Loading...
HomeMy WebLinkAbout02172026 Planning & Zoning Work Session NotesWORK SESSION NOTES PLANNING & ZONING Called by: Clare Sullivan Time: 6:00 P.M. Date: 2/17/2026 Purpose: KPEDD training and overview of subdivision code Present: Daniel Meuninck Courtney Bringhurst Jamie Crocker Commission Members Present: Clare Sullivan Brenan Hornseth Nathaniel Charbonneau Rhonda Hubbard June Pemberton Andrew Wilder Planning & Zoning Commission Meeting Summary Meeting called to order at 6:00 P.M. 1. KPEDD / CEDS Overview KPEDD (Kenai Peninsula Economic Development District) is a federally recognized Economic Development District (EDD) that maintains the Comprehensive Economic Development Strategy (CEDS), required for many EDA grants. KPEDD provides regional data and coordination but does not regulate zoning. Public comment on the draft CEDS is open through March 7. • Seward Trends Discussed: • Borough growing overall; Seward shrinking • Aging population and fewer young families • Housing and workforce constraints • CEDS Focus Areas: • Broadband, workforce, infrastructure, transportation, land use, resiliency Industry Forum scheduled for April 23 in Seward. Staff to distribute draft CEDS and local data links. 2. Title 16 — Subdivision Code Updates Purpose: Clarify subdivision standards, address gaps from recent development, align with state/borough practices, and improve predictability. • Major Proposed Changes: • Adds clear purpose/intent language to Chapter 16 • Requires construction plans prior to final plat approval • Developer responsible for roads, water, sewer, drainage, electric, communications • No sale of unplatted property; no building permit without required utilities • Clarifies preliminary plat process and roles of staff, Commission, Borough • Establishes detailed standards for utilities, drainage, streets, lighting WORK SESSION NOTES PLANNING & ZONING 3. Subdivision Agreements & Financial Security Improvements must be completed prior to final plat approval or secured through a Subdivision Agreement with financial guarantee. Commission discussed simplifying current tiered contingency percentages to a flat -10%. Staff to consult Finance and report back. 4. Utilities, Wells & Septic Sewer connection required within 200 feet of a main; septic allowed beyond 200 feet if DEC compliant. Considering a waiver process for wells in constrained areas, potentially requiring 1-acre minimum lots, engineering/geologic reports, and ongoing owner maintenance. Staff coordinating with DEC and Borough. 5. Drainage Drainage plans must show stormwater collection, conveyance, and discharge. Concerns include downstream impacts and driveway flooding. Staff to refine standards with Public Works and evaluate retention basin options. 6. Streets & Lighting Increase right-of-way from 50 to 60 feet. Consider limiting cul-de-sacs and establishing maximum block length standards. Require sidewalks, bike lanes, or equivalent pedestrian facilities. Require downward -shielded, dark -sky —friendly street lighting with consistent standards. 7. Developer Reimbursement Program (DRP) Located in Title 5. City may fund up to 50% of infrastructure costs. Does not eliminate subdivision security requirements. Contingency percentages may require review alongside DRP. 8. Next Steps Staff to obtain input from Public Works, Electric, Fire, Finance, and Borough/DEC on technical standards and well/septic issues. Commission priority is completing Title 16 before summer. March regular meeting may be canceled if there are no agenda items. March 17 work session to continue Title 16. Possible special meeting for multifamily CUP if ready. Meeting adjourned at 7:30 P.M.