railroad. Seward became an incorporated City in 1912. The Alaska Railroad was constructed between 1915 and 1923, and Seward developed as an ocean terminus and supply center. By 1960, Seward was the largest community on the Kenai Peninsula. Tsunamis generated during the 1964 earthquake destroyed the railroad terminal and killed several residents. After the earthquake, Sewardites rebuilt and the harbor was moved to its current location. During the 2000's the harbor expanded to the east and south. Beginning in 1980, the City acquired 6 20 and developed the Seward Marine Industrial Center. Kenai Fjords National Park was also designated at that time. The development of the cruise ship industry and improvements to the Seward Highway have brought thousands of additional tourists to Seward. And, as an ice-free harbor, Seward has become an important supply center for Interior Alaska. With the threat of global climate change it is expected that Seward's role as a gateway to the Arctic will continue to grow. 2.2 Location The City of Seward is situated in the northwest corner of Resurrection Bay, a north-south fjord 19 miles long and 3 miles wide opening to the Gulf of Alaska, and on the southeast coast of the Kenai Peninsula, 125 highway miles south of Anchorage. Resurrection Bay depths exceed 150 fathoms (900 feet) and the mountains on either side rise to elevations more than 4000 feet above sea level. The City lies at the foot of Mount Marathon and is the gateway to the Kenai Fjords National Park. It lays at approximately 60107' N Latitude, 149126' W Longitude (the harbor itself is within Section 3, Township 1 South, Range 1 West, Seward Meridian). The area of the city encompasses 15 sq. miles of land and 7 sq. miles of water. 2.3 Climate The sub-arctic maritime climate at Seward is characterized by relatively mild winters and summers. The average temperature is 25 F in winter and 62 F in the summer. A monthly climatic summary is shown in Table 1. Table 1 -Monthly Climate Summary, Seward,Alaska Jan Feb [Mar][Apr][May] Jun Jul Aug Sep Oct Nov Dec Annual Average Max. Temperature 31.0 33.0 38.0 45.0 52.0 59.0 62.0 62.0 56.0 45.0 37.0 33.0 46.0 (F) Average Min. Temperature 21.0 22.0 HHH 46.0 50.0 50.0 44.0 35.0 26.0H 34.0 (F) Average Total Precipitation 7.20 5.83 4.13 4.72 4.76 2.32 2.24 5.47 10.35 9.8- 7.17 7.83 71.82 (in.) Average Total 16.1 19.0 13.3 5.8 0.3 0.0 0.0 0.0 0.0 1.7 7.5 20.8 84.4 Snowfall (in.) Source:Western Region Climate Center 2.4 Winds 7 21 Winds at Seward are effectively aligned north-south with the topography of Resurrection Bay. Winds are predominately northerly from October to March shifting to southerly in June and July and back to northerly by October. The Corps of Engineers harbor expansion feasibility report indicates a 50-year recurrence interval design wind for wave analysis of 63 miles per hour. This data was similar to that found by R&M Engineers (2012)50-year sustained winds 59 miles per hour (51.5 knots). The ocean swell enters Resurrection Bay and builds up from the south. Winds over 35 knots from the north are common during the winter months with southerly winds of 6 to 15 knots, occasionally higher, during the summer months. Strong winds can occur from either the north or south at any time of the year. 2.5 Tides Tides at Seward have a mean range of 8.33 feet and a diurnal range of 10.62 feet, causing tidal currents of 1 (flood) to 1.7 (ebb) knots. Tide levels, referenced to mean lower low water(MLLW)are shown in Table 2. Extreme high tide levels result from the combination of astronomic tides and rise in local water levels due to atmospheric and wave conditions. Table 2—Tidal Data, Seward,Alaska Tide Elevation (feet) Highest Observed Water Level +15.59 Mean Higher High Water (MHHW) +10.58 Mean High Water(MHW) + 9.67 Mean Sea Level (MSL) + 5.54 Mean Tide Level (MTL) + 5.52 Mean Low Water(MLW) + 1.36 Mean Lower Low Water (MLLW) 0.00 Lowest Observed Water Level —5.12 Source: NOAA, National Ocean Service Station# 9455090 2.6 Waves Measured wave data is not available for the Seward area. As reported in the Corps of Engineers boat harbor expansion feasibility report,the following general statements appear applicable to the wave climate a. Wave heights of 4 to 6 feet are the maximum observed by longtime local residents (in the vicinity of the existing harbor). b. "Typical" wave periods range from about 3 to 6 seconds. 8 22 c. Local residents and recorded data indicate waves from the south-southeast predominate. d. Long-period swells from the open ocean do not impact the existing harbor area. (Long period waves DO impact the marine industrial center on the east side of the bay.) The Corps feasibility report wave analysis completed in 1998 found that a 6.2-foot wave height and a 4.6 second period design wave should be used for breakwater structure design. Waves of approximately 3 feet in the vicinity of the boat harbor are common with southerly summer winds. 2.7 Ice Resurrection Bay is ice free throughout the year. The existing harbor does not freeze up, although skim ice does form occasionally around the perimeter of the harbor during the coldest winter months. 2.8 Land Use and Ownership In addition to the City owned land surrounding the boat harbor, the Alaska Railroad owns significant private land that is leased to both commercial and industrial businesses. The AKRR is currently pushing to enlarge their freight dock and also pursue further development opportunities. 3. 0 Existing Harbor Facilities 3.1 The Boat Harbor The original harbor was authorized by Congress in 1930 and later modified by Congress in 1935. The authorization provided for a 4.75-acre basin at a —12.5 MLLW depth protected by a south breakwater 580 feet long and a north breakwater 950 feet long. Construction began in 1931. The authorization was modified in 1954 to raise the elevation of the south breakwater and add tow pile breakwaters at the entrance to the basin. This project was completely destroyed by the 1964 earthquake. The Rivers and Harbors Act, 19 August 1964, provided for the relocation and reconstruction of a 12.45-acre harbor with entrance channel at—15 feet MLLW protected by two rock mound breakwaters of 1060 and 1750 feet,with future provision for expansion. Reconstruction began in August 1964 incrementally as other waterfront projects were constructed. The project was completed in November 1965. The northwest corner of the present basin (from approximately F Float northward on the west side of the basin) is a locally constructed basin expansion. The harbor was expanded to the east when the breakwater was relocated approximately 400 feet to the east by the Corps of Engineers. 9 23 Several floods have affected the harbor since construction. The event with the most impact was the fall flood in 1995 when approximately 23,000 cubic yards of material entered the harbor, primarily in the northeast corner covering the tidal grid. Approximately 20,000 cubic yards were dredged in 1996. The grid was left covered with sediment and abandoned. Many of the existing floats were constructed and installed by the State of Alaska in 1966 through 1973 soon after the harbor basin was completed. X-Float was originally constructed in 1978 and rebuilt in 1996 following its catastrophic failure. A,B and C-Floats had utility upgrades and were re-decked and re-billeted in 1996. These floats including S- hoat were replaced in 2016, G, K and L-float were replaced in 2022 The City of Seward signed the Transfer of Responsibility Agreement turning the ownership of the float system over to the City (from the State) in February 1999. The Corps of Engineers quitclaim deeded the basin back to the City in November 1999. RECENT EXPANSION& PROJECTS • D Float replaced 2014 • Harbormaster Office Restroom remodel 2013-2014 • Z Float completed 2011 • East I and T dock renovations 2008 • 50 ton lift pit relocation 2008 • SE Harbor Floats (M, N, O, P, Q) completed 2007 • New restrooms at South Harbor 2007 • North Harbor Float Extension 2005 • East Harbor Expansion 2007 • Oil Collection Station Upgrades 2015 • A, B C & S-float 2017 • South Launch Ramp 2018 • North East launch ramp 2022 • G, K& L-float 2022 In 2012 portions of the north harbor, northeast harbor, and harbor entrance were dredged by the Corps of Engineers contractor at a total cost of approximately $1.5 Million consisting of $571,000 of local (primarily Commercial Passenger Vessel) funds and $929,000 in federal funds. In 2013 D Float was designed at cost of$100,000 funded by a Denali Commission Grant. D Float was rebuilt at a cost of$, 2,138,838 (or approximately $38,000 per slip) with the cost split between the City and a State of Alaska Department of Transportation Harbor Facility Grant. Also in 2013 the harbor restrooms were remodeled at a total cost of$130,000 from a state legislative grant. Portions of the north harbor,E, F,H,J and G Floats were replaced with new concrete floats in 2001. An engineer's inspection report dated January 2011 looked at the southwest quadrant of the harbor and found A, D and S Floats in serious or critical condition. Floats B, C, and G were found to be in poor condition, D-float was replaced in 2014, A, B, C and S-float were replaced in 2017, the remainder of G, K & L-float were replaced in 2022. 10 24 The South Launch ramp was replaced in 2018 and the Northeast Launch ramp was replaced in 2022. Table 3 -Harbor Vital Statistics, 9/13/23 Slip Number Length Available 23' 29 32' 306 40' 134 50' 64 75' 8 90, 11 100, 6 150' 2 170' 1 573 total slips 22,223 ft. Parallel Over 6,303Feet Total Available Over 28,526 Feet Table 4 -Moorage Available by Float Float Number Length A North 29 26 A South 434 feet B 54 32 C 62 32 D 58 40 E, South 34 50 E, North 24 75, 90, 100 F, South 680 feet F, South 2 75 F, North 30 50 F, T-Head 1 60 G, North 245 feet H 64 40 H, T- Head 1 90 11 25 I 405 feet J 60 32 K South 29 32 K North 460 feet L 390 feet M 16 32 M parallel 264 feet N 30 32 O 30 32 P, South 14 32 P, North 12 40 Q parallel 368 feet R 485 feet S, South 350 feet S, North 350 feet T 790 feet X 6 slips 682 feet Z 4 slips 400 feet 3.2 Seward Marine Industrial Center (SMIC) The most recent Master Plan of the Seward Marine Industrial Center was reviewed and approved in January 2018. As of November 2018 the construction of a new rubble mound breakwater is complete. 4.0 The Development Plan This plan was developed by using the outline of the 2003 Boat Harbor Planning and Development Guide. The changes and updates were prepared by City staff and reviewed by the Port and Commerce Advisory Board and recommended for approval by the City Council. The plan was discussed during a series of public meetings. 4.1 Economic Evaluation and Harbor Statistics General - Seward has transitioned from an economic dependence on resource based markets to a visitor and recreation-based economy. Most economic growth since 1990 has been driven by the visitor industry, with employment in trade, services and transportation growing at a 5.9 percent annual rate, until the recession that began in late 2008. The community has capitalized on its road and railroad connections to Anchorage; its cruise ship terminal (roughly 80 vessels call each summer); and its location as the major access point for visits to the Kenai Fjords National Park and the Chiswell Islands (the most visited 12 26 part of the Alaska Maritime National Wildlife Refuge). Seward's Alaska SeaLife Center is another major visitor attraction. Seward competes for visitors with other South Central Alaska communities: Homer,Kenai, and Whittier. Each town has its own sets of attractions. Commercial fishing remains a significant part of the Seward economy. 2013 proved to be a record breaking year for salmon production in Alaska. The City hopes to be able to bring back some of the commercial fishing vessel activity that has moved away from Seward. The state prison located nearby and other government facilities,including the national park headquarters, are also important year-round employers. Although a major sawmill was opened in 1993, it never became competitive, and has remained closed since 1994. In 2020 the American Community Survey by the US Census Bureau estimated there were 1,108 jobs held by Seward residents, and 1,918 employed residents in the 99664 ZIP code, but this total does not reflect seasonal jobs and other Seward jobs that are held by non- residents. Approximately 20% of these jobs are in recreation and hospitality, 20% in the public sector, and another 20% in education, healthcare, and social assistance. The remaining 20% is divided between resource extraction (forestry, fishing, mining), transportation and warehousing, real estate and financial management, and construction, with small percentages of professional/scientific and manufacturing. In recent years,population growth in Seward has been flat. The 2022 population of Seward was 2,625 and the 2012 population was 2,692. Seward gains a portion of its total municipal revenues from its sales tax (4%) and its accommodation tax (4%). The community depends on these revenues to provide services to both residents and visitors. Taxable sales in Seward have trended upward in recent years, from $1.08 million in 2012 to to$9.1 million in 2020. The largest share of sales is within the retail and service sector. Visitor sales, supported by Seward harbor and marine-related activities contribute substantially to overall municipal revenues. The Harbor collects Passenger fees from charter and tour boat operators at the rate of$3.50 per passenger carried. Prior to 2006 the Passenger fee was $1.50 per passenger. All boats in the harbor pay a Capital Repair and Replacement fee depending upon the length of the vessel. Beginning in 2010 the Harbor has received some of the Raw Fish tax. The following graph and table shows the amount of passenger fees collected between 2003 and 2012 along with the Harbor's portion (50%) of the Raw Fish tax in 2011 and 2012: Table 5 2013 2014 2015 2016 2017 2018 2019 2020 2021 Passenger 613,974 607,286 668,182 637,541 570,984 565,302 590,747 163,858 609,435 Fee Tourism, recreation and commercial fishing provide substantial support to the community through the boat harbor. Replacement and modernization of the harbor facilities will 13 27 enhance the users experience and increase the harbor's ability to generate support for the community. Current Harbor Use—The 2022 use of the Seward Harbor by vessel owners with a reserved slip is shown in the following summary: Charter boat vessels moored in Seward Harbor There are 129 charter boats paying passenger fees in the Seward harbor. These vessels range in length from 23 feet to 115 feet, with an average of 43 feet. Commercial fishing boats There are 13 commercial fishing vessels moored in Seward harbor. These vessels range in length from 27 feet to 59 feet, with an average of 42.5 feet. Motor vessels moored in Seward Harbor There are 540 motorboats moored in the Seward harbor. These vessels range in length is from 19 feet to 110 feet, with an average of 36.5 feet. Sailboats moored in Seward Harbor There are 150 sailboats moored in the Seward harbor. These vessels range in length is from 23 feet to 54 feet, with an average of 35.3 feet. Tugboats moored in Seward Harbor There are 2 tugs moored in the Seward harbor. The vessels range in length is from 60 to 105 feet, with an average of 82.5 feet. During the winter season a number of tugboats come to Seward for moorage. In 2021-2022 there were 8 tugs tied up for the winter. For the purpose of this plan, the category motor vessels do not include sailboats. Table 6 shows the current waiting list for permanent slips in the Seward harbor and includes 265people. As a result of the pandemic, the last few years have seen an increased interest in outdoor recreation, which has resulted in substantial growth to the harbor wait lists. Since there is an annual fee for remaining on the waiting list,it best represents those people with a commitment to moor in the Seward harbor. However, since the wait for a slip can be several years, many prospective vessel owners are forced to shop for other moorage alternatives. Table 6, Wait List by Slip Length Vessel/ Slip Length (ft.) Number of Vessels 14 28 23 4 32 78 40 61 50 46 75 8 90 7 100 0 >105 0 4.2 U. S. Army Corps of Engineers Role Following the 1964 Earthquake federal legislation was adopted that requires that the Corps be primarily responsible for harbor dredging. For example,in 2012,the Corps was the lead agency for maintenance dredging in the harbor and the Harbor paid for dredging the portions of the harbor that were not federally mandated. Another critical Corps-related issue is called Navigational Servitude. In 2014 the Water Resources Development Act (WRDA) included new legislative language in Section 6004 that will allow the construction of improvements on the South Harbor Uplands. The CORP did an underwater survey in 2020 the Seward Harbor does not need to be dredged at this time. Waiting for the next CORP maintenance dredge cycle. 4.3 Development Criteria The current layout of the harbor was completed with the east harbor expansion in 2011. The harbor's top challenges are maximizing the use of available moorage slips; replacing ageing docks (COMPLETED); and providing new services. Environmental and Permit Aspects-Permits will be needed through the Corps of Engineers to replace and add floats, trestles and bulkheads and to do any in-water work. Items such as a new grid,fill and dredging and disposal will be the most challenging,because they are considered the most environmentally sensitive. Land Use and Zoning — The City-owned land at the harbor is zoned Harbor Commercial. Adjacent lands are zoned: Park, Industrial, and Auto Commercial. Alaska Railroad - The Alaska Railroad owns land north of the Boat Harbor. The City and Railroad completed a land swap in October 2014 in order to facilitate re-development of the land formerly occupied by the US Coast Guard Shore facility, we also completed a 15 29 railroad contract (8670) for the easterly breakwater that reside on railroad tidelands into Lease 03-102 to solidify the City's possession of the easterly breakwater. Boat Storage and Boat Work Yards- There are several privately owned yards at the north end of the Boat Harbor. Maintaining additional vessel storage within proximity of the boat lift is a continuing challenge. In mid- 2013 the largest boatyard near the harbor closed its operations. Another boat yard closed this summer (2023) which is hindering vessel haul outs. There are additional private boat yards in the area,with the largest of those located at Lowell Point. Parking — During the summer the harbor area is one of the most heavily used areas in Seward with regard to the availability of parking spaces. There is just enough parking available, especially during summer weekends, holidays and Silver Salmon Derby time. There is limited adjacent space available to make into parking space. Day parking, in addition to long-term parking, was identified as critical. The tour boat companies have developed remote parking lots with shuttle buses that bring customers to the harbor. Public Restrooms and Showers —In 2013 the harbor used $130,000 in state grant funds to remodel the restrooms at the Harbormaster's Office. Additional funds to complete the project were received from the State of Alaska Commercial Passenger Vessel funds.Public restroom facilities are limited, especially for the influx of summer visitors in the harbor area. The primary restroom location is in the harbormaster's office building, which also includes a few showers. Other restroom locations include the Park Service Headquarters and Kenai Fjords Tours facilities. These facilities are near the harbormaster's office. Additional public restrooms are located in the south uplands parking area and northeast parking area. The Harbor needs another set of restrooms in the northwesterly quadrant of the Harbor. From that corner of the Harbor, it is approximately 1200 feet to the nearest public restroom. Launch Ramp Improvements - There are two existing launch ramps in the boat harbor, one at the NE corner and one at the SW corner of the basin. The Harbor has made use of grant funds to replace both of the launch ramps the South ramp in 2018 and the Northeast ramp in 2022. One planned improvement was to lengthen the launch ramps in order to make them safer to use at very low tide levels, this has been completed with the replacement of both ramps. Slip Sizes —In the past, boats were smaller and correspondingly the harbor included more 17 and 24-foot slips, the smaller 17ft slips were removed with the completion of A, B C and S-float project. The current harbor expansion added mostly 32-foot slips, some 23- foot slips, and some linear moorage on K, S and Z-float. Leased Properties — All harbor leases, upon renewal or change of lease, should be considered by administration for easement and rights of way access along with CPI adjustments. 16 30 4.4 Float System Layout Fleet—The number of vessels seeking moorage in the harbor was determined from the wait list shown in table 6. Until the 2008 recession there had been a national trend in the marine industry, both in sales and manufacturing, toward larger and wider boats. The results of a questionnaire in 2003 showed that 75 percent of those responding agreed that some smaller slips could be eliminated, if"other" arrangements could be made for the smaller boats. Therefore, the minimum new slip size was recommended to be 32 feet with increased emphasis on 40 foot and larger slips. Space for transient vessels will be included to the greatest extent possible for the transient commercial fishing fleet in addition to recreational vessels. Slips in the 60-foot to 100-foot range have been included that will accommodate large yachts, commercial fishing vessels, and tour boats. Also, linear moorage is provided for even larger vessels up to 90 and 120 feet. Large commercial fishers include about 30 vessels 37 to 125 feet long with a beam 15 to 35 feet and draft 7 to 13 feet, approaching 15 feet when fully loaded. Only about 10 are presently in reserved slips. Barges, tugs, ferries and research vessels occasionally use the harbor, most often wintering over. Main Interior Channels — The main channel running diagonally north-south in the central part of the harbor will be a minimum of 150 to 200 feet wide to accommodate the tour boats and larger commercial fishing vessels accessing the processing docks and"T" dock. A common standard is 5 times the largest beam width for two-way traffic, (5 x 35 = 175 feet). Other access channels to the floats and launch ramps will be a minimum 100 feet, which would accommodate vessels with beams up to 20 feet. Fairways — The actual dimension of the fairway (the distance between the ends of slip finger floats on adjacent docks) should consider several factors: ❑ Environmental (wind, waves and currents) ❑ Vessel maneuverability ❑ Boat handler experience Wind is the most important environmental factor affecting moorage in Seward. Waves and currents are not significant factors at the Seward Harbor. Currents during tidal exchange are present, but are not considered significant. It is well known, due to the shape of Resurrection Bay, that the winds blow either northerly or southerly and seldom from the east or west. The slips are laid out in the north/south direction for this reason. The effect of the wind on a boat will depend on the "sail" area presented to the wind, which will usually be the greatest with the wind on the beam. The fairways are east/west,beam to the winds. Vessels vary in their maneuverability. Twin-screw vessels and those with bow thrusters can maneuver quite well in tight situations. Single screw vessels and most sailboats are quite maneuverable moving forward,but can be notoriously bad when backing 17 31 and can be significantly affected by winds. Boat handling skills also vary considerably. The Seward Harbor has visitors from all skill levels from novice to expert boat handlers. The current practice in the harbor is to allow boats to extend up to 4 feet beyond the slip finger, which is presently included in the city code for the harbor. The common engineering standard for fairway sizing is to make the clear distance between the boat extremities no less than 1.5 times the longest boat length using that fairway. It is often increased to 1.75 times the boat length if maneuvering conditions warrant. Larger vessels 50 feet and longer sometimes have fairway widths up to 2 times the vessel length. This distance is needed to allow vessels to safely enter their slip and make turning movements. The American Society of Civil Engineers"Planning and Design Guidelines for Small Craft Harbors" recommends a minimum fairway width of 1.5 times the longest slip. The minimum fairway widths for the Seward Harbor are set at 1.5 times the slip length with no overhang. The new D-float that completed in April 2014 was designed with the same dimensions (number of slips, size of slips, and width of fairway) as the dock that it replaced. With no vessel overhang from the slip fingers,the minimum fairway dimensions would be: Table 7,Minimum Fairway Dimension Slip Length(ft) 1.5 x L Fairway (ft) 60 90 50 75 40 60 32 48 Access channels to launch ramps will be a minimum 100 feet. Slip Width—Boat sizes have changed over the past 20 plus years with the principle change being the beam width. Slips in the Seward Harbor are doublewide to accommodate two vessels between slip finger floats. The width depends on the vessels to be served, environmental conditions and operator skills plus the judgment of the design engineer. Generally, the minimum distance between slip finger floats has been taken as roughly 2.3 times the width of the vessel for double occupancy. Vessel beam width varies greatly; however, correlations to boat length have been made by others based on statistical research of boat manufacturer's data and inventory of Alaskan harbor users. The following table provides guidelines for the stall spacing assuming the vessel is equal to the slip length. Table 8, Stall Spacing Guidelines Slip Length (ft) Slip Clear Spacing (ft, double) 18 32 75 49.0 50 40.0 40 34.0 32 30.0 The clear spacing above exceeds the minimum values, however, they are considered prudent due to the winds, vessel maneuverability, operator experience, presumption of commercial use especially in the larger slips, variability in vessel beam and minimum width fairways. Interior Access Channel- The main channel running diagonally north-south in the central part of the harbor is a minimum of 150 feet wide between X-Float and E-Float and 200 feet wide in other areas to accommodate the larger commercial fishing vessels accessing the fish processing docks and "T"-dock. Access to launch ramps will be a minimum 100 feet,which would accommodate vessels with beams up to 20 feet. Widths would be larger if possible. In this case, limited space makes the access width narrower than desired. East Harbor Float La, o�A new marginal float, Z-Float, was built as close to the breakwater as possible and extends to and beyond the angle point in the breakwater. It has been proposed that Z-Float have five main floats with slips as shown in the following table. Table 9,East Harbor Float System See proposed layout at the end of Appendix A Slip Size Number of Slips 32 36 40 22 50 18 60 8 100 5 120 1 Total Slips 90 Total Transient 1200 feet A 600-foot section of the existing X-Float was relocated to the east harbor also. It parallels the Z-Float and provides linear moorage for the larger commercial fishing vessels that are not accommodated in the new slips. The remaining 150 feet of X-Float was left in place 19 33 and the privately owned fuel dock was attached. The result was re-named R float. Neither X-Float nor R-Float offer shore power for moored vessels. Float Replacement Program- In 2010- 2011 the Harbor's contract engineer, URS, completed an inspection of the docks in the Southwest area of the Harbor. The docks included were A, B, C, D, G, and S and the South Launch Ramp. In 2014, D Float was replaced at a total cost of approximately $2.2 Million. The State funded half of the cost of the A, B, C, S, and a portion of G float replacement in 2017 and the remaining portion of G, K and L-float were replaced in 2022 Float System Construction- The 2003 plan recommended concrete floats. However, the floats that were installed during the period 2006-2022 have all been timber construction on floatation tubs. The wooden docks are easier to repair and much better for snow removal. The concrete floats E through J should be scheduled for replacement 2023 4.5 Float System Utilities Potable Water The Harbor staff is pleased with the design and operation of the potable water system that were installed on D, G, K, L, M, N, O,P and Q Floats. . Plan review and certification to operate the public water system is required from the State Department =' of Environmental Conservation. Fire Protection The City of Seward has adopted the International Potable water Riser Fire Code (IFC) and associated State amendments as the model code for fire protection standards. The IFC essentially requires a standpipe type fire protection system. In addition to the IFC, the National Fire Protection Association (NFPA) has several standards that must be considered. The following NFPA standards apply: ❑ NFPA 303, Marinas and Boat Yards ❑ NFPA 307, Construction and Fire Protection of Marine Terminals, Piers and Wharves, ❑ NFPA 14, Standpipe and Hose Systems On Float Fire Valve The existing replacement floats followed the above codes and standards. The fire protection system for new or replaced floats and refurbished docks will also follow these same codes and standards. The codes and standards will again be reviewed along with experience with the existing new system during the final design stage. A dry standpipe system is recommended. Sewer System 20 34 The harbor is taking steps to make the boat pump-out stations more user friendly. Specifically, the use of tokens is being eliminated, so that customers won't need to go to the office before using the pump-out stations. The State of Alaska has federal grant funds that can be used on a 75% matching basis in order to improve pump-out facilities. The harbor currently has 3 sewer pump out systems located on Q and Z-float, E and F have several location located on the floats. Power and Lighting Most new boat slips will be configured with shore power. Power -- - configurations will vary with 120 volt,30 ampere,single phase;208 volt, 30 ampere, single phase; and 208/120 volt, 50 ampere, three phase. Special configurations have been installed for large vessels. There are a number of shore power pedestals that supply more than !: one voltage configuration. 3 All power will be served from utility transformers on shore, near the pedestrian approaches to the harbor. Power distribution cables will be routed beneath the approaches,down the gangways,and into the float distribution panels. All shore power pedestals are new. The Harbor staff is pleased with the power pedestals that were installed on M,N, O,P, and Q Floats. On A, B, C, D, K and L Float the water faucets were incorporated Power Pedestal with into the power pedestals. Both duplex style units, intended to be Light located midway between slip floats, and single style units will be considered. Energy consumption is monitored at each pedestal and billed to the customer, accordingly. The pedestals will be configured with digital style meters. The receptacles specified for the pedestals will be conventional locking style as stipulated by the National Electrical Code. Circuit breakers will be "bolt-on" style to minimize corrosion at their connection to the terminals. During 2014 several harbors in Southeast Alaska experienced problems with the implementation of the new Electric Code requirements for Ground Fault Circuit Interrupters (GFCI) on docks. These new systems will trip with a very slight amount of stray current. Some vessels owners at these SE harbors installed new isolation transformers to eliminate stray current. Lighting will be integrated into the shore-tie pedestal to maintain consistency with the North Harbor installation. This design has proven to be cost effective and efficient. The luminaries are mounted at a height of about 4-feet above the deck. All the luminaries were switched from metal halide lamps to LED bulbs with good life expectancy qualities. Additional LED luminaries have been installed on the approaches and gangways. 4.6 Gangways and Trestles New or newly remodeled inner harbor facilities are required to be compliant with the Americans With Disabilities Act(ADA)rules and guidance published in September 2002. 21 35 At a minimum, 80-foot gangways, similar to those installed at B, D, E, F, J, Q, S, X, Z- Floats and the fish cleaning station located at the Northeast launch ramp., will be provided at pedestrian access points to the float system. Timber trestles have been designed to accept the new gangways. The new gangways are in place at B S and the new fish cleaning float at the Northeast Launch Ramp only R-dock gangway will not meet ADA requirements. L 4.7 Launch Ramps New Aluminum Gangway-J Dock at Extreme The North East launch ramp was High Tide completed in 2022. With the completion of the new launch ramp the North East Fish Cleaning Station was located adj acent to the launch ramp to leave better access for vessels to load and unload off of the trailers. Meanwhile the sewage pump-out at that location was disassembled and abandoned. At the other end of the harbor,the South West launch ramp was replaced in 2018. The Alaska Department of Fish and Game used federal Sport Fish Restoration funds to re- build both boat ramps. ADF&G paid 100%for the design cost for both boat ramps. The construction costs was shared at a ratio of 75%to 25%. One consideration is that the grant agency requires a minimum number of boat/trailer parking stalls in order to qualify for grant funding, which was integrated into the design. 4.8 Parking Areas South Harbor Uplands-A set of restrooms (2007) and a new Mariner's Memorial (2012- 2014) were built in the South Harbor uplands. The City's recycling bin is also located in the area. In 2014, the parking department installed a paved road surface that leads up to the parking area. With the 2014 WRDA bill the Navigational Servitude, issue has been federally resolved and so the Corps of Engineers will no longer restrict commercial development in this area. This area also may be ideal for a new convention center or harbormaster office. It will be important to strive for the proper balance between commercial development and parking. There are 80 truck&trailer stalls and 60 single car stalls in the South Harbor Uplands. The Uplands is the City's default parking area for the truck&trailers, although they are allowed to park across the street in the South Lot. The parking fee is different in the two locations: $20 oversize rate in the South Lot compared to $10 flat rate on the Uplands. 22 36 Northeast Parking Area - In 2012 the new Coast Guard Station and Army Resort Dispatch building were built in this area. In 2022,new pavement was added. The Northeast parking area has 93 truck&trailer stalls and 54 stalls for single cars (180 Total). The restrooms in this area are the most primitive in the harbor and should be scheduled for upgrade within the next 5 years. 4.9 Travelift® and Maintenance Area The northwesterly quadrant of the harbor was re-built in 2008. This included moving the location of the travel lift and strengthening both I and T docks. New pavement was placed in this area in 2013. 4.10 Public Crane A preliminary design report looked at two possible location and two sizes of cranes. Further discussion, along with public testimony, resulted in a unanimously passed PACAB Resolution, 2014-01, approving design and construction of an 8 ton crane to be located at the end of I dock. The alternative suggested by the administration was a 5 ton crane located on the old Travel Lift Dock I-dock. The purpose of either of these projects would be for mariners to load and unload fish and gear. The city has hired Moffatt and Nichol to design a five ton crane on I-dock,it is currently at 95%design waiting on finding a funding source to have it installed. 4.11 Wash Down Facility A new wash down facility in the area of the Travelift has been design by PND engineers the city has currently applied for a grant through the 2022 Port Infrastructure Development program(PIDP)this would benefit harbor users by offering a convenient way to clean their boats. And since potential contaminants would be captured for proper disposal,the facility would also be good for the environment. A wash down facility was built at SMIC in 2013 and the harbor staff is refining operational techniques. The pressure washing equipment is mounted on a trailer and it could be used at both SMIC and the Boat Harbor if a slab with containment was built. 4.12 Drive Down Float A new drive down float is proposed for the northeast corner of the harbor,just to the north of the NE launch ramps. The drive down float would provide access for boats to load and unload supplies and equipment or do minor maintenance. Only temporary short term mooring would be permitted and no overnight mooring. The float would be 60 feet wide by 100-feet long, held in place by steel piling and have an approximately 100 foot steel bridge/gangway accessing the NE parking area. The float and bridge would be similar to the drive down dock in Sitka, Alaska, which is heavily used by boats. 23 37 4.13 Tidal Grid The harbor did have a tidal grid in the northeast corner until the flood in the fall of 1995. At that time,the grid was buried by sediment washed into the basin by the flood. The grid was never uncovered, primarily because of the high cost of potential contaminated soil disposal. It is possible that state matching grant funds may be used to construct a new grid. A tidal grid is proposed to be installed between I dock and the Travelift in the NW quadrant of the harbor. Accessibility from both land and water exist at this site, and similar working infrastructure already exists on both sides. An alternative location with more room is the currently unused North East corner of the harbor area between the east side of the T dock and the NE Boat Ramp/Fish Cleaning Station. 4.14 Fish Cleaning Facilities The harbor has replaced the fish cleaning station in the NE corner of the harbor. The new fish cleaning station is located off of the trestle north of the boat launch. This will improve these facilities for this quadrant of the harbor. 4.15 Restroom Facilities The harbormaster office restrooms were remodeled during the winter of 2013-2014 using monies from the State Commercial Passenger Vessel (CPV) funds. A second shower was added to the women's side of the restrooms and the restrooms are fully ADA compliant. A new restroom facility should be located somewhere in the North Harbor area, possibly by Napa in the Northeast corner of the parking lot. 4.16 ADA Accessible Fishing Pier An ADA accessible fishing pier is planned for the south side of the south parking fill in the vicinity of Scheffler creek flowing into the bay from the lagoon. The rocky slope configuration of the beach restricts the handicapped from fishing in this area. Specific plans have not been developed, but the pier is envisioned as a"T" shape end with railings designed to allow wheelchair bound people the opportunity to fish. The pier will a1 e provide an observation location for the public to watch the fishing action and boats entering and leaving the harbor. The design will also require special considerations for its location within the heavy wave zone. 4.17 Harbormaster's Office and Shop The existing harbormaster's office and shop is located in the center of the harbor tourist and business area. The building is still functional, but could use significant remodeling and code and safety upgrades. In 2014 a new paint job was applied to the roof of the building which was starting to rust all over. Locate a new Harbormasters office on the South Harbor Uplands. It is currently one of our Legislative Priorities. 24 38 4.18 Develop the South Harbor uplands Look at prioritizing in moving the electric into the utility right of way and have the entire area re-platted to accommodate retail shops/offices and a new Harbormasters Office. 5.0 Accessibility 5.1 Background The Americans with Disability Act(ADA)rules for marinas were established in 2002 and revised in 2010. The rules are administered by the United States Access Board in section 1003 Recreational Boating Facilities. 5.2 Accessible Routes Surrounding the Seward Harbor are parking lots with many designated ADA parking stalls in close proximity to the docks. The Seward Harbor has replaced most of its gangways to meet ADA standards. Those standards require gangways that are at least 80 feet long and 5 feet wide. The following seven gangways are fully compliant: B, D, E, F, J, M-Q, S, X, and Z. The only gangway: that is not compliant is R-float.. 5.3 Boat Slips Only the new and rebuilt portions of the harbor are required to meet ADA standards. All the floats in the harbor have ADA compliant slips. Accessible boat slips must have a surface five feet wide without any barriers that limit access. In Seward the newer docks listed above have five foot wide fingers that provide the necessary access in order to meet this requirement. On the other hand, linear moorage in Seward generally has bull rails that disqualify linear moorage for ADA consideration. For example, the harbor has at least three designated ADA slips,with signs, located at: the first space on A, B, C, D-float, M-1, and N-2 and two locations on K and L-float and 1 on Z-float. Apparently these slips have been designated due to the proximity to parking and the boat ramp,but in each slip the existing bull rails disqualify those ADA slips. The rules do allow that a five foot wide opening every ten feet of linear dock qualifies as ADA moorage. The Seward Harbor has 578 slips of various sizes and almost 6303 linear feet of side-tie moorage. According to the rules, the 6303 linear feet is the equivalent of 157 slips. Thus Seward has a total slip equivalent of 735 =578 + 157. The ADA rules prescribe how many accessible slips are required based on the total number of slips in the marina. Marinas having between 701 and 800 slips are required to have a minimum of 10 accessible slips. The accessible slips should be of various sizes and dispersed throughout the accessible portions of the marina. A marina does not have to provide more accessible slips than 25 39 required. Accessible slips do not need to be marked and are not reserved in the same way as vehicle parking spaces. Facilities should hold the accessible slips open for persons with disabilities until all other slips are filled. At that point, the slip may be made available for general use. For seasonal slip holders, accessible slips should be held until the expiration period for slip contracts has expired. Marina operators may choose to make information regarding accessible boat slips available in promotional material or a facility guide. Ensuring that accessible slips are available to persons with disabilities is an operational issue and operators should contact the Department of Justice for further information. NOTE: The words in the bold font above are directly quoted from the Access Board's guide booklet, "Accessible Boating Facilities". 5.4 Upland Facilities In 2014 newly remodeled restrooms and water fountains at the Seward Boat Harbor meet all ADA requirements. 6.0 Plan Implementation Future projects will be completed incrementally in phases. Implementation of each phase will include the following normal operating procedure. ❑ A phase will be identified by the Harbormaster and his staff ❑ The Port and Commerce Advisory Board (PACAB) will review and approve the phase, recommending it to the City Council, ❑ The City Council will review and approve the phase and funding Public input will be a part of the process during public meetings at both the PACAB and City Council stages prior to final approval for construction. 26 40 APPENDIX A "! '•rw:�ww:J _ tyre 3�a � r>,rs srar rwYrw f wrsrw mrwa CC3 1H33A38ro0tm Immi Z _ II • S y„y el �'A� I I c PF �1r l �t II i r I r 1 ,r fi 27 41 APPENDIX B PURI ANDt_'[] 'IP IF,It1_:F,ADN'Ik.)'0Rl IMAI?II RESOLl.1 ION 2177_=-101b4 A RFSOI,U'TTON 01. TIIF. SF.'4 "ARD PORT %ND {.[}ittIF;RC'F. ADVISORY BOARD (PAC.AB), kF.Cf}M't1t-NIING CITY COUNCIL APPROVAL OF THE SE YARD I OAT BARB{}R PLAN ►irrHERFAS, rl,c S;w,%Tkl City Cou77cil approval the Smartt Boat Harbor Plan un Deeemhgr�,20 14;4md V4'llll?RFAfi,the Putt and C:onum me Advisory Board(FACAB)ltas been working since Deccanber�, 2014 witli city staff to of ntinue updating and i rprovii7g the Seward Boat Harlxx Plan: and WITFRFA , the ni ti-w Plan is irLw:,,.Icd to scrx policy rnakcrs and advi rs as a gcmral Iiiin and fundinglusti:ication for the doveloprncnt z_IA d17L'.A6Luk1l 17CNuti%:jTd ko.i[ 4nd ' �4'11EREAS,Pre4 ibu5 plans hs�ve o�c�t includcxl u lan;l comm�r ial antl tr mg)ortatitm interests or concern-;this pl-an psrop4m�ed ur udr)pil a rmwte all-inuluziivo vi4Tw; and WHEREAS, the plan dtmcrlhe; ps3.q;ihle. Fulurcprri)icc.tw,he)th in thG m4r-term and in the.long-term_ After adoption,the plan will Iporn time to time need revision and updcttt as mods and opp>orturiitics appear,and as pr,�joct identifice as priorities are curnpleted. NOW,THERFFORF,, BE IT RESOLVL01A THE 11014:1 !tSD COMNIER'uE ADV ISORY BOARD OF TIIF CITY OF SEA' ARD AIL'kSK,1k that, Section I. FAC'AD rr-ommcnil:i City Council aprpmval of the updated Seward lio.nt 1421-hnr plan. Section 2. ThiN remflutinn%ha11 raks efficct immaiately upon its adoption. PASSED AND APPROV P..D ny th;: Port and Commerce Advisory Board of the City,of Seward-. Ala l.a,Lhis 21"J dL v ni'Nuwesnhcr. 2033. 28 42 Worksession Topics for Council to Prioritize Alternative Energy Sources: Hydro and Tidal Comprehensive Plan, Strategic Plan South Harbor Uplands Development including Harbormaster Building Housing Issues Paving and Sidewalk Improvements - replacement and extension Grant pass-through policy Soliciting Community Groups / Clearinghouse for Community Improvement ideas 43 PACAB Meeting Date Meeting Topic REGULAR 1/4/2023 Harbor Tariff SPECIAL 1/18/2023 REGULAR 2/1/2023 Chamber Marketing SPECIAL 2/15/2023 2.30 Draft Ordinance REGULAR 3/1/2023 SMIC Development Plan SPECIAL 3/22/203 HEA Heat Pump/Res 2023-001 REGULAR 4/5/2023 Utility Infrastructure WS 4/26/2023 Legislative Priorities REGULAR 5/3/2023 Legislative Priorities Resolution WS 5/17/2023 Heat Loop Update REGULAR 9/6/2023 Vessel and Property Tax and AML Attendance WS 9/20/2023 Emergency Services REGULAR 10/4/2023 Harbor Plan WS 10/25/2023 Developing Worksession Topics for Council to Prioritize REGULAR 11/1/2023 Boat Harbor Plan/Discussion Topics for Council Prioritze WS 11/15/2023 REGURLAR 12/6/2023 Fisheries Issues WS 12/20/2023 44