HomeMy WebLinkAbout02102025 City Council Work Session Laydown - Design PresentationSEWARD FIRE STATION
CITY CO, \CIL DR=S \TATIO\
02.10,2025
PROJECT TEAM
R&M CONSULTANTS, INC.
I<P 3
A
CH ITECTS
INTEGRUS
Reid iddleton
Project Management, Planning/Public Involvement, Civil Engineering
Architecture/Landscape Architecture
Architecture, Specialty Design Consulting
Structural Engineering
RSA Engineering, Inc. Mechanical & Electrical Engineering
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Jordan C. Legan Training/Design Consultant
PAGE 2
10.29.2024 CHARRETTE
PREFERRED
01. Exposed Wood
02. Transparent map on wall in hallway
03. Transparency, visible/wood
04. Art -centered, "artsy"
Northern Lights art
Showcase local artist
05. Low maintenance materials
06. Defined floor areas
07. Roof overhang
08. Balancing institutional functionality with inviting aura
09. Broken up volumes (the building isn't one volume)
10. Welcoming, permeated with community engagement feel
y ■ARCHITECTS INTEGRUS PAGE 3
SITE PLAN
i7i
KEY
1. Public Entrance/Exit
2. Public Parking
3. Drop -Off
4. Apparatus Entrance/Exit
5. Overflow/Event Parking
6. Apparatus Zone
AMMI
7. Volunteer/Employee Parking
8. Shipping Container Training Structure
9. Ready Vehicle Parking
10. Apparatus Entrance/Exit
Apparatus Turn Movement
Visitor Vehicle Turn Movement
SITE PHOTOS
y ■ARCHITECTS INTEGRUS PAGE 4
FLOOR PLANS L
SPRINKER
RISER
F 90
MAIN ELEC
F.91
STOR
F.60
TRAINING
TOWER
F.70
VEHICLE
MAINTENANCE
BAY
F.51
SHOP
COMPRESSOR
F.57
3C, RR
F.63
0
HOSE
TORAGE
F.53
i
Scale: 1" = 20'-0"
0 5 10 15 20
PATIO
F.81
40
j % L _
7
FITNESS
F.36
SCBA
I F.58
SHOP
F.56
I
1
0 0
APPARATUS BAY
F.50
IA
1
MAP
I
1 1 1
STOR
F.59
VEST
F.6�
MAP
KITCHEN
F.33
JANITOR
CLO
TURNOUT
F.54
01
RR
F.63
0
RR
F.22
STOR
F.2r
I
ST
B.2
I I I I I
DECON
F.55
f
n
OFF
TLF.13
PANTRY
F.34
TRAINING ROOM/
EOC/
COMMU
ROOM
F.03
EOC STOR
F.09
STOR
F.38
L STOR
F.05
J AL__
WORKROOM
F.11
H
STOR
F.04
AV
F.06
VEST
RR
F.02
0
RR
F.02
01 A
ILp
f•
I■ p
OFF L
F.12 T
OFF
- I F.18
�0
CONF
B.3
RECEPTIO
F.10
ee an _
OFF
B.1
SPACE PLANNING SUMMARY - BUILDING
DEPARTMENT
GROUP
EXISTING SF
CURRENT NEED SF
FUTURE NEED SF
FIRE DEPARTMENT
Public
639
3,428
3,428
Administration
936
2,706
3,246
Living
2,138
3,700
4,680
Duty Crew Report
0
200
200
Apparatus
3,274
10,540
10,540
Fire Dept. Subtotal
6,987
20,574
22,094
Grossing Factor @ 35%
-
7,201
7,733
FIRE DEPT TOTAL BUILDING AREA (SF)
6,987
27,775
29,827
Area Schedule (Gross Building)
Level
Area
LEVEL 1
24,887 SF
LEVEL 2
6,822 SF
Grand total
31,709 SF
KEY
Public Space
Administration
Living
Apparatus
T SHIRT VENDING
& T SHIRT DISPLAY
LOBBY/MUSEUM
F.01
Training Tower
MEP
Circulation
y ■ARCHITECTS INTEGRUS PAGE 5
FLOOR PLANS L
L2+3
L
V
V
MECH YARD
F.93
OPEN TO BELOW
L3
TRAINING MEZZANINE
F.52
MECH
F.94
t
C
OPEN TO BELOW
N
WORKSTATIONS
FA0
Scale: 1" = 20'-0"
0 5 10 15 20 40
DORM
F.30
DORM DORM
MDF
F.95
DORM DORM
F.30 F.30�
LIVING
RR 0
F 31
LIVING
KEY
STOR
F.37
LAUNDRY
F.32
OFF
F.15
PATIO
DAYROOM
F.33
Public Space
Administration
Living
Apparatus
OFF
F.14
Training Tower
MEP
Circulation
ARCHITECTS LNTEGRUS PAGE 6
ELEVATIONS
y ■ARCHITECTS INTEGRUS PAGE 7
EXTERIOR 3D VIEW
ig
Way
'II ■I II ■ r
■M1 ■M1 ■I 11 a 1
111 II.I II II Hill I! !""I
HE I I t°f
y ■ARCHITECTS INTEGRUS PAGE 8
EXTERIOR 3D VIEW
rtra
(-1
ce
agi& INTEGRUS PAGE 9
y MARCH ITECTS
TRAINING INTERVENTIONS
INTERVENTION 1 - CONSTRUCT TRAINING MEZZANINE
Operable Window
Operable
Window
Commercial
Stairs
Confined
Space Access
Balcony
Flexible _
Training
Space
ILO 1PIrA)N — LEVEL2
Exterior
Window
Targets
Vaulted
Space
Windows
Overhead
Beam
Residential
Stairs
Multi -Pitch
Climbing Wall
INTERVENTION 2 - CONSTRUCT 3-STORY TRAINING TOWER
*In addition to typical training scenerios, the tower provides training
opportunities specific to cruise ships.
Forcib Entry
Door
Exterior Hose
Movement
Pad /
Fire Protection
/ Sprinkler Riser
Training Room
Vertical Confined
Space Problem
Training Stairs
Vertical Ladder
Well Hole
Roof Access
a
Lateral Confined
Space Problem
Exterior Hose
Movement
Pad
FLOOR PLAN — LEVEL1
FLOOR PLAN — LEVEL2
FLOOR PLAN — LEVEL3
Vault
Elevator
Hoistway
Hose Tower
Vertical Rope
Access Problem
Hose Tower
Access
INTERVENTION 5 - CONSTRUCT APPARATUS BAY "DEBRIEF AREA" (learning area)
Outdoor TV
)LL 1
FLOOR PLAN —"DEBRIEF"
Mural of Seward
city hydrants/
streets on wall
W h iteboa rd
INTERVENTION 3 - CONSTRUCT SHIPPING CONTAINER TRAINING
STRUCTURE
Sports Lighting -
Pitched and Flat Roof Props
T
Tensioned Highline
Rope Anchors
INTERVENTION 4 - CONSTRUCT PRIVATE ACCESS ROAD (the "training loop")
Hydrant
Rated "Tree"p
Anchors Pc
Hydrant
•
Low -Angle 4
Rescue {
Problem '.
y ■ARCHITECTS INTEGRUS PAGE 10
SUMMARY
Through a series of collaborative meetings and planning sessions, the project team has advanced the design of the
Seward Fire Station to the 15% completion milestone. This effort builds on the findings of the initial Needs Assessment
and is tailored to the selected site at the Forest Acres Campground, situated off Seward Highway 9 and Hemlock Avenue.
The proposed station is a forward -looking, multi -functional community facility designed to:
Support Operational Evolution:
Enable the transition from an entirely
volunteer fire department to a combination
of career and volunteer staffing models.
The existing fire station is beyond its
useful life, no longer meeting operational
and design standards, and community
and Department needs have outgrown
the limited space. The new facility
accommodates current operations while
planning for future growth, including
additional career staff and apparatus.
Prioritize Training Capabilities:
Provides dedicated, state-of-the-art
training facilities for volunteer and career
firefighters. Not only will this serve Seward,
but the region, as it is an absent resource.
A nationally recognized fire training
specialist contributed to the design to
ensure these needs were comprehensively
addressed and Seward -specific.
Enhance Community Resources:
Serve not only as an efficient fire station
but also house the City of Seward's
Building Department and community
space, offering expanded functionality to
support city operations and community
engagement.
_.1
='t ®ARCHITECTS INTEGRUS PAGE 11
NEXT STEPS
01
02
04
Seek and Secure
Funding for Design
and Construction
- State & Federal Grants
- Bonds, loans, cash reserves, revenues
Complete Design
65% & 95%
M
010
Finalize Design
and Construction
Documents
Project Cost
$40,000,000
= ■ARCHITECTS INTEGRUS PAGE 12
PRELIMINARY BUDGET BREAKDOWN
City of Seward Fire Station
Project budgeting
01.14.2025
Cost
Project Size (square footage)
Fire Station
31,709
adjust accordingly
Total SF
31,709
Project cost per SF
$887
adjust accordingly
Base Building
$ 28,125,883
Site
$ 1,932,580
Construction Cost Total (not including other projects costs) $30,058,463
Construction Contingency (change order reserve)
8.00%
$2,404,677
5-15% depending on new or renovation
For changes during construction and unforseens such as bad soils and/or hidden conditions/
hazmat
Architect/Engineer (A/E) design fees
8.00%
$2,404,677
4 8% for DB and 7 10% for DBB
Design phase
Architect/Engineer (A/E) construction administration
2.50%
$751,462
1-2% for DB and 2-3% for DBB
For Q&A during construction and field inspections for QA/QC
MEP Commissioning
0.50%
$150,292
To finalize the mech systems
Special Inspections (welding, compaction, concrete)
0.50%
$150,292
Inspection of structural elements during construction (may not be required depending on
structural system)
FF&E (funiture, fixture & equiment)
3.00%
$901,754
Furniture and other loose equipment
FF&E Audio/Visual
0.50%
$150,292
AV equipment including IT, presentation and video conferencing
Owner's project management
1.00%
$300,585
Architects
Either hired or an employee of the organization
Project Contingency
5.00%
$3,366,548
3% for new and 5% for renovation
For expenses not anticipated such as additional furnishings or equipment not directly related to
construction and/or additional architectural and engineering
Total Project Costs (including land)
29.00%
$40,639,042
Project Costs + Construction Costs
Total Project Costs per SF
$1,282
Project Costs + Construction Costs (per SF)
The items above represent anticipated costs related to the overall project. It's intended as a starting point and guide to all possible costs encountered during a typical project. Percentages would increase/decrease depending on size/scale of project
='t ®ARCHITECTS INTEGRUS PAGE 13