Forecast period 2025–2084
Roadmap -Completed
2023 utility disposal votes
2-year moratorium on utility disposal –October, 2023
Guidance to explore utility alternatives –Spring 2025
First survey done September 11, 2025
Expiration of disposal moratorium –October, 2025
Three town hall meetings
September 29, 2025December 10, 2025May 28, 2026
Financial deep-dives on August 10 –11, 2026 (in-progress)
Alternative Analysis to Date - Three Paths
Each path is modeled under four cases: Worst Case, Mid-Case, Base Case, Best Case
Rate As Is Governance MUA or
Coop
The utility converts to a Municipal Agency (MUA)
or a Cooperative and purchases wholesale power
and passes through the fuel escalator. Ratebase
as-is.
Local Control Build Godwin 4th of
July Creek Hydroelectric Project
(G4J)
The utility in any form builds the Godwin/4th of
July hydroelectric project. Purchased power
drops significantly in 2033. Excess generation is
sold into the market to further reduce costs.
Ratebase per 2026 draft rate study.
Sale of the Utility
Priced at the lowest-cost Railbelt utility, the MEA
total bill of 24.56 c/kWh, escalated on fuel and
load growth only. MEA current average rate.
The four cases model changes in construction costs, available water for Hydro power, financing costs, load growth, fuel price escalation, and energy resale.
Local Control & Build G4J Scenario — Major Assumptions
Timeline
2026 Anticipate preliminary permit and license application development
begins. Application for renewable energy fund grant.
2030 License is issued and bond advance note negotiated.
2031 Construction begins – estimated 2 – 3 years.
2033 G4J In service and producing power. Purchased power is
significantly reduced.
2035 Investment Tax Credit applied and long-term financing acquired.
2061
Rates, energy sales and financing
–Customer rates are set at the distribution system cost-of-service floor per
2026 draft rate study.
–Power above local needs is sold into the energy market. Sales lower local
rates, pay the G4J project debt and reserves, and fund a rate stabilization
fund.
–The Investment Tax Credit reduces project cost by 30% to 50%, depending
on the case.
–The remainder is financed by 25-year bonds from RUS, CFC, CoBank or
municipal debt, refinanced once for a 50-year repayment period matching
asset life.
In the sale case the addition of G4J doesn’t change the cost of power in a
larger utility
–
–
The fuel portion of rates is based on current assumptions.
Load growth is based on current trends.
MEA’s average cost of power is used as the sale rate.
–
–
–
All amounts are in nominal dollars, except for power expense
Scenario Analysis
1. Worst Case
1. Low load, high interest rates, high construction costs, low G4J energy production
2. Mid-Case
1. Below-average loads, moderately high interest rates, moderately higher construction costs,
moderate G4J energy production
3. Base Case
1. Current loads, current interest rates, current construction estimates, base case G4J energy
production
4. Best Case
1. High load, low interest rates, lower construction costs, high G4J energy production
The Four Cases Summarized –Key Variables
Best CaseBase CaseMid-CaseWorst Case
Inputs:
150,000125,000100,00075,000G4J energy (MWh/yr)
70,000,00056,000,00049,000,00042,000,000Seward load (kWh/yr)
$136.0M$181.0M$227.0M$273.0MConstruction + permitting
$3,885$5,171$6,485$7,800Installed cost — construction ($/kW)
50%50%40%30%ITC direct pay (2035)
3.38%4.50%5.63%6.75%Long-term debt rate
1,286 GWh2,184 GWh1,831 GWh1,903 gWhSurplus energy for sale
Rates in cents per kWh.
The Four Cases Summarized –Key Variables
Best CaseBase CaseMid-CaseWorst Case
Outputs:
22.93
19.08
24.05
28.88
24.75
24.56
28.99
25.30
25.00
38.79
34.49
25.46
Rate 2030 —As-is
Local
Sale
22.37
9.68
23.30
28.31
14.75
24.34
28.48
21.50
25.20
38.22
34.13
26.09
Rate 2035 —As-is
Local
Sale
21.02
8.70
22.59
26.93
13.63
26.00
27.27
20.33
25.75
36.81
32.66
26.69
Rate 2045 —As-is
Local
Sale
Rates in cents per kWh.
Average electric rate under each path
Roadmap –Next Steps
Second survey –August 19, 2026
Fourth townhall and Council presentation –September 28, 2026
Survey resultsSummary financial analysisPresentation by national cooperative representatives
Work session with Council –alternatives presentation –November 23, 2026