Loading...
HomeMy WebLinkAbout03262024 City Council Laydown - McDonaldMadame Mayor and Seward City Council, I am writing this letter in response to the Bear Mountain Tunnel project to provide Seward with a second tunnel over Lowell Point road. Despite the fact of prepratory work already beginning and a United States Army Corp of Engineers permit for the project, a mistake has been made in not including hydro power in the project. Seward's original power plant was hydro powered from the exact same location up the canyon to Mt. Marathon. Two tunnels leaves one tunnel (the original one) the opportunity to be retrofitted with hydroelectric generators. The technology is already tried and proven; all we have too do is install them. The potential to have the generators in line every 75 ft or so all through the mountain is a gold mine for the Seward Utility consumer, and can generate all or a very large part of our needs. Potential excess power to sell is also not an opportunity to be missed. I implore the Council to stop stonewalling, and face the facts and do your best to align them for a positive future for utility customers from Seward to mile 24. Thank you for your consideration. Tim McDonald March 26th 2024