HomeMy WebLinkAboutRES2026-023 CRW Engineering - Nash Rd Electrical EasementSponsored by: Sorensen
CITY OF SEWARD, ALASKA
RESOLUTION 2026-023
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA,
AUTHORIZING THE CITY MANAGER TO APPROVE THE PROPOSALS WITH CRW
ENGINEERING GROUP, INC AND ALASKA CONSTRUCTION SURVEYS, LLC FOR
NASH ROAD ELECTRICAL EASEMENT ACQUISITION SERVICES IN AN AMOUNT
NOT TO EXCEED $260,000 AND APPROPRIATING FUNDS
WHEREAS, the City of Seward Electric Utility operates and maintains transmission and
distribution facilities along Nash Road between the Seward Highway and Sawmill Creek; and
WHEREAS, portions of the existing transmission line have been in place for decades and have
historically operated under prescriptive rights without formally recorded utility easements; and
WHEREAS, the City is proceeding with construction improvements along Nash Road and
recognizes the need to secure formal recorded electrical easements to ensure long-term system
reliability, vegetation management, access for maintenance, and protection of public infrastructure;
and
WHEREAS, CRW Engineering Group, Inc. has submitted a proposal dated February 24, 2026, to
coordinate easement evaluation, compensation analysis, preparation, and negotiation services for
approximately forty-six (46) affected properties along Nash Road in an amount not to exceed
$181,500; and
WHEREAS, Alaska Construction Surveys, LLC has provided an estimate of $49,150 for field
surveying, boundary verification, and preparation of easement maps and legal descriptions
required for recording; and
WHEREAS, each affected property owner will receive an individual compensation offer based
on 2026 tax values and ownership verification as outlined in the CRW proposal, with compensation
paid directly by the City of Seward; and
WHEREAS, formalizing these easements will secure long-term access for vegetation clearing,
pole replacement, transmission upgrades, emergency response, and ongoing maintenance of
critical electric infrastructure serving the community; and
WHEREAS, the total professional services cost for easement acquisition coordination, surveying,
mapping, legal documentation, and negotiation support is not to exceed $260,000; and
WHEREAS, securing these easements protects the public's investment in the electric system and
aligns with best utility management practices; and
WHEREAS, compensation to property owners for the purchase of individual electrical easements
may be negotiated separately and paid directly by the City of Seward in accordance with approved
CITY OF SEWARD, ALASKA
RESOLUTION 2026-023
Page 2 of 2
valuation methodologies. The calculation for determining compensation for the easements will be
100% of the tax value (depending on whether an easement is already in place) x sq ft for an
overhead electrical facility.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SEWARD, ALASKA:
Section 1. The City Council hereby authorizes the City Manager to enter into professional services
agreements with CRW Engineering Group, Inc. and Alaska Construction Surveys, LLC for
easement evaluation, survey, mapping, and acquisition services associated with the Nash Road
transmission improvements.
Section 2. Funding in the amount of $260,000 is hereby appropriated and transferred from the
Electric Fund account 15000-0000-3710 to the Nash Road Transmission Improvement Project
Fund 15351-0000-3700 to the 15351-0000-7009 contracted services account for professional
services associated with easement acquisition.
Section 3. This resolution shall take effect immediately upon adoption.
APPROVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA THIS 9'h
DAY OF MARCH 2026.
Sue McClure, Mayor
AYES: Barnwell, Warner, Osenga, Calhoon, McClure
NOES: None
ABSENT: Crites, Draper
ABSTAIN: None
ATTEST:
r
7'
Kris Peck
City Clerk
City Council Agenda Statement
Meeting Date: March 9, 2026
To: City Council
Through: Kat Sorensen, City Manager
From: Taylor Crocker, Electric Department
Subject: Resolution 2026-023: Authorizing the City Manager to Approve the
Proposals with CRW Engineering Group, Inc and Alaska Construction
Surveys, LLC for Nash Road Electrical Easement Acquisition Services in
an Amount Not to Exceed $260,000 and Appropriating Funds
Background and justification:
The City of Seward Electric Utility owns and operates transmission infrastructure along Nash
Road between the Seward Highway and Sawmill Creek. Portions of this transmission line have
existed for decades; however, in the historical development of the Seward Electric System, formal
recorded utility easements were never acquired for segments of this corridor. The line has operated
under prescriptive rights due to its longstanding presence.
As the City moves forward with construction and system improvements along Nash Road, it is
both prudent and necessary to formalize recorded electrical easements across approximately forty-
six (46) affected properties. While prescriptive rights may provide a legal basis for continued
occupancy, they do not provide the clarity, security, or long-term protection that recorded
easements offer.
Acquiring formal easements will:
• Secure permanent legal access for operations and maintenance
• Provide clear authority for vegetation management and tree clearing
• Protect the City's investment in transmission infrastructure
• Reduce future legal risk and potential disputes with property owners
• Align the Seward Electric Utility with standard industry practices followed by electric
utilities statewide and nationally
CRW Engineering Group, Inc. has submitted a proposal dated February 24, 2026, to provide
easement evaluation, ownership verification, compensation analysis, document preparation, and
negotiation coordination services for an amount not to exceed $181,500. Alaska Construction
Surveys, LLC has provided a cost estimate of $49,150 to perform boundary verification, field
survey work, and preparation of easement maps and legal descriptions. The total professional
services cost is not to exceed $260,000.
Under the proposed process, each property owner will receive an individual compensation offer
based on 2026 tax -assessed values and confirmed ownership records. Compensation for easement
acquisition will be paid directly by the City of Seward.
Formalizing these easements at this stage of construction ensures the City secures long-term
infrastructure rights while work is already underway in the corridor. This action represents
responsible stewardship of public utility assets and strengthens the long-term reliability and
defensibility of the Seward Electric transmission system.
Comprehensive and Strategic Plan Consistency Information
This legislation is consistent with (citation listed):
Comprehensive Plan:
Strategic Plan:
Other:
Total amount of funds listed in this legislation:
This legislation (✓):
Creates revenue in the amount of:
Creates expenditure in the amount of:
Creates a savings in the amount of:
Has no fiscal impact
X
Funds are (✓):
Budgeted Line item(s): 15351-0000-7009
X
$ 260,000
$ 260,000
Not budgeted
Not applicable
Affected Fund (✓):
General
Boat Harbor
Motor Pool
SMIC
Parking
Other
X
Electric
Water
Available Fund Balance/Net Position (unaudited) as of $
12/31/25
X
Yes
Attorney Signature:
Not applicable Comments:
Wastewater
Healthcare
Note: amounts are unaudited
5,500,551.19
Finance Director Signature:
Administration Recommendation
X Adopt Resolution
Other:
rift
RW
ENGINEERING GROUP
February 24, 2026
Sturgeon Electric Company, Inc
1301 E. 64th Ave
Anchorage, AK 99518
Attn: Mr. Josh Henrick,
Re: Nash Road Electrical Easements
Engineering Services Fee Proposal
Dear Josh,
CRW Engineering Group Inc. (CRW) is pleased to provide this cost proposal to provide engineering
services to coordinate and negotiate electrical easements along a 1-mile segment of Nash Road.
Scope of Work:
Easement Evaluation
CRW will evaluate the existing easements on approximately 46 properties adjacent to the proposed
power lines along Nash Road. We will then project a 30-foot wide offset from the proposed power lines
and determine the locations and widths for proposed easements. It is assumed that the easement will
be consistent across properties regardless of the length of conflict (i.e. if the easement area only crosses
a small segment of the property, the proposed easement will established as if the conflict is across the
entire property). Drawings will be based on surveyed ROW lines and existing power pole locations
provided by Alaska Construction Surveys (ACS).
CRW will prepare a map identifying proposed easement locations for presentation to the City of Seward.
Once concurrence on the easement areas is provided, CRW will forward the AutoCAD drawings with the
proposed easement areas to ACS who will prepare maps and easement descriptions under a separate
contract with Sturgeon Electric.
Easement Preparation
CRW, through our subconsultant Trawver Land Services, will review and confirm ownership for each
parcel based on the last deed of record or available title reports. A proposed compensation for each
easement will be developed based on 2026 existing tax values and presented to the City of Seward for
concurrence. Where required for specific parcels (DNR, SBA, CIRI, etc..) we will review appraisal
provided by a third party to establish proposed correspondence.
A sample electrical easement will be prepared and sent to the City of Seward for approval. Easements
for up to 46 properties will then be prepared using the approved electrical easement language and the
easement maps and descriptions prepared by ACS. These documents will be delivered to each property
owner and our team will make a minimum of three attempts to contact (telephone, email, mail,
meetings, etc..) each property owner to acquire the easements.
If the property owner does not accept the initial offer, we will coordinate with the City of Seward who
will lead negotiations with those owners. Our team will coordinate with the City and other team
CRW ENGINEERING GROUP 394uArcric Boulevard, Suite 30u, Anchorage, AK99503
February 24, 2026
Nash Road Electrical Easements
Engineering Services Fee Proposal
members as needed to support meetings and/or negotiations. We will also advise the City of Seward on
recommended counter offers or administrative settlements for the City's consideration.
Assumptions & Exclusions:
The following assumptions were made in preparing this fee proposal.
• Property appraisals, as required, will be provided by others.
• Surveying services, as required, will be provided by ACS.
• Compensation to property owners for easements will be paid directly by the City of Seward.
• Legal review or advice related to easement acquisition and/or other aspects of the project are
not included.
• No public involvement effort is anticipated by CRW.
• Travel to Seward is not anticipated and, if required, may cause the proposed budget to be
exceeded.
Schedule:
CRW is prepared to begin this work immediately following the notice to proceed. The following
schedule is anticipated:
• NTP: Feb 16, 2026
• Complete Easement Analysis: Early March 2026
• Easement Maps & Descriptions: March — April 2026
• Draft Easements: Mid to Late April 2026
• Easements Sent Out: Early May 2026
Basis of Compensation:
All work will be performed on a Time and Materials basis.
Phase Description
1 Project Management
2 Easement Evaluation
Cost
$9,500
$28,000
Easement Preparation
$144,000
Total $181.500
Additional services can be added to the scope on a time and materials basis in accordance with the
attached rate spreadsheet. We look forward to working with you on this project. If you have any
questions or require further information, please do not hesitate to contact me.
2 of 3
February 24, 2026
Nash Road Electrical Easements
Engineering Services Fee Proposal
Sincerely,
CRW Engineering Group, Inc
Matt Edge, PE
Principal/Civil Engineer
Attachments: CRW Rate Spreadsheet, CRW Standard Terms and Conditions, Trawver Land Services
Proposal
ACCEPTANCE OF THE PROPOSAL AND AUTHORIZATION TO PROCEED
The proposed scope of services, fee, and contract conditions are acceptable to the Sturgeon Electric
Company, Inc, and CRW Engineering Group, Inc. is authorized to proceed with the work.
By 0(4- S 0 r-L n S "en
Title C f
Date 3/iliac,
* Person with authority to commit the resources of Sturgeon Electric Company, Inc
ATTEST.
KRIS PECK
CITY CLERK
3 of 3