Loading...
HomeMy WebLinkAboutRES2025-028 Land Services Study Nash RdSponsored by: Sorensen CITY OF SEWARD, ALASKA RESOLUTION 2025-028 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO UPDATE THE CITY'S CONTRACT WITH ELECTRIC POWER SYSTEMS, INC TO CONDUCT A LAND SERVICES STUDY FOR EASEMENTS ALONG NASH ROAD FOR THE PHASE II TRANSMISSION UPGRADE PROJECT WHEREAS, the City of Seward Electric Department is undertaking the Nash Road Phase II project to upgrade the final stretch of 69kV transmission to 115kV transmission in preparation for the future conversion of the entire City of Seward -owned transmission system to 115kV; and WHEREAS, the City of Seward requires a Land Services Study to define existing easements, identify missing easements, and determine the requirements for expanding current easements along the project corridor; and WHEREAS, Electric Power Systems, Inc. (EPS) has submitted a proposal to perform easement diligence services, which includes research on recorded easements, cataloging unrecorded documents, and providing deliverables summarizing the findings in the form of a report, spreadsheet, and project graphics; and WHEREAS, EPS has been selected for this work due to their existing contract for the design and engineering of the Nash Road 69kV to 115kV transmission upgrade project, ensuring continuity and efficiency in the project; and WHEREAS, EPS has proposed completing the recorded document research for a not -to - exceed amount of $12,600 and the unrecorded document cataloging efforts for a separate not -to - exceed amount of $51,500, with work to be completed within two to eight weeks after Notice to Proceed; and WHEREAS, conducting this study is necessary to ensure the proper legal framework for the transmission upgrade and to facilitate the long-term stability of the City's electric transmission infrastructure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, that: Section 1. The City Council hereby authorizes the City Manager to upgrade the contract with Electric Power Systems, Inc, to conduct a Land Services Study for easements along Nash Road for the Phase II Transmission Upgrade Project. Section 2. Funding in the amount of $64,100 is hereby appropriated from Electric Fund reserves account 15000-0000-3400 to capital equipment account 15351-0000-8103 Electric Nash Road Infrastructure Project Fund. CITY OF SEWARD, ALASKA RESOLUTION 2025-028 Page 2 of 2 Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska this 24th day of March 2025. THE CITY OF SEWARD, ALASKA Sue McClure, Mayor AYES: Wells, Osenga, Crites, Barnwell, Warner, McClure NOES: None ABSENT: Finch ABSTAIN: None ATTEST: Kris Peck City Clerk (City Seal) '.`stomi,,,• 9 • t S, AL 1 - OF +''8l i5:Qttt v-t 1 1 1 City Council Agenda Statement Meeting Date: March 24, 2025 To: City Council Through: Kat Sorensen, City Manager From: Taylor Crocker, Electric Operations Supervisor Subject: Resolution 2025-028: Authorizing the City Manager to Update the City's Contract with Electric Power Systems, Inc to Conduct a Land Services Study for Easements Along Nash Road for the Phase II Transmission Upgrade Project Background and justification: The City of Seward Electric Department is undertaking the Nash Road Phase II project to upgrade the final stretch of 69kV transmission to 115kV transmission. This upgrade is part of the broader plan to convert the entire City -owned transmission system to 115kV, ensuring enhanced reliability and capacity for future energy needs. To facilitate this project, the City must conduct a Land Services Study to: • Define existing easements along the project corridor • Identify missing easements • Gain insight into the requirements for expanding current easements Electric Power Systems, Inc. (EPS) has been selected for this work due to their existing contract for the design and engineering of the Nash Road 69kV to 115kV transmission upgrade. Their familiarity with the project and access to existing data will ensure efficiency and continuity. EPS has proposed the following scope of work: Recorded Document Research: Conducting a detailed inventory of recorded easements within the first two miles of Nash Road east of Seward Highway. This research will be conducted using data from the Bureau of Land Management, Department of Natural Resources, Kenai Peninsula Borough GIS, and City of Seward GIS. The estimated cost for this work is $12,600, with a completion timeframe of two weeks after Notice to Proceed. Unrecorded Document Cataloging: Scanning and cataloging approximately ten banker's boxes of unrecorded documents that may pertain to existing easements. This additional research will support the transmission upgrade by identifying easements that need legal clarification or expansion. The estimated cost for this effort is $51,500, with an anticipated completion within eight weeks after Notice to Proceed and receipt of the documents. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: Strategic Plan: Other: Total amount of funds listed in this legislation: $ 64,100 This legislation: Creates revenue in the amount of: Creates expenditure in amount of: Creates a savings in the amount of: $ Has no fiscal impact Funds are: Budgeted Line item(s): 15351-0000-8103 X X Not budgeted Not applicable $ 64,100 Fund Balance Information Affected Fund: General Boat Harbor Motor Pool X Available Fund Balance SMIC Electric Parking Water Other Infrastructure Funding X Yes Attorney Signature: Not applicable Comments: Wastewater Healthcare Note: amounts are unaudited Finance Director Signature: Attorney Review Administration Recommendation X Adopt Resolution Other: Iectric Power S sit Consulting Engineers Inc' Right -of -Way Services VIA ELECTRONIC MAIL January 29, 2025 Mr. Taylor Crocker Operations Manager Electric Department City of Seward 238 5th Avenue Seward, Alaska 99664 SUBJECT: Nash Road Phase II Transmission 115kV Upgrade Project Proposal for Easement Diligence Services Dear Mr. Crocker: Electric Power Systems, Inc. (EPS) is pleased to present our proposal to provide easement diligence services for the City of Seward's (COS) 115kV Extension project. This research will inventory existing COS recorded easements along the project corridor and catalogue unrecorded documents in COS' possession. Recorded Documents Per our conversation, our recorded document research will be limited to the first two miles of Nash Road east of Seward Highway. Based upon our research, we anticipate this research will include four sections in two different townships (S001N001W, Sections 26, 35, and 36 and S001S001W, Section 1). We will rely on information readily available from Bureau of Land Management (BLM), Department of Natural Resources, Kenai Peninsula Borough GIS, and COS GIS. Our deliverables are anticipated to include: 1) a brief letter summarizing our findings; 2) a spreadsheet outlining the easements found and the properties needing additional rights acquired; and 3) project graphics to support the letter and spreadsheet. We can provide this information via hard copies, electronic files, or the format of your choosing. As discussed, our diligence will not include marketable title. We estimate we can complete this work for the not -to -exceed amount of $12,600. www.epsrow.com 3305 Arctic Blvd., Suite 201, Anchorage, Alaska 99503-4575 Phone: (907) 522-1953 • Fax: (907) 770-7749 Email: row@epsinc.com This cost is allocated to our staff as follows: Staff Title Hours Rate Cost Fred Mortimer ROW Manager 24 $214 $5,136 Kathryn Schreckenghost Project Manager 16 $205 $3,280 Megan Premer ROW Assistant 40 $103 $4,120 Rounded Total $12,600 We can complete this work within two weeks after Notice to Proceed. Unrecorded Documents Per our conversation, COS has approximately ten bankers boxes of unrecorded documents that may pertain to this research. EPS will scan and catalogue these documents and can include them in the research and deliverables described above. We estimate we can complete this work for the not -to -exceed amount of $51,500. This cost is allocated to our staff as follows: Staff Title Hours Rate Cost Fred Mortimer ROW Manager 56 $214 $11,984 Kathryn Schreckenghost Project Manager 72 $205 $14,760 Megan Premer ROW Assistant 240 $103 $24,720 Rounded Total $51,500 We can complete this work within eight weeks after Notice to Proceed and delivery of COS' unrecorded documents. In summary, we can complete our recorded document research for a not -to -exceed amount of $12,600 and the unrecorded document cataloguing efforts for a separate not -to -exceed amount of $51,500. We assume these two tasks will be issued separate Notices to Proceed. We anticipate delivering on time and within budget, but should we encounter unforeseen or unavoidable delays, we will keep you advised. electric Power S ^s Consulting Engineers IfC' Right -of -Way Seroiee_s www.epsrow.com 3305 Arctic Blvd., Suite 201, Anchorage, Alaska 99503-4575 Phone: (907) 522-1953 • Fax: (907) 770-7749 Email: row@epsinc.com Page 2 of 3 Thank you for the opportunity to work with you and please feel free to contact me at (907) 646-5128 or fmortimer@epsinc.com with any questions you may have. Sincerely, ELECTRIC POWER SYSTEMS, INC. ANL Fred Mortimer, AICP, SR/WA Right of Way Manager electric Power S ^s Consulting Engineers IfC' Right -of -Way Seroiee_s www.epsrow.com 3305 Arctic Blvd., Suite 201, Anchorage, Alaska 99503-4575 Phone: (907) 522-1953 • Fax: (907) 770-7749 Email: row@epsinc.com Page 3 of 3