Loading...
HomeMy WebLinkAbout01072025 Planning & Zoning PacketPlanning & Zoning Commission Meeting Packet Regular Meeting Tuesday, January 7, 2025 Council Chambers, City Hall 7: 00 p.m. 1963 1965 2005 kintual All-Amenca City 1 I I.. The City of Seward, Alaska PLANNING & ZONING COMMISSION MEETING AGENDA City Council Chambers, 410 Adams Street Please silence all cell phones and devices during the meeting Chair Carol Griswold Vice Chair Brenan Hornseth Commissioner Nathaniel Charbonneau Commissioner Vanessa Verhey Commissioner Sean Ulman Commissioner Rhonda Hubbard Commissioner Clare Sullivan 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL Community Development Director Daniel Meuninck City Planner Courtney Bringhurst Executive Assistant Clara Brown City Clerk Kris Peck January 7, 2025 at 7:00 p.m. 4. CITIZEN COMMENTS ON ANY SUBJECT EXCEPT THOSE ITEMS SCHEDULED FOR PUBLIC HEARING (Those who have signed in will be given the first opportunity to speak. Time is limited to 3 minutes per speaker and 36 minutes total time for this agenda item.) 5. APPROVAL OF AGENDA AND CONSENT AGENDA (Approval of Consent Agenda passes all routine items listed under Item 7. Consent Agenda items are not considered separately unless a commissioner requests. In the event of such a request, the item is returned to the Regular Agenda. Marked with *.) 6. SPECIAL ORDERS, PRESENTATIONS, AND REPORTS A. Proclamations and Awards - None B. City Administration Report C. Other Reports and Announcements - None D. Presentations (Presentations are limited to ten minutes each, excluding Q&A, and are limited to two per meeting unless increased by the commission.) - None 7. CONSENT AGENDA A. Minutes of Preceding Meeting 1)* Approve December 3, 2024 Planning & Zoning Commission Meeting Minutes 5 8. PUBLIC HEARINGS (Public hearing comments are limited to five (5) minutes per person. After all speakers have spoken, a person may speak for a second time for no more than one (1) minute.) A. Resolutions Requiring Public Hearing 2 1) Resolution 2025-001, of the Planning and Zoning Commission of the City of Seward, Alaska, Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Fourth of July Creek Subdivision, Seward Marine Industrial Center (SMIC), That Point of Block 10, Excluding Lots 1 & 2; Located at 3207 Sorrel Road; Creating Tract A & B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat 8 2) Resolution 2025-002, of the Planning and Zoning Commission of the City of Seward, Alaska, Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Tract B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat; Lot 3, Block 8, Fourth of July Creek Subdivision, SMIC Seward Ship's Drydock Replat; and Lot 4A-4, Block 7, Fourth of July Creek Subdivision, SMIC, JAG Replat; Located at 3207, 3311, & 3314 Sorrel Road; Creating Tracts B-1 & B-2, Block 10 and Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subdivision, SMIC, Park Replat 26 9. UNFINISHED BUSINESS A. Resolutions - None 10. NEW BUSINESS A. Resolutions 1) Resolution 2025-003, of the Planning and Zoning Commission of the City of Seward, Alaska, Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Lots 1, 2, & 3, Block 10, Original Townsite of Seward; Located at 237 & 235 Fourth Ave; Creating Lot 1A, Block 10, Seward Original Townsite, Kawabe Park Replat 47 B. Other New Business 1) Discussion of building height overlay 2) Discuss the work session topics for Tuesday, January 21, 2025. a. Municipal Lands Inventory and Management Plan (a) Provide recommendations for city -owned land that could be used for housing b. P&Z Priorities 11. INFORMATIONAL ITEMS AND REPORTS (No action required.) A. Reminder of Meetings 1) Work session on Tuesday, January 21st, 2025, at 6:00 pm in Council Chambers at City Hall. 2) Joint work session with City Council on Monday, January 27th, 2025 at 5:30 pm in Council Chambers at City Hall. 3) Regular meeting on Tuesday, February 4th, 2025, at 7:00 pm in Council Chambers at City Hall. 3 B. Other Items 12. CITIZEN COMMENTS (There is no sign in for this comment period. Time is limited to five (5) minutes per speaker.) 13. COMMISSION AND ADMINISTRATION COMMENTS AND RESPONSES TO CITIZEN COMMENTS 14. ADJOURNMENT 4 City of Seward, Alaska Planning & Zoning Commission Meeting Minutes December 3, 2024 Volume 8, Page CALL TO ORDER The December 3, 2024, regular meeting of the Planning & Zoning Commission was called to order at 7:00 p.m. by Chair Carol Griswold. OPENING CEREMONY Vice Chair Hornseth led the Pledge of Allegiance to the flag. ROLL CALL There were present: Carol Griswold, presiding, and Brenan Hornseth Nathaniel Charbonneau Vanessa Verhey Sean Ulman Rhonda Hubbard Clare Sullivan comprising a quorum of the Commission; and Daniel Meuninck, Community Development Director Courtney Bringhurst, City Planner Clara Brown, Executive Assistant Kris Peck, City Clerk Excused — Hubbard, Verhey Absent — None Vacant — None CITIZEN COMMENTS ON ANY SUBJECT — None APPROVAL OF AGENDA AND CONSENT AGENDA Motion (Sullivan/Charbonneau) Approval of Agenda and Consent Agenda Motion Passed Unanimous The clerk read the following approved consent agenda items: Approval of the October 8, 2024, Planning & Zoning Commission Meeting Minutes City of Seward, Alaska Planning & Zoning Commission Meeting Minutes December 3, 2024 Volume 8, Page Resolution 2024-023, of the Planning and Zoning Commission of the City of Seward, Alaska, Granting a Six -Month Extension to Conditional Use Permit 2024-003 Issued to CIRI Alaska Tourism Corporation (CATC) to Construct a Second Bunkhouse on Lot 22A, Clearview 2018 Replat; Located at 208 Phoenix Road; Within an Auto Commercial (AC) Zoning District SPECIAL ORDERS, PRESENTATION, AND REPORTS City Administration Report Community Development Director Daniel Meuninck provided an update on the Comprehensive Plan survey and noted around 180 people had completed the survey so far. His staff had been giving presentations around the community to encourage participation in the Comprehensive Plan survey. On another topic, Meuninck said the Parks and Recreation racquetball final was coming up. Last year, Community Development staff took the gold and silver medals. Other Reports and Announcements NEW BUSINESS Other New Business Review 2025 meeting dates and proposed date changes Meuninck recalled Planning & Zoning meeting changes that took place in 2024 due to elections and council budget work sessions. He outlined the 2025 schedule in the packet and noted the potential schedule conflicts. The commission reviewed their 2025 meeting dates and confirmed changes to the 2025 schedule: Meetings: April 8 instead of April 1 and October 14 instead of October 7. Work Sessions: April 22 instead of April 15. Receive direction from the Commission on how to move forward with past work session topics such as marijuana establishments and housing The commission asked for a Joint Work Session with City Council on January 27, 2024 to discuss housing and marijuana establishments. Discuss work session topic for Tuesday, December 17, 2024. The commission set their Work Session topics for Tuesday, December 17, 2024 to include: Review proposed marijuana ordinance, building height requirements, and accessory dwelling units (ADU). City of Seward, Alaska Planning & Zoning Commission Meeting Minutes December 3, 2024 Volume 8, Page INFORMATIONAL ITEMS AND REPORTS Reminder of Meetings Work session on Tuesday, December 17, 2024, at 6:00 pm in Council Chambers at City Hall Regular meeting on Tuesday, January 7, 2025, at 7:00 pm in Council Chambers at City Hall CITIZEN COMMENTS — None COMMISSION AND ADMINISTRATION COMMENTS & RESPONSE TO CITIZEN COMMENTS Charbonneau wanted to clarify where the Comprehensive Plan survey could be found. Meuninck explained that the Comprehensive Plan survey links could be found on the city Community Development website, as well as the postcards with QR codes. The surveys would remain open through May 2025. Community Development staff had a series of survey presentations lined up for: PACAB, American Legion, Chamber of Commerce, and the Senior Center. Ulman noted the Comprehensive Plan survey was fairly user friendly and allowed the user to speak their mind on a few key points. He thanked staff for designing such a good survey. Sullivan noted that Community Development staff would be at the American Legion tomorrow to present on the Comprehensive Plan survey. The survey event was open to all and tablets would be provided to complete the surveys. Peck asked which survey was the most popular out of the four. Bringhurst responded that the Vision for Seward survey had the most with 180 responses. Quality of Life was in a close second place. ADJOURNMENT The meeting was adjourned at 7:55 p.m. Kris Peck Carol Griswold City Clerk Chair (City Seal) Planning and Zoning Agenda Statement Meeting Date: January 7, 2025 To: Planning and Zoning Commission Through: Daniel Meuninck, Community Development Director From: Applicant Agenda Item: Resolution 2025-001, of the Planning and Zoning Commission of the City of Seward, Alaska, Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Fourth of July Creek Subdivision, Seward Marine Industrial Center (SMIC), That Point of Block 10, Excluding Lots 1 & 2; Located at 3207 Sorrel Road; Creating Tract A & B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat Background and justification: Attached for the Commission's review and recommendation to the Seward City Council and Kenai Peninsula Borough Planning Commission is a preliminary plat submitted by AK Lands, Land Surveying LLC on behalf of the City of Seward. The tract of land being subdivided is the far western portion of the SMIC area, primarily comprising tidelands, the SMIC harbor, and access to Spring Creek and Fourth of July beach. The proposed plat will divide the current tract of land legally known as, That Point of Block 10, Excluding Lots 1 & 2, Fourth of July Creek Subdivision, SMIC into two tracts of land to be known as, Tract A & B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat. During the 2023 update of the Municipal Lands Inventory and Management Plan, the Commission recommended that the Spring Creek Campground and beach access area be platted into one parcel so it could be rezoned to Park. This preliminary plat is the first step in fulfilling that recommendation. Seward City Code § 16.01.015(A) states that "No preliminary or final plat for the subdivision or resubdivision of land located within the city limits shall be approved by the city unless all of the required improvements set forth in section 16.05.010 are provided for by the subdivider, owner, proprietor or developer in the manner described in sections 16.05.015." Spring Creek Campground is operated as a dry campground, and there are no plans to further develop the property at this time. However, the parcel has access to city water, sewer, and electrical lines adjacent to the property. The parcel also has access to Nash Road. Thus, a subdivision agreement will not be required with this plat. The east side of the parcel is located within a FEMA mapped flood zone `D', which means that there are possible but undetermined flood hazards, however, an official flood hazard analysis has not been conducted yet for the area. The northeast side of the property is located within an AE flood zone. This designation indicates land that is close to a body of water and is a high -risk flood area with a 1 % annual chance of flooding and a 26% chance of flooding over the course of a 30- 8 year mortgage. The west side of the property, the portion primarily located within the tidelands, is a VE flood zone. This flood zone indicates a coastal area with a high risk of flooding from storm surges and wave action. Any development occurring within these flood zones will require additional permitting and regulations. All conditions required by Seward City Code § 16.01.015(C), Conditions to plat approval, were met. The property owners within 300 feet of the requested preliminary plat were notified of the proposed subdivision, and the property was posted with public notice signage. In accordance with City and Borough requirements, the Seward City Council and Planning and Zoning Commission must review and comment on a preliminary plat of city -owned land before submittal to the Borough for approval. Subdivision Review: Zoning: The property is currently zoned Industrial (I). Size: Tract A will be 22.469 acres. Tract B will be 70.524 acres. Utilities: Both Tracts of land have access to city water, sewer, and electricity on the east side of the property. Existinr Use: Tract A is currently being used as a dry campground and parking area to access the Spring Creek beach. Tract B is used as a boat harbor, storage, and beach access to Fourth of July beach. Access: Tract A has access to Nash Road. Tract B has access to private roads such as Mustang Ave and Sorrel Road. Flood Zone: According to the Kenai Peninsula Borough Floodplain map, Tract A and B have portions of land located within the Seward Mapped Flood Data Area (SMFD) and FEMA flood zones D, AE, and VE. Any development within these areas would require a floodplain permit. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Vol 1, Chapter 3.6.1 — Improve, expand and diversify year-round parks Plan: and recreational opportunities for residents and visitors. Vol 1, Chapter 3.6.1.1 • Identify, protect, and preserve scenic and natural areas for recreational enjoyment. • Continue to protect and preserve all city parks. Vol 1, Chapter 3.6.1.2 • Ensure that Municipal land acquired for or converted to long-term or permanent park or recreational uses are officially dedicated as park land Strategic Plan: N/A 9 Staff Comments Department Comments No Comment N/A Building Department X Fire Department X Public Works Department Remove public access on the utility access easement. Concerns about the tidelands being rezoned to Park in the future. Harbor Department X Police Department X Electric Department X Telecommunications X Property owners within three hundred (300) feet of the proposed platting action were notified of this public hearing. Public notice signs were posted on the property and all other public hearing requirements of Seward City Code § 15.01.040 were complied with. At the time of this publication the Community Development Department has received no public inquiries. If any correspondence is received after publication of this agenda statement, it will be submitted to the Commissioners for their review. The Commission is required to provide a recommendation to the Kenai Peninsula Borough to approve this preliminary plat if they feel it has met the requirements in Seward City Code Title 15 & 16. 10 CITY OF SEWARD, ALASKA PLANNING AND ZONING COMMISSION RESOLUTION 2025-001 A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF SEWARD, ALASKA, RECOMMENDING SEWARD CITY COUNCIL AND KENAI PENINSULA BOROUGH APPROVAL OF THE PRELIMINARY PLAT OF FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER (SMIC), THAT POINT OF BLOCK 10, EXCLUDING LOTS 1 & 2; LOCATED AT 3207 SORREL ROAD; CREATING TRACT A & B, BLOCK 10, FOURTH OF JULY CREEK SUBDIVISION, SMIC, SPRING CREEK REPLAT WHEREAS, AK Lands, Land Surveying LLC has submitted a preliminary plat on behalf of the City of Seward for review and recommendation to the Seward City Council and Kenai Peninsula Borough; and WHEREAS, the parcel being subdivided is located at 3207 Sorrel Road; and WHEREAS, the current parcel is one tract of land comprising the tidelands and harbor to the west of SMIC, the Spring Creek campground / beach area, and the Fourth of July beach; and WHEREAS, the proposed plat will divide the tract into two parcels, Tract A, which will encompass the Spring Creek campground, beach, and adjacent tidelands, and Tract B, which will comprise the remainder of land south of the Spring Creek campground down to the Fourth of July beach; and WHEREAS, during the 2023 update of the Municipal Lands Inventory and Management Plan, the Seward Planning and Zoning Commission recommended that the Spring Creek campground and beach area be platted as a single parcel; and WHEREAS, the tract of land being subdivided is currently zoned Industrial (I); and WHEREAS, the size of Tract A & B meet the required minimum lot size and lot width for the Industrial zoning district; and WHEREAS, according to the Kenai Peninsula Borough Floodplain map, Tract A and B have portions of land located within the Seward Mapped Flood Data Area (SMFD) and FEMA flood zones D, AE, and VE; and WHEREAS, any construction within these flood zones would require additional permitting; and WHEREAS, both Tracts of land have access to city water, sewer, and electricity on the east side of the property; and 11 WHEREAS, a subdivision agreement will not be required with this plat; and WHEREAS, all conditions required by Seward City Code § 16.01.015, Conditions to plat approval, were met; the property owners within 300 feet of the requested replat were notified of the proposed subdivision, and the property was posted with public notice signage; and WHEREAS, any preliminary plat of city -owned property must be approved by the Seward City Council; and WHEREAS, it is the Planning and Zoning Commission's responsibility to act in an advisory capacity to the Seward City Council and the Kenai Peninsula Borough regarding subdivision plat proposals within the City of Seward. NOW, THEREFORE, BE IT RESOLVED by the Seward Planning and Zoning Commission, that: Section 1. The Commission hereby recommends removing the 50' public access easement, leaving it only as a 50' utility easement. Section 2. The Commission hereby recommends that in accordance with Seward City Code Section 16.01.015 (B), the Seward City Council and Kenai Peninsula Borough approve the submittal of the preliminary plat of Fourth of July Creek Subdivision, Seward Marine Industrial Center (SMIC), That Point of Block 10, Excluding Lots 1 & 2; Located at 3207 Sorrel Road; Creating Tract A & B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the Seward Planning and Zoning Commission this 7t' day of January, 2025. THE CITY OF SEWARD, ALASKA Carol Griswold, Chair AYES: NOES: ABSENT: ABSTAIN: ATTEST: 12 Kris Peck City Clerk (City Seal) 13 Key Industrial Plat Boundary Proposed subdivision boundary Context Map Preliminary Plat Application Property Map RES 2025-001 - Subdividing Fourth of July Creek Subdivision, Seward Marine Industrial Center, That Point of Block 10, Excluding Lots 1 & 2; Creating Tract A & B, Block 10, Fourth of July Creek Subdivision, Seward Marine Industrial Center, Spring Creek Replat Location: 3207 Sorrel Road Parcel #: 14534040 14 Preliminary Plat Application Floodplain Map RES 2025-001 - Subdividing Fourth of July Creek Subdivision, Seward Marine Industrial Center, That Point of Block 10, Excluding Lots 1 & 2; Creating Tract A & B, Block 10, Fourth of July Creek Subdivision, Seward Marine Industrial Center, Spring Creek Replat Location: 3207 Sorrel Road Parcel #: 14534040 15 TRACT B ALASKA T/DELANOS \ SURVEY 1571 d• (PL4T NO. 99-7J \ tih 6�° )96 op N s" CERTIFICATE OF OWNERSHIP AND DEDICATION I HEREBY CERTIFY THAT THE CITY OF SEWARD IS THE OWNER OF THE REAL PROPERTY SHOWN AND DESCRIBED HEREON AND THAT I ON BEHALF OF THE CITY OF SEWARD HEREBY ADOPT THIS PLAN OF SUBDIVISION AND BY MY FREE CONSENT DEDICATE ALL RIGHTS -OF -WAY AND PUBLIC AREAS TO PUBLIC USE AND GRANT ALL EASEMENTS TO THE USE SHOWN. OWNER CITY OF SEWARD 410 ADAMS STREET CITY HALL BUILDING SEWARD, AK 99664 AUTHORIZED OFFICIAL SIGNATURE DATE TITLE PRINTED NAME NOTARY'S ACKNOWLEDGMENT FOR: ACKNOWLEDGED BEFORE ME THIS DAY OF 2024. NOTARY PUBLIC FOR ALASKA MY COMMISSION EXPIRES: CERTIFICATE OF ACCEPTANCE THE UNDERSIGNED OFFICIAL IDENTIFIED BY NAME AND TITLE IS AUTHORIZED TO ACCEPT AND HEREBY ACCEPTS ON BEHALF OF FOR PUBLIC USES AND FOR PUBLIC PURPOSES THE REAL PROPERTY TO BE DEDICATED BY THIS PLAT INCLUDING EASEMENTS, RIGHTS -OF -WAY, ALLEYS, AND OTHER PUBLIC AREAS SHOWN ON THIS PLAT IDENTIFIED AS FOLLOWS: THE ACCEPTANCE OF LANDS FOR PUBLIC USE OR PUBLIC PURPOSE DOES NOT OBLIGATE THE PUBLIC OR ANY GOVERNING BODY TO CONSTRUCT, OPERATE, OR MAINTAIN IMPROVEMENTS. AUTHORIZED OFFICAL SIGNATURE DATE TITLE PRINTED NAME PLAT APPROVAL THIS PLAT WAS APPROVED BY THE KENAI PENINSULA BOROUGH PLANNING COMMISSION AT THE MEETING OF KENAI PENINSULA BOROUGH CURVE RADIUS DELTA ANGLE ARC LENGTH CHORD LENGTH CHORD BEARING C1 (258.49') (068°54'20") (310.87') (292.47') (N34°18'12"W) TRACT B ✓OHNSON - Sly/FT 5UBO/vS/0N USS 1651 (PLOT NO 7J-9) (S79°34'13HE 201.96') PROPOSED TRACT A BLOCK 10 978,768 SQ.FT 22.469 ACRES N SURVEYOR'S CERTIFICATE I, STACY M WESSEL, PROFESSIONAL LAND SURVEYOR, HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. ° is Q ZONEAE \ (EAST 171.53') N N (50' PUBLIC ACCESS AND UTILITY ESMT.) N ZONEAE LINE BEARING AND DISTANCE L1 (N21°17'27"E 24.00') L2 (S64°30'00"W 45.28') L3 (S25°30'00"E 95.64') L4 (N26°45'00"W 60.00') N89°25'07"E 2083.53' ZONE VE PROPOSED TRACT B BLOCK 10 3,072,007 SQ.FT 70.524 ACRES sr0o c)00 700 frffrc..149.. _� 1 TN /\ _��I to Wess I -`N .1 �F9F •o��� �h �R. '0FES S 1• 411P� ZONE VE BLOCK 10 PLAT NO. 97-27 4,050,775 SQ. FT 92.993 ACRES (N89°25'07"E 793.19') (60' SPRING CREEK DRAINAGE ESMT.) LOT 1 BLOCK 10 PLOT N0. 97-27 100' w 00 0 NASH ROAD cri \ o 0 /- -� w rn \ i V V 0. (' 10' PIPELINE ESMT. BK113 PG863 L ZONE VE Ns w LC) II (589°25'47"W 277.51') W (589°55'09"E 75.77') o iD l0 o ri o Q1 0 (S69°07'56"E 2.48') LEGEND () RECORD PER PLAT NO. 97-27 [1 RECORD PER PLAT NO. 2002-22 RECORD PER PLAT FOURTH OF [) JULYSMICJAG REPLAT SIGN 1/ SATELLITE SWITCH CABINET POWER POLE E ELECTRICAL MANHOLE ELECTRIC METER LIGHT POLE TRANSFORMER UTILITY PEDESTAL IETI m rn }O '.O LOT FEMA FLOOD HAZARD AREA EASEMENT FENCE E ELECTRICAL LINES (GIS) T TELECOMMUNICATION LINES (GIS) TRACT B 1OHNSON - Sly/ET SUBOMS/ON USS 1651 ("LO/ N0. 73-96j S SEWER LINES (GIS) SD STORM DRAIN LINES (GIS) W WATER LINES (GIS) w LOT 2 BLOCK 1 (PLOT N0. 97-27j S to S 100' I I 100' (S00°34'28"E 60.00') LOT 1A-1 Iu LOT/42 BLOCK (PLOT N0. 2022-19 L LOT 24-1 BLOCK .9 (PLOT N0. 2022-19 LOT 24-2 BLOCK 9 (PLAT NO. 2022-1) i s (S89°51'04"E 130.12') 100'= l 7 LOT2 BLOCK (PLAT NO. 97-27j 01 0 0 0 o- SD N CO 0 00 w (20' STORM WATER OUTFALL ESMT. APPROXIMATE) / LOT / LOT2 BLOCK (PLOT N0. 2015-11j LOT 14 BLOCK 1 (PLOT NO 2000-6j LOT 2 c E 0' 150' 300' UNSUBOM/OEO RE/W4/NOER JELLISON AVENUE VV )i BLOCK 3 (PLOT N0. 97-27) TRACT A4 (MUSTANG AVENUE) PRIVATE SERVICE ROAD, SW2022-2 T LOT 3 LOT 3A BLOCK 1 (PL4TN0. 2017-13j E S LOT1 t0 SD LOT18 BLOCK 7 (PL4T N0. 2011-17) LOT BLOCK 7 (PL4T N0. 2002 229 SD LOT /, BLOCK (PLOT N0. 97-27) LOT 2, BLOCK (PLAT N0. 97-27) <;\ 0' - 00„ c1O •00/ m LOT 4C BLOCK 7 (PL4T N0. 2011-17) ° TRACT A4 (MORRIS AVENUE) PRIVATE SERVICE ROAD, SW2022-2 -LE= LOT1A2 BLOCK 7 (PLOT N0. 2021XX) LOT1A BLOCK (PL4T N0. 20702 22j < > (9 4\ „o/ .VO LOT 5 LOT 1 BLOCK ('PLOTN0. 20/7- kV LOT 40-1 BLOCK 7 (PLOT N0. 2021XX) LOT BLOCK 8 1 (PLOT N0. 2002 22j ,,I36 40 • PRIES / 1 NARY (S89°24'52"W 1340.52') ZONE VE elf ZONEAE 0 t0 LOT 14-1 BLOCK 7 (PLAT NO. 2021XX) SORREL ROAD UNSUBO/V/0E0 LOT 44-3 BLOCK 7 (PLOT N0. 2021 2) 60' 60' S 0 t0 LOT / BLOCK 2 (PLAT N0. 2022-2) LOT 1 BLOCK 5 (PLOT N0. 2022-2) 60' - - 0 0 cc w U 5 w 01 w 60' 0 to 0 t0 LOT 5 BLOCK 6 (PLAT N0. 20214 LOT BLOCK 6 (PLOT N0. 2021-82 LOT 2 BLOCK 6 (PLOT N0. 2001-2) 1 LOT 3 BLOCK 6 (PLAT N0. 2001 22 N A V 12 THIS PLAT 24 w r-I cc 7 8 BETTY CATO AVE. Z 0 18 SPRING CRE FOURTH OF JULY CREEK MUSTA AVE. NG REL RD 19 DELPHIN RD 17 SEWARD CITY LIMITS 20 T1S VICINITY MAP SCALE: 1" = 1/2 MILE NOTES: 1. THIS IS A PROPOSED PLATTING ACTION. NO BOUNDARY SURVEY HAS BEEN PERFORMED. 2. NOT ALL SITE FEATURES ARE SHOWN WITHIN THE PROPOSED SUBDIVISION. UTILITY LINES ARE BASED ON SMIC UTILITIES CAD DRAWING AND ARE APPROXIMATE. 3. LOT 1, BLOCK 10 LOCATION IS APPROXIMATE DUE TO LACK OF DIMENSION TIES PER THE RECORD PLAT. 4. TRACT A4 IS A SERVICE ROAD ACCESS AND UTILITY EASEMENT. ACCESS RESTRICTED TO LESSEES, CITY OF SEWARD, AND OTHER AUTHORIZED PERSONNEL. 5. THIS PROPERTY IS SUBJECT TO RESERVATIONS AND EXCEPTIONS AS CONTAINED IN U.S. PATENT 50-81-0141 RECORDED JULY 15, 1981 AT BOOK 23 AND PAGE 765 AND AMENDMENTS THERETO AS SHOWN IN "NOTICE", RECORDED MAY 26, 1993, BOOK 68 PAGE 155. 6. THIS PROPERTY IS SUBJECT TO RESERVATIONS AND EXCEPTIONS AS CONTAINED IN STATE OF ALASKA PATENT 5914 RECORDED AUGUST 7, 1981 AT BOOK 23 PAGE 956 AND RESERVATIONS AND EXCEPTIONS AS CONTAINED IN STATE OF ALASKA PATENT 362 RECORDED ON MAY 19, 1994, BOOK 72 PAGE 572. 7. PUBLIC ACCESS EASEMENTS VACATED BY PLAT NO. 97-27, APPROVED BY THE DEPARTMENT OF NATURAL RESOURCES JANUARY 20, 1994 AND THE KEANI PENINSULA BOROUGH PLANNING COMMISSION JULE 9, 1997 A. PUBLIC ACCESS EASMENT DESCIBED WITHIN STATE OF ALASKA PATENT OF ASLS 76-69 AS 50 FOOT ALONG THE ORDINARY HIGH WTER OF FOURTH OF JLY CREEK AND OTHER UNNAMED CREKKSDS AS PORTRAYED ON THE BLM SURVEY PLAT OF T1S R1E SM., ACCEPTED 12/28/78 B. 25 FOOT PEDESTIAN ASEMENT ALONG THE MEAN HIGH TIDE LINE OF RESURRECTION BAY DESCRIBED ON SURVEY PLAT OF ASLS 76-69. C. PUBLIC ACCESS EASEMENT DESCRIBED WITHIN THE STATE OF ALASKA PATENT NO. 5914 FOR U.S. SURVEY 4827 AS 50 FOOT ALONG THE MEAN HIGH WATER MARK OF RESURRECTION BAY, THE ORDINARY HIGH WATER MARK OF FOURTH OF JULY CREEK AND UNNAMED STREAMS AS PORTRAYED ON THE OFFICIAL SURVEY PLAT OF U.S. SURVEY NO. 4827 8. EASEMENTS ON PLAT 97-27 AND PLAT 2007-2 WERE NOT FULLY DIMENSIONED, LOCATION SHOWN HEREON ARE APPROXIMATE. 9. NO PERMANENT STRUCTURE SHALL BE CONSTRUCTED OR PLACED WITHIN A UTILITY EASEMENT WHICH WOULD INTERFERE WITH THE ABILITY OF A UTILITY TO USE THE EASEMENT. 10. WASTEWATER DISPOSAL: PLANS FOR WASTEWATER DISPOSAL, THAT MEET REGULATORY REQUIREMENTS ARE ON FILE AT THE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION. 11. LOTS WITHIN THIS SUBDIVISION MAY BE LOCATED WITHIN A DESIGNATED FLOOD HAZARD AREA; IF SUCH IS THE CASE, DEVELOPMENT MUST COMPLY WITH TITLE 15 OF THE CITY OF SEWARD'S CHARTER AND CODE OF LAWS. A SURVEY TO DETERMINE THE ELEVATION OF THE PROPERTY MAY BE REQUIRED PRIOR TO CONSTRUCTION. 12. A PORTION OF THIS PROPERTY IS IN FLOOD ZONE VE AND ZONE AE, THAT IS DEFINED AS, SPECIAL FLOOD HAZARD AREA SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD, IN THE FLOOD INSURANCE RATE MAP, IDENTIFIED AS COMMUNITY PANEL NO 02122C5030E, WHICH BEARS AN EFFECTIVE DATE OF OCTOBER 20, 2016. EXACT DESIGNATION CAN ONLY BE DETERMINED BY AN ELEVATION CERTIFICATE. WATER LINE AND FLOOD ZONE DELINEATION ARE GIS DATA PROVIDED BY THE NATIONAL FLOOD HAZARD LAYER. Plat of: FOURTH OF JULY CREEK SUBDIVISION SEWARD MARINE INDUSTRIAL CENTER SPRING CREEK REPLAT CREATING TRACT A AND TRACT B, BLOCK 10 CONTAINING 92.993 ACRES MORE OR LESS A SUBDIVISION OF: BLOCK 10, FOURTH OF JULY CREEK SUBDIVISION SEWARD MARINE INDUSTRIAL CENTER FILED UNDER PLAT NO. 97-27 CITY OF SEWARD SEWARD RECORDING DISTRICT KENAI PENINSULA BOROUGH LOCATED WITHIN: SECTION 18, T1S, R1E, S.M., AK. OWNER CITY OF SEWARD P.O. BOX 167 SEWARD, ALASKA 99664 AK LANDS - Land Surveying - AK Lands, Land Surveying LLC 13521 Venus Way Anchorage, AK 99515 aklands@aklands.com http://aklands.com (907) 744-LAND Date: 11/13/2024 Drawn: SMW Scale: 1 "= 150' Date of Survey: N/A Sheet: AUTHORIZED OFFICAL SIGNATURE Checked: N/A PN: 1436 Field Book: N/A KPB No. 16 Community Development/ Planning & Zoning 410 Adams Street, Seward, Alaska 99664 •(907) 224-4049 • (907) 224-4020 or email: planning@cityofseward.net PRELIMINARY PLAT SUBMITTAL FORM EPRELIMINARY PLAT ❑ REVISED PRELIMINARY PLAT (no fee required) PHASED PRELIMINARY PLATO PRELIMINARY PLAT FOR PRIVATE STREETS / GATED SUBDIVISION All requirements of Seward Code Title 16 apply and must be met. SUBDIVISION PLAT NAME: must not include business names, contact staff for assistance if needed. Fourth of July Creek Sub., Seward Marine Industrial Center, Spring Replat PROPERTY INFORMATION: legal description Block 10, Fourth of July Creek Sub., SMIC,Plat No. 97-27 Section, Township, Range Section 18, T1S, R1E, S.M., AK. General area description Seward Marine Industrial Center City Seward Total Acreage 92.993 SURVEYOR Company: AK Lands Land Surveying Contact Person: Stacy Wessel Mailing Address: PO Box 110485 City, State, Zip Anchorage, AK 99511 Phone: (907) 744-LAND e-mail: stacy@aklands.com PROPOSED WASTEWATER AND WATER SUPPLY WASTEWATER ✓❑ on site City WATERnon site City SUBMITTAL REQUIREMENTS A preliminary plat application will be scheduled for the next available Planning and Zoning meeting after a complete application has been received. ❑,/ Electronic file of Plat and ▪ Preliminary plat NON-REFUNDABLE submittal fee $200.00- �✓ Certificate to plat for ALL parcels included in the subdivision Documentation showing proof of signatory authority (partnerships, corporations, estates, trusts, etc.) ❑ Public Notice Sign(s) Posted on property - City staff will contact you to pick up sign EXCEPTIONS REQUESTED TO PLATTING CODE: A letter, to be presented to the Planning and Zoning commission, with substantial evidence justifying the requested exception and fully stating the grounds for the exception request, and the facts relied upon, MUST be attached to this submittal. 1. 2. 3. KPB 20.30.030(A) KPB 20.30.170 KPB 20.30.210 APPLICANT: SIGNATURES OF ALL LEGAL PROPERTY OWNERS ARE REQUIRED. Additional signature sheets can be attached. When signing on behalf of another individual, estate, corporation, LLC, partnership, etc., documentation is required to show authority of the individual(s) signing. Contact KPB staff for clarification if needed. OWNER(s) Name (printed): Stacy Wessel Signature: 5'�� 0)" Phone: (907) 744-LAND e-mail: stacy(caklands.com Name (printed): Signature: Phone: e-mail: Name (printed): Signature: Phone: e-mail: FOR OFFICE USE ONLY RECEIVED BY DATE SUBMITTED Receipt # 17 The preliminary plat shall be drawn to scale of sufficient size to be clearly legible and shall clearly show the following: 1. Within the title block: Not applicable to my plat. The required information has been shown/noted. a. Name of the subdivision which shall not be the same as an existing city, town, tract, or subdivision of land in the borough, of which a plat has been previously recorded, or so nearly the same as to mislead the public or cause confusion; b. Legal description, location, date, and total area in acres of the proposed subdivision; and c. Name and address of owner(s), as shown on the KPB records and the certificate to plat, and registered land surveyor; 2. North point; 3. The location, width and name of existing or platted streets and public ways, railroad rights -of -way, and other important features such as section lines or political subdivisions or municipal corporation boundaries abutting the subdivision; 4. A vicinity map, drawn to scale showing location of proposed subdivision, north arrow if different from plat orientation, township and range, section lines, roads, political boundaries, and prominent natural and manmade features, such as shorelines or streams; 5. All parcels of land including those intended for private ownership and those to be dedicated for public use or reserved in the deeds for the use of all property owners in the proposed subdivision, together with the purposes, conditions, or limitations of reservations that could affect the subdivision; 6. The names and widths of public streets and alleys and easements, existing and proposed, within the subdivision; 7. Status of adjacent lands, including names of subdivisions, lot lines, block numbers, lot numbers, rights -of -way; or an indication that the adjacent land is not subdivided; 8. Approximate locations of areas subject to inundation, flooding, or storm water overflow, the line of ordinary high water, wetlands when adjacent to lakes or non -tidal streams, and the appropriate study which identifies a floodplain, if applicable; 9. Approximate locations of areas subject to tidal inundation and the mean high water line; 10. Block and lot numbering approximate dimensions and total numbers of proposed lots; 11. The approximate location of known existing municipal wastewater and water mains, and other utilities within the subdivision and immediately abutting thereto 12. Contours at suitable intervals when any roads are to be dedicated unless the planning director or commission finds evidence that road grades will not exceed 6 percent on arterial streets, and 10 percent on other streets; N/A 13. Approximate locations of slopes over 20 percent in grade and if contours are shown, the areas of the contours that exceed 20 percent grade shall be clearly labeled as such; N/A 14. Apparent encroachments, with a statement indicating how the encroachments will be resolved prior to final plat approval N/A 18 November 13, 2024 City of Seward Planning Commission City Hall Building 410 Adams St. Seward, AK 99664 Subject: Request for Exceptions to Regulations for Subdivision of Block 10, Fourth of July Creek Subdivision - SMIC Dear Members of the City of Seward Planning Commission, The City of Seward is undertaking two concurrent subdivision projects (replats) within the Seward Marine Industrial Center (SMIC), which is situated on the eastern side of Resurrection Bay at the end of Nash Road, just six road miles from the city center. SMIC is a specialized heavy industrial area encompassing 15 square miles of coastal land, owned entirely by the City of Seward. It serves as a critical hub for maritime services, including full -service shipyards, maritime boat areas, and port facilities. The area is constantly evolving to meet the maritime needs of Alaska. The purpose of this letter is to request exceptions to Kenai Peninsula Borough (KPB) Code 20.30.030(A), 20.30.170, and 20.30.210 for both replats. These exceptions are essential to facilitate important community enhancements and support ongoing industrial developments. Part One: Spring Creek Campground Replat The first replat involves subdividing Block 10, Fourth of July Creek Subdivision Seward Marine Industrial Center, Plat No. 97-27, into two lots, one of which encompasses the current Spring Creek Campground area. Currently, Block 10 encompasses 92.993 acres. The campground is located in the northern section of SMIC and is fronted by Nash Road, a 100-foot dedicated public right-of-way. The subdivision aims to divide Block 10 along an existing fence line, designating the campground area as Tract A, which will be 22.469 acres. This campground has historically been used by tourists and residents for camping and fishing. By creating a distinct parcel, the City intends to utilize this area independently to better serve public needs. The southern portion of the parcel, to be labeled Tract B, fronts Tract A4—a private service road —and will comprise the remaining 70.534 acres. 19 Part Two: Fourth of July Beach Park Development The second replat, conducted concurrently but to be recorded afterward, involves subdividing Tract B into two lots. One of these lots will absorb Lot 3, Block 8, Fourth of July Creek Subdivision SMIC (Plat 2002-22), forming a single lot intended for a park already known as Fourth of July Beach, located west-southwest of Sorrel Road. The new parcel will eventually be rezoned into a park zoning designation. Additionally, Lot 4A-4, Block 7, JAG Replat will be subdivided into two lots to create a parking area supporting the park. Both the park area and parking lot have dedicated fee simple rights - of -way abutting the new lots, fronted by Sorrel Road, a 60-foot right-of-way. The remaining portions will continue to support SMIC's industrial operations and are fronted by Tract A4, a private road. Exceptions Requested 1. Exception to KPB Code 20.30.030(A) - Proposed Street Layout Requirements and KPB Code 20.30.210 - Lots Access to Street KPB Code 20.30.030(A) states that streets provided on the plat must provide fee simple right-of-way dedications to the appropriate governmental entity. KPB Code 20.30.210 requires that each lot shall abut on a fee simple dedicated street except as provided by KPB 20.30.030(B). o Explanation: In the Spring Creek Campground Replat, proposed Tract A fronts Nash Road, a fee simple dedicated right-of-way available for public use. However, Tract B, the southern remainder, does not front a dedicated right-of- way but fronts on Tract A4, a private 60-foot-wide tract developed as a service road serving SMIC's needs. The City wishes to retain control over this tract to manage access within SMIC, ensuring safety and operational efficiency. Justifications for Exception: 2. Special Circumstances or Conditions Affecting the Property • Controlled Industrial Access: SMIC's heavy industrial nature requires controlled access to ensure safety and security for operations and personnel. Introducing dedicated public rights -of -way could compromise these critical needs. • Unique Ownership Structure: The City owns all lands within the subdivision, including Tract A4, allowing for internal management of access without impacting public road systems. 20 3. Necessity for Preservation and Enjoyment of a Substantial Property Right • Operational Efficiency and Safety: Retaining private control over Tract A4 is essential for managing traffic flow, restricting unauthorized access, and maintaining safety protocols within the industrial area. ■ Practical Compliance: Granting these exceptions is the most practical way to comply with the intent of the KPB Code while addressing the unique requirements of an industrial maritime center. 4. No Detriment to Public Welfare or Injury to Other Property ■ Uninterrupted Access: All lots will continue to have access via Tract A4 or Sorrel Road, ensuring no lot is denied access. ■ Enhanced Public Amenities: Creating dedicated park and campground areas enhances public welfare by providing recreational spaces without impeding industrial operations. ■ Safety Considerations: Controlled access reduces the risk of accidents in heavy industrial zones, protecting both the public and industrial personnel. 2. Exception to KPB Code 20.30.170 - Block Length Requirements KPB Code 20.30.170 requires blocks to be not less than 330 feet nor more than 1,320 feet in length. o Explanation: The current block configuration and proposed subdivisions do not conform to these block length requirements due to the unique layout and ownership structure of the industrial area. All lands within the subdivision are owned by the City, and block lengths are dictated by existing industrial uses and geographic constraints. The block was originally subdivided in 1997. Justifications for Exception: 2. Special Circumstances or Conditions Affecting the Property • Geographic Constraints: The area's geography and existing industrial infrastructure make it impractical to conform to standard block length requirements. • Existing Industrial Uses: Operational needs of the industrial facilities require larger parcels for efficient functioning. 3. Necessity for Preservation and Enjoyment of a Substantial Property Right • Operational Efficiency: Strict adherence to block length requirements would disrupt existing industrial operations and hinder efficient land use. ■ Practical Compliance: Granting the exception allows the City to optimize land use while maintaining compliance with the overall intent of the code. 21 4. No Detriment to Public Welfare or Injury to Other Property • No Impact on Adjacent Properties: Since the City owns all surrounding land, there is no adverse effect on neighboring properties. • Public Benefit: The subdivision facilitates the creation of public amenities such as parks and campgrounds, enhancing community welfare. Additional Considerations • Compliance with Road Width Standards: Tract A4 has been established with a width of 60 feet, meeting KPB Code requirements for road dedication widths and ensuring adequate access dimensions. • Historical Precedent: The City has previously undertaken similar plats and replats within SMIC to meet evolving needs. These have been reviewed and approved by the Seward Planning and Zoning Commission and the Kenai Peninsula Borough, setting a precedent for the current request. • Future Ownership Considerations: As the City is the sole owner of the lands within the subdivision and plans to retain ownership, the exceptions will not adversely affect future development or ownership transitions. Conclusion In light of the special circumstances and the unique configuration of SMIC—bounded by Resurrection Bay —the City of Seward respectfully requests that the Commission grant the exceptions to KPB Code 20.30.030(A), 20.30.210, and 20.30.170 for both replats. These exceptions are necessary for the practical, safe, and efficient development of the area and align with the intent of the KPB Code without causing detriment to public welfare or adjacent properties. This will also provide additional parks for the public while keeping the industrial area secure and operational. We appreciate your consideration of this request and are available to provide any additional information or answer any questions you may have. Sincerely, 3 a:�y G9244w Respectfully, AK Lands, Land Surveying by Stacy Wessel , Professional Land Surveyor 22 AKLANDS Lond Surveying October 21, 2024 Vince Piagentini Kenai Peninsula Borough 144 N. Binkley St. Soldotna, AK 99669 Subject: Spring Creek and Park Replat — Letter of Authorization PO Box 110485 Anchorage, AK 99515 (907) 744-LAND. aklands@aklands.com http://aklands.com Mr. Piagentini, I, TcLsc-Y. , is the owner or authorized agent of Lot 1, Block 10 and Block 10, Fourth of July creek Subdivision Seward Marine industrial Center (proposed -Spring Creek Replat) and Lot 4A-1, Block 7, Fourth of July creek Subdivision Seward Marine Industrial Raibow Replat (Proposed Park Replat) and authorize AK Lands, Land Surveying LLC to represent us before the City of Seward and Kenai Peninsula Borough for all requests related to the easement vacation, platting action, and its related activities. City of Sward r�ic;ci.441{\ Dc ,`t1/4-C k'►lkAcC(Z �t) l 2- 2- Date 1 of 1 23 CITY OF SEWARD, ALASKA AFFIDAVIT OF MAILING PUBLIC HEARING NOTICE C( CU-q I-c vvr-1 , upon oath, deposes and states: That she is employed in the Community Development Office of the City of Seward, Alaska; and that on De rormber 121 2o2_1 she mailed a Notice of Public Hearing to the real property owners within a 300-foot periphery of Fourth of July Creek Subdivision, Seward Marine Industrial Center, that Point of Block 10, Excluding Lots 1 & 2; Located at 3207 Sorrel Road as prescribed by Seward City Code 15.01.040/16.01.015. �h Affirmed and signed this 12. day of Oec'(1rnj7P- 2024. (`per ' �„ AFFIDAVIT OF POSTING PUBLIC HEARING NOTICE I, C �� 10J-a hr-c)w\-3r1 , hereby certify that I have posted a Notice of Public Hearing, as prescribed by Seward City Code 15.01.040 for the property located at Fourth of July Creek Subdivision, Seward Marine Industrial Center, that Point of Block 10, Excluding Lots 1 & 2; Located at 3207 Sorrel Road, the owners of which have petitioned for a Public Hearing to replat the aboved named property, creating Tract A & B, Block 10, Fourth of July Creek Subdivision, Seward Marine Industrial Center, Spring Creek Replat._ The notice was posted on Oeeoi d ar J2 Zo'L , which is days prior to the public hearing on this petition. I acknowledge this Notice must be posted in plain sight, maintained and displayed until all public hearings have been completed. Affirmed and signed this I Z� day of cFco,-nb Signature 25 Planning and Zoning Agenda Statement Meeting Date: January 7, 2024 To: Planning and Zoning Commission Through: Daniel Meuninck, Community Development Director From: Applicant Agenda Item: Resolution 2025-002, of the Planning and Zoning Commission of the City of Seward, Alaska, Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Tract B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat; Lot 3, Block 8, Fourth of July Creek Subdivision, SMIC Ship's Drydock Replat; and Lot 4A-4, Block 7, Fourth of July Creek Subdivision, SMIC, JAG Replat; Located at 3207, 3311, & 3314 Sorrel Road; Creating Tracts B-1 & B-2, Block 10 and Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subdivision, SMIC, Park Replat Background and justification: Attached for the Commission's review and recommendation to the Seward City Council and Kenai Peninsula Borough Planning Commission is a preliminary plat submitted by AK Lands, Land Surveying LLC on behalf of the City of Seward. This preliminary plat is dividing Tract B in the preliminary Spring Creek Replat, Block 10, Fourth of July Creek Subdivision, SMIC, into two tracts of land to be known as, Tract B-1 and B-2, Block 10, Fourth of July Creek Subdivision, SMIC, Park Replat. Proposed Tract B-2 will also absorb Lot 3, Block 8, Fourth of July Creek Subdivision, SMIC Ship's Drydock Replat. This plat will also divide Lot 4A-4, Block 7, Fourth of July Creek Subdivision, SMIC, JAG Replat into two parcels, Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subdivision, SMIC, Park Replat During the 2023 update of the Municipal Lands Inventory and Management Plan, the Commission recommended that the Fourth of July beach and access area be cleaned up and platted into one parcel so that it could be rezoned to Park. The Commission also recommended that a parcel on the east side of Sorrel Road be platted as a separate parcel to recommend as a parking area if additional parking was needed in the future. This preliminary plat is the first step in fulfilling those recommendations. Seward City Code §16.01.015(A) states that "No preliminary or final plat for the subdivision or resubdivision of land located within the city limits shall be approved by the city unless all of the required improvements set forth in section 16.05.010 are provided for by the subdivider, owner, proprietor or developer in the manner described in sections 16.05.015." Tract B-2 and Lots 4A-5 and 4A-6 do not have access to city water, sewer, and electricity. However, the parcels are currently only used for parking and beach access. There are no plans to change this use or to further develop the land. Thus, a subdivision agreement will not be required 26 with this plat. The east side of Tract B-1 and B-2 and all of Lots 4A-5 and 4A-6 are located within a FEMA mapped flood zone D, which means that there are possible but undetermined flood hazards, however, a flood hazard analysis has not been conducted yet for those areas. The west side of Tract B-1 and B-2, the portions primarily located within the tidelands, are in a VE flood zone. This flood zone indicates a coastal area with a high risk of flooding from storm surges and wave action. Any development occurring within these flood zones will require additional permitting and regulations. All conditions required by Seward City Code §16.01.015(C), Conditions to plat approval, were met. The property owners within 300 feet of the requested preliminary plat were notified of the plat, and the property was posted with public notice signage. In accordance with City and Borough requirements, the Seward City Council and Planning and Zoning Commission must review and comment on a preliminary plat of city -owned land before submittal to the Borough for approval. Subdivision Review: Zoninz: The property is currently zoned Industrial (I). Size: Tract B-1 will be 56.963 acres. Tract B-2 will be 15.331 acres. Lot 4A-5 will be 2.760 acres. Lot 4A-6 will be 0.716 acres or 31,168 square feet. Utilities: Tract B-1 has access to city water, sewer, and electricity on the east side of the property. Tract B-2 and Lots 4A-5 and 4A-6 do not currently have access to city water, sewer, and electricity. Existing Use: The parcels are used for a boat harbor, storage, parking, and beach access. Access: Tract B-1 will have access to the private roads, Mustang Ave, Morris Avenue, and Sorrel Road. Tract B-2 will have access to Sorrel Road. Lot 4A-5 will have access to Sorrel Road and Olga Street. Lot 4A-6 will have access to Sorrel Road. Flood Zone: According to the Kenai Peninsula Borough Floodplain map, Tract B-1 and B-2 have portions of land located within the Seward Mapped Flood Data Area (SMFD) and FEMA flood zones D and VE. Lots 4A-5 and 4A-6 are located within a FEMA flood zone D. Any development within these hazard areas would require a floodplain permit. Comprehensive and Strategic Plan Consistency Information qm This legislation is consistent with (citation listed): Comprehensive Vol 1, Chapter 3.6.1 — Improve, expand and diversify year-round parks Plan: and recreational opportunities for residents and visitors. Vol 1, Chapter 3.6.1.1 • Identify, protect, and preserve scenic and natural areas for recreational enjoyment. • Continue to protect and preserve all city parks. Vol 1, Chapter 3.6.1.2 27 • Ensure that Municipal land acquired for or converted to long-term or permanent park or recreational uses are officially dedicated as park land Strategic Plan: N/A Staff Comments Department Comments No Comment N/A Building Department X Fire Department X Public Works Department Plat a full cul-de-sac at the end of Sorrel Road Harbor Department X Police Department X Electric Department X Telecommunications X Public Comment Property owners within three hundred (300) feet of the proposed platting action were notified of this public hearing. Public notice signs were posted on the property and all other public hearing requirements of Seward City Code § 15.01.040 were complied with. At the time of this publication the Community Development Department has received no public inquiries. If any correspondence is received after publication of this agenda statement, it will be submitted to the Commissioners for their review. The Commission is required to provide a recommendation to the Kenai Peninsula Borough to approve this preliminary plat if they feel it has met the requirements in Seward City Code Title 15 & 16. 28 CITY OF SEWARD, ALASKA PLANNING AND ZONING COMMISSION RESOLUTION 2025-002 A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF SEWARD, ALASKA, RECOMMENDING SEWARD CITY COUNCIL AND KENAI PENINSULA BOROUGH APPROVAL OF THE PRELIMINARY PLAT OF TRACT B, BLOCK 10, FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER (SMIC), SPRING CREEK REPLAT; LOT 3, BLOCK 8, FOURTH OF JULY CREEK SUBDIVISION, SMIC, SEWARD SHIP'S DRYDOCK REPLAT; AND LOT 4A-4, BLOCK 7, FOURTH OF JULY CREEK SUBDIVISION, SMIC, JAG REPLAT; LOCATED AT 3207, 3311, & 3314 SORREL ROAD; CREATING TRACTS B-1 & B-2, BLOCK 10 AND LOTS 4A-5 & 4A-6, BLOCK 7, FOURTH OF JULY CREEK SUBDIVISION, SMIC, PARK REPLAT WHEREAS, AK Lands, Land Surveying LLC has submitted a preliminary plat on behalf of the City of Seward for review and recommendation to the Seward City Council and Kenai Peninsula Borough; and WHEREAS, the current parcel is three tracts of land, Tract B comprising the tidelands and harbor to the west of SMIC and the Fourth of July beach, Lot 3 comprising the parking and beach access to Fourth of July beach, and Lot 4A-4 comprising parking and storage; and WHEREAS, during the 2023 update of the Municipal Lands Inventory and Management Plan, the Seward Planning and Zoning Commission recommended that the Fourth of July beach area be platted as a single parcel and that a portion of land be designated for future parking; and WHEREAS, the proposed plat will divide Tract B into two parcels, Tract B-1, which will encompass the harbor to the west of SMIC, and Tract B-2, which will include Lot 3, will encompass the Fourth of July beach, parking, and adjacent tidelands; and WHEREAS, Lot 4A-4 will be divided into Lots 4A-5 and 4A-6, with Lot 4A-6 being the lot that will be designated as a potential future parking area for Fourth of July beach; and WHEREAS, the tract of land being subdivided is currently zoned Industrial (I); and WHEREAS, the size of Tract B-1 and B-2 and Lots 4A-5 and 4A-6 meet the required minimum lot size and lot width for the Industrial zoning district; and WHEREAS, all of Lots 4A-5 and 4A-6 and portions of Tract B-1 and B-2 are located within a FEMA mapped flood zone D; and 29 WHEREAS, the west side of Tract B-1 and B-2 are located within a FEMA mapped flood zone VE; and WHEREAS, any type of construction within these designated flood zones would require additional permitting; and WHEREAS, there are no plans to change the current use of parking and beach access, or further develop Tract B-2 and Lots 4A-5 and 4A-6; and WHEREAS, Tract B-1 has access to city water, sewer, and electric; and WHEREAS, a subdivision agreement will not be required with this plat; and WHEREAS, all conditions required by Seward City Code § 16.01.015, Conditions to plat approval, were met; the property owners within 300 feet of the requested replat were notified of the proposed subdivision, and the property was posted with public notice signage; and WHEREAS, any preliminary plat of city -owned property must be approved by the Seward City Council; and WHEREAS, it is the Planning and Zoning Commission's responsibility to act in an advisory capacity to the Seward City Council and Kenai Peninsula Borough regarding subdivision plat proposals within the City of Seward. NOW, THEREFORE, BE IT RESOLVED by the Seward Planning and Zoning Commission, that: Section 1. The Commission hereby recommends that a full cul-de-sac be platted at the end of Sorrel Road. Section 2. The Commission hereby recommends that, in accordance with Seward City Code Section 16.01.015 (B), the Seward City Council and Kenai Peninsula Borough approve the submittal of the preliminary plat of Tract B, Block 10, Fourth of July Creek Subdivision, SMIC, Spring Creek Replat; Lot 3, Block 8, Fourth of July Creek Subdivision, SMIC Seward Ship's Drydock Replat; and Lot 4A-4, Block 7, Fourth of July Creek Subdivision, SMIC, JAG Replat; Located at 3207, 3311, and 3314 Sorrel Road; Creating Tracts B-1 & B-2, Block 10 and Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subdivision, SMIC, Park Replat Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the Seward Planning and Zoning Commission this 7th day of January, 2025. THE CITY OF SEWARD, ALASKA 30 Carol Griswold, Chair AYES: NOES: ABSENT: ABSTAIN: ATTEST: Kris Peck City Clerk (City Seal) 31 Context M Industrial Plat Boundary Proposed subdivision boundary 400 feet Preliminary Plat Application Property Map RES 2025-002 - Subdividing Tract B, Block 10, Fourth of July Creek Subd., Seward Marine Industrial Center (SMIC), Spring Creek Replat; Lot 3, Block 8, Fourth of July Creek Subd., SMIC Seward Ship's Drydock Replat; and Lot 4A-4, Block 7, Fourth of July Creek Subd., SMIC JAG Replat; Creating Tracts B-1 & B-2, Block 10 and Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subd. SMIC, Park Replat Location: 3207, 3311, & 3314 Sorrel Road Parcel #: 14534040 & 14534049 & 14534049 32 Proposed Tract B-1 N 500 feet Proposed Tract B-2 Preliminary Plat Application Floodplain Map Proposed Lot 4A-5 d Lot 4A- Context M RES 2025-002 - Subdividing Tract B, Block 10, Fourth of July Creek Subd., Seward Marine Industrial Center (SMIC), Spring Creek Replat; Lot 3, Block 8, Fourth of July Creek Subd., SMIC Seward Ship's Drydock Replat; and Lot 4A-4, Block 7, Fourth of July Creek Subd., SMIC JAG Replat; Creating Tracts B-1 & B-2, Block 10 and Lots 4A-5 & 4A-6, Block 7, Fourth of July Creek Subd. SMIC, Park Replat Location: 3207, 3311, & 3314 Sorrel Road Parcel #: 14534040 & 14534049 & 14534074 33 TRACT B \ ALASKA T/DEL4NOS \ SURVEY 1571 (PLAT N0. 99-72 \ \ \ LOT 3 BLOCK 10 (PLOT N0. 2024 X4 CERTIFICATE OF OWNERSHIP AND DEDICATION O I HEREBY CERTIFY THAT THE CITY OF SEWARD IS THE OWNER OF THE REAL PROPERTY SHOWN AND DESCRIBED HEREON AND THAT I ON BEHALF OF THE CITY OF SEWARD HEREBY ADOPT THIS PLAN OF SUBDIVISION AND BY MY FREE CONSENT DEDICATE ALL RIGHTS -OF -WAY AND PUBLIC AREAS TO PUBLIC USE AND GRANT ALL EASEMENTS TO THE USE SHOWN. OWNER CITY OF SEWARD 410 ADAMS STREET CITY HALL BUILDING SEWARD, AK 99664 AUTHORIZED OFFICIAL SIGNATURE DATE TITLE PRINTED NAME NOTARY'S ACKNOWLEDGMENT FOR: ACKNOWLEDGED BEFORE ME THIS DAY OF 2024. NOTARY PUBLIC FOR ALASKA MY COMMISSION EXPIRES: CERTIFICATE OF ACCEPTANCE THE UNDERSIGNED OFFICIAL IDENTIFIED BY NAME AND TITLE IS AUTHORIZED TO ACCEPT AND HEREBY ACCEPTS ON BEHALF OF FOR PUBLIC USES AND FOR PUBLIC PURPOSES THE REAL PROPERTY TO BE DEDICATED BY THIS PLAT INCLUDING EASEMENTS, RIGHTS -OF -WAY, ALLEYS, AND OTHER PUBLIC AREAS SHOWN ON THIS PLAT IDENTIFIED AS FOLLOWS: THE ACCEPTANCE OF LANDS FOR PUBLIC USE OR PUBLIC PURPOSE DOES NOT OBLIGATE THE PUBLIC OR ANY GOVERNING BODY TO CONSTRUCT, OPERATE, OR MAINTAIN IMPROVEMENTS. AUTHORIZED OFFICAL SIGNATURE DATE TITLE PRINTED NAME PLAT APPROVAL THIS PLAT WAS APPROVED BY THE KENAI PENINSULA BOROUGH PLANNING COMMISSION AT THE MEETING OF KENAI PENINSULA BOROUGH CURVE RADIUS DELTA ANGLE ARC LENGTH CHORD LENGTH CHORD BEARING C1 (258.49') (068°54'20") (310.87') (292.47') (N34°18'12"W) C2 [229.99'] [062°27'54"] [250.74'] [238.50'] [N31°48'21"W] C3 {169.701 {027°42'53'} {82.08'} {81.29'} {S76°44'08"E} C4 {170.00'} {014°46'45'} {43.85'} {43.85'} {S55°38'51"E} C5 {50.001 {070°39'09'} {61.66'} {57.83'} {S12°53'14"E} C6 {50.001 {109°28'47"} {95.55'} {81.66}' {S32°22'40"E} TRACT B JOHNSON - 5H'//T SUED/vS/0N USS 1651 (PLAT N0. 73-962 N SURVEYOR'S CERTIFICATE I, STACY M WESSEL, PROFESSIONAL LAND SURVEYOR, HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. ZONEAE ZONE AE 7-I N \(50' PUBLIC ACCESS AND UTILITY ESMT.) S 1 N89°25'07"E 2083.53' PROPOSED TRACT B-1 BLOCK 10 2,481,315 SQ.FT 56.963 ACRES 6' .] �OF A• :'162-lll '*: 49 TH •.* to less 4' N 1oS1�r8OFESSI LINE BEARING AND DISTANCE L1 (N21°17'27"E 24.00') L2 (S64°30'00"W 45.28') L2 [S64°35'00"W 45.33'] L3 (S25°30'00"E 95.64') L3 [S25°25'00"E 95.75'] L4 (N26°45'00"W 60.00') L4 [N26°45'00"W 60.07'] L5 [S63°02'15"E 211.52'] L6 [S63°02'15"E 154.99'] L6 {S62°56'43"E 154.80'} L7 [N89°48'04"E 30.00'] L8 [N21°17'54"E 60.04'] L9 [S87°19'17"E 60.04'] L10 [N21°22'38"E 36.02'] L11 [N75°07'13"W 58.04'] S N N (50' PUBLIC ACCESS AND UTILITY ESMT.) / , 10' PIPELINE ESMT. BK113 PG863 vv TRACT B BLOCK 10 SPRING CREEK REPLAT 3,072,007 SQ.FT 70.524 ACRES ZONE VE (569°07'56"E 2.48') S89°24'52"W 1236.92' (S89°55'09"E 75.77') M o O ri 0 N 0 0 N m to N u LOT / BLOCK 10 PLAT N0. .97-27 (589°25'47"W 277.51') V^V II (S00°34'28"E 60.00') LOT 1A-1 LOT 142 I BLOCK .9 (PLAT N0. 2022-1j L0T24-1 BLOCK 9 (PLAT N0. 2022-12 LOT2A2 BLOCK 9 (PLAT N0. 2022-12 s/- // (S89°51'04"E 130.12'1 PROPOSED TRACT B-2 BLOCK 10 667,832 SQ.FT 15.331 ACRES E NASH ROAD LEGEND () RECORD PER PLAT NO. 97-27 [ ] RECORD PER PLAT NO. 2002-22 RECORD PER PLAT FOURTH OF [] JULYSMICJAG REPLAT SIGN A%SATELLITE SWITCH CABINET POWER POLE tELECTRICAL MANHOLE ELECTRIC METER LIGHT POLE TRANSFORMER ID UTILITY PEDESTAL I ET I 7777777i7ii7 EASEMENT VACATION FEMA FLOOD HAZARD AREA EASEMENT FENCE E ELECTRICAL LINES (GIS) T TELECOMMUNICATION LINES (GIS) S TRACT B ,/OHNSON - SNIT 5U80/VS/ON USS 1651 (PLAT N0. 7.1 96j SEWER LINES (GIS) SD STORM DRAIN LINES (GIS) W WATER LINES (GIS) LOT 1 JJ LOT 1 LOT 2 BLOCK 4 (PLAT NO. 2015-112 LOT 14 BLOCK 1 (PLAT NO 2000-62 100'= LOT 2 BLOCK 7 (PLAT N0. 97-272 (20' STORM WATER OUTFALL ESMT. APPROXIMATE) , / /ss jS8o8pS0„ - 1ppfpfrps. 2ps•02 SD LOT LOT2 BLOCK 1 (PLAT N0. 97-27j JELLISON AVENUEVV vv BLOCK (PLAT N0. 97-27) TRACT A4 (MUSTANG AVENUE) PRIVATE SERVICE ROAD, SW2022-2 T E LOT .1 LOT 3A BLOCK 4 (PLAT N0. 20/7-13j 0 - LOT 4B BLOCK 7 (PLAT N0. 20/1-17j LOT BLOCK 7 (PLOT N0. 2002 222 SD LOT 1, BLOCK 8 (PLAT N0. 97-27j LOT2, BLOCKS (PLAT N0. 97-27j L7 {5' UTILITY ESMT.} VACATED THIS PLAT FORMER LOT LINE TO BE VACATED 1340.30' VI w cn [N89°25'33"E R+ 251.40]' m LOT 4C BLOCK 7 (PLAT NO. 2011-0 N6, LOT 3 BLOCK 8 77,140 SQ.FT 1.771 ACRES 10' -{5' UTILITY ESMT} E 0' 150' 300' UNSUBD/vDED IEMA/NDER S LOT 4 TRACT A4 (MORRIS AVENUE) PRIVATE SERVICE ROAD, SW2022-2 -LE LOT4A2 BLOCK (PLAT NO. 2024 XX2 LOT 5 LOT 4 BLOCK 1 (P39TN0. 2017-112 LOT1A BLOCK 7 (PLAT N0. 2002 22j 00 'V {589°32'48"W 425.08'} tea+ -{5' UTILITY ESMT.} VAR\S N89°25'56"E 369.45' PROPOSED CQ LOT 4A-6, BLOCK 7 (50' SECTION LINE ESMT.)S. NARY (589°24'52"W 1548.52') ZONE VE /es 31,168 SQ.FT ± RRF q� A0.716 ACRES 29' 117. - [(S89°24'52"W 208.22')] L [50' SECTION LINE ESMT.] 0 ZONEAE LOT40-1 BLOCK (PLAT N0. 2021 XXJ LOT 4A-4, BLOCK 7 PLAT NO. 2024-XX 151,415 SQ.FT. 3.476 ACRES LOT 44-3 BLOCK 7 (PLAT N0. 2024 XX2 {589°33'56"W 299.10'} w 0 No 01 N N N A w "' 299.04' {N89°25'56"E 416.33'}- SORREL ROAD UNSUBD/vDED PROPOSED LOT 4A-5 BLOCK 7 120,247 SQ.FT ± 2.760 ACRES {10' UTILITY ESMT} 0 LD 60' 60' 60' N W O W 11 CCV) �o Q L90 ow a> CC Hi QN w Q > S o LD LOT / BLOCK 2 (PLAT N0. 2022 22 LOT 1 BLOCK 5 (PLAT N0. 2022-2) 0 Up LOT 5 BLOCK 6 (PLAT N0. 20214 LOT 4 BLOCK 6 (PLAT NO. 2021-8) z 0 0 N w O 00 60' LOT 2 BLOCK 6 (PLOT N0. 2001 2j 1 LOT 3 BLOCK 6 ("LAT NO. 200129 - A 1Z 12 THIS PLAT w c-I 24 7 BETTE CATO AVE. c Q 18 SPRIN / E MUSTA A\VE. NG FOURTH w L�- EL RD 19 8 SEWARD CITY LIMITS 20 T1S VICINITY MAP SCALE: 1" = 1/2 MILE 1. THIS IS A PROPOSED PLATTING ACTION. NO BOUNDARY SURVEY HAS BEEN 2. NOT ALL SITE FEATURES ARE SHOWN WITHIN THE PROPOSED SUBDIVISION. UTILITY LINES ARE BASED ON SMIC UTILITIES CAD DRAWING AND ARE APPROXIMATE. 3. TRACT A4 IS A SERVICE ROAD ACCESS AND UTILITY EASEMENT. ACCESS RESTRICTED TO LESSEES, CITY OF SEWARD, AND OTHER AUTHORIZED PERSONNEL. 4. THIS PROPERTY IS SUBJECT TO RESERVATIONS AND EXCEPTIONS AS CONTAINED IN U.S. PATENT 50-81-0141 RECORDED JULY 15, 1981 AT BOOK 23 AND PAGE 765 AND AMENDMENTS THERETO AS SHOWN IN "NOTICE", RECORDED MAY 26, 1993, BOOK 68 PAGE 155. 5. THIS PROPERTY IS SUBJECT TO RESERVATIONS AND EXCEPTIONS AS CONTAINED IN STATE OF ALASKA PATENT 5914 RECORDED AUGUST 7, 1981 AT BOOK 23 PAGE 956 AND RESERVATIONS AND EXCEPTIONS AS CONTAINED IN STATE OF ALASKA PATENT 362 RECORDED ON MAY 19, 1994, BOOK 72 PAGE 572. 6. EASEMENTS VACATED THIS PLAT: A. THE WEST 5' UTILITY EASEMENT OF LOT 3, BLOCK 8 FOURTH OF JULY CREEK SUBDIVISION SEWARD MAINE INDUSTRIAL CENTER SEWARD SHIP'S DRYDOCK REPLAT, PLAT NO. 2002-22. 7. PUBLIC ACCESS EASEMENTS VACATED BY PLAT NO. 97-27, APPROVED BY THE DEPARTMENT OF NATURAL RESOURCES JANUARY 20, 1994 AND THE KEANI PENINSULA BOROUGH PLANNING COMMISSION JULE 9, 1997 A. PUBLIC ACCESS EASMENT DESCIBED WITHIN STATE OF ALASKA PATENT OF ASLS 76-69 AS 50 FOOT ALONG THE ORDINARY HIGH WTER OF FOURTH OF JLY CREEK AND OTHER UNNAMED CREKKSDS AS PORTRAYED ON THE BLM SURVEY PLAT OF T1S R1E SM., ACCEPTED 12/28/78 B. 25 FOOT PEDESTIAN ASEMENT ALONG THE MEAN HIGH TIDE LINE OF RESURRECTION BAY DESCRIBED ON SURVEY PLAT OF ASLS 76-69. C. PUBLIC ACCESS EASEMENT DESCRIBED WITHIN THE STATE OF ALASKA PATENT NO. 5914 FOR U.S. SURVEY 4827 AS 50 FOOT ALONG THE MEAN HIGH WATER MARK OF RESURRECTION BAY, THE ORDINARY HIGH WATER MARK OF FOURTH OF JULY CREEK AND UNNAMED STREAMS AS PORTRAYED ON THE OFFICIAL SURVEY PLAT OF U.S. SURVEY NO. 4827 8. EASEMENTS ON PLAT 97-27 AND PLAT 2007-2 WERE NOT FULLY DIMENSIONED, LOCATION SHOWN HEREON ARE APPROXIMATE. 9. NO PERMANENT STRUCTURE SHALL BE CONSTRUCTED OR PLACED WITHIN A UTILITY EASEMENT WHICH WOULD INTERFERE WITH THE ABILITY OF A UTILITY TO USE THE EASEMENT. 10. WASTEWATER DISPOSAL: PLANS FOR WASTEWATER DISPOSAL, THAT MEET REGULATORY REQUIREMENTS ARE ON FILE AT THE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION. 11. LOTS WITHIN THIS SUBDIVISION MAY BE LOCATED WITHIN A DESIGNATED FLOOD HAZARD AREA; IF SUCH IS THE CASE, DEVELOPMENT MUST COMPLY WITH TITLE 15 OF THE CITY OF SEWARD'S CHARTER AND CODE OF LAWS. A SURVEY TO DETERMINE THE ELEVATION OF THE PROPERTY MAY BE REQUIRED PRIOR TO CONSTRUCTION. 12. A PORTION OF THIS PROPERTY IS IN FLOOD ZONE VE THAT IS DEFINED AS, SPECIAL FLOOD HAZARD AREA SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD, IN THE FLOOD INSURANCE RATE MAP, IDENTIFIED AS COMMUNITY PANEL NO 02122C5030E, WHICH BEARS AN EFFECTIVE DATE OF OCTOBER 20, 2016. EXACT DESIGNATION CAN ONLY BE DETERMINED BY AN ELEVATION CERTIFICATE. WATER LINE AND FLOOD ZONE DELINEATION ARE GIS DATA PROVIDED BY THE NATIONAL FLOOD HAZARD LAYER. Plat of: FOURTH OF JULY CREEK SUBDIVISION SEWARD MARINE INDUSTRIAL CENTER PARK REPLAT CREATING TRACT B-1 AND TRACT B-2, BLOCK 10 AND LOT 4A-5 AND 4A-6, BLOCK 7 CONTAINING 70.524 ACRES MORE OR LESS A SUBDIVISION OF: TRACT B, BLOCK 10 FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER SPRING CREEK REPLAT FILED UNDER PLAT NO. 2025-XX AND LOT 3, BLOCK 8, FOURTH OF JULY CREEK SUBDIVISION SEWARD MARINE INDUSTRIAL CENTER, SEWARD SHIP'S DRYDOCK REPLAT, FILED UNDER PLAT 2002-22 AND LOT 4A-4, BLOCK 7 FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER JAG REPLAT FILED UNDER PLAT NO. 2024-XX CITY OF SEWARD SEWARD RECORDING DISTRICT KENAI PENINSULA BOROUGH LOCATED WITHIN: SECTION 18, T1S, R1E, S.M., AK. OWNER CITY OF SEWARD P.O. BOX 167 SEWARD, ALASKA 99664 A K LAN DS AK Lands, Land Surveying LLC 13521 Venus Way Anchorage, AK 99515 aklands@aklands.com (907) 744-LAND Date: 11/13/2024 Drawn: SMW Date of Survey: N/A Sheet: AUTHORIZED OFFICAL SIGNATURE Checked: N/A PN: 1437 Field Book: N/A KPB No. 64 Community Development/ Planning & Zoning 410 Adams Street, Seward, Alaska 99664 •(907) 224-4049 • (907) 224-4020 or email: planning@cityofseward.net PRELIMINARY PLAT SUBMITTAL FORM EPRELIMINARY PLAT ❑ REVISED PRELIMINARY PLAT (no fee required) PHASED PRELIMINARY PLATO PRELIMINARY PLAT FOR PRIVATE STREETS / GATED SUBDIVISION All requirements of Seward Code Title 16 apply and must be met. SUBDIVISION PLAT NAME: must not include business names, contact staff for assistance if needed. Fourth of July Creek Sub., Seward Marine Industrial Center, Spring Replat PROPERTY INFORMATION: legal description Block 10, Fourth of July Creek Sub., SMIC,Plat No. 97-27 Section, Township, Range Section 18, T1S, R1E, S.M., AK. General area description Seward Marine Industrial Center City Seward Total Acreage 92.993 SURVEYOR Company: AK Lands Land Surveying Contact Person: Stacy Wessel Mailing Address: PO Box 110485 City, State, Zip Anchorage, AK 99511 Phone: (907) 744-LAND e-mail: stacy(a�aklands.com PROPOSED WASTEWATER AND WATER SUPPLY WASTEWATER ✓❑ on site City WATERnon site City SUBMITTAL REQUIREMENTS A preliminary plat application will be scheduled for the next available Planning and Zoning meeting after a complete application has been received. ❑,/ Electronic file of Plat and ▪ Preliminary plat NON-REFUNDABLE submittal fee $200.00- �✓ Certificate to plat for ALL parcels included in the subdivision Documentation showing proof of signatory authority (partnerships, corporations, estates, trusts, etc.) ❑ Public Notice Sign(s) Posted on property - City staff will contact you to pick up sign EXCEPTIONS REQUESTED TO PLATTING CODE: A letter, to be presented to the Planning and Zoning commission, with substantial evidence justifying the requested exception and fully stating the grounds for the exception request, and the facts relied upon, MUST be attached to this submittal. 1. 2. 3. KPB 20.30.030(A) KPB 20.30.170 KPB 20.30.210 APPLICANT: SIGNATURES OF ALL LEGAL PROPERTY OWNERS ARE REQUIRED. Additional signature sheets can be attached. When signing on behalf of another individual, estate, corporation, LLC, partnership, etc., documentation is required to show authority of the individual(s) signing. Contact KPB staff for clarification if needed. OWNER(s) Name (printed): Stacy Wessel Signature: 5'ir� Lf/.e Phone: (907) 744-LAND e-mail: stacy(caklands.com Name (printed): Signature: Phone: e-mail: Name (printed): Signature: Phone: e-mail: FOR OFFICE USE ONLY RECEIVED BY DATE SUBMITTED Receipt # 35 The preliminary plat shall be drawn to scale of sufficient size to be clearly legible and shall clearly show the following: 1. Within the title block: Not applicable to my plat. The required information has been shown/noted. a. Name of the subdivision which shall not be the same as an existing city, town, tract, or subdivision of land in the borough, of which a plat has been previously recorded, or so nearly the same as to mislead the public or cause confusion; b. Legal description, location, date, and total area in acres of the proposed subdivision; and c. Name and address of owner(s), as shown on the KPB records and the certificate to plat, and registered land surveyor; 2. North point; 3. The location, width and name of existing or platted streets and public ways, railroad rights -of -way, and other important features such as section lines or political subdivisions or municipal corporation boundaries abutting the subdivision; 4. A vicinity map, drawn to scale showing location of proposed subdivision, north arrow if different from plat orientation, township and range, section lines, roads, political boundaries, and prominent natural and manmade features, such as shorelines or streams; 5. All parcels of land including those intended for private ownership and those to be dedicated for public use or reserved in the deeds for the use of all property owners in the proposed subdivision, together with the purposes, conditions, or limitations of reservations that could affect the subdivision; 6. The names and widths of public streets and alleys and easements, existing and proposed, within the subdivision; 7. Status of adjacent lands, including names of subdivisions, lot lines, block numbers, lot numbers, rights -of -way; or an indication that the adjacent land is not subdivided; 8. Approximate locations of areas subject to inundation, flooding, or storm water overflow, the line of ordinary high water, wetlands when adjacent to lakes or non -tidal streams, and the appropriate study which identifies a floodplain, if applicable; 9. Approximate locations of areas subject to tidal inundation and the mean high water line; 10. Block and lot numbering approximate dimensions and total numbers of proposed lots; 11. The approximate location of known existing municipal wastewater and water mains, and other utilities within the subdivision and immediately abutting thereto 12. Contours at suitable intervals when any roads are to be dedicated unless the planning director or commission finds evidence that road grades will not exceed 6 percent on arterial streets, and 10 percent on other streets; N/A 13. Approximate locations of slopes over 20 percent in grade and if contours are shown, the areas of the contours that exceed 20 percent grade shall be clearly labeled as such; N/A 14. Apparent encroachments, with a statement indicating how the encroachments will be resolved prior to final plat approval N/A 36 Park Replat Property Information: Legal Description Subdivision Of: TRACT B, BLOCK 10 FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER,SPRING CREEK REPLAT FILED UNDER PLAT NO. 2025-XX AND LOT 3, BLOCK 8, FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER, SEWARD SHIP'S DRYDOCK REPLAT, FILED UNDER PLAT 2002-22 AND LOT 4A-4, BLOCK 7 FOURTH OF JULY CREEK SUBDIVISION, SEWARD MARINE INDUSTRIAL CENTER, JAG REPLAT FILED UNDER PLAT NO. 2024-XX 37 November 13, 2024 City of Seward Planning Commission City Hall Building 410 Adams St. Seward, AK 99664 Subject: Request for Exceptions to Regulations for Subdivision of Block 10, Fourth of July Creek Subdivision - SMIC Dear Members of the City of Seward Planning Commission, The City of Seward is undertaking two concurrent subdivision projects (replats) within the Seward Marine Industrial Center (SMIC), which is situated on the eastern side of Resurrection Bay at the end of Nash Road, just six road miles from the city center. SMIC is a specialized heavy industrial area encompassing 15 square miles of coastal land, owned entirely by the City of Seward. It serves as a critical hub for maritime services, including full -service shipyards, maritime boat areas, and port facilities. The area is constantly evolving to meet the maritime needs of Alaska. The purpose of this letter is to request exceptions to Kenai Peninsula Borough (KPB) Code 20.30.030(A), 20.30.170, and 20.30.210 for both replats. These exceptions are essential to facilitate important community enhancements and support ongoing industrial developments. Part One: Spring Creek Campground Replat The first replat involves subdividing Block 10, Fourth of July Creek Subdivision Seward Marine Industrial Center, Plat No. 97-27, into two lots, one of which encompasses the current Spring Creek Campground area. Currently, Block 10 encompasses 92.993 acres. The campground is located in the northern section of SMIC and is fronted by Nash Road, a 100-foot dedicated public right-of-way. The subdivision aims to divide Block 10 along an existing fence line, designating the campground area as Tract A, which will be 22.469 acres. This campground has historically been used by tourists and residents for camping and fishing. By creating a distinct parcel, the City intends to utilize this area independently to better serve public needs. The southern portion of the parcel, to be labeled Tract B, fronts Tract A4—a private service road —and will comprise the remaining 70.534 acres. 38 Part Two: Fourth of July Beach Park Development The second replat, conducted concurrently but to be recorded afterward, involves subdividing Tract B into two lots. One of these lots will absorb Lot 3, Block 8, Fourth of July Creek Subdivision SMIC (Plat 2002-22), forming a single lot intended for a park already known as Fourth of July Beach, located west-southwest of Sorrel Road. The new parcel will eventually be rezoned into a park zoning designation. Additionally, Lot 4A-4, Block 7, JAG Replat will be subdivided into two lots to create a parking area supporting the park. Both the park area and parking lot have dedicated fee simple rights - of -way abutting the new lots, fronted by Sorrel Road, a 60-foot right-of-way. The remaining portions will continue to support SMIC's industrial operations and are fronted by Tract A4, a private road. Exceptions Requested 1. Exception to KPB Code 20.30.030(A) - Proposed Street Layout Requirements and KPB Code 20.30.210 - Lots Access to Street KPB Code 20.30.030(A) states that streets provided on the plat must provide fee simple right-of-way dedications to the appropriate governmental entity. KPB Code 20.30.210 requires that each lot shall abut on a fee simple dedicated street except as provided by KPB 20.30.030(B). o Explanation: In the Spring Creek Campground Replat, proposed Tract A fronts Nash Road, a fee simple dedicated right-of-way available for public use. However, Tract B, the southern remainder, does not front a dedicated right-of- way but fronts on Tract A4, a private 60-foot-wide tract developed as a service road serving SMIC's needs. The City wishes to retain control over this tract to manage access within SMIC, ensuring safety and operational efficiency. Justifications for Exception: 2. Special Circumstances or Conditions Affecting the Property • Controlled Industrial Access: SMIC's heavy industrial nature requires controlled access to ensure safety and security for operations and personnel. Introducing dedicated public rights -of -way could compromise these critical needs. • Unique Ownership Structure: The City owns all lands within the subdivision, including Tract A4, allowing for internal management of access without impacting public road systems. 39 3. Necessity for Preservation and Enjoyment of a Substantial Property Right • Operational Efficiency and Safety: Retaining private control over Tract A4 is essential for managing traffic flow, restricting unauthorized access, and maintaining safety protocols within the industrial area. ■ Practical Compliance: Granting these exceptions is the most practical way to comply with the intent of the KPB Code while addressing the unique requirements of an industrial maritime center. 4. No Detriment to Public Welfare or Injury to Other Property ■ Uninterrupted Access: All lots will continue to have access via Tract A4 or Sorrel Road, ensuring no lot is denied access. ■ Enhanced Public Amenities: Creating dedicated park and campground areas enhances public welfare by providing recreational spaces without impeding industrial operations. ■ Safety Considerations: Controlled access reduces the risk of accidents in heavy industrial zones, protecting both the public and industrial personnel. 2. Exception to KPB Code 20.30.170 - Block Length Requirements KPB Code 20.30.170 requires blocks to be not less than 330 feet nor more than 1,320 feet in length. o Explanation: The current block configuration and proposed subdivisions do not conform to these block length requirements due to the unique layout and ownership structure of the industrial area. All lands within the subdivision are owned by the City, and block lengths are dictated by existing industrial uses and geographic constraints. The block was originally subdivided in 1997. Justifications for Exception: 2. Special Circumstances or Conditions Affecting the Property • Geographic Constraints: The area's geography and existing industrial infrastructure make it impractical to conform to standard block length requirements. • Existing Industrial Uses: Operational needs of the industrial facilities require larger parcels for efficient functioning. 3. Necessity for Preservation and Enjoyment of a Substantial Property Right • Operational Efficiency: Strict adherence to block length requirements would disrupt existing industrial operations and hinder efficient land use. ■ Practical Compliance: Granting the exception allows the City to optimize land use while maintaining compliance with the overall intent of the code. 40 4. No Detriment to Public Welfare or Injury to Other Property • No Impact on Adjacent Properties: Since the City owns all surrounding land, there is no adverse effect on neighboring properties. • Public Benefit: The subdivision facilitates the creation of public amenities such as parks and campgrounds, enhancing community welfare. Additional Considerations • Compliance with Road Width Standards: Tract A4 has been established with a width of 60 feet, meeting KPB Code requirements for road dedication widths and ensuring adequate access dimensions. • Historical Precedent: The City has previously undertaken similar plats and replats within SMIC to meet evolving needs. These have been reviewed and approved by the Seward Planning and Zoning Commission and the Kenai Peninsula Borough, setting a precedent for the current request. • Future Ownership Considerations: As the City is the sole owner of the lands within the subdivision and plans to retain ownership, the exceptions will not adversely affect future development or ownership transitions. Conclusion In light of the special circumstances and the unique configuration of SMIC—bounded by Resurrection Bay —the City of Seward respectfully requests that the Commission grant the exceptions to KPB Code 20.30.030(A), 20.30.210, and 20.30.170 for both replats. These exceptions are necessary for the practical, safe, and efficient development of the area and align with the intent of the KPB Code without causing detriment to public welfare or adjacent properties. This will also provide additional parks for the public while keeping the industrial area secure and operational. We appreciate your consideration of this request and are available to provide any additional information or answer any questions you may have. Sincerely, 3 a:�y G9244w Respectfully, AK Lands, Land Surveying by Stacy Wessel , Professional Land Surveyor 41 November 13, 2024 City of Seward Planning Commission City Hall Building 410 Adams St. Seward, AK 99664 Subject: Request to Vacate a 5-Foot Utility Easement — Lot 3, Block 8 Dear Members of the City of Seward Planning Commission, In conjunction with our previous request for exceptions to certain Kenai Peninsula Borough (KPB) Codes related to the Fourth of July Creek Subdivision, Seward Marine Industrial Center, Park Replat, the City of Seward is also requesting the vacation of a platted 5-foot utility easement. Request Overview The City of Seward seeks to vacate the platted 5-foot utility easement located along the west 5 feet of Lot 3, Block 8, Fourth of July Creek Subdivision SMIC, Seward Ship's Drydock Replat, Plat 2002-22. This lot is part of an ongoing platting action where it will be absorbed into a newly created Tract located within Block 10, Fourth of July Creek Subdivision SMIC, Plat No. 97-27. Justification for Vacation • No Existing Utilities: The City of Seward Electric, Water, and Sewer GIS applications indicate that there are no utilities within the platted 5-foot utility easement. Therefore, vacating the easement will not disrupt any existing utility services. • Facilitating Development: If the utility easement were to remain in its current position, it could obstruct development within the new lot configuration. Vacating the easement will allow for optimal land use and facilitate creative development opportunities. • Potential for Easement Relocation: If needed, the 5-foot utility easement can be relocated from the former lot line to a location that better serves this development and any future utility requirements. Benefit to the Community Granting the vacation of the 5-foot utility easement will enable the City of Seward to proceed with creating a new lot that enhances economic opportunities and supports the community's development goals. This action aligns with our efforts to improve public amenities and promote efficient land use within SMIC. 42 Conclusion We believe that this request meets the criteria for easement vacations under KPB regulations. Vacating the easement will not adversely affect any existing utilities or properties and will contribute positively to the area's development. We appreciate your consideration of this request and are available to provide any additional information or answer any questions you may have. Sincerely, Gt%J Respectfully, AK Lands, Land Surveying by Stacy Wessel , Professional Land Surveyor 43 AKLANDS Lond Surveying October 21, 2024 Vince Piagentini Kenai Peninsula Borough 144 N. Binkley St. Soldotna, AK 99669 Subject: Spring Creek and Park Replat — Letter of Authorization PO Box 110485 Anchorage, AK 99515 (907) 744-LAND. aklands@aklands.com http://aklands.com Mr. Piagentini, I, TcLsc-Y. , is the owner or authorized agent of Lot 1, Block 10 and Block 10, Fourth of July creek Subdivision Seward Marine industrial Center (proposed -Spring Creek Replat) and Lot 4A-1, Block 7, Fourth of July creek Subdivision Seward Marine Industrial Raibow Replat (Proposed Park Replat) and authorize AK Lands, Land Surveying LLC to represent us before the City of Seward and Kenai Peninsula Borough for all requests related to the easement vacation, platting action, and its related activities. City of Sward r�ic;ci.441{\ Dc ,`t1/4-C k'►lkAcC(Z �t) l 2- 2- Date 1 of 1 44 CITY OF SEWARD, ALASKA AFFIDAVIT OF MAILING PUBLIC HEARING NOTICE C' L Gi-r, i v Vvrl , upon oath, deposes and states: That she is employed in the Community Development Office of the City of Seward, Alaska; and that on Opearnh.er 12, .2 vZ-1 she mailed a Notice of Public Hearing to the real property owners within a 300-foot periphery of Fourth of July Creek Subdivision, Seward Marine Industrial Center, that Point of Block 10, Excluding Lots 1 & 2; Lot 3, Block 8, Fourth of July Creek Subd. SMIC Ship's Drydock Replat; Lot 4A-4, Block 7, Fourth of July Creek Subd. SMIC JAG Replat; Located at 3207 & 3311 Sorrel Road as prescribed by Seward City Code 15.01.040/16.01.015. Affirmed and signed this /2 day of -m-_2024. 0 AFFIDAVIT OF POSTING PUBLIC HEARING NOTICE I, J) -v , hereby certify that I have posted a Notice of Public Hearing, as prescribed by Seward City Code 15.01.040 for the property located at Fourth of July Creek Subdivision, Seward Marine Industrial Center, that Point of Block 10, Excluding Lots 1 & 2; Lot 3, Block 8, Fourth of July Creek Subd. SMIC Ship's Drydock Replat; Lot 4A-4, Block 7, Fourth of July Creek Subd. SMIC JAG Replat; Located at 3207 & 3311 Sorrel Road, the owners of which have petitioned for a Public Hearing to replat the above named properties, creating Tracts B-1 & B-2, Block 10 and Tracts 4A-5 & 4A- 6, Block 7, Fourth of July Creek Subd. SMICL Park Replat. The notice was posted on DeC(rnher / 2 s 02/ , which is ,. i days prior to the public hearing on this petition. I acknowledge this Notice must be posted in plain sight, maintained and displayed until all public hearings have been completed. Affirmed and signed this 1211—\ day of Orrohib,„ , Signature 46 Planning and Zoning Agenda Statement Meeting Date: January 7, 2025 To: Planning and Zoning Commission Through: Daniel Meuninck, Community Development Director From: Applicant Agenda Item: Resolution 2025-003: Recommending Seward City Council and Kenai Peninsula Borough Approval of the Preliminary Plat of Lots 1, 2, & 3, Block 10, Original Townsite of Seward; Located at 237 & 235 Fourth Ave; Creating Lot 1A, Block 10, Seward Original Townsite, Kawabe Park Replat Background and justification: Attached for the Commission's review and recommendation to the Seward City Council and Kenai Peninsula Borough Planning Commission is a preliminary replat submitted by AK Lands, Land Surveying LLC on behalf of the City of Seward. This plat will vacate the interior lot lines that formerly separated Lots 1, 2, & 3 of Block 10, Original Townsite of Seward, and create one, single lot which will be known as Lot 1A, Block 10, Seward Original Townsite, Kawabe Park Replat. During the 2023 update of the City of Seward Municipal Lands Inventory and Management Plan, the Planning and Zoning Commission recommended that the city replat Kawabe Park into one parcel. The current use of the land will not change, and it will remain zoned as a Park. A public hearing is not required for this plat as Seward City Code §16.01.015(F) states that a plat submitted to create a single parcel through the vacation of interior lot lines shall be exempt from the requirements of a public hearing. In accordance with City and Borough requirements, the Seward City Council and Planning and Zoning Commission must review and comment on a preliminary plat of city -owned land before submittal to the Borough for approval. Subdivision Review: ZoninJ: The property is currently zoned Park (P). Size: The parcel will be 9,007 square feet. Utilities: The parcel has access to all city utilities (water, sewer, and electric). Existing Use: Park - public restrooms, covered pavilion with one picnic table, mural, and walkway. 47 Access: The parcel has access to Fourth Ave on the east, Adams Ave on the north, and an alley on the west. Flood Zone: According to the Kenai Peninsula Borough Floodplain map the parcel is not within a FEMA mapped flood zone. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Vol 1, Chapter 3.6.1.1 Plan: • Identify, protect, and preserve scenic and natural areas for recreational enjoyment. • Continue to protect and preserve all city parks. Strategic Plan: N/A Staff Comments Department Comments No Comment N/A Building Department X Fire Department X Public Works Department X Harbor Department X Police Department X Electric Department X Telecommunications X It is the Commission's responsibility to provide a recommendation to the Kenai Peninsula Borough to approve this plat if the Commission feels that it meets the requirements outlined in Title 16 of Seward City Code. 48 CITY OF SEWARD, ALASKA PLANNING AND ZONING COMMISSION RESOLUTION 2025-003 A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF SEWARD, ALASKA, RECOMMENDING SEWARD CITY COUNCIL AND KENAI PENINSULA BOROUGH APPROVAL OF THE PRELIMINARY PLAT OF LOTS 1, 2, & 3, BLOCK 10, ORIGINAL TOWNSITE OF SEWARD; LOCATED AT 237 & 235 FOURTH AVE; CREATING LOT 1A, BLOCK 10, SEWARD ORIGINAL TOWNSITE, KAWABE PARK REPLAT WHEREAS, AK Lands, Land Surveying LLC has submitted a preliminary plat on behalf of the City of Seward for review and recommendation to the Seward City Council and Kenai Peninsula Borough; and WHEREAS, the proposed plat is vacating two interior lot lines, formerly separating Lots 1, 2, & 3 on Block 10 in the Original Townsite of Seward, creating one parcel which will be called Lot 1A; and WHEREAS, this action was recommended by the Planning and Zoning Commission in the 2023 update of the City of Seward Municipal Lands Inventory and Management Plan; and WHEREAS, the parcels are currently zoned Park (P); and WHEREAS, the use of the property as a park will remain the same; and WHEREAS, none of the parcels are located within a mapped FEMA flood zone; and WHEREAS, the proposed parcel is 9,007 square feet; and WHEREAS, the parcel has access to Fourth Ave on the east, Adams Ave on the north, and an alley on the west; and WHEREAS, the lot is currently served by City water, sewer, and electric; and WHEREAS, Seward City Code §16.01.015(F), states that a plat submitted to create a single parcel through the vacation of interior lot lines shall be exempt from the requirements of a public hearing; and WHEREAS, any preliminary plat of city -owned property must be approved by the Seward City Council; and WHEREAS, it is the Planning and Zoning Commission's responsibility to act in an advisory capacity to the Seward City Council and Kenai Peninsula Borough regarding plat proposals within the City of Seward. 49 NOW, THEREFORE, BE IT RESOLVED by the Seward Planning and Zoning Commission, that: Section 1. The Commission hereby recommends that, in accordance with Seward City Code Section 16.01.015 (B), the Seward City Council and Kenai Peninsula Borough approve the submittal of the preliminary plat of Lots 1, 2, & 3, Block 10, Original Townsite of Seward; Located at 237 & 235 Fourth Ave; Creating Lot 1A, Block 10, Seward Original Townsite, Kawabe Park Replat. Section 2. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the Seward Planning and Zoning Commission this 7th day of January, 2025. THE CITY OF SEWARD, ALASKA Carol Griswold, Chair AYES: NOES: ABSENT: ABSTAIN: ATTEST: Kris Peck City Clerk (City Seal) 50 Context Map JEFFERSOhk ]EFFERSJ N JEFFERSON *DAMS r Single-family Residential Multi -family Residential Urban Residential Office Residential Central Business Auto Commercial Institutional Park WASH N TON +ASHINGTON Preliminary Plat Application Property Map RES 2025-003 - Vacating the interior lot lines separating Lots 1, 2, & 3, Block 10, Original Townsite of Seward; Creating Lot 1A, Block 10, Seward Original Townsite, Kawabe Park Replat Location: 237 & 235 Fourth Ave Parcel #: 14908027 & 14908031 51 CERTIFICATE OF OWNERSHIP AND DEDICATION I HEREBY CERTIFY THAT THE CITY OF SEWARD IS THE OWNER OF THE REAL PROPERTY SHOWN AND DESCRIBED HEREON AND THAT I ON BEHALF OF THE CITY OF SEWARD HEREBY ADOPT THIS PLAN OF SUBDIVISION AND BY MY FREE CONSENT DEDICATE ALL RIGHTS -OF -WAY AND PUBLIC AREAS TO PUBLIC USE AND GRANT ALL EASEMENTS TO THE USE SHOWN. OWNER CITY OF SEWARD 410 ADAMS STREET CITY HALL BUILDING SEWARD, AK 99664 AUTHORIZED OFFICIAL SIGNATURE DATE TITLE PRINTED NAME NOTARY'S ACKNOWLEDGMENT FOR: ACKNOWLEDGED BEFORE ME THIS NOTARY PUBLIC FOR ALASKA MY COMMISSION EXPIRES: CERTIFICATE OF ACCEPTANCE DAY OF 2024. THE UNDERSIGNED OFFICIAL IDENTIFIED BY NAME AND TITLE IS AUTHORIZED TO ACCEPT AND HEREBY ACCEPTS ON BEHALF OF THE CITY OF SEWARD FOR PUBLIC USES AND FOR PUBLIC PURPOSES THE REAL PROPERTY TO BE DEDICATED BY THIS PLAT INCLUDING EASEMENTS, RIGHTS -OF -WAY, ALLEYS, AND OTHER PUBLIC AREAS SHOWN ON THIS PLAT IDENTIFIED AS FOLLOWS: THE ACCEPTANCE OF LANDS FOR PUBLIC USE OR PUBLIC PURPOSE DOES NOT OBLIGATE THE PUBLIC OR ANY GOVERNING BODY TO CONSTRUCT, OPERATE, OR MAINTAIN IMPROVEMENTS. AUTHORIZED OFFICIAL SIGNATURE DATE TITLE PRINTED NAME PLAT APPROVAL THIS PLAT WAS APPROVED BY THE KENAI PENINSULA BOROUGH PLANNING COMMISSION AT THE MEETING OFxxxxx. KENAI PENINSULA BOROUGH AUTHORIZED OFFICAL SIGNATURE LEGEND (M) MEASURED (R) RECORD PER PLAT NO. 1 (C) COMPUTED ELECTRICAL JUNCTION BOX ELECTRIC METER LIGHT POLE STREET LIGHT FIRE HYDRANT -0- POWER POLE 0 TELE. PEDISTAL g WATER VALVE VACATE LOT LINES OHP OVERHEAD POWER LINE S UNDERGROUND SEWER LINE (GIS) UNDERGROUND WATER LINE (GIS) [XXXX] ZONING LOT 22 BLOCK 15 SEWARD TOWNSITE PLAT NO. 1 LOT 21 a 0 in m i» m LOT 40 co LOT 39 c\ LOT 38 LOT 37 BLOCK 10 SEWARD TOWNSITE PLAT NO. 1 LOT36 LOT 35 LOT 34 [CENTRAL BUSINESS DISTRICT] 0 0 BLOCK 15 SEWARD TOWNSITE PLAT NO. 1 LOT 18,19,20 WEST 34' in m Cn a 2 0 0 a 0 20' 20' in m LOT 19 EAST 66' BLOCK 15 SEWARD TOWNSITE PLAT NO. 1 [CENTRAL BUSINESS DISTRICT] LOT20 EAST 66' ADAMS AVENUE EAST (R) N89°32'22"E (C) 100.00' (R&H) in m i» m 0 0 m LOT 1 3,000 SQ.FT ± 0.069 ACRES LOT LINES VACATED ~I THIS PLAT EAST 100.00' (R) PROPOSED LOT 1A BLOCK 10 9,007 SQ.FT ± 0.207 ACRES EAST 100.00' (R) LOT 2 3,000 SQ.FT ± 0.069 ACRES BLOCK 10 SEWARD TOWNSITE PLAT NO. 1 LOT 3 3,000 SQ.FT ± 0.069 ACRES 0 0 0 m N89°32'22"E (C) 100.00' (R&H) EAST (R) LOT 4 LOT 5 LOT 6 LOT 7 0 0 0 0 w N T 0 0 O N 0 c H 0 0 0 3 1 1 40' 40' 3f1N3AV H117 b LOT 22 LOT 21 BLOCK 16 SEWARD TOWNSITE PLAT NO. 1 [CENTRAL BUSINESS DISTRICT] 40' 40' in m in m LOT 38A BLOCK 9 SEWARD TOWNSITE LINDSEY REPLAT NO. . PLAT NO.98-34 [CENTRAL BUSINESS DISTRICT] LOT37 LOT 36 BLOCK 9 SEWARD TOWNSITE PLAT NO.1 NORTH 25' OF LOT 35 SOUTH 25' OF LOT 35 LOT 34 T1S R1W SM 4 SCHEFFLER CREEK SMALL BOAT HARBOR • 0 9 OPN ONr SON -THIS PLAT . ADAMS ST. WASH INGTON ST.) RESURRECTION BAY 2 RESURRECTION BAY 10 11 N O 0 O 0 VICINITY MAP SCALE: 1" = 1/2 MILE NOTES: 1. THIS IS A PROPOSED PLATTING ACTION. 2. NO EASEMENTS VACATED THIS PLAT. 3. ZONING INFORMATION, UNDERGROUND WATER, AND SEWER LINES AND ARE FROM THE CITY OF SEWARD GIS INTERACTIVE MAP. 4. OTHER UNDERGROUND UTILITIES, NOT SHOWN HEREON, MAY EXIST ON LOT 1, 2, & 3. 5. THERE ARE OTHER SITE FEATURES ON LOT 1, 2, & 3 THAT IS NOT SHOWN HEREON. 0' 20' 40' SURVEYOR'S CERTIFICATE I, STACY M WESSEL, PROFESSIONAL LAND SURVEYOR, HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. .A� S,l PRELIKI /�j �'• Stacy M. Wessel . j P LAT ,III /D/?°FESS10NA1.�P�D +•. Plat of: SEWARD ORIGINAL TOWNSITE KAWABE PARK REPLAT CREATING LOT 1A, BLOCK 10, CONTAINING 0.207 ACRES A SUBDIVISION OF: LOTS 1, 2, AND 3, BLOCK 10 ORIGINAL TOWNSITE OF SEWARD FILED UNDER PLAT NO. 1 CITY OF SEWARD SEWARD RECORDING DISTRICT KENAI PENINSULA BOROUGH LOCATED WITHIN: SW1/4 OF SECTION 10, T1S, R1W, S.M., AK. OWNER CITY OF SEWARD P.O. BOX 167 SEWARD, ALASKA 99664 ((kAN DS �Lond Surveying — AK Lands, Land Surveying LLC PO Box 110485 Anchorage, AK 99511 aklands@aklands.com http://aklands.com (907) 744-LAND Date: 11/15/2024 Scale: 1"= 20' Date of Survey: XX-XX-XXXX Sheet: 1 of 1 Drawn: SMW PN: 1435 Field Book: XX KPB No. N/A 51 Community Development/ Planning & Zoning 410 Adams Street, Seward, Alaska 99664 • (907) 224-4049 • (907) 224-4020 or email: planning@cityofseward.net PRELIMINARY PLAT SUBMITTAL FORM ['PRELIMINARY PLAT REVISED PRELIMINARY PLAT (no fee required) PHASED PRELIMINARY PLAT❑ PRELIMINARY PLAT FOR PRIVATE STREETS / GATED SUBDIVISION All requirements of Seward Code Title 16 apply and must be met. SUBDIVISION PLAT NAME: must not include business names, contact staff for assistance if needed. Seward Original Townsite, Kawabe Park Replat PROPERTY INFORMATION: legal description Lots 1, 2, and 3, Block 10, Original Townsite of Seward, Plat 1 Section, Township, Range Section 10, T1 S, R1W, SM General area description Downtown Seward, Kawabe Park City Seward Total Acreage 0.207 SURVEYOR Company: AK Lands Land Surveying Contact Person: Stacy Wessel Mailing Address: PO Box 110485 City, State, Zip Anchorage, AK 99511 Phone: (907) 744-LAND e-mail: stacy@aklands.com PROPOSED WASTEWATER AND WATER SUPPLY WASTEWATER ❑ on site City WATER'on site City SUBMITTAL REQUIREMENTS A preliminary plat application will be scheduled for the next available Planning and Zoning meeting after r mplete applicatimr, has been received. ['Electronic file of Plat and 'Preliminary plat NON-REFUNDABLE submittal fee $200.00- ['Certificate to plat for ALL parcels included in the subdivision ODocumentation showing proof of signatory authority (partnerships, corporations, estates, trusts, etc.) ❑ Public Notice Sign(s) Posted on property - City staff will contact you to pick up sign EXCEPTIONS REQUESTED TO PLATTING CODE: A letter, to be presented to the Planning and Zoning commission, with substantial evidence justifying the requested exception and fully stating the grounds for the exception request, and the facts relied upon, MUST be attached to this submittal. 1. 2. 3. APPLICANT: SIGNATURES OF ALL LEGAL PROPERTY OWNERS ARE REQUIRED. Additional signature sheets can be attached. When signing on behalf of another individual, estate, corporation, LLC, partnership, etc., documentation is required to show authority of the individual(s) signing. Contact KPB staff for clarification if needed. OWNER(s) Name (printed): Stacy Wessel Signature: L/(/c''/Y Phone: (907) 744-LAND e-mail: ' ytc'�,aklands.com Name (printed): Signature: Phone: e-mail: Name (printed): Signature: Phone: e-mail: FOR OFFICE USE ONLY RECEIVED BY DATE SUBMITTED Receipt # 53 The preliminary plat shall be drawn to scale of sufficient size to be clearly legible and shall clearly show the following: 1. Within the title block: Not applicable to my plat. The required information has been shown/noted. a. Name of the subdivision which shall not be the same as an existing city, town, tract, or subdivision of land in the borough, of which a plat has been previously recorded, or so nearly the same as to mislead the public or cause confusion; b. Legal description, location, date, and total area in acres of the proposed subdivision; and c. Name and address of owner(s), as shown on the KPB records and the certificate to plat, and registered land surveyor; 2. North point; 3. The location, width and name of existing or platted streets and public ways, railroad rights -of -way, and other important features such as section lines or political subdivisions or municipal corporation boundaries abutting the subdivision; 4. A vicinity map, drawn to scale showing location of proposed subdivision, north arrow if different from plat orientation, township and range, section lines, roads, political boundaries, and prominent natural and manmade features, such as shorelines or streams; 5. All parcels of land including those intended for private ownership and those to be dedicated for public use or reserved in the deeds for the use of all property owners in the proposed subdivision, together with the purposes, conditions, or limitations of reservations that could affect the subdivision; V 6. The names and widths of public streets and alleys and easements, existing and proposed, within the subdivision; V 7. Status of adjacent lands, including names of subdivisions, lot lines, block numbers, lot numbers, rights -of -way; or an indication that the adjacent land is not subdivided; 8. Approximate locations of areas subject to inundation, flooding, or storm water overflow, the line of ordinary high water, wetlands when adjacent to lakes or non -tidal streams, and the appropriate study which identifies a floodplain, if applicable; V 9. Approximate locations of areas subject to tidal inundation and the mean high water line; 10. Block and lot numbering approximate dimensions and total numbers of proposed lots; V 11. The approximate location of known existing municipal wastewater and water mains, and other utilities within the subdivision and immediately abutting thereto V 12. Contours at suitable intervals when any roads are to be dedicated unless the planning director or commission finds evidence that road grades will not exceed 6 percent on arterial streets, and 10 percent on other streets; N/A 13. Approximate locations of slopes over 20 percent in grade and if contours are shown, the areas of the contours that exceed 20 percent grade shall be clearly labeled as such; N/A 14. Apparent encroachments, with a statement indicating how the encroachments will be resolved prior to final plat approval N/A Subdivision Name: Date 54 Meeting Date: January 7, 2025 To: Planning and Zoning Commission From: Daniel Meuninck, Community Development Director Subject: Discuss where building height overlays may be appropriate within Seward to allow buildings up to 38 ft and/or 50 ft. Background and justification: The Planning and Zoning Commission held a work session on December 17th, 2024 to continue discussing building height restrictions in City Code. General input from the Commission and the public supported a building height that would accommodate 3-stories. Input from developers and the building inspector recommended that the current height restriction of 34' does not always feasibly accommodate a 3-story building. Further discussion also highlighted that allowing a 4t1'- story could make development more financially viable. The Commission discussed the option of raising the building height to 38' and allowing a CUP for buildings up to 50'. However, the majority of the Commission felt uncertain about raising the building height overall and allowing CUPs. A suggestion was made to develop a building height overlay. This would allow the Commission to select areas of Seward where taller buildings may be appropriate and to raise the building height only in those specific areas. The Commission has been granted a joint work session with the City Council on January 27th, and would like to present some more formalized suggestions at that time. Due to the lack of time to schedule additional work sessions, the building height overlay discussion has been added to this, January 7th, P&Z meeting agenda to start identifying areas within Seward that may be appropriate for taller buildings. These suggestions can then be brought to the joint work session for further discussion with the City Council. 55 Official Seward Zoning Map This is to certify that this is the official Seward Zoning Map referred to in Sec_ 15.01.030 of Tide 15 of the Seward City Code This zoning map replaces all previous official zoning maps and is intended to incorporate and contain all revisions as enacted by ordinances as of this date. Attest. Kris Peck, City Clerk 43.40/6-093 41 2116001 49 2019-905 46a316.9m 41 2019010 452020001 aF➢802 89A10011 51 2206a5 81=014 621/2016_ 492618 91096111 10gp0y T/00619 2242026 4222020 9280110 111r0p21 91262022 Legend ❑ Cm/ Limits Aural Residential single Mundy Resdenaal T Fa mite, Residential IN mum Family Resirtential IN Urban Residential IN Office Residential 311 Harbor commercial Auto Commercial Central Business Oislnct r industrial A I31it00ana1 ✓ Park ▪ ReMurce Management ❑ 0ittoric Nark% — Undeveloped Right-06We? City of Seward Zoning Map Map produced by Quinn Tracy - City of Seward August 2003 Updated by Alaska Map Company 2003. 2620 Updated by Soto GIS Consulting lne.2024 The graphics on this map were produced from the best available sources_ The City of Seward assumes no responsibility for any omissions, inaccuracies, or other errors that may exist. N9 Oat 1990636 Dor 11141991 Mbet No. 11 era 1026008 Date 2111111037 Adopted by the Kenai Peninsula Borough as part of the Borough Comprehensive Plan on Nov. 5, 1985, (Ord. 85.77), amended May 3, 1988 (Ord. BH-ID). Adopted by the City of Seward (Ord. 626) on Nov 6, 1989, Effective Jan_ 2, 1990 REYIa1ON5 Alum No. 21 O1LL Dab Mae1 rm296z 7302003 Ne. Ord 472012403 tiDa5 s2▪ 9261z z 1991SG1 r992-015 112511901 T:212s992 1f 16 1997-014 1991418 5N2199T 691991 96 29 20o64g4 2005003 0234006 Br13WU3 al alLsmr 201600e 5101015 592016 4 5 6 0 14A0Or 1991-027 1904-029 1994-035 s995015 1995012 Ammkon 11 1990531 091997.1104 131992266 63 34 55 36 5r sa Ord. 2n22.015 2022-015 2023404 2023018 2024.001 2024002 9912924604 so O1 62 61 e4 ee 2024006 2021402 2/261995 62n1994 1111.3991 69.91.994 461996 1151996 10260996 1b1219ra6 21600992 6100991 Date 132612022 1192023 3'130 23 T11O202S 2123021 2122024 4292024 0332024 a19'N24 Alba No. 17 18 19 20 21 22 22 9• 25 29 5 6T e6 09 1u T1 22 73 14 79 26 71 50 1492611 19964197 19990f1 2010-002 2006004 2000508 216010 2060-019 2661601 2501-005 Ord 699997 en6199a 12/1311699 2/149666 2/157950 4110'A00 51192001 502001 9142001 1004001 De1e Most No. 06 31 32 65 34 35 36 ST 71 71 19 60 2T6010 2006011 NOT= 2007.004 2001-0W 2006-000 2009009 9252106 109139006 TA291T 123¢w1 11259907 920006 5122006 2009002 19251003 3010-001 15/92/10 20114101 1 4132011 Ord Deis Meet 81 42 6i 84 85 00 61 a6 a9 90 91 0L 0.5 I 2 Miles I 7 ( 1 1 r 1 1 0.75 1,5 3 Kilometers