HomeMy WebLinkAbout09082025 City Council Work Session Laydown R&MCITY OF SEWARD
HARBORMASTER BUILDING &
SOUTH UPLANDS IMPROVEMENTS
CONCEPT DESIGN
Prepared by R&M Consultants, Inc. I September 2025
R&M CONSULTANTS, INC.
Project Management, Planning, Civil Engineering
KPB
ARCHITECTS
Architectural and Landscape Architecture
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
PLANNING CHARRETTE
'YKj
SEPTEMBER 8, 2025
SOUTH UPLANDS MASTERPLAN
HARBORMASTER BUILDING
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
SITE PHOTOS
.5ix K3
SEPTEMBER 8, 2025
I , ; I 1 ri 1:- bY :* " • '7";''''.1W- •-• • • • .107:-
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
SITE PLAN
J
K3
SEPTEMBER 8, 2025
s ems: e-4 ,-4 �e�.�e�.�e�.�e�.�e�.�e�.�e�.•^4e�.�e�
HARBORMASTER OFFICE
/4 7i./' ,4747.4.� .� .� .� .� .� .� .� .� .� .���� �' ,•.r,�.r1.r1r1.r1.r1.r•1.r•1.i^1.r•1.r•1.r•1.r•1 ra747474747474 r ,
•.^L•!". �f•L•f•L•f•L•f•L•f•LY^.Y•`. Y•`. Y•`. •`. Y•`. Y•`. Y•`. Y•`. •l^. •f•`.•f•`.•f•`.•f•`.•f•`.•t•`.•t•`.•t•`.•!L•!L•!L•!L•!:•!:•!L•!L•ILY.•!.•!.-
LEASE AREA
1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
AIIIIIIIIIIII I
w•w••w•w•w•w•w•w•w•w•w•
•
,14
1,•••• • ...N...N..Ni •e_.�....N .N....,fie-N.. Ar.,- •
.Q,.rp, , . .:3
40
ao
IFt
14.7
C-e e C
r4 74 74
•
NEW
LEGEND
w
DESCRIPTION
LOT LINE
EDGE OF PAVEMENT
FIRE LANE
WATER LINE
SANITARY SEWER LINE
UTILITY EASEMENT
BUILDING RESTRICTION LINE
SWALE/BASIN CONTOURS
ORDINARY HIGH WATER
STRIPING
BUILDING
FLOAT
BUILDING
ASPHALT PAVEMENT
CONCRETE
SAND/GRAVEL
RIPRAP
LANDSCAPING
BOARDWALK
LOADING ZONE
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
SITE PLAN
J
K3
SEPTEMBER 8, 2025
..�LYLYLYL
r4-v -v
.ir4r4r4ra
r� r7 rY
r: e•: ems: r:•e•e: r•'r•'r: h•'r.-.-.-.-.-h-.-.-.-.-.-.-.^.•e+.. •r:•e+.•e+.•r -e, -e •e—..; ...% .�%' ,�%' ,��'
I� .� /� .� .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .� . � .{�' �r .r1.r1.r1.r1.r1.r 1.r 1.i 1.r 1.r 1.r 1.r 1 ra r 1,� .� .ra ra ra r . r1.r 1.r•1.r•1. 4" 1.r•1.r•1. :::aa:a:7
-r; ems, r.-r, r.%"%"-"%"%"%"%"%"%"%"%r. ems. r4....�.•eyte.. 7:4 71. e7.-e�.-r.-r.-r.-r.-r.Y:-r -r -r.Y.-..-..- r, r, r, r, r, r, r, r.
••eL•eLYi-IL-IL •Y
•e'.•ee.e' '.•'•.•e•Y .
•
•
/
/
L J
•'w
HARBORMASTER OFFICE
LEASE AREA
PLI
10004 w
C C 47
•e
747474 74
• r:Y:
"'Err w w w w v w-
•rt•
wwwwwwwwwww;w•-
-��.'-et` �.'-et` �.'-et` �.'-et` �.'-et` �.'-et` �.'-ej` �.r-e�+.�+
7"vwwwwww•w1•
•
•
wwwwwwww•w
w'w'w'w'w'swr'•
40
LEGEND
NEW
w
DESCRIPTION
LOT LINE
EDGE OF PAVEMENT
FIRE LANE
WATER LINE
SANITARY SEWER LINE
UTILITY EASEMENT
BUILDING RESTRICTION LINE
SWALE/BASIN CONTOURS
ORDINARY HIGH WATER
STRIPING
BUILDING
FLOAT
BUILDING
ASPHALT PAVEMENT
CONCRETE
SAND/GRAVEL
RIPRAP
LANDSCAPING
BOARDWALK
LOADING ZONE
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
SITE PLAN
K3
SEPTEMBER 8, 2025
1 1 1 1 1 1
1 1'1 1 1 1
I I I I I
///
/ I
—+ HARBORMASTER OFFICE k
----- M11
+___ .i 1 `
\\1 [1H
I I i I i I Ib1.6Aihi 1 1 1 18,wATAIV1 I 1 1 1 I 1I111I1 1J11 1iw
` I I I I I INI I I I I I I IWI I WI I I I IWI ^ ^I 1 I 1
—t--- S� ... • s S s s s s S s s S s
0110
r'^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ . J X^ ^
:\ : \ \\ \
X \\ \\ \\%\ \ \ \ \ \\%\ \ \\ \
\ `� X� \\�
�\,\\X\,\\\
OH/E OH/E OH/E OH/E
f.=
LEASE AREA
o ao
LEGEND
NEW
w
7
5
DESCRIPTION
LOT LINE
EDGE OF PAVEMENT
FIRE LANE
WATER LINE
SANITARY SEWER LINE
UTILITY EASEMENT
BUILDING RESTRICTION LINE
SWALE/BASIN CONTOURS
ORDINARY HIGH WATER
STRIPING
BUILDING
FLOAT
BUILDING
ASPHALT PAVEMENT
CONCRETE
SAND/GRAVEL
RIPRAP
LANDSCAPING
BOARDWALK
LOADING ZONE
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
SITE PLAN
K3
SEPTEMBER 8, 2025
Ittotk
gristtititt
t0' ti
VT—
—
ie}
LEGEND
NEW
w
DESCRIPTION
LOT LINE
EDGE OF PAVEMENT
FIRE LANE
WATER LINE
SANITARY SEWER LINE
UTILITY EASEMENT
BUILDING RESTRICTION LINE
SWALE/BASIN CONTOURS
ORDINARY HIGH WATER
STRIPING
BUILDING
FLOAT
BUILDING
ASPHALT PAVEMENT
CONCRETE
SAND/GRAVEL
RIPRAP
LANDSCAPING
BOARDWALK
LOADING ZONE
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
PROGRAM
K3
SEPTEMBER 8, 2025
City of Seward
Date: 15-May-25
Harbormaster Building
Space
Proposed SF
Amount
Floor
1
Public
Entry Vestibule
300
1
300
1
Administration/Public Counter
300
1
300
1
Lobby/Waiting Area
615
1
615
1
Conference Room
405
1
405
1
Restroom
100
1
100
1
Parking Kiosk
105
1
105
1
Subtotal
1825
2
Private
Private Office Type A
105
4
420
1 & 2
Private Office Type B
150
1
150
1
Workstations
270
1
270
1
Workstations
245
1
245
2
Maintenance Shop
1750
1
1750
1
Locker Room
400
1
400
1
Breakroom
280
1
280
2
Conference Room
175
1
175
2
Restroom
50
3
150
1 & 2
Subtotal
3840
3
Storage Areas
1
Administration Storage
60
1
60
1
Big Storage
175
1
175
1
Small Storage
50
1
50
1
Storage
320
1
320
2
Subtotal
605
TOTAL
6270
Total w/ 15% circulation
941
7211
Total w/ 20% circulation
1254
7524
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
ADJACENCY DIAGRAMAI
tik K3
SEPTEMBER 8, 2025
TOOL WALL
MAINTENANCE SHOP
LOCKER ROOM
- 12 LOCKERS
- CENTER BENCH
-LAUNDRY
-SHOWER
STORAGE
ENCLOSED STAIR
RR
PRIVATE
RR
PARKING
KIOSK
6-P
WORKSTATIONS
PRIVATE
OFFICE
PRIVATE OFFICE
PRIVATE
OFFICE
PUBLIC
RR
VESTIBULE
12-16P
CONFERENCE ROOM
3-P
ADMIN / PUBLIC COUNTER
ENCLOSED STAIR
SECURITY LINE
LOBBY/WAITING
ELEVATOR
LEVEL 1
OPEN TO BELOW
ROOF
ENCLOSED STAIR
4-P
CONFERENCE
ROOM
PRIVATE
OFFICE
PRIVATE
OFFICE
STORAGE
u)
WORKSTATION:
ADMIN OPEN TO BELOW
ROOF DECK
PRIVATE
RR
BREAK ROOM
ENCLOSED STAIR
ELEVATOR
LEVEL 2
VESTIBULE
PARKING KIOSK
LOBBY/WAITING
VERTICAL CIRCULATION
PUBLIC RESTROOM
CONFERENCE ROOM
ADMINISTRATION/PUBLIC COUNTER
PRIVATE OFFICE
STORAGE
OPEN WORKSTATIONS
PRIVATE RESTROOM
LOCKER ROOM
MAINTENANCE SHOP
CIRCULATION
VERTICAL CIRCULATION
CONFERENCE ROOM
PRIVATE OFFICE
STORAGE
OPEN WORKSTATIONS
PRIVATE RESTROOM
MAINTENANCE SHOP
BREAK ROOM
CIRCULATION
ROOF DECK
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
CONCEPT MASSING SOUTH FACADE
K3
SEPTEMBER 8, 2025
•
CITY OF SEWARD -HARBORMASTER &SOUTH UPLANDS
CONCEPT MASSING NORTH FACADE
.5ix K3
SEPTEMBER 8, 2025
/10/4 "77
0°4
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
CONCEPT DESIGN
Ala K3
SEPTEMBER 8, 2025
KEY FEATURES
•
: 1. Windows
• 2. Industrial
: 3. Warm tones
• 4. Lighting
5. Multiple levels
•
•
•
•
•
•
•
•
•
•
•.
• OPPORTUNITIES FOR ADDITIONAL
• VISITOR AMENITIES
• The masterplan of the South Uplands includes several amenities in addition to
• the Harbormaster building. These include a boardwalk extension from the harbor
• along the north side, lease sites for businesses to add to the economical vibrancy
• of the harbor and a reimagined parking area that provides efficient access to the
• boat ramps and ample space to support visitor activities.
The concept presents additional opportunities for site amenities to enhance the
exceptional site resources. The top of the Harbormaster building can become
a rooftop gathering place to take in the views of the harbor and Resurrection
Bay and offer interpretive opportunities of learning. A "social stair" or outdoor
gathering area can be built into the building or boardwalk, allowing for social
gathering, interaction, and engagement . This informal gathering space will be
located at an important location of the uplands plan to become a node of activity
or a place for contemplation on the fair weather days during the quieter months.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
COSTS DESIGN FEES
.1lo K3
SEPTEMBER 8, 2025
01
02
03
04
SEM50/ DESIGNCHATIC
$232,000.00
65% DEVELOPMENT
$267,000.00
DESIGN STANDARDS
FOR LAND LEASE
PROJECTS
$70,000.00
10 O CONSTRUCTION
510 DOCUMENTS
$251,000.00
*TOTALS ROUNDED TO NEAREST THOUSAND
CITY OF SEWARD - HARBORMASTER &SOUTH UPLANDS
COSTS PROJECT COSTS
K3
SEPTEMBER 8, 2025
Cost
Project Size (square footage)
Harbormaster
8,153
adjust accordingly
Total SF
8,153
Project cost per SF
$887
adjust accordingly
Base Building
$ 7,231,711
Maintenance Shop
$ 1,300,000
Total SF: 1,859 / $700 per SF
Boundary & Design Survey
$ 40,466
Site
$ 1,932,580
Construction Cost Total (not including other projects costs) $10,504,757
Construction Contingency (Change Order Reserve)
8.00%
$733,143
5-15% depending on new or renovation
For changes during construction and unforseens such as bad soils and/or hidden conditions/
hazmat
Architect/Engineer (A/E) Design Fees
7.50%
$749,076
4 8% for DB and 7-10% for DBB
Design phase
Design Standards for Land Lease Projects
$69,020
Architect/Engineer (A/E) Construction Administration
2.50%
$229,107
1-2% for DB and 2-3% for DBB
For Q&A during construction and field inspections for QA/QC
MEP Commissioning
0.50%
$45,821
To finalize the mech systems
Special Inspections (welding, compaction, concrete)
0.50%
$45,821
Inspection of structural elements during construction (may not be required depending on
structural system)
FF&E (funiture, fixture & equiment)
3.00%
$274,929
Furniture and other loose equipment
FF&E Audio/Visual
0.50%
$45,821
AV equipment including IT, presentation and video conferencing
Owner's Project Management
1.00%
$91,643
Architects
Either hired or an employee of the organization
Project Contingency
5.00%
$1,160,113
3% for new and 5% for renovation
For expenses not anticipated such as additional furnishings or equipment not directly related to
construction and/or additional architectural and engineering
Total Project Costs (including land)
28.50%
$13,949,252
Project Costs + Construction Costs
Total Project Costs per SF
$1,711
Project Costs + Construction Costs (per SF)
The items above represent anticipated costs related to the overall project. It's intended as a starting point and guide to all possible costs encountered during a typical project. Percentages would increase/decrease depending on size/scale of project