HomeMy WebLinkAboutRES2025-066 Sturgeon Electric Directional Boring Servicesf
Sponsored by: Sorensen
CITY OF SEWARD, ALASKA
RESOLUTION 2025-066
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ACCEPT THE
PROPOSAL WITH STURGEON ELECTRIC FOR DIRECTIONAL
BORING SERVICES TO SUPPORT CITY ELECTRIC DEPARTMENT
WORK ORDERS AND PROJECTS IN THE AMOUNT OF $111,475 WITH
A 30% CONTINGENCY, NOT TO EXCEED $144,917.50
WHEREAS, the City of Seward Electric Department has identified multiple system
improvement projects that require directional boring services, including cable replacements and
converting overhead to underground power lines; and
WHEREAS, several of these projects require bores in locations that are inaccessible by
excavator, such as highway and railroad crossings; and
WHEREAS, the Electric Department was able to secure a boring crew from Sturgeon
Electric at a daily rate of $9,325.00 per day and anticipates utilizing the crew for approximately
two weeks, resulting in an estimated base cost of $111,475.00; and
WHEREAS, an additional 30% contingency, or $33,442.50, is being requested to allow
flexibility in completing customer -driven job orders requiring boring services, if time allows; and
WHEREAS, the total projected cost for these boring services is $144,917.50.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, that:
Section 1. The City Council hereby authorizes the City Manager to contract with Sturgeon
Electric for directional boring services in an amount not to exceed $144,917.50.
Section 2. Funding in the amount of $144,917.50 is hereby appropriated from the Electric
Enterprise Fund Work Orders department contracted services account (15000-3007-7009) to
support this work.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND APPROVED by the City Council of the City of Seward, Alaska this 14th
day of July 2025.
THE CITY OF SEWARD, ALASKA
.t.u)tk`YtcCPti.
r.,
Sue McClure, Mayor
CITY OF SEWARD, ALASKA
RESOLUTION 2025-066
AYES: Warner, Barnwell, Wells, Crites, Finch, Osenga, McClure
NOES: None
ABSENT: None
ABSTAIN: None
Kris Peck
City Clerk
(City Seal)
[1
City Council Agenda Statement
Meeting Date: July 14, 2025
To: City Council
Through: Kat Sorensen, City Manager
From: Taylor Crocker, Electric Operations Supervisor
Subject: Resolution 2025-066: Authorizing the City Manager to Accept the Proposal
with Sturgeon Electric for Directional Boring Services to Support City
Electric Department Work Orders and Projects in the Amount of $111,475
with a 30% Contingency, Not to Exceed $144,917.50
Background and justification:
The City of Seward Electric Department has several critical system improvement projects
scheduled for completion before winter, including the conversion of overhead lines to
underground, and the replacement of aging underground cable. Many of these projects are in areas
where traditional excavation is not feasible, such as highway and railroad crossings. Directional
boring is the only viable method in these locations.
The Electric Department has secured availability from Sturgeon Electric, a qualified contractor,
to provide boring services at a daily rate of $9,325.00. The crew will be available for
approximately two weeks, with a projected base cost of $111,475.00. To allow for additional
customer -driven job orders that may arise during this period, an additional 30% contingency is
requested, bringing the total not -to -exceed amount to $144,917.50.
This resolution authorizes the City Manager to contract with Sturgeon Electric for boring services,
ensuring that essential infrastructure projects are completed efficiently and safely prior to winter
weather conditions.
Comprehensive and Strategic Plan Consistency Information
This legislation is consistent with (citation listed):
Comprehensive Plan:
Strategic Plan:
Other:
Certification of Funds
Total amount of funds listed in this legislation: $ 144,917.50
This legislation (✓):
X
Creates revenue in the amount of:
Creates expenditure in amount of:
Creates a savings in the amount of:
Has no fiscal impact
Funds are (✓):
X
$ 144,917.50
$
Budgeted Line item(s): 15000 3007 7009 — Work Orders: Contracted Services
Not budgeted
Not applicable
Fund Balance Information
Affected Fund (✓):
General
Boat Harbor
Motor Pool
Available Fund Balance
SMIC
Parking
Other
X
Electric
Water
$
Wastewater
Healthcare
Note: amounts are unaudited
Acting Finance Director Signature:/1"--"-------
X
Yes
Attorney Signature:
Not applicable Comments:
Administration Recommendation
X
Adopt Resolution
Other:
STURGEON ELECTRIC
1301 E. 64th Ave.
Anchorage, Ak. 99518
Seward Electric
238 5th Ave Seward, AK 99664
Estimated Price for Boring
ATTN: Taylor Crocker
Seward Electric SHALL COMPENSATE THE CONTRACTOR AT THE LABOR AND EQUIPMENT RATES SPECIFIED BELOW
RATES VALID UNTIL 3.31.2026
Lodging will be billed at cost plus 10%
RATE
I
EXTENDED UNIT PRICE
Material Price and Haul to site locations
1
$
8,900.00
$
8,900.00
Daily Boring Rate $9,325/Day
11
$
9,325.00
$
102,575.00
Boring Rate is based on a 12 hr day for 2 operators all equipment and tooling
TOTAL Estimated Labor, Equipment, and Material
$
111,475.00
MATERIAL / OTHER COSTS COST
10%
Lodging
$ -
$0.00
$
-
$ -
$0.00
$
-
TOTAL MATERIAL OR OTHER COSTS
$ -
$0.00
$
-
TOTAL COST
$ -
$0.00 $
111,475.00
Josh Henrick Josh Milla
GENERAL FOREMAN Project Manager
Jhenrick a(�,myrgroup.com jmilla@myrgroup.com
CELL: 907.617.3186 CELL: 907.371.0510
FAX: 522.2068
STURGEON ELECTRIC
1301 E. 64th Ave.
Anchorage, Ak. 99518
Seward Electric
238 5th Ave Seward, AK 99664
3 man crew rate
ATTN: Taylor Crocker
Seward Electric SHALL COMPENSATE THE CONTRACTOR AT THE LABOR AND EQUIPMENT RATES SPECIFIED BELOW
RATES VALID UNTIL March 31, 2026
LODGING WILL BE BILLED AT COST + 10%, UNLESS PROVIDED
Qty
RATE 1 PER HOUR
HOURS
EXTENDED UNIT PRICE
Foreman ST
1
$
172.50
40.00
$
6,900.00
Foreman DT
1
$
269.50
10.00
$
2,695.00
Journeyman ST
1
$
161.00
40.00
$
6,440.00
Journeyman DT
1
$
248.75
10.00
$
2,487.50
Apprentice ST
1
$
144.25
40.00
$
5,770.00
Apprentice DT
1
$
217.50
10.00
$
2,175.00
$
-
MANHAUL
1
$
34.00
50.00
$
1,700.00
BUCKET TRUCK
1
$
57.00
50.00
$
2,850.00
MINI EXCAVATOR WITH TRAILER
$
42.00
$
-
DIGGER/AUGER TRUCK
1
$
59.00
50.00
$
2,950.00
PULLER / TENSIONER
$
45.00
$
-
FLATBED TRUCK
$
29.00
$
-
TOTAL LABOR & EQUIPMENT
$
33,967.50
MATERIAL / OTHER COSTS COST
10%
HOURS
Lodging
$ -
$0.00
$
-
$ -
$0.00
$
-
TOTAL MATERIAL OR OTHER COSTS
$ -
$0.00
$
-
TOTAL COST
$
$0.00
$
33,967.50
Josh Henrick Josh Milla
GENERAL FOREMAN Project Manager
Jhenrick@myrgroup.com jmilla@myrgroup.com
CELL: 907.617.3186 CELL: 907.371.0510
FAX: 522.2068