Loading...
HomeMy WebLinkAboutRES2026-010 R&M Support - Harbormaster FacilitySponsored by: Sorensen CITY OF SEWARD, ALASKA RESOLUTION 2026-010 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ACCEPT THE PROPOSAL FROM R&M CONSULTANTS, INC. FOR THE DESIGN, ENGINEERING, AND CONSTRUCTION FOR THE NEW HARBORMASTER'S FACILITY AND SOUTH HARBOR UPLANDS DEVELOPMENT FOR A TOTAL PROJECT COST OF $13,949,252 AND TO EXECUTE TASK ORDER 38 IN AN AMOUNT NOT TO EXCEED $2,088,980 AND APPROPRIATING FUNDS WHEREAS, a new Harbormaster's Facility and South Harbor Uplands improvements have been in the Seward Boat Harbor Master Plan for a significant amount of time; and WHEREAS, a Feasibility Study was conducted by R&M Consultants, Inc. in 2025 to determine operational needs and provide preliminary designs of the facility and uplands development with an overall project cost of $13,949,252; and WHEREAS, this resolution is an authorization to execute Task Order 38 with R&M Consultants, Inc to proceed with the design and engineering for the project and authorizes expenditures for those tasks along with construction administration in an amount not to exceed $2,088,980 (included in the overall cost); and WHEREAS, an RFP for construction will be issued and brought back before council as the other part of the overall project expense; and WHEREAS, harbor passenger fees, that have historically used to pay harbor improvement bonds, will be continued to pay for the majority the new bond for the facility and improvements, with the remainder being paid by CPV funds NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA: Section 1. Authorize the City Manager to accept the proposal with R&M Consultants, Inc., giving Notice to Proceed, for the Design, Engineering, and Construction Support of the Harbormaster's Facility and South Harbor Uplands Development. Section 2. Funding in the total amount of $13,949,252, which includes $2,088,980, is hereby appropriated from the designated Harbormaster Office Building Project Fund 11433-0000-8101 Infrastructure Expense Account and shall be paid from the revenue bond proceeds. Section 3. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA THIS 26TH DAY OF JANUARY 2026. CITY OF SEWARD, ALASKA RESOLUTION 2026-010 Page 2 of 2 AYES: NOES: ABSENT: ABSTAIN: ATTEST: THE CITY OF SEWARD, ALASKA Sue McClure, Mayor Osenga, Calhoon, Barnwell, Crites, Warner, Draper, McClure None None None Kris Peck, City Clerk %1%III1lt titi .o°� of SEW1,•,i 6 • City Council Agenda Statement Meeting Date: January 26, 2026 To: City Council Through: Kat Sorensen, City Manager From: Jason Bickling, Deputy City Manager Subject: Resolution 2026-010: Authorizing the City Manager to Accept the Proposal from R&M Consultants, Inc. for the Design, Engineering, and Construction for the New Harbormaster's Facility and South Harbor Uplands Development for a Total Project Cost of $13,949,252 and to Execute Task Order 38 in an Amount Not to Exceed $2,088,980 and Appropriating Funds. Background and justification: A new Harbormaster's Office and South Harbor Uplands improvements have been in the Seward Boat Harbor Plan for a very long time. Like many of our city facilities, it is beyond its lifespan, is undersized, in disrepair, inefficient, and requires regular maintenance to keep it functioning. As with all facility infrastructure needs, we've been working towards getting everything up to 15% design so that we can solicit for funding and legislators know that we are invested and ready to start projects. With that, we completed a feasibility for the Harbormasters office last year which was presented to council along with a preliminary development plan for the South Harbor Uplands. The preliminary design included a new 2-story harbormaster's office would be on the southwest corner of the harbor (where the harbor can be seen from the building) a new business lease area a boardwalk and path that goes around the uplands that would tie foot traffic from the current boardwalk down into the waterfront trail system new public restrooms paved and organized parking for both cars and boat trailers removing the camping area and creating an expanded park and recreation area to the south end behind the "break -away condos" The overall cost is $13,949,252 and includes the Harbormaster Office (design, engineering, and construction), utility design and installation for area (electricity, water sewer, fire hydrants), Uplands Development (survey, design, and construction) — parking lot. The costs that are NOT included are: - The boardwalk on the north side of the uplands (Boardwalk will be installed adjacent to the Harbormaster's office itself as part of the bond.) It doesn't make sense to construct the boardwalk until after the leased facilities and uplands improvements are constructed anyway, which will likely be another year or two out and - The Development of the Design Standards work on the lease sites (to make these look consistent to the area) on the lease sites (these are not for public use and cannot be included in expenses covered by the bond). The costs can be paid with CPV funds, or through an internal loan paid back with boat trailer parking funds or lease revenue funds. To fund the project, the Harbor currently has passenger fees for tour boats and charters that pay for the Harbor Infrastructure and improvements expansion through bonds. The current bond expires in March of this year. The passenger fees would remain the same at ($3.50) and continue to provide the revenue to pay for this new bond. Cruise Ship CPV funds will be used for the remainder. The lease sites, if they are developed, would generate approximately $100,000 in revenue annually. and boat trailer parking fees could also contribute to the expenses. If approved, we will be having regular discussions with council for updates, review, and approval. - After the design is brought to 35%, we will be putting out an RFP for construction. We will be bringing that contract before you for approval. - The exterior picture are space concepts — we will be coming before council to discuss the exterior design and look of the building and the lease sites. For the lease sites themselves, we are scheduling a discussion item with PACAB on February 18th to review options for the lease area, which will be brought back before council. The tentative timeline for this project is that engineering and design would start immediately with the goal of doing groundwork and foundation work for the harbormaster's building this summer. The building would be constructed from the fall of 2026 to the spring of 2027 Uplands construction would happen in the spring and summer of 2027. Approval of this resolution approves moving forward with the project at the overall price, approves R&Ms Proposal (Task Order 38 — Harbormaster Building & South Harbor Uplands Design through Construction) and acts as a notice to proceed for the full design and engineering and construction support of the project at a cost of $2,088,980 (included in the overall cost of the project). This is a conservative estimate, and we foresee the actual number being lower, especially in construction administration. An RFP will be put out for the construction of the project, which will be brought before council as a contract with the successful bidder as the other major cost for the project. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 3.5.1.1 Encourage the growth and development of an efficient, functional boat harbor that meets Seward's commercial and recreational needs. Strategic Plan: Other: Harbor Master Plan Certification of Funds Total amount of funds listed in this legislation: $ 2,088,980 This legislation (✓): Creates revenue in the amount of: $ Creates expenditure in the amount of: $ Creates a savings in the amount of: $ X Has no fiscal impact Funds are (✓): Budgeted Line item(s): Not budgeted Not applicable X Affected Fund (✓): General Boat Harbor Motor Pool Available Fund Balance SMIC Parking Other Electric Water $ Wastewater Healthcare Note: amounts are unaudited Finance Director Signature: '",- 51zsz•te X Yes Attorney Signature: Not applicable Comments: Administration Recommendation X Adopt Resolution Other: PeA& R&M CONSULTANTS, INC. ANCHORAGE I FAIRBANKS I JUNEAU January 16, 2026 R&M No. 2734.38 Jason Bickling Assistant City Manager City of Seward, Alaska 410 Adams St., City Hall Building Seward, Alaska 99664 RE: Task Order 38 - Harbormaster Building & South Uplands Design through Construction Dear Mr. Bickling, R&M Consultants, Inc. (R&M) is pleased to submit this fee proposal to the City of Seward under our On -Call Engineering Services contract to provide professional services to design and support construction of a new Harbormasters Building and improvements to the Harbor South Uplands. This proposed task order is in response to request from you and the Seward Harbormaster, Tony Sieminski, following multiple scoping conversations preceded by work completed under Task Order 34. Carrying the conceptual building schematic and site improvements forward, R&M and our partner KPB Architects, with supporting subconsultant specialists, will complete the following scope of work: • Boundary and Design Survey of the South Uplands • Geotechnical Investigation informing structural design • Harbormaster Office Building Design o Approximately 8,000 SF 2-story building of office space, public space and a maintenance shop • Site Design and landscape architecture for South Uplands o Parking, vehicular and pedestrian circulation, connections to adjacent lands, and lease area prep • Construction Support Services o Bid package assistance, owner's representation, on -site construction administration, special inspections • Project Management o Includes presentation/work session(s) with City Council at 35% design milestone and others as needed The scope of work will be completed through the following tasks (lead), each of which will have milestone deliverables: 1. Project Management & Planning (R&M) 2. Geotechnical Investigation (R&M) 3. Boundary and Design Survey (R&M) RMCONSULT.COM 19101 VANGUARD DRIVE, ANCHORAGE, AK 995071 907.522.1707 Page 2 of 2 4. 35% Design (R&M Site, KPB Building) 5. 65% Design (R&M Site, KPB Building) 6. 100% Design & Permit Bid Support (R&M Site, KPB Building) 7. Construction Administration (R&M, KPB support) 8. Special Inspections (R&M) We are aware the city can bond up $13,950,000, which was requested based on the completed Concept Design level cost estimations and included a conservative project contingency of $1,160,113. The Concept Design estimated construction materials for the Harbormaster building and site improvements to be $11,454,312 (excluding the proposed boardwalk due to wide variability in material and installation costs). Our proposed fee to complete the scope of work included in this letter and the detailed in the attachment is $2,088,980. The attached proposal cost breakdown details levels of effort, scope items, and personnel for tasks and subconsultants. Construction administration service have been proposed assuming a desired maximum level of effort, which may be renegotiated during the project's design process to best meet Seward's needs. R&M's work will be invoiced on a Time and Expense basis, KPB's and additional subconsultant fees are fixed price to be invoiced by percent complete. Thank you again for the opportunity to continue supporting the City of Seward. Please contact me at toleson@rmconsult.com or 646-9645 if you have questions. Sincerely, R&M CONSULTANTS, INC. Taryn Oleson-Yelle, AICP Senior Planner, Project Manager (Signature) (Date) Accepted by the City of Seward Kat Sorensen, City Manager Jason Bickling, Deputy City Manager R&M CONSULTANTS, INC. ANCHORAGE I FAIRBANKS I JUNEAU Firm: Client: R&M City of Seward Project Title: Harbormaster Office South Uplands Plan Date: 12/29/2025 Task Discipline Task Description ' Labor Expenses Sub Contractors Task Totals Cost Basis 1 Plan Project Management & Planning $ 67,404.90 $ 2,283.00 $ - $ 69,688.00 T&E 2 ES Geotechnical Investigation $ 48,868.76 $ 8,039.00 $ 28,050.00 $ 84,958.00 T&E 3 Survey Boundary and Design Survey $ 51,777.80 $ 9,068.00 $ - $ 60,846.00 T&E 4 Eng/Arch 35% Design $ 61,099.56 $ 373.00 $ 223,873.97 $ 285,347.00 T&E 5 Eng/Arch 65% Design $ 59,046.80 $ 373.00 $ 266,357.98 $ 325,778.00 T&E 6 Eng/Arch 100% Design & Permit Bid Support $ 47,213.36 $ 504.00 $ 297,763.51 $ 345,481.00 T&E 7 CA Construction Administration $ 596,876.84 $ 46,082.00 $ 228,325.66 $ 871,284.00 T&E 8 CA Special Inspections $ 37,577.86 $ 3,620.00 $ 4,400.00 $ 45,598.00 T&E 9 $ - $ - $ - $ - 10 $ - $ - $ - $ - Total Project Cost Estimate: 2,088,980 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 1 TASK DESCRIPTION: Project Management & Planning DATE: 12/29/2025 GROUP: Plan METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: SUB -TASK NO SUB -TASK DESCRIPTION Principal Project Manager Staff Planner Principal Professional 2 Admin Assistant L. Story T. Oleson-Yelle R. Selby Project Management 1 120 80 Invoicing 24 Bi-weekly Meeting with Seward 30 Subcontractor Coordination 120 Work Session with Council at 35% in Seward Prep and Presentation 12 4 Travel 4 Milestone Meetings with Design Team in Seward Kickoff 8 2 35% 8 2 65% 8 2 Pre -Construction 8 2 TOTAL LABOR HOURS 1 342 92 0 0 0 0 0 0 0 LABOR RATES ($/HR) $ 347.16 $ 166.03 $ 111.69 $ - $ - $ - $ - $ - $ - $ - LABOR COSTS ($) $ 347.16 $ 56,782.26 $ 10,275.48 $ - $ - $ - $ - $ - $ - $ - EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1. Work Session in person with City Council to review and approve proposed design elements (exterior, site layout, etc.) r Misc. Supplies 2 $ 50.00 $ 100.00 R&M Vehicle Milage 1280 $ 0.75 $ 960.00 Per Diem Meals 5 $ 131.00 $ 655.00 Per Diem Lodging 2 $ 284.00 $ 568.00 TOTAL EXPENSES: $ 2,283 R&M Laboratory Testing TOTAL COST OF LABOR $ 67,404.90 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 2,283.00 FIRM: AMOUNT: TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ FIRM'S TOTAL COST $ 69,688.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 2 TASK DESCRIPTION: Geotechnical Investigation DATE: 12/29/2025 GROUP: ES METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: C. Fell, T. Ross SUB -TASK NO SUB -TASK DESCRIPTION Principal Project Manager Geosciences GM Sr. Geotech Eng Geotech Eng Geotech Eng OT Principal Professional 2 Professional 4 Professional 3 Professional 1 Professional 1 L. Story T. Oleson-Yelle C Fell T. Ross L. Southerland L. Southerland Project Management 1 10 16 Site Investigation Planning, Coordination, Prep 1 2 4 12 Exploration and Safety Plans 4 12 CoS Dig Permit and Utility Locates 8 Mobe/Demobe 8 8 Geotechnical Drilling 1 1 32 16 Lab Coordination 2 4 Reporting Data Compilation 8 24 Analysis and Design 12 22 Draft Geotechnical Report 1 2 18 32 Final Geotechnical Report 1 2 4 8 TOTAL LABOR HOURS 1 13 23 53 162 24 0 0 0 0 LABOR RATES ($/HR) $ 347.16 $ 166.03 $ 217.35 $ 205.28 $ 153.96 $ 230.95 $ - $ - $ - $ - LABOR COSTS ($) $ 347.16 $ 2,158.39 $ 4,999.05 $ 10,879.84 $ 24,941.52 $ 5,542.80 $ - $ - $ - $ - 11 EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1) Assumes 3 test borings, including one each to 30-feet, 60-feet, and 70-feet. LPT samples at 2.5-foot intervals to 10 feet and at 5-foot intervals thereafter. Assumes mud -drilling techniques to mitigate expected heave. 2) Assumes 4 field days at 12-hours each. 3) Assumes seismic liquefaction analysis, building foundation recommendations including possible pile foundations or feasibility of deep ground improvements, and geotechnical recommendations for pavement section and other associated earthworks. 4) Seward will secure any authorizations and approvals necessary for R&M to access the project site and complete field work. 5) Seward understands boring locations may be controlled by necessary separation distances from existing features including overhead/buried utilities. 6) If contaminated soils or groundwater are suspected or encountered, R&M will note the issue on field logs but won't collect environmental samples. 7) R&M will retain collected soil samples for a minimum of 30 days following completion of laboratory testing and will then discard them. 8) This proposal is valid for 90 days. II Per diem (OCONUS, 10/01- 03/31) 4 $ 343.00 $ 1,372.00 Field Equipment (per test boring) 3 $ 100.00 $ 300.00 TOTAL EXPENSES: $ 1,672 R&M Laboratory ST-37M ST-43M ST-11M ST-45M Testing Particle Size Analysis of Soils - Sieve and Wash#200 [ASTM D 6913] 6 $ 305.00 $ 1,830.00 TOTAL COST OF LABOR $ 48,868.76 Particle Size Analysis of Soils - Wash#200 Only [ASTM D 422] 12 $ 195.00 $ 2,340.00 Moisture Content of Soil and Rock [ASTM D 2216] 23 $ 53.00 $ 1,219.00 Liquid and Plastic Limit [ASTM D 4318] 3 $ 326.00 $ 978.00 R&M MATERIAL LABORATORY EXPENSES $ 6,367.00 SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 1,672.00 FIRM: AMOUNT: Discovery TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 28,050.00 $ 25,500.00 FIRM'S TOTAL COST $ 84,958.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 3 TASK DESCRIPTION: Boundary and Design Survey DATE: 12/29/2025 GROUP: Survey METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: D. Hale SUB -TASK NO SUB -TASK DESCRIPTION Survey GM Sr. Land Surveyor 2-Person Survey Crew 2-Per. Survey Crew OT Professional 5 Professional 5 - - B. Preston D. Hale - - Project Management 4 4 Field Tasks Travel To/From Seward 4 4 Boundary Survey & Site Control 4 16 4 Vertical Control 4 Design Survey 24 16 Utility Survey 8 Office Tasks Research 4 Field Data Reduction 16 Boundary Computations 8 Topographic Basemap 32 Survey Control Sheet 8 Professional Review 4 Deliverales 4 TOTAL LABOR HOURS 4 84 48 32 0 0 0 0 0 0 LABOR RATES ($/HR) $ 310.93 $ 232.44 $ 323.01 $ 484.52 $ - $ - $ - $ - $ - $ - LABOR COSTS ($) $ 1,243.72 $ 19,524.96 $ 15,504.48 $ 15,504.64 $ - $ - $ - $ - $ - $ - EXPENSES COMMENTS Project Expenses ITEM(S) Misc. Field Supplies QUANTITY UNIT PRICE TOTAL PRICE 1. This estimate is to perform a boundary and design survey of Tract H, Seward Original Townsite Waterfront Park Replat (Plat No. 2012-4) in winter conditions. ! 1 $ 100.00 $ 100.00 GPS Equip. 4 $ 450.00 $ 1,800.00 Per Diem 16 $ 448.00 $ 7,168.00 TOTAL EXPENSES: $ 9,068 R&M Laboratory Testing 1 TOTAL COST OF LABOR $ 51,777.80 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 9,068.00 FIRM: AMOUNT: TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ FIRM'S TOTAL COST $ 60,846.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 4 TASK DESCRIPTION: 35% Design DATE: 12/29/2025 GROUP: Eng/Arch METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: C. Black, T Oleson-Yelle SUB -TASK NO SUB -TASK DESCRIPTION Project Manager Site Development Civil Eng Staff Civil Eng Professional 2 Professional 4 Professional 2 Engineer 1 T. Oleson-Yelle C. Black S. 0 Project Management 40 Subcontractor Coordination 8 8 Coordination Meetings 8 Research & Review As-Builts 4 4 4 Site Visit 8 Civil Plans 40 Cover, Notes, Legend, etc. 8 12 Existing Conditions, Demo Plan 8 12 Site Plan 8 24 Site Grading 16 24 Site Sections 8 16 Overall Utility Plan 8 16 Storm Drainage Drawings 8 16 Water/Sewer Service Plan and Profiles 16 24 Civil and Utility Details 8 16 QC of Deliverables & Comment Response 8 8 TOTAL LABOR HOURS 48 68 108 164 0 0 0 0 0 0 LABOR RATES ($/HR) $ 166.03 $ 226.41 $ 166.03 $ 120.75 $ - $ - $ - $ - $ - $ - LABOR COSTS ($) I $ 7,969.44 $ 15,395.88 $ 17,931.24 $ 19,803.00 $ - $ - $ - $ - $ - $ - EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1. One site visit to Seward 2. KPB will lead building design, R&M will lead South Uplands land planning and site development 3. KPB Fee Proposal includes additonal subs contracted through KPB: Structural (RMI) - $25,553.30 Mechanical (RSA) - $17,640 Electrical (RSA) - $13,680 r Misc. Field Supplies 1 $ 50.00 $ 50.00 R&M Vehicle Milage 256 $ 0.75 $ 192.00 Per Diem Meals 1 $ 131.00 $ 131.00 TOTAL EXPENSES: $ 373 R&M Laboratory Testing TOTAL COST OF LABOR $ 61,099.56 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 373.00 FIRM: AMOUNT: KPB Architects TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 223,873.97 $ 203,521.79 FIRM'S TOTAL COST $ 285,347.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 5 TASK DESCRIPTION: 65% Design DATE: 12/29/2025 GROUP: Eng/Arch METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: C. Black, T Oleson-Yelle SUB -TASK NO SUB -TASK DESCRIPTION Project Manager Site Development Cavil Eng Staff Civil Eng Professional 2 Professional 4 Professional 2 Engineer 1 T. Oleson-Yelle C. Black S. 0 Project Management 40 Subcontractor Coordination 8 8 Coordination Meetings 8 Site Visit 8 Civil Plans 40 Cover, Notes, Legend, etc. 8 12 Existing Conditions, Demo Plan 8 12 Site Plan 8 24 Site Grading 16 24 Site Sections 8 16 Overall Utility Plan 8 16 Storm Drainage Drawings 8 16 Water/Sewer Service Plan and Profiles 16 24 Civil and Utility Details 8 16 QC of Deliverables & Comment Response 8 8 TOTAL LABOR HOURS 48 64 104 160 0 0 0 0 0 0 LABOR RATES ($/HR) $ 166.03 $ 226.41 $ 166.03 $ 120.75 $ - $ - $ - $ - $ - $ - LABOR COSTS ($) $ 7,969.44 $ 14,490.24 $ 17,267.12 $ 19,320.00 $ - $ - $ - $ - $ - $ EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1. One site visit to Seward 2. KPB will lead building design, R&M will lead South Uplands land planning and site development 3. KPB Fee Proposal includes additonal subs contracted through KPB: Structural (RMI) - $24,779.40 Mechanical (RSA) - $29,283.50 Electrical (RSA) - $22,443.50 4. Assumes cost estimation under Design Bid Build tradtional approach, Cost Estimator (TBD) estimate provided by R&M based on previous projects 1 Misc. Field Supplies 1 $ 50.00 $ 50.00 R&M Vehicle Milage 256 $ 0.75 $ 192.00 Per Diem Meals 1 $ 131.00 $ 131.00 TOTAL EXPENSES: $ 373 R&M Laboratory Testing TOTAL COST OF LABOR $ 59,046.80 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 373.00 FIRM: AMOUNT: KPB Architects Cost Estimator TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 266,357.98 $ 230,143.62 $ 12,000.00 FIRM'S TOTAL COST $ 325,778.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 6 TASK DESCRIPTION: 100% Design & Permit Bid Support DATE: 12/29/2025 GROUP: Eng/Arch METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: C. Black, T Oleson-Yelle SUB -TASK NO SUB -TASK DESCRIPTION Project Manager Site Development Civil Eng Staff Civil Eng Professional 2 Professional 4 Professional 2 Engineer 1 T. Oleson-Yelle C. Black S. 0 Project Management 40 Subcontractor Coordination 8 8 Coordination Meetings 8 Site Visit 8 8 Civil Plans 40 Cover, Notes, Legend, etc. 4 8 Existing Conditions, Demo Plan 4 8 Site Plan 4 12 Site Grading 8 12 Site Sections 4 8 Overall Utility Plan 4 8 Storm Drainage Drawings 4 8 Water/Sewer Service Plan and Profiles 8 16 Civil and Utility Details 4 8 ADEC Stormwater Leeter of Nonobjection 8 16 QC of Deliverables & Comment Response 8 4 TOTAL LABOR HOURS 48 68 68 104 0 0 0 0 0 0 LABOR RATES ($/HR) $ 166.03 $ 226.41 $ 166.03 $ 120.75 $ - $ - $ - $ - $ - $ - LABOR COSTS ($) $ 7,969.44 $ 15,395.88 $ 11,290.04 $ 12,558.00 $ - $ - $ - $ - $ - $ - 1 EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1. One site visit to Seward 2. KPB will lead building design, R&M will lead South Uplands land planning and site development 3. KPB Fee Proposal includes additonal subs contracted through KPB: Structural (RMI) - $18,447.30 Mechanical (RSA) - $42,000 CA + $1,560 Permit Support Electrical (RSA) - $32,640 CA + $1,560 Permit Support 4. Assumes cost estimation under Design Bid Build tradtional approach, Cost Estimator (TBD) estimate provided by R&M based on previous projects 11 Misc. Field Supplies 1 $ 50.00 $ 50.00 R&M Vehicle Milage 256 $ 0.75 $ 192.00 Per Diem Meals 2 $ 131.00 $ 262.00 TOTAL EXPENSES: $ 504 R&M Laboratory Testing TOTAL COST OF LABOR $ 47,213.36 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 504.00 FIRM: AMOUNT: KPB Architects Cost Estimator TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 297,763.51 $ 258,694.10 $ 12,000.00 FIRM'S TOTAL COST $ 345,481.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 7 TASK DESCRIPTION: Construction Administration DATE: 12/29/2025 GROUP: CA METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: G Shear SUB -TASK NO SUB -TASK DESCRIPTION Project Manager CA Project Manager Inspector Inspector OT Professional2 - - - T. Oleson-Yelle G. Shear H. Seibold H. Seibold Project Management 20 222 Onsite Inspection 1760 880 TOTAL LABOR HOURS 20 222 1760 880 0 0 0 0 0 0 LABOR RATES ($/HR) $ 166.03 $ 244.52 $ 175.09 $ 262.63 $ - $ - $ - $ - $ - $ - LABOR COSTS ($) $ 3,320.60 $ 54,283.44 $ 308,158.40 $ 231,114.40 $ - $ - $ - $ - $ - $ - 1 EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE 1. Assumed a 9 month construction schedule with full time Construction Administration Onsite Inspection. - ! Local Mileage (R&M vehicle) 0 $1.00 $ - Food PD (OCONUS) 60 $131.00 $ 7,860.00 Housing (monthly) 9 $3,500.00 $ 31,500.00 Nuclear Density Gauge (Daily) 30 $110.00 $ 3,300.00 General Consumables 1 $2,027.00 $ 2,027.00 Concrete Compressive Strength Cylinder 12 $50.00 $ 600.00 Asphalt Content by Ignition Method 1 $330.00 $ 330.00 Bulk Specific Gravity of Asphalt (Core) 1 $175.00 $ 175.00 Sieve Analysis with Wash 1 $290.00 $ 290.00 TOTAL EXPENSES: $ 46,082 R&M Laboratory Testing TOTAL COST OF LABOR $ 596,876.84 R&M MATERIAL LABORATORY EXPENSES $ - SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 46,082.00 FIRM: AMOUNT: KPB Architects TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 228,325.66 $ 207,568.78 FIRM'S TOTAL COST $ 871,284.00 COST ESTIMATE PER TASK FIRM: R&M Consultants, Inc. PROJECT TITLE: Harbormaster Office South Uplands Plan TASK NO: 8 TASK DESCRIPTION: Special Inspections DATE: 12/29/2025 GROUP: CA METHOD OF PAYMENT: T&E RATE YEAR 2026 PREPARED BY: M Warner SUB -TASK NO SUB -TASK DESCRIPTION CA Project Manager Lab Manager Special Inspector Special Inspector OT SI Technician SI Technician OT - - - - - G. Shear M. Wariner E. Schramm E. Schramm J. Siemens J. Siemens Project Management 12 Special Inspections Structural Fill Inspections/Testing 24 10 Foundation Inspections 24 12 Reinforcing Steel Inspections 32 16 Concrete Inspections/Testing 40 20 16 8 Structural Steel Grid Ceiling/Special Inspections 16 8 TOTAL LABOR HOURS 0 12 112 56 40 18 0 0 0 0 LABOR RATES ($/HR) $ 244.52 $ 238.48 $ 135.84 $ 203.78 $ 120.75 $ 181.13 $ - $ - $ - $ - LABOR COSTS ($) $ - $ 2,861.76 $ 15,214.08 $ 11,411.68 $ 4,830.00 $ 3,260.34 $ - $ - $ - $ - 7 EXPENSES COMMENTS Project Expenses ITEM(S) QUANTITY UNIT PRICE TOTAL PRICE ' r Food PD (OCONUS) 20 $ 131.00 $ 2,620.00 TOTAL EXPENSES: $ 2,620 R&M Laboratory CT-01 Testing Concrete Compressive Strength Cylinder 20 $ 50.00 $ 1,000.00 TOTAL COST OF LABOR $ 37,577.86 R&M MATERIAL LABORATORY EXPENSES $ 1,000.00 SUB -CONTRACTORS: Firm Initials and Price Per Task FIRM'S TOTAL EXPENSES $ 2,620.00 FIRM: AMOUNT: QA Services TOTAL SUBCONTRACTOR PRICES (w/markup %): 10.00% $ 4,400.00 $ 4,000.00 FIRM'S TOTAL COST $ 45,598.00 December 1, 2025 Christopher D. Fell, CPG Group Manager — Geosciences R&M Consultants, Inc. 9101 Vanguard Drive Anchorage, AK 99507 P.O. Box 111165 Anchorage, Alaska 99511 (907) 344-6431 Fax (866) 901-3499 Quote # 25-470 Discovery Drilling Inc. is pleased to submit this cost estimate for geotechnical drilling services in Seward, Anchorage. We plan to field a truck -mounted CME-75 operated by a 2-man crew to perform this work. Discovery Drilling understands the scope of work is as follows: • Mobilize drill, equipment, & crew to site. • Drill, sample, and backfill (2) soil borings to 60', And (1) to 40' collecting split spoon samples at standard geotechnical intervals. • Borings will be backfilled with cuttings unless contaminants are encountered, • Nothing installed in borings. Discovery Drilling assumes the following regarding this work: • Client will be responsible for site access. • Client will be responsible for utility locates. • No wage requirements apply to this work. Mobilization/Demobilization of truck -mounted drill, crew, and equipment to site — LS: $3,030 Geotechnical Drilling Services — estimate 4 days @ $5,220/day: $20,880 HSA wear items, expendables — estimate 160' @ $9/ft: $1,440 Cut, Patch, Backfill material — estimate 3 each @ $50/ea: $150 Estimated Project Total: $25,500.00 We look forward to working with you on this project. Please call with any questions you may have. Sincerely, Losi Vaha'akolo Operations Manager Discovery Drilling Inc. Kz3 Architects December 5, 2025 Taryn Oleson-Yelle Senior Planner R&M Consultants, INC RE: Seward Harbormaster and South Uplands Master Plan — Fee for Architecture and Engineering Dear Taryn: Thank you for the opportunity to work with you on this exciting project in Seward, Alaska. Our team met internally to develop our approach and work plan to accomplish these deliverables. Scope of Work: 1. Harbormaster Office Building a. Approximately 8,000 SF b. Office Space c. Public Space d. Maintenance shop e. 2 story building 2. Site Design and landscape Architecture for South Uplands Site a. Parking b. Circulation c. Boardwalk d. Land Lease location 3. Design Standards for Land Lease Projects — Deferred a. Zoning/regulatory research b. Development of criteria for building typology c. Building design criteria d. Special features/details/signage e. Building technical performance Project Team: Architecture: KPB Architects Site/Landscape Design: KPB Architects Structural Engineering: Reid -Middleton Mechanical/Electrical Engineering: RSA Engineers Lighting Design: First Circle 500 L Street, Suite 400 Anchorage, AK 99501 P: 907.274.7443 F: 907.274.7407 www.kpbarchitects.com Kt3 Architects Deliverables: Schematic Design - 35% • Concept Verification (plans and exterior materials review and charrette) • Code Study • Site Plan • Floor Plans • Exterior Elevations • 2 in-house exterior renderings Design Development - 65% • Code Study and Code Plan • Site Plan • Floor Plans • Reflected Ceiling Plans • Exterior Elevations • Building Sections • Specifications • Architectural and Furniture Finish Presentation • Light Fixture Selections • Coordination with Engineers • Cost Estimate Coordination • Pre -Permit meeting with Building Official • Client Meeting for review and approval of drawings • One meeting per week to review status and respond to questions • 2 in-house exterior renderings • 2 in-house interior renderings Construction Documents —100% • Code Study and Code Plan • Site Plan • Floor Plans • Furniture Plans • Reflected Ceiling Plans • Interior Elevations • Details • Door Schedules • Coordination with Engineers • Finish Material Legend and Schedule • Final furniture package • Specifications • Cost Estimate Coordination • Client meeting for review and approval of documents Kt3 Architects • One meeting per week to review status and respond to questions Regulatory, Permitting & Bidding Support (CMGC or DBB) • Permitting questions and responses. • Assist in issuing bid package • Assist in bid analysis • Conformed Drawings Construction Administration (CA), and Closeout • Coordination With Contractor • Site Visits • Submittal Reviews • Review Request for Information (RFI) • Generate ASI's as needed. (Architect Supplemental Information) • Punch List • Final inspection post punch list. • One OAC meeting per week to review status and respond to questions. Schedule: A Design Schedule will be developed in partnership with R&M and the City of Seward Assumptions and Exclusions *Building Permit Cost not included in this proposal *Professional Renderings can be added for additional fee *Cost Estimator not included in this proposal. Cost Estimator can be added for additional fee Design Fee Summary: Task 300 : Schematic Design — 35% Task 400 : Design Development — 65% Task 500 : Construction Documents — 100% Task 700 : Permitting & Bidding Task 800 : Construction Administration TOTAL : Fee includes reimbursables and 10% markup on subconsultants Task 1100 : Design Standards for Land Lease Projects — Deferred TOTAL : $203,521.79 $230,143.62 $228,407.01 $30,287.00 $207,568.78 $899,928.20 $56,860,.00 $56,860.00 Kt3 Architects Thank you for the opportunity and please feel free to contact us should you have any questions or concerns. Sincerely, Approved Andrew Weiss, AIA, NCARB KPB Architects Inc. Taryn Oleson-Yelle R&M Consulting, INC PROPOSAL FOR PROFESSIONAL SERVICES Client Name RFP/Proposal Number Project Number Project Name Prepared By Date Template version date 8/12/2020 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss 11.17.2025 KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 604.00 0.00 0.00 0.00 378.00 0.00 1,555.00 0.00 348.00 0.00 KPB Professional fees $ - $ 171,536.00 $ - $ - $ - $ 99,792.00 $ - $ 181,935.00 $ - $ 78,648.00 $ - Total KPB Prof fees $ 531,911.00 Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name RMI RSA RSA Sub -consultant fee 0.00 102,472.00 130,800.00 103,920.00 0.00 0.00 0.00 0.00 40,820.00 0.00 0.00 Sub -consultant expenses 0.00 1,616.00 467.50 467.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Handling fee Total Sub -consultant costs $ 2,551.00 $ 378,012.00 $ 38,056.30 $ 418,619.30 Travel and Reimbursable Expenses Per Diem -Meals Per Diem -Meals Quantity Lodging Lodging Quantity Ground Transportation Ground Transportation Quantity Auto Rental Auto Rental Quantity Airfare Airfare Quantity Parking Parking Quantity Vehicle Milage Vehicle Milage Quantity Other Travel Item Other Travel Item Quantity Other Travel Item Other Travel Item Quantity Other Reimbursable expenses Mark-up on Reimbursable Expenses 72 $ 25.00 See Attached Listing on final page Subtotal KPB expenses Mark-up fee $ 1,800.00 KPB Reimb exp $ 6,257.90 15 $ 200.00 $ 3,000.00 0 $ - 0 $ - 0 $ - 0 $ - 1270 $ 0.70 $ 889.00 0 $ - $ - 0 $ - $ - 10.00% $ - $ 5,689.00 $ 568.90 Total Grand Total for Project $ 956,788.20 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 1 of 17 Summary Page Fee Proposal Matrix by Discipline and Task Discipline KPB Architects Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other TOTAL Phase 300 Phase 400 Phase 500 Project Number Project Name Prepared By Phase 700 24027.01 COS Harbormaster Andrew Weiss Phase 800 Task 1100 Schematic Design - 35% Design Development - 65% Construction Documents - 100 Keguiatory, Construction Permitting & Bidding Support Administration inww�n _- nn n(T&M w/NTE) uesign Standards for Land Lease Total Total Total Total Total Total Contract Total $ 137,448.49 $ 142,367.22 $ 119,065.71 $ 14,157.00 $ 106,326.78 $ 56,860.00 $ 576,225.20 $ - $ - $ - $ - $ - $ - $ - $ 25,553.30 $ 24,779.40 $ 21,131.30 $ 3,270.00 $ 29,354.00 $ - $ 104,088.00 $ 17,640.00 $ 29,283.50 $ 42,000.00 $ 5,280.00 $ 37,064.00 $ - $ 131,267.50 $ 13,680.00 $ 22,443.50 $ 32,640.00 $ 5,280.00 $ 30,344.00 $ - $ 104,387.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9,200.00 $ 11,270.00 $ 13,570.00 $ 2,300.00 $ 4,480.00 $ - $ 40,820.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 203,521.79 $ 230,143.62 $ 228,407.01 $ 30,287.00 $ 207,568.78 $ 56,860.00 $ 956,788.20 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 2 of 17 FEE MATRIX Phase 300 PROPOSAL FOR PROFESSIONAL SERVICES Schematic Design - 35% Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 149.00 0.00 0.00 0.00 100.00 0.00 431.00 0.00 42.00 0.00 KPB Professional fees $ - $ 42,316.00 $ - $ - $ - $ 26,400.00 $ - $ 50,427.00 $ - $ 9,492.00 $ - Total KPB Prof fees $ 128,635.00 _ Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ 25,284.00 $ 17,640.00 $ 13,680.00 $ - $ - $ - $ - $ 9,200.00 $ - $ - Sub -consultant expenses $ - $ 269.30 $ - $ - $ - $ - $ - $ - $ - $ - $ - Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ 269.30 $ 65,804.00 $ 6,607.33 $ 72,680.63 _ Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps Mark-up on Reimbursable Expenses 18 units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ 450.00 KPB Reimb exp $ 2,206.16 6 $ 200.00 $ 1,200.00 $ - $ - $ - $ - $ - $ - $ - $ - 508 $ 0.70 $ 355.60 $ - $ - $ - $ - $ - 10.00% $ 200.56 Total Task Total $ 203,521.79 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 3 of 17 Phase 300 Schematic Design - 35% Details Phase300 Labor Detail Schematic Design - 35% PROPOSAL FOR PROFESSIONAL SERVICES Project Number Project Name Prepared By 24027.01 COS Harbormas er-S. Uplands PIE - Andrew Weiss Rate Hours Total Principal 345.00 0.00 Project Manager/ Desi. ner 284.00 149.00 $ 42,316.00 Architect III 231.00 0.00 Architect II 177.00 0.00 Architect I 154.00 0.00 Sr. Landscape Architect/ Planner 264.00 100.00 $ 26,400.00 Project Designer III 165.00 0.00 Project Designer II 117.00 431.00 $ 50,427.00 Project Designer I 101.00 0.00 Interior Designer 226.00 42.00 $ 9,492.00 Administrative 188.00 0.00 Labor Detail Plannin 9 Coordination Meetings Regulatory Research Code Review 6.00 2.00 8.00 6.00 8.00 20.00 Reports Meetings Public Presentations 6.00 6.00 6.00 Meetings with Regulatory Agencies 6.00 6.00 Meetings with Stakeholders 3.00 3.00 Schematic Design - Architecture Programming Development Design Design Drawings Design Specifications QA/QC 6.00 16.00 40.00 10.00 10.00 24.00 24.00 120.00 48.00 30.00 16.00 Submittal 4.00 10.00 NE Team Coordination 6.00 6.00 6.00 Cost Estimate Coordination 4.00 4.00 4.00 Schematic Design - Site/Landscape Master Plan Update and AE Coord Site Plan 24.00 30.00 12.00 20.00 Site Amenities 8.00 8.00 KPB Team Coordination/Narratives 8.00 8.00 Presentation Submittal 3D Renders 40.00 Packet 6.00 10.00 Site Plan 10.00 Furniture 16.00 Concept Varification On -site Charrette 8.00 8.00 8.00 3D images Material selection studies 8.00 8.00 8.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 4 of 17 Phase300 Labor Detail Phase 400 PROPOSAL FOR PROFESSIONAL SERVICES Design Development - 65% Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 114.00 0.00 0.00 0.00 66.00 0.00 411.00 0.00 152.00 0.00 KPB Professional fees $ - $ 32,376.00 $ - $ - $ - $ 17,424.00 $ - $ 48,087.00 $ - $ 34,352.00 $ - Total KPB Prof fees $ 132,239.00 Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ 24,510.00 $ 29,160.00 $ 22,320.00 $ - $ - $ - $ - $ 11,270.00 $ - $ - Sub -consultant expenses $ - $ 269.40 $ 123.50 $ 123.50 $ - $ - $ - $ - $ - $ - $ - % Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ 516.40 $ 87,260.00 $ 8,777.64 $ 96,554.04 Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps % Mark-up on Reimbursable Expenses 18 units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ 450.00 KPB Reimb exp $ 1,350.58 3 $ 200.00 $ 600.00 $ - $ - $ - $ - $ - $ - $ - $ - 254 $ 0.70 $ 177.80 $ - $ - $ - $ - $ - 10.00% $ 122.78 Total Task Total $ 230,143.62 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 5 of 17 Phase 400 Design Development - 65% Details Phase 400 Labor Detail Design Development - 65% PROPOSAL FOR PROFESSIONAL SERVICES Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands PI. Andrew Weiss Rate Hours Total Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 0.00 114.00 0.00 0.00 0.00 66.00 0.00 411.00 0.00 152.00 0.00 $ - $ 32,376.00 $ - $ - _ $ $ 17,424.00 $ $ 48,087.00 $ _ $ 34,352.00 $ Labor Detail Planning _ Coordination Meetings 6.00 6.00 Regulatory Research 2.00 8.00 Code Review 1.00 4.00 Reports Meetings Public Presentations 6.00 6.00 6.00 Meetings with Regulatory Agencies 6.00 6.00 Meetings with Stakeholders 3.00 3.00 Design Development - Architecture Design 8.00 24.00 24.00 Design Drawings 40.00 120.00 40.00 Design Specifications 10.00 60.00 QA/QC 10.00 30.00 Submittal 4.00 10.00 A/E team coordination 6.00 6.00 6.00 Cost estimate Coordination 4.00 4.00 4.00 Design Develpmnt - Site/Landscape Master Plan Update and AE Coord 16.00 16.00 Site Plan 16.00 24.00 Site Amenities 16.00 16.00 KPB Team Coordination/Narratives 8.00 8.00 Cost Estimate Coordination 4.00 Graphics for Presentation 3D Renders 40.00 30.00 Packet 8.00 12.00 24.00 Site Plan 8.00 Furniture 24.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 6 of 17 Phase 400 Labor Detail Phase 500 PROPOSAL FOR PROFESSIONAL SERVICES Construction Documents -100 Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 59.00 0.00 0.00 0.00 74.00 0.00 305.00 0.00 154.00 0.00 KPB Professional fees $ - $ 16,756.00 $ - $ - $ - $ 19,536.00 $ - $ 35,685.00 $ - $ 34,804.00 $ - Total KPB Prof fees $ 106,781.00 _ Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ 20,862.00 $ 42,000.00 $ 32,640.00 $ - $ - $ - $ - $ 13,570.00 $ - $ - Sub -consultant expenses $ - $ 269.30 $ - $ - $ - $ - $ - $ - $ - $ - $ - Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ 269.30 $ 109,072.00 $ 10,934.13 $ 120,275.43 _ Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps Mark-up on Reimbursable Expenses 18 units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ 450.00 KPB Reimb exp $ 1,350.58 3 $ 200.00 $ 600.00 $ - $ - $ - $ - $ - $ - $ - $ - 254 $ 0.70 $ 177.80 $ - $ - $ - $ - $ - 10.00% $ 122.78 Total Task Total $ 228,407.01 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 7 of 17 Phase 500 Construction Documents - 100% Details Phase500 Labor Detail PROPOSAL FOR PROFESSIONAL SERVICES Construction Documents - 100% Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands PI. Andrew Weiss Rate Hours Total Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/Designer Planner Project III Project Designer II Project Designer I Interior Designer Administrative $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 0.00 59.00 0.00 0.00 0.00 74.00 0.00 305.00 0.00 154.00 0.00 $ - $ 16,756.00 $ - $ - _ $ $ 19,536.00 $ $ 35,685.00 $ _ $ 34,804.00 $ Labor Detail Planning _ Coordination Meetings 6.00 6.00 Regulatory Research 2.00 8.00 Code Review 2.00 8.00 Reports Meetings Public Presentations 6.00 6.00 6.00 Meetings with Regulatory Agencies 6.00 6.00 Meetings with Stakeholders 3.00 3.00 Construction Documents Design Design Drawings 6.00 60.00 40.00 Design Specifications 4.00 30.00 QA/QC 6.00 24.00 Submittal 2.00 12.00 A/E Team Coordination 6.00 6.00 6.00 Interim 95% Submittal 6.00 24.00 Cost Estimate Coordination 4.00 4.00 4.00 FF&E Package 80.00 Final Design - Site/Landscape Master Plan Update and AE Coord 8.00 8.00 Site Plan 16.00 28.00 Site Amenities 32.00 24.00 KPB Team Coordination/Narratives 8.00 8.00 Cost Estimate Coordination 4.00 Graphics for Presentation 3D Renders 24.00 Packet 8.00 24.00 Site Plan 8.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 8 of 17 Phase500 Labor Detail Phase 700 PROPOSAL FOR PROFESSIONAL SERVICES Regulatory, Permitting & Bidding Support (CMGC or DBB) Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 32.00 0.00 0.00 0.00 6.00 0.00 16.00 0.00 0.00 0.00 KPB Professional fees $ - $ 9,088.00 $ - $ - $ - $ 1,584.00 $ - $ 1,872.00 $ - $ - $ - Total KPB Prof fees $ 12,544.00 Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ 3,270.00 $ 5,280.00 $ 5,280.00 $ - $ - $ - $ - $ 2,300.00 $ - $ - Sub -consultant expenses $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - % Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ - $ 16,130.00 $ 1,613.00 $ 17,743.00 Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps % Mark-up on Reimbursable Expenses units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ - KPB Reimb exp $ - $ 200.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.70 $ - $ - $ - $ - $ - $ - 10.00% $ - Total Task Total $ 30,287.00 Confidential Information (Rev3.4) KPB Architects,Inc. Printed on 12/4/2025, 1:00 PM Page 9 of 17 Phase 700 Regulatory, Permitting & Bidding Support (CMGC or DBB) Details Phase 700 Labor Detail PROPOSAL FOR PROFESSIONAL SERVICES Regulatory, Permitting & Bidding Support (CMGC or DBB) Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands PIS Andrew Weiss Rate Hours Total _ Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 0.00 32.00 0.00 0.00 0.00 6.00 0.00 16.00 0.00 0.00 0.00 $ - $ 9,088.00 $ - $ - $ - _ $ 1,584.00 $ - $ 1,872.00 $ - $ - $ - Labor Detail Coordinate owner 4.00 Issue Package 4.00 4.00 Addenda Bid Analysis 4.00 Meetings 4.00 2.00 4.00 Permiting Questions and Responces 16.00 4.00 8.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 10 of 17 Phase 700 Labor Detail Phase 800 PROPOSAL FOR PROFESSIONAL SERVICES Construction Administration (T&M w/NTE) Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 188.00 0.00 0.00 0.00 56.00 0.00 228.00 0.00 0.00 0.00 KPB Professional fees $ - $ 53,392.00 $ - $ - $ - $ 14,784.00 $ - $ 26,676.00 $ - $ - $ - Total KPB Prof fees $ 94,852.00 _ _ Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ 28,546.00 $ 36,720.00 $ 30,000.00 $ - $ - $ - $ - $ 4,480.00 $ - $ - Sub -consultant expenses $ - $ 808.00 $ 344.00 $ 344.00 $ - $ - $ - $ - $ - $ - $ - Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ 1,496.00 $ 99,746.00 $ 10,124.20 $ 111,366.20 _ _ Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps Mark-up on Reimbursable Expenses 18 units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ 450.00 KPB Reimb exp $ 1,350.58 3 $ 200.00 $ 600.00 $ - $ - $ - $ - $ - $ - $ - $ - 254 $ 0.70 $ 177.80 $ - $ - $ - $ - $ - 10.00% $ 122.78 Total Task Total $ 207,568.78 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 11 of 17 Phase 800 Construction Administration (T&M w/NTE) Details Phase 800 Labor Detail PROPOSAL FOR PROFESSIONAL SERVICES Construction Administration (T&M w/NTE) Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands PIE - Andrew Weiss Rate Hours Total Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 0.00 188.00 0.00 0.00 0.00 56.00 0.00 228.00 0.00 0.00 0.00 $ - $ 53,392.00 $ - $ - $ - _ $ 14,784.00 $ $ 26,676.00 $ $ $ Labor Detail Respond to Permitting Comments 8.00 8.00 Submittals 24.00 8.00 16.00 Substitution Requests 8.00 RFI's 16.00 32.00 ASI's 16.00 32.00 Site Visits (3) 24.00 24.00 Inspections (3) 24.00 24.00 24.00 Closeout 8.00 24.00 16.00 OAC Meetings (1 hr per week) 52.00 52.00 Conformed Documents 8.00 24.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 12 of 17 Phase 800 Labor Detail Task 1100 PROPOSAL FOR PROFESSIONAL SERVICES Design Standards for Land Lease Projects Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands Plan Andrew Weiss KPB Professional fees Discipline Principal Project Manager/ Designer Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative Rate $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 Hours 0.00 62.00 0.00 0.00 0.00 76.00 0.00 164.00 0.00 0.00 0.00 KPB Professional fees $ - $ 17,608.00 $ - $ - $ - $ 20,064.00 $ - $ 19,188.00 $ - $ - $ - Total KPB Prof fees $ 56,860.00 Sub -consultants for this contract (attach breakdown for each sub -consultant) Sub -consultant type Civil Structural Mech Elec BHS Geotech Survey Cost Estimate Lighting Other Other Sub -consultant name 0 RMI RSA RSA 0 0 0 0 0 0 0 Sub -consultant fee $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Sub -consultant expenses $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Mark-up on Sub -consultant fees & expenses 10.00% Subtotal sub -consultant exp Subtotal sub -consultant fee Subtotal Mark-up Total Sub -consultant costs $ - $ - $ - $ - _ Travel and Other Reimbursable Expenses Per Diem -Meals Lodging Ground Transportation Auto Rental Airfare Parking Vehicle Milage Other Travel Item Other Travel Item Other Reimbursable exps Mark-up on Reimbursable Expenses units @ units @ units @ units @ units @ units @ units @ units @ units @ $ 25.00 See Attached Listing on final page Subtotal KPB expenses $ - KPB Reimb exp $ - $ 200.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.70 $ - $ - $ - $ - $ - $ - 10.00% $ - Total Task Total $ 56,860.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 15 of 17 Task 1100 Design Standards for Land Lease Projects Details Phase 1100 Labor Detail PROPOSAL FOR PROFESSIONAL SERVICES Design Standards for Land Lease Projects Project Number Project Name Prepared By 24027.01 COS Harbormaster-S. Uplands PI Andrew Weiss Rate Hours Total Principal Project Manager/ Desigher Architect III Architect II Architect I Sr. Landscape Architect/ Planner Project Designer III Project Designer II Project Designer I Interior Designer Administrative $ 345.00 $ 284.00 $ 231.00 $ 177.00 $ 154.00 $ 264.00 $ 165.00 $ 117.00 $ 101.00 $ 226.00 $ 188.00 0.00 62.00 0.00 0.00 0.00 76.00 0.00 164.00 0.00 0.00 0.00 $ - $ 17,608.00 $ - $ - $ - $ 20,064.00 $ - $ 19,188.00 $ - $ - $ - Labor Detail Zoning/Regulatory Research 6.00 4.00 Review and Research of Precedents 4.00 4.00 12.00 Dev of Criteria for Bldg Typology 4.00 8.00 20.00 Bldg Design Criteria 8.00 10.00 24.00 Special Features/Details/Signage 10.00 10.00 20.00 Bldg Technical Performance 8.00 8.00 12.00 Draft Standards Document 12.00 12.00 40.00 Review and Coordination 8.00 8.00 8.00 Final Standards Document 8.00 10.00 24.00 Confidential Information (Rev3.4) KPB Architects, Inc. Printed on 12/4/2025, 1:00 PM Page 16 of 17 Phase 1100 Labor Detail REID MIDDLETON, INC. Date: 12/2/2025 R3 STRUCTURAL ENGINEER'S FEE ESTIMATE PROJECT: Seward South Uplands Harbormaster Building PREPARED FOR: KPB PREPARED BY: David Stierwalt, PE Terms: Lump Sum PROPOSAL NO: 402025.913.000.101 PRINCIPAL ASSOCIATE ASSOCIATE SENIOR PROJECT DESIGN DESIGNER PROJECT LINE TASK ITEM PRINCIPAL ENGINEER ENGINEER ENGINEER 1 ADMIN TOTALS TOTALS 1 35% Concept Design Setup 1 1 1 $ 652 Load Criteria 2 2 $ 780 Foundation Layout / Design 2 4 $ 1,084 Pile Layout & Framing & Caps (if required) 8 8 $ 3,120 2nd Floor Layout / Design (and Low Roof) 2 4 $ 1,084 Roof Layout / Design 2 4 $ 1,084 Wall / Window / Door Framing Design 2 4 $ 1,084 Lateral System Design 4 8 $ 2,168 NEW Restroom Facilities 8 16 $ 4,336 Boardwalk/Social Stair - N/A $ - Playground /Park Support - N/A $ - 35% Drawings 4 16 $ 3,384 Specifications - TOC 1 1 $ 382 Weekly OA Meetings 8 $ 1,904 Milestone Presentation (in Seward) 12 $ 2,856 Misc. Project Management 1 4 1 $ 1,366 Subtotal Task 1 2 60 0 0 0 66 3 131 $ 25,284 2 65% Design Development 65% Drawings 8 24 $ 5,552 Draft Specifications 8 2 $ 2,192 Calculations 12 12 $ 4,680 NEW Restroom Facilities 8 16 $ 4,336 Pile Coord with Geotech 2 2 $ 780 Boardwalk/Social Stair - N/A $ - Playground /Park Support - N/A $ - QC Review 2 2 2 $ 1,320 Weekly OA Meetings 6 $ 1,428 Milestone Presentation (in Seward) 12 $ 2,856 Misc. Project Management 1 4 1 $ 1,366 62 0 0 0 56 3 124 $ 24,510 3 100% Construction Docs 95%Drawings 8 8 $ 3,120 95% Specifications 8 2 $ 2,192 95% Calculations 6 6 $ 2,340 NEW Restroom Facilities 4 4 $ 1,560 Pile Coord with Geotech 2 2 $ 780 Boardwalk / Social Stair - N/A $ - Playground /Park Support - N/A $ - QC Review 2 2 2 $ 1,320 95% Check -In 4 $ 952 Stamped Final Drawings 2 4 $ 1,084 Final Specifications 1 $ 238 Final Calculations 1 2 $ 542 NEW Restroom Facilities 4 4 $ 1,560 Boardwalk / Social Stair - N/A $ - Playground /Park Support - N/A $ - Weekly OA Meetings 4 $ 952 Milestone Presentation (in Seward) 12 $ 2,856 Misc. Project Management 1 4 1 $ 1,366 Subtotal Task 3 0 62 0 A 0 0 32 3 100 $ 20,862 TOTAL HOURS: 8 0 184 0 0 0 154 9 $ 70,656 HOURLY RATE: $ 270 $ 248 $ 238 $ 212 $ 188 $ 170 $ 152 $ 144 SUBTOTAL LABOR: $2,160 $0 $43,792 $0 $0 $0 $23,408 $1,296 $70,656 ESTIMATED REIMBURSABLE EXPENSES (3) trips to Seward for presentations $808 TOTAL EST FEE: $71,464 A: REIMBURSABLES INCLUDE PHOTOS, M LEAGE, PER DIEM COSTS, PLOTTING & COURIER CHARGES. B: REFER TO REID MIDDLETON, INC EXHIBITS A & B. C: THIS PROJECT WILL NOT BE PUT ON HOLD OR HAVE THE PERIOD OF PERFORMANCE EXTENDED WITHOUT AN OPPORTUNITY TO ADJUST THE ENGINEERING FEES TO ACCOUNT FOR THE ADDITIONAL REWORK ASSOCIATED WITH A RESTART OR ELONGATED TIMELINES. 1 REID MIDDLETON, INC. Date: 12/2/2025 R3 STRUCTURAL ENGINEER'S FEE ESTIMATE PROJECT: Seward South Uplands Harbormaster Building PREPARED FOR: KPB PREPARED BY: David Stierwalt, PE Terms: T&MNot to Exceed PROPOSAL NO: 402025.913.000.101 ITEM PRINCIPAL ASSOCIATE PRINCIPAL ASSOCIATE SENIOR ENGINEER PROJECT ENGINEER DESIGN ENGINEER DESIGNER I PROJECT ADMIN LINE TOTALS TASK TOTALS 4 Regulatory, Permitting and Bidding Support Respond to Structural Permitting Comments Respond to Structural Bidding Comments Subtotal Task 4 1 4 8 .- 1 $ 1,366 $ 1,904 $ 3,270 5 Construction Administration Respond to Field Questions (RFIJDCVR) 24 30 $ 10,272 Review Structural Submittals Site Visit / SOR (x3) 8 24 30 24 $ 6,464 $ 9,360 As -Built Drawings Misc. Project Management 1 2 4 4 1 $ 1,084 $ 1,366 Subtotal Task 5 0 11.1.62 iiMil 0 liMP 0 0 88 1 152 $ 28,546 TOTAL HOURS: 2 0 74 0 0 0 88 2 $ 31,816 HOURLY RATE: $ 270 $ 248 $ 238 $ 212 $ 188 $ 170 $ 152 $ 144 SUBTOTAL LABOR: $540 $0 $17,612 $0 $0 S0 $13,376 $288 $31,816 ESTIMATED REIMBURSABLE EXPENSES (3) trips to Seward $808 TOTAL EST FEE: $32,624 A: REIMBURSABLES INCLUDE PHOTOS, M LEAGE, PER DIEM COSTS, PLOTTING & COURIER CHARGES. B: REFER TO REID MIDDLETON, INC EXHIBITS A & B. C: THIS PROJECT WILL NOT BE PUT ON HOLD OR HAVE THE PERIOD OF PERFORMANCE EXTENDED WITHOUT AN OPPORTUNITY TO ADJUST THE ENGINEERING FEES TO ACCOUNT FOR THE ADDITIONAL REWORK ASSOCIATED WITH A RESTART OR ELONGATED TIMELINES. 35% Concept Design 65% Design Development 100% Construction Docs Regulatory, Permitting and Bidding Support Construction Administration SUM Labor Expenses TOTAL $ 25,284 $ 269 $ 25,553 $ 24,510 $ 269 $ 24,779 $ 20,862 $ 269 $ 21,131 $ 3,270 $ - $ 3,270 $ 28,546 $ 808 $ 29,354 $ 102,472 $ 1,615 $ 104,087 Lump Sum Total $ 70,656 $ 808 $ 71,464 T&M NTE Total $ 31,816 $ 808 $ 32,624 SUM $ 102,472 $ 1,615 $ 104,087 1 R S A Engineering, Inc KPB Architects 500 L Street, Suite 400 Anchorage, AK 99501 July 14, 2025 November 19, 2025 November 24, 2025 ATTENTION: Natalie Dickhaus Dear Natalie, REFERENCE: Harbormaster and South Uplands Mechanical and Electrical Design Fees Mechanical & Electrical Engineers RSA Engineering is pleased to offer a fee proposal for mechanical and electrical engineering services for the referenced project. We have based our scope of work on the Harbormaster and South Uplands concept design packet, your e-mail correspondence dated June 23, 2025 along with the following assumptions: General: • Nov 24: Bidding services have been replaced with reconciliation services. These service include review of contractor and A/E estimate at the 65%, 95%, and 100% milestones. • Nov 19: We have revised the fee letter to include construction administration services, which will be provided on a T&M basis. We anticipate that once we utilize 80% of the funds we will notify you and determine if additional funds are required. o In Office Construction Administration (C/A) services include submittal review and DCVR review/response. o We have provided Two inspections for Mechanical and Electrical, which are line itemed in the proposal. These are assumed to be day trips to Seward. o Project Closeout services include review of operation and maintenance manuals and preparation of record drawings based upon contractor generated redline mark-ups. • Scope: Harbor Master building in Seward, AK. The building will be approximately 8,000 sq. ft and contain office space, public space, and a maintenance shop. • Deliverables: We will provide the following design submittals, 35% Schematic Design, 65% Design Development, and 100% Bid Documents. • Specifications will be prepared using CSI Master Format as part of a bound project manual. For the 35% submittal a specification table of contents will be delivered. 65% and 100% submittals will include complete specifications. • Review Meetings: We have included time for review meetings with the owner following the 35% and 65% submittals. • Site Visits: We have included a one -day trip to Seward to participate in a design review after the 65% design submittal. • Permitting: We will answer any questions that come up during the plan review process and issue any sketches or clarifications as required. All other construction phase services will be negotiated subsequently to the design phase. Mechanical: 670 W. Fireweed Ln, Ste 200 Anchorage, AK (907) 276-0521 I www.rsa-ak.com November 24, 2025 • Mechanical design will include new plumbing, heating, and ventilation. Plumbing systems will be designed to 5 feet outside of the building foundation to connect to site utilities designed by Civil Engineer. • Sprinkler systems will be performance specified to be designed and installed by the successful bidding Sprinkler contractor. Electrical: • Electrical Design will include new power distribution, lighting and telecom systems for the new building. • Fire Alarm systems will be performance specified to be designed and installed by the successful bidding Fire Alarm contractor. Exclusions: • We have not included construction phase services (bid phase assistance, submittal review, DCVR review/response, construction inspections, O&M manual review, and preparation of record drawings based upon contractor generated mark-ups). Construction phase services will be negotiated at a later time. RSA proposes the following lump sum fee for this project: Project Deliverables 35% Schematic Design 65% Design Development 100% Construction Documents Reconciliation Design Subtotal: CA Services (T&E) In Office CA Inspection 1 Inspection 2 Project Closeout C/A Subtotal: GRAND TOTALS: Travel Mechanical Electrical Costs Total $17,640.00 $13,680.00 $0.00 $31,320.00 $29,160.00 $22,320.00 $247.00 $51,727.00 $42,000.00 $32,640.00 $0.00 $74,640.00 $5,280.00 $5,280.00 $0.00 $10,560.00 $94, 080.00 $73, 920.00 $247.00 $168, 247.00 $24, 720.00 $20, 280.00 $0.00 $45, 000.00 $2, 880.00 $2, 880.00 $344.00 $6,104.00 $2, 880.00 $2, 880.00 $344.00 $6,104.00 $6,240.00 $3,960.00 $0.00 $10,200.00 $36,720.00 $30,000.00 $688.00 $67,408.00 $130,800.00 $103,920.00 $935.00 $235,655.00 Please review and advise if this proposal is acceptable by issuing us a contract or sending us a notice to proceed. We look forward to working with you on this project. rrd/bw 25-0279r2/P25-164 Sincerely, ffl/.4 Ralph R. DeStefano, P.E. Principal Mechanical Engineer Page 2of2 BEAUTIFUL AND INTELLIGENT LIGHTING DESIGN 3187 Airway Avenue, Bldg C, Costa Mesa CA 92626 Introduction December 2, 2025 Andrew Weiss KPB Architects 500 L Street Suite 400 Anchorage AK 99501 Re: Harbormaster & South Uplands o: 949.681.0500 Dear Andrew, I am pleased to submit this lighting design proposal for the Harbormaster and South Uplands project located in Seward, AK. First Circle Design, Inc.'s recognition in the architectural world has been achieved by its numerous award -winning, world -renown lighting designs. Established in 2006, FCD's portfolio includes landscape, site, specialty lighting design for casinos, hospitality, office, restaurants, retail, mixed -use, sports, live entertainment, and much more! The design team at FCD is committed to illuminating each Client's vision and achieving all project goals by providing exceptional coordination and communication. During the design process, we evaluate and propose energy efficient strategies and cost effective management methods. As a leading force in innovative lighting design utilizing LED technology, First Circle Design, Inc. is the prime choice for a well -coordinated, signature lighting design that is economical and maintenance friendly. This document is in three parts as follows: PART I: Scope of Services PART II: Investment and Terms PART III: Services Not Included, Client Responsibility, and General Conditions Please do not hesitate to call or email me should any questions or comments arise. Sincerely, Matt Levesque Founding Principal matt@firstcircledesign.com GUARANTEED HIGH END TECHNOLOGY PERFORMANCE DESIGN INTEGRATION PROVEN SYSTEM AND DESIGN METHODOLOGY BEAUTIFUL AND INTELLIGENT LIGHTING DESIGN 3187 Airway Avenue, Bldg C, Costa Mesa CA 92626 Scope of Services Scope of Work The following areas are included: • Site including ramps and boardwalk • Harbor Master interior and exterior The following areas are not included: • Leasing building. • Any areas not specified above. o: 949.681.0500 Schematic Design Upon the Client's approval of this proposal, First Circle Design, Inc. (FCD) will proceed with the commencement of the Schematic Design phase. FCD will participate in design conferences with the Landscape Architect, Architect, Interior Designer, Client, and other consultants to discuss and confirm project illumination criteria, project cost guidelines, local energy codes, and design standards, and, will coordinate schedule parameters. FCD will provide preliminary design drawings, illustrations, and manufacture cutsheets to further illustrate the lighting design intent. FCD will submit/present up to (1) design package and (1) revision for this phase of work. FCD has estimated up to (3) design meetings/conference calls in this phase. Design Development Based on the Client's comments of the Schematic Design documents, confirmation of updated backgrounds, and received payment for any open invoices, FCD will proceed with the Design Development phase. FCD will provide design drawings in Revit + CAD formats with supporting manufacturer cutsheets. FCD will coordinate the lighting control system with the project's electrical engineer. FCD will provide control zone layouts and control interface locations. FCD will develop photometric lighting calculation studies as necessary to inform on the lighting design intent. FCD will submit/present up to (2) design packages for this phase of work. FCD has estimated up to (4) design meetings/conference calls in this phase. GUARANTEED HIGH END TECHNOLOGY PERFORMANCE DESIGN INTEGRATION PROVEN SYSTEM AND DESIGN METHODOLOGY BEAUTIFUL AND INTELLIGENT LIGHTING DESIGN firstcircle 3187 Airway Avenue, Bldg C, Costa Mesa CA 92626 o: 949.681.0500 Construction Documents Based on the Client's comments of the design documents, budget direction, confirmation of updated backgrounds, and received payment for any open invoices, FCD will proceed with the Construction Document phase. FCD will provide updates to all design documents, manufacturer cutsheets and control zone information. FCD will consult with the Architect/Landscape Architect/Interior Designer to coordinate the lighting details as necessary. FCD will consult with the Architect/Interior Designer on the lamping and control technology for all decorative fixtures. FCD will submit/present up to (2) design packages and edits as needed per permit comments for this phase of work. Additional submissions may warrant negotiation of additional fees. FCD has estimated up to (4) design meetings/conference calls in this phase. Construction Administration Based on the Client's approval of the Construction Document phase and received payment for any open invoices, FCD will proceed into the Construction Administration phase. During this phase of work, FCD will continue to coordinate and consult with the Client, Landscape Architect, Architect, Interior Designer, Electrical Engineer, and Electrical Contractor. FCD will review manufacturer shop drawings and lighting submittals as needed. FCD will coordinate with the Architect/Client to respond to Contractor's RFI as required. GUARANTEED HIGH END TECHNOLOGY PERFORMANCE DESIGN INTEGRATION PROVEN SYSTEM AND DESIGN METHODOLOGY BEAUTIFUL AND INTELLIGENT LIGHTING DESIGN firstcircle 3187 Airway Avenue, Bldg C, Costa Mesa CA 92626 Investment & Terms o: 949.681.0500 Phases Fees Schematic Design Fee $9,200.00 Design Development Fee $11,270.00 Construction Documents Fee $13,570.00 Bidding Fee $2,300.00 Construction Administration Fee $4,480.00 Hourly Rates • Principal Designer: $230/hr. • Senior Designer: $140/hr. • Document Manager: $130/hr. • Project Designer: $120/hr. • Production Assistant: $70/hr. Expense & Payment Terms • Per the Architect's primary agreement. Design Fee Total: $40,820.00 GUARANTEED HIGH END TECHNOLOGY PERFORMANCE DESIGN INTEGRATION PROVEN SYSTEM AND DESIGN METHODOLOGY BEAUTIFUL AND INTELLIGENT LIGHTING DESIGN firstcircle 3187 Airway Avenue, Bldg C, Costa Mesa CA 92626 Services Not Included, Client Responsibility, and General Conditions Services Not Included Emergency lighting layout and circuiting Electrical engineering compliance documents. Egress photometric calculations. o: 949.681.0500 Client Responsibility. Prior to commencement of work, the Client shall provide First Circle Design, Inc. with the following information: SCHEDULE - Project schedule with key milestone dates and a critical path. VENDORS - List of preferred vendors, if any. POINT OF CONTACT - Identification of the Project Manager/Coordinator and authorized individuals required in the approval process. PROJECT DIRECTORY - Directory of all other project consultants including company names, key personnel, addresses, telephone, and fax numbers. General Conditions RESPONSIBILITY - The Lighting Designer is not responsible for equipment failures and delays caused by manufacturers, contractors, shippers, installers, or users. APPROVAL - Any substitutions made from the Designer's specification shall require approval by the Designer prior to installation. ELECTRICAL ENGINEERING - First Circle Design, Inc. does not prepare stamped construction documents, as this is the scope of the Electrical Engineer. PROCUREMENT AND INSTALLATION - The Lighting Designer is not responsible for and will not provide either procurement or installation of any system or hardware. Thank you for considering First Circle Design, Inc. Sincerely, Matt Levesque Founding Principal matt@firstcircledesign.com GUARANTEED HIGH END TECHNOLOGY PERFORMANCE DESIGN INTEGRATION PROVEN SYSTEM AND DESIGN METHODOLOGY