Loading...
HomeMy WebLinkAboutRES2026-025 AK Built Construction Change Order 1Sponsored by: Sorensen CITY OF SEWARD, ALASKA RESOLUTION 2026-025 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER WITH AK BUILT CONSTRUCTION & DESIGN, LLC FOR AN ADDITIONAL 275 FEET OF CABLE RAILING FROM D FLOAT TO B FLOAT FISH WEIGH STATION IN THE AMOUNT OF $119,000 PLUS A 10% CONTINGENCY AND APPROPRIATING FUNDS WHEREAS, the City of Seward has access to funds allocated from the Commercial Passenger Vessel (CPV) fund to be used for port facilities, harbor infrastructure, and other services provided to the commercial passenger vessels and the passengers on board those vessels; and WHEREAS, an RFP was issued for the replacement/renovation of the boardwalk between Ray's and KFT and issued to AK Built Construction and Design, LLC; and WHEREAS, this project was bid under budget and additional funding is available; and WHEREAS, on February 9, 2026, AK Built Construction and Design provided a unit cost at the request of Harbormaster to continue with a portion of phase 2 of this project; and WHEREAS, AK Built Construction can accomplish this additional work on or before the June 30, 2026, deadline. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA: Section 1. The City Council hereby authorizes the City Manager to proceed with a change order with AK Built Construction and Design, LLC in the amount of $119,000.00 with a 10% contingency, for the additional 275 feet of cable railing from D Float to B Float fish weigh station. Section 2. Funding in the amount of $119,000.00 plus a 10% contingency, for the additional 275 feet of cable railing from D Float to B Float fish weigh station, is hereby transferred and appropriated on the Harbor CPV KPB fund 11113-0000-8101. Section 3. This resolution shall take effect immediately upon its adoption. APPROVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA THIS 23rd DAY OF MARCH 2026. Sw-t*i1le CShoe- Sue McClure, Mayor CITY OF SEWARD, ALASKA RESOLUTION 2026-025 Page 2 of 2 AYES: Osenga, Calhoon, Barnwell, Crites, Warner, Draper, McClure NOES: None ABSENT: None ABSTAIN: None ATTEST: 7 Kris Peck City Clerk City Council Agenda Statement Meeting Date: March 23, 2026 To: City Council Through: Kat Sorensen, City Manager From: Tony Sieminski, Harbormaster Subject: Resolution 2026-025: Authorizing the City Manager to Execute a Change Order with AK Built Construction & Design, LLC for an Additional 275 Feet of Cable Railing from D Float to B Float Fish Weigh Station in the Amount Of $119,000 Plus a 10% Contingency and Appropriating Funds Background and justification: The City of Seward has access to the Commercial Passenger Vessel (CPV) fund for port facilities, harbor infrastructure, and other services provided to the commercial passenger vessels and the passengers on board those vessels. In February a formal request was made to AK Built for a unit cost or linear cost for additional cable railing to be added between D Float and B Float fish cleaning station for safety and continuity with the original project. After evaluation, it was determined to be within our budget to proceed with an additional 275 feet of railing to be replaced. AK Built Construction & Design can accomplish this additional work within the 2026 season and meet the deadline of June 30, 2026, for a cost of $435.95 per linear foot or $119,000 for 275 feet. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 3.5.1 Maintain a thriving Port and Harbor Strategic Plan: Economic base Other: Total amount of funds listed in this legislation: This legislation (✓): x Creates revenue in the amount of: Creates expenditure in amount of: Creates a savings in the amount of: Has no fiscal impact Funds are (✓): Budgeted Line item(s): 11113-0000-8101 X $ 119,000.00 Not budgeted Not applicable $ $ $119,000.00 $ Affected Fund (V): General Boat Harbor Motor Pool X X SMIC Parking Other Electric Water CPV KPB Wastewater Healthcare Note: amounts are unaudited Available Fund Balance/Net Position as of 12/31/25 $ 5,553,067.47 X Yes Attorney Signature: Not applicable Comments: Finance Director Signature: Attorney Review Administration Recommendation X Adopt Resolution Other: Professional Services Agreement with AK Built Construction & Design, LLC For Additional Cable Railing Installation CHANGE ORDER No. 1 This change ORDER No. 1 and Notice to Proceed is pursuant to Section 27.2 of the Professional Services Agreement entered into February 5, 2026 between the City of Seward, Alaska and AK Built Construction & Design, LLC. This Change Order is effective March 24, 2026. AK Built Construction & Design, LLC. are hereby directed to amend the Scope of Work defined in the Professional Services Agreement — Section 4 — to include additional cable railing system between D Float and B Float Fish Cleaning Station , as further described in the attached Exhibit A: "2025 Harbor Boardwalk Renovation/Replacement Phase 1 — Cable Railing Unit Pricing". The contract price is hereby increased in an amount of $119,000.00 to be paid in accordance with the original contract provisions. All other provisions of the Professional Services Agreement remain in full force and defect. Dated this 24 day of March 2026 APPROVED BY: City of Seward 1 By: Kit deer-Serensen Title: City Manager A Date: /2-(12L> ATTEST: Kris Pect City Clerk IM(Ku%Ef) AK Built Construction & Design, LLC. By: Robert Colles Title: Managing Member Date: 3/11/2026 AK BUILT CONSTRUCTION 8t DESIGN, LLC GENERAL CONTRACTING - ENGINEERING - PROJECT ADMINISTRATION February 9, 2026 Tony Sieminski Harbormaster 907.224.3138 tsieminski@cityofseward.net City of Seward 1300 46 Ave Seward, Alaska 99664 RE: 2025 Harbor Boardwalk Renovation/Replacement Phase 1— Cable Railing Unit Pricing AK Built Construction and Design, LLC (AK Built) is pleased to provide this proposal for the installation of additional cable rail system per City of Seward direction. It is understood this proposal is being provided to allow for a cost per linear foot of railing install. With the unit price, the Harbormaster can consider replacement of existing timber railing with a new cable rail system. Table 1 - Proposal Schedule Item No. Description Estimated Quantity Quoted Price CO-1 Cable Rail System 24 LF $10,462.80 Quote Total $10,462.80 Item CO-1 includes materials, equipment, and labor necessary to fully install the cable rail system. It is assumed the work would take place concurrent with the current project schedule if this proposal is accepted. This estimate assumes a full section of cable rail system. 24 linear feet represents a cable rail running from terminal post to terminal post and results in unit price of $435.95/LF for your evaluation purposes. AK Built looks forward to working with you to complete your project goals. Please reach out to me if you have any questions or would like to discuss details further. Sincerely, Robert Colles, PE AK Built Construction & Design, LLC Project Manager/Managing Member 907-854-9115 rlcolies@akbuilt.net P❑ BoX 771203, EAGLE RIVER, AK 99577 — PHGNE: (907) B54-91 1 5 PAGE 1 OF 1