HomeMy WebLinkAboutORD2026-009 Title 16 - SubdivisionsSponsored: Planning & Zoning Commission
Introduction: September 28, 2026
Public Hearing: October 12, 2026
Enactment: October 12, 2026
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA,
AMENDING SEWARD CITY CODE §16.01 AND §16.05 TO CLARIFY PUBLIC
IMPROVEMENT REQUIREMENTS WHEN SUBDIVIDING, DEVELOPING, OR
SELLING LAND
WHEREAS, for half a century, the City of Seward has required developers to install public
improvements when subdividing property; and
WHEREAS, since at least 1977, unless an exception applied, a developer that subdivides property
within the City limits has been required to provide public streets, telephone, electrical lines, water
system, sewage disposal system, and street lighting. Compare SCC 16.01.015 with Ordinance 443,
Section 23-1 (1977); and
WHEREAS, subdivision public improvements are a win -win because they substantially increase
the value of subdivided land, provide amenities expected by residents, while also benefiting
subsequent buyers and the public by having reasonable and necessary utilities and road access,
which are essential for modern life; and
WHEREAS, the most financially beneficial time to install the public improvements is at the time
of subdivision because that allows subsequent buyers to wrap the subdivision improvement costs
into the purchase costs with a 30-year mortgage, which makes housing more affordable; and
WHEREAS, if subdivision public improvements are delayed until after the subdivided lots are
sold, then the buyers are financially disadvantaged because they cannot wrap the subdivision
improvement construction costs into the purchase loan and they typically cannot afford the
subdivision improvement construction costs, which prevents the properties from being developed,
suppresses the property values, harms the economy, makes housing more expensive, and harms
the other taxpayers who have to initially pay for the improvements with a local improvement
district; and
WHEREAS, the City presents this ordinance to clarify the code without altering the underlying
requirements that developers that subdivide property are required to install public improvements.
NOW, THEREFORE, THE CITY OF SEWARD ORDAINS:
Section 1. Seward City Code Chapter 16.01 General Provisions is amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 2 of 20
16.01.005. Purpose.
A. The purpose of this chapter is to:
1. Establish design and development criteria for public and private improvements;
2. Define what are required public improvements;
3. Regulate when required public improvements must be installed to maximize
opportunities for property owners to wrap public improvement construction costs into
a long-term mortgage, which makes housing more affordable; and
4. Outline the procedures and responsibilities oLthe developer [or [urnishing plans and
completing the improvements.
B. This article applies to any division or redivision of real property within the corporate
boundary of the City oLSeward. This article does not apply to land leases or cemetery plots.
Section 2. Seward City Code Section 16.01.015 Conditions to Plat Approval is hereby amended
to read as follows (new language is in bolded italics and underlined, and deleted language is
stricken):
16.01.015. Conditions to plat approval.
A. The applicant must install all the required public improvements within the boundaries of
the development and may be required to make improvements beyond the development
boundary for all the improvements to function properly. In addition, improvements must
be designed and constructed to provide for future extension to adjoining lands. ale
preliminary -or- rna1-plat-€er-the subdivision or-res ubdiyision- of land -located within -the -city
1immits-shal-l- appreved-1 the-eityunless al-1-of-the rem-i-repreeerr is -se €erthin-section
1-6,05.010-are-provided-fer-by the -subdivider, owner, proprietor er-de-eleper-in-thc manner
deseribediri- section 16;05.0 5,
B. No final plat for the subdivision or resubdivision of land located within the city limits shall
be approved by the city unless all the required improvements set forth in section 16.05.010
are provided for by the subdivider, owner, proprietor, or developer in the manner described
in section 16.05.015. No preliminary-plat-of-ei owned-preper y may-lie-sabmitted-4e-t-he
Kenai-Peninsul&-Bereugh-planning scion-fen-approval-witheu.t-the prior -consent -of -the
city -council:
C. Public posting. The applicant shall post the property subject to the application with public
notices as provided by the city at least ten days before the date of the required public hearing.
Such notices shall be placed so as to be visible from each improved street adjacent to the
property. The applicant is responsible for removing the posted notices within five days after
the hearing is completed. Failure to properly post notices is grounds for deferral or denial of
the application. No one except the applicant, an agent of the applicant, or the city shall remove
or tamper with any such required posted notice during the period it is required to be
maintained under this paragraph.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 3 of 20
D. Proof of posting. Before the public hearing, the applicant shall submit to the city an affidavit
signed by the person who posted the notice or caused the posting to be done that the notice
was posted as required by this section.
E. Notification of neighboring property owners. A notice of preliminary plat review shall be
mailed not less than ten days prior to the meeting review date to the owners of record on the
Kenai Peninsula Borough assessor records of real property within 300 feet of the periphery
of the parcel affected by the proposed plat.
F. A plat submitted to create a single parcel through the vacation of interior lot lines shall be
exempt from subsection (c), public posting, (d), proof of posting and (e), notification of
neighboring property owners.
G. Construction plans. Upon approval of the preliminary plat and before the start of any
construction, the developer must submit construction plans for all proposed required public
improvements and associated private improvements and utilities within and outside the
proposed development's boundary.
(Ord. 443, 1977; Ord. 580, 1986; Ord. 610, 1988; Ord. 97-01; Ord. 98-06)
Section 3. Seward City Code Section 16.01.020 Conveyances Restricted In Present Subdivisions
is hereby amended to read as follows (new language is in bolded italics and underlined, and
deleted language is stricken):
16.01.020. Conveyances restricted in present subdivisions.
The owner of land located in a subdivision shall not transfer, sell, offer to sell, or enter
a contract to sell land in a subdivision before a plat of the subdivision has been reviewed by the
City, approved by the Borough platting authority, and recorded in accordance with state law. A
person shall not file or record a plat or other document depicting subdivided land in a public
recorder's office unless the plat or document has been reviewed by the City and approved by the
Borough platting authority.
€ eept as provided in -section 4-6.05.030, no-eweer-e€-record-as-e€-October -4 1977, e€
tttidevelelied-es-leeated-witi#t- an area eevered by -a valid plat -recorded-prier-4e-�levernber-
1977; shall cones any sueble s-fie-arty-et ter per-serf-e less-lte-€ st,-prevides- €er-stteh-lots-the pubbe
improvements required by -section +R-th-mannef-described in- section 4-6.05.415
(Ord. 443, 1977; Ord. 610, 1988)
Section 4. Seward City Code Section 16.01.025 Building Permits Restricted is hereby amended to
read as follows (new language is in bolded italics and underlined, and deleted language is
stricken):
16.01.025. Building permits restricted.
A. No building permit shall be issued for construction of a dwelling unit on an undeveloped lot
leeated-within-an-area-eove�-by-a-valid-plat recorded-prier-4o Novembef-2-84977, until the
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 4 of 20
owner thereof has provided for such required public improvements to the lot as if the owner
were subdividing to create the lot. lets -the public -improvements -required by -section
4-6.05.414 i-n-the-+manner-described in-section-4-6.0541S,
Section 5. Seward City Code Section 16.01.030 Exceptions is hereby amended to read as follows
(new language is in bolded italics and underlined, and deleted language is stricken):
16.01.030. Reserved. Exceptions.
The r-efrictions-set-€erth in- ,ectiens-i-4 020-and-i.44-.02-5-are-modi€ied-as-follews
-f. Where -the -subdivider -owner, proprieter-or-developer--ewtts-not mere-than--si*
undeveloped -lets -located within -an -area -Fevered by --a valid -plat -recorded prier to -the
effective date of -this -tiller tlte-restrictions-ef,ectiens-1 .41.020-and-l-6:di-:02-5-shall-stet
y.
2 --Where-the-subdivider, owner; proprietor or-developer-oftlte-uedeveleped lets-eenvcys
all-efhis-lots-ta-a-single perser►-io--a-bu1k sale; tlhe-restrictions of sections-4-6:04.020-and
1-6-.41-025 shall- tetapply-to-suel enveyances; however, all-stuelrrestrictions-shall-apply
to-the-transferee-e€-st -lots,
3—Where--t e-subdivider, eweer, proprietor -or -developer ofsteeh-uedevcloped-lets-serves
upon -the city-manager-..,� ten -notice of-his-intee te-convey or-constfuet-aed-the-c-ity
manager -certifies that -the -city -came -provide access to e partieular-publie-improvement
required by -section 4-6.45.410-withi-rr-sip-month-after receipt -of -notice of -such -intent;
the-subd-ividef--owner;-proprietor or -developer shall -not be -required to -provide -that
partic larit revement--prier-te-thelawful-conveyance•e€stteh-leter--prior-to-the issuance
efe building -permit for the -construction ef-a-dweJliftg-++nit-on-sueh- lot.
(Ord. 443, 1977; Ord. 610, 1988)
Section 6. Seward City Code Chapter 16.01 General Provisions is amended by enacting a new
section to read as follows (new language is in bolded italics and underlined)
16.01.045 Review and approval.
A. Any proposed vacation,. subdivision,. or replat showing a subdivision of land lying within
the corporate boundary of the City of Seward must first be submitted to the city for review
prior to submitting the plat to the Kenai Peninsula Borough planning department.
B. Prior to filing a platting or subdivision application with the city, the applicant may request
a pre -application conference with city staff to discuss the proposal and relevant city
regulations.
C. Applications [or preliminary plats must comply with the requirements of this chapter and
must be submitted with a completed Preliminary Plat Submittal Form.
D. A preliminary plat review fee as established by the current City of Seward fee schedule must
be submitted to the city at the time ofapplication.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 5 of 20
E. Upon acceptance of the application, the subdivision request must be scheduled for review
and recommendation before the city planning and zoning commission.
F: The city planning and zoning commission must review the proposed action take public
testimony, and adopt a written recommendation for the borough platting authority.
G. If the city notifies the borough platting authority or if the borough platting authority
identifies that a final plat under review has substantially changed from the preliminary plat
reviewed by the city planning and zoning commission the city's previous recommendation
of approval is revoked and the plat must be returned to the city's planning and zoning
commission for further review. The following are examples of a substantial change: a
change in alignment or dedication of a right-of-way, addition of one or more lots, or a
major change in lot design. In such instances, the city planning and zoning commission
must review the revised plat, take public testimony, and adopt a written recommendation
for the borough platting authority.
H. The Kenai Peninsula Borough Planning Director or the Planning Commissions as
described in borough code, are the platting authorities for subdivision applications within
the City of Seward.
I. Notwithstanding the other provisions in this section: no preliminary plat of city -owned
property maybe submitted to the Kenai Peninsula Borough platting authority for approval
without the prior consent of the city council.
Section 7. Seward City Code Chapter 16.01 General Provisions is amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.01.050 Conflict with other laws.
If a section in this title conflicts with another ordinance, unless the right to do so is preempted
or prohibited by the state or federal law, the following rules apply. In case of conflict between
the provisions of this title and another ordinance, the more specific provision governs. If no
specific provision exists, the more restrictive provision governs. If two provisions are equally
specific, the more restrictive provision governs.
Section 8. Seward City Code Section 16.05.010 Required Public Improvements is hereby amended
to read as follows (new language is in bolded italics and underlined, and deleted language is
stricken):
16.05.010. Required public improvements.
A. The subdivider, owner, proprietor, or developer must install all the required public
improvements within the boundaries of the development and may be required to make
improvements beyond the development boundary for all the improvements to function
properly.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 6 of 20
B. The term "required public improvements" shall mean the following:
1. Streets. All -streets located within- subdivision subject-te-the-requirements-of-this-title
shall -13e-not less than-50 feet -in -width and-shall--be-gravel surfaced aeeer4i.ng-to-city
specifications. For specific requirements see section 16.05.050.
2. Communication and electric lines. All new-eernmunicatien-and-electric lines shall -fie
installed underground, unless found -to -be -impractical by -the eernm-issien-and-affirmed
by -the eity-cou-neil; and-inaeeerdance with-speeiieatiens-of-the appropriate -utility
eernpanies-an4-the-eity, For specific requirements see section 16.05.040.
3. Water system. Where the-eity"water system- will -service -the area-eevered by -the plat -or
proposed -plat; the-subdivider-shall-provide-the-+ater-system--aeeerdanee--w}t-h-the
speei€ieatiens-established- the and-affirmed--by-the eity-council—Fire
hydrants -shall —be -provided to -standards established -by --the Ameriean-Waterworks
Association -and -shall be--a-brand-specified by the -city -The subdivider -shall -not be
required-te-drilli-ndividual-wells: For specific requirements see section 16.05.030.
4. Sewage disposal Sewer system. Where the -city sewer -system -will -service the area
covered by -the plat -or -proposed plat; the subdivider -shall -provide -the sewer -system -in
eerriplianee-with-all-applicable-state and -federal health and en-virenmental-laws-and
regulations: For specific requirements see section 16.05.035.
5. Street lighting. Street lighting shall-be-installed-inaeeerdanee-with -the requirements of
the-eity-For specific requirements see section 16.05.050.
6. Drainage. For specific requirements see section 16.05.045.
Section 9. Seward City Code Section 16.05.015 Compliance Procedure is hereby amended to read
as follows (new language is in bolded italics and underlined, and deleted language is stricken):
16.05.015. Compliance procedure.
A. The subdivider, owner, proprietor, or developer must install the required public
improvements and is deemed to have satisfied the requirements of this title by completing
installation be(qre anal plat or by entering when -he -has -entered into the subdivision
agreement with the city. The subdivision agreement shall be written to cover one or a
combination of the following alternatives available to the subdivider:
1. The subdivider may elect to complete all required public improvements prior to approval
and recording of the final plat or prior to sale or issuance of a building permit, as the
case may be. If this is done, the subdivision agreement, delineating the construction and
inspection requirements for each improvement, shall be entered into prior to
commencement of construction.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 7 of 20
2. The subdivider may elect to complete required improvements after approval and
recording of the final plat, the conveyance or the issuance of the building permit. In this
event, the subdivision agreement shall delineate:
a. The construction and inspection requirements of the appropriate governmental
agency or city department concerning the required improvements;
b. The time schedule for completion of required improvements;
c. A method of insuring that such improvements shall be completed to the
specifications required and in the time schedule agreed upon.
3. The subdivider may elect to form a special assessment district prior to any sales,
obligating all property owners in the subdivision to assume the costs of all required
public improvements not previously installed.
B. The improvements required under the terms of the subdivision agreement shall be fully
completed within three years of the date of execution of the agreement, except if a special
assessment district has been formed, in which case improvements will be installed when a
sufficient demand is made of the city.
C. The subdivision agreement shall provide for the apportionment of the costs of required public
improvements between the city and the subdivider as provided in the special assessment
district or as follows:
1. Administrative and recording costs relating to public improvements guarantees. The
subdivider shall pay 100 percent of all costs incurred in supplying and administering any
method of public improvement guarantees provided for in subsection (d) of this section;
2. Inspection, surveillance and testing. The subdivider shall pay 100 percent of all costs
relating to any inspection, surveillance, and testing by the city necessary for final
acceptance of any required public improvement. Costs of inspection, surveillance and
testing shall be established in advance between the developer and the city upon the
developer's request;
3. Streets. The subdivider shall pay 100 percent of the cost of streets within the boundaries
of the subdivision;
4. Water improvements. The subdivider shall pay 100 percent of the cost of all water
facilities constructed within the subdivision;
5. Sewage disposal Sewer system. The subdivider shall pay 100 percent of the sewage
disposal sanitary -sewer system installed within the subdivision;
6. Electric and communication. The subdivider shall pay 100 percent of the cost of
installing electric lines with cost participation as provided in the current approved tariffs
of the communication company serving the subdivision;
7. Street lighting. The subdivider shall pay 100 percent of the cost of street lighting
apparatus.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 8 of 20
8. Drainage. The subdivider shall pay 100 percent of the cost of drainage implementation
within the subdivision.
D. To assure the installation of required public improvements which are not accepted at the time
the final plat is filed, the subdivision agreement shall require the subdivider to guarantee the
completion of all such improvements by one or more of the methods specified below. The
means of a guarantee may be changed during the guarantee period through a written
modification of the agreement. The amount of guarantee shall be determined on the basis of
the subdivider's cost estimate. The guarantee shall remain in effect until final acceptance of
the required public improvements. The engineer's cost estimate shall state the estimated cost
of completion for each required public improvement. Cost estimates for each required public
improvement must be approved by the city manager. For purposes of establishing the amount
necessary for the guarantee of completion of public improvements, a percentage for overrun
allowance shall be added to the total estimated cost of public improvements as follows:
Total Estimated Cost of Improvements
Percentage of Overrun Allowance
$0.00 to $500,000.00
20%
$500,001.00 to $1,000,000.00
15%
$1,000,001.00 and over
10%
E. The subdivision agreement shall include one or more of the following methods to guarantee
the construction of required public improvements:
1. Performance bond. The subdivider may elect to provide a surety bond from a company
authorized to do business in the state. The bond shall be in an amount equal to the
estimated cost of all required public improvements plus an overrun allowance as
provided above. The bond shall be payable to the city in the event that any required
public improvements are not finally accepted in accordance with the provisions of this
subdivision agreement and shall be posted by no person other than the subdivider.
2. Deposit in escrow. The subdivider may elect to deposit a cash sum equal to the estimated
cost of all required public improvements, plus overrun allowances as provided above,
either with the city or in escrow with a responsible financial institution authorized to do
business in the state. In case of an escrow account, the subdivider shall file with the city
an escrow agreement which includes the following terms:
a. Funds of the escrow account shall be held in trust until released by the city and may
not be used or pledged by the subdivider as security in any matter during that time
other than payment for the improvements. The funds may be used for payment of
improvements as made, except that the escrow holder shall withhold from
disbursement so much of the funds as is estimated to be necessary to complete the
construction and installation of such improvements, plus an overrun allowance as
provided above.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 9 of 20
b. In the case of a failure on the part of the subdivider to complete any improvement
within the required time period, the institution shall immediately make all funds in
the account available to the city for use in the completion of those improvements.
3. Letter of credit. The subdivider may elect to provide from a bank or other responsible
financial institution authorized to do such business in Alaska, an irrevocable letter of
credit. Such letter shall be filed with the city and shall certify the following:
a. That the creditor irrevocably guarantees funds in an amount equal to the estimated
cost of all required public improvements plus overrun allowances as provided above
for the completion of all such improvements;
b. That in case of failure on the part of the subdivider to complete any specified
improvements within the required time period, the creditor shall pay to the city
immediately, and without further action, such funds as are necessary to finance the
completion of those improvements up to the limit of credit stated in the letter.
(4) Special assessment district. The subdivider may elect to pay all required assessments
levied against the property for the installation of public improvements. The city shall
make every reasonable effort to obtain all grant moneys available for financing of the
public improvements.
(Ord. 443, 1977; Ord. 610, 1988; Ord. No. 2024-008, § 1, 5-13-2024)
Section 10. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.020 Construction plans.
A. Generally. The developer must submit construction plans for all proposed and required
public improvements, associated private improvements, and all other utilities within and
outside the proposed development's boundary.
B. Construction plan submittal.
1. Plan sets. Prior to submittal of the final plat, and before the start of any construction,
the developer must furnish to the city complete sets of construction plans, profiles,
details, and special construction provisions for all existing and proposed
improvements. The administrative official must determine the number of plan sets to
be submitted. Plan sets should be_forwarded to the appropriate departments and other
officials for review.
2. Engineer's stamp. Construction plans must be stamped by the professional engineer
licensed in the State of Alaska who is responsible for the improvement designs.
Multiple engineer stamps are required for plans with multiple discipline designs, e.g.,
civil, electrical, structural engineering.
C. Construction plan —Details.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page .10 of 20
1. Size. All construction plans must be submitted on a minimum 11- by 17-inch sheets.
The administrative official may approve alternative sheet sizes.
2. Information. The drawings must contain the following information:
a. Name of subdivision.
b. Type of work.
c. Date.
d. Name of engineer preparing the drawings and the engineer's stamp.
e. Space for approval signature by the administrative official.
f. A north arrow and scale.
3. Scale. Horizontal scale must be one -inch equals 50 feet or greater. Vertical scale must
be one -inch equals five feet or less with a minimum scale of one -inch equals ten feet.
The administrative official may approve alternative scales.
4. Benchmarks. The locations, elevations, and description of datum of permanent
benchmarks must be shown.
5. Street profiles. Profiles of streets must indicate finished and existing grades for
centerline oLthe street and must extend a minimum o[150 feet beyond the limits of
the proposed project or, if intersecting an existing street, extend to the far side of the
existing street.
a. Street profiles must also include the drainage profiles along all streets in the
subdivision.
6. Details to be included. Plans and profiles, where applicable, must include location,
elevation, size, materials, and all other details of the proposed improvements.
7. Complete data. Complete survey data must be shown for all horizontal and vertical
curves.
8. Location of utilities. Construction plans must include the location of all existing and
pr posed required public improvements and utilities.
D. As -built drawings. The developer, upon completion of required improvements, must submit
a reproducible and digital format copy of as -built plans.
Section 11. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined)
16.05.025 Utility access.
A. Public rights -of -ways or easements, together with the right of ingress and egress, must be
provided where necessary for required public utilities. Where public rights -of -ways or
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 11 of 20
easements are required, and approved for public water systems, sewage disposal systems,
electric facilities, or other similar public improvements, the following requirements apply:
1. Width. All utility access corridors must be accessible for maintenance and must have
adequate space within the corridor to accomplish maintenance,, excavation, and
stockpiling of material. The minimum width for a public easement that does not abut
a public right-of-way is ten feet, unless otherwise recommended by the commission or
required by the platting authority.
2. Surface. Utility access corridors must be graded and compacted to provide a suitable
surface for access and maintenance.
3. Restricted access. Where a utility access corridor adjoins a public street, the
administrative official may require improvements to prevent access by the public.
B. The administrative official may require other utility and access easements to be shown on
a plat. Those private easements are not necessarily dedicated to or maintained by the public
and must be noted as such on the plat.
C. A note must be added to the plat stating either (1) the purpose of the easement, the grantee
of the easement, restrictions on the easement use, and whether the easement is permanent
or temporary, or private or public; or (2) reference to a recorded instrument with the same
information.
Section 12. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.030. Water system.
A. The connection to and provision of potable water is governed by this chapter and chapter
14.10.
B. Except as provided in this section, a developer of any subdivision or any new residential or
commercial construction must install and connect the development to the public water
system in accordance with the specifications established by the commission and affirmed
by the city council. Any extension of the public water system must be engineered and
constructed in accordance with all applicable City and Alaska Department of
Environmental Conservation requirements. Each lot and each dwelling unit must be
connected to the public water system unless the commission grants a waiver in accordance
with this section.
1. Unless otherwise prohibited by this title, the commission may consider a waiver_from
the public water connection requirement when either of the _following conditions is
met:
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 12 of 20
a. The proposed subdivision or development is located more than 400 feet from an
existing public water system, measured along the public right-of-way to the nearest
boundary of the subdivision; or
b. Connection to the public water system is impracticable due to excessive slope,
topography, geologic conditions= or other documented physical site constraints that
cannot reasonably be overcome through conventional design or construction
methods. Increased construction cost alone does not constitute an impracticable
condition.
2. A request for a waiver must be submitted in writing and must include substantial
evidence demonstrating that the applicable eligibility criteria are met and that an
adequate, reliable, and safe alternative water supply will be provided. Prior to
consideration by the commission, Community Development staff and the Public Works
Director shall review the waiver request for completeness and consistency with the
intent of this section and provide a recommendation to the commission regarding
approval or denial of the request. The application must include the following:
a. A report prepared by a registered professional engineer demonstrating the physical
and, where applicable, legal availability of an adequate water supply to serve the
anticipated demand of the subdivision or development.
b. Documentation demonstrating that the proposed water supply is capable of
providing a reliable year-round supply of potable water sufficient to meet the
anticipated demand of the development. The analysis shall consider, as applicable,
anticipated occupancy and use, source yield or availability, seasonal variations,
storage capacity, treatment requirements, and supplemental or reserve water
supplies.
c. Documentation of compliance with all applicable Alaska Department of
Environmental Conservation requirements and other applicable state or federal
requirements. When a proposed system may constitute a public water system under
state law, the applicant shall provide documentation of the system's classification
and any required approvals from the Alaska Department of Environmental
Conservation.
d. A maintenance and monitoring plan addressing the continued operation,
maintenance, treatment, testing, and monitoring of the alternative water supply, as
applicable.
e. Documentation of any required state water right, permit, certificate, or
authorization applicable to the proposed water source.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 13 of 20
f. The following alternative water supply systems may be approved, subject to the
requirements of this section and all applicable City, state and federal requirements:
i. Private well
1. The lot area shall be no less than 40,000 square feet;
2. The applicant shall demonstrate legal and physical availability of an
adequate water supply;
3. The applicant shall provide documentation of well yield or other
information sufficient to demonstrate that the well can meet the
anticipated demand of development;
4. The system shall comply with all applicable Alaska Department of
Environmental Conservation requirements.
ii. Community well system
1. The system shall be designed to provide an adequate and reliable
water supply to all lots or development served;
2. The applicant shall provide documentation demonstrating
adequate source capacity, storage, treatment, and distribution to
meet anticipated demand;
3. The applicant shall establish a legally enforceable mechanism ,for
the continued operation, maintenance, monitoring, repair, and
replacement of the system; and
4. The system shall obtain all applicable Alaska Department of
Environmental Conservation and other required approvals.
iii. Cistern and rainwater catchment systems.
I. The system shall be designed to provide a reliable year-round
supply of potable water sufficient to meet the anticipated demand
of the development.
2. The applicant shall provide documentation demonstrating
anticipated water demand, water availability, required storage
capacity, and any proposed supplemental or reserve water supply.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 14 of 20
For a rainwater catchment system, the analysis shall also consider
available collection area, anticipated precipitation, seasonal
variations in Erecipitation, and collection e(ciency.
3. Cisterns, storage tanks, collection systems, treatment systems, and
associated components used to provide potable water shall be
designed and constructed of materials suitable for potable water
use and shall be protected from contamination.
4. Rainwater intended for potable use shall be screened, treated,
disinfected, or otherwise protected as necessary to provide a safe
potable water supply in accordance with applicable building,
plumbing, and state requirements.
5. The system shall provide reasonable access for inspection,
cleaning, maintenance, repair, and water delivery, where
applicable.
6. Hauled potable water may be used as a supplemental or emergency
water source. Reliance on hauled water as a primary water source
shall require specific approval by the commission and shall be
supported by evidence demonstrating that a reliable and adequate
supply can be maintained.
7. The system shall comply with all applicable building, plumbing,
Alaska Department of Environmental Conservation, and other
state or federal requirements.
C. Review Criteria. In determining whether to grant a waiver, the commission shall find
that:
a. Special circumstances or conditions affecting the property justify consideration
of an alternative water supply;
b. The proposed alternative water supply provides an adequate, reliable, and safe
potable water supply for the anticipated developments
c. The waiver is necessary for the preservation and enjoyment of a substantial
property right and represents a practical means of complying with the intent of
this title:
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 15 of 20
d. The proposed alternative water supply can be reasonably operated and
maintained over the long term; and
e. Granting the waiver will not be detrimental to the public health, safety, or welfare
or injurious to other property in the area.
D. All waivers associated with a subdivision shall be granted at the time of preliminary plat
approval. A waiver may not be requested with a final plat submittal.
E. In the event that a public water main is extended and becomes available for service to
the property, including installation within or adjacent to the public right-of-way abutting
the property, the property owner is required to connect to the public water system within
12 months of receiving notice from the cif
F. Fire protection requirements are based on whether the development is located within or
outside the fire protection service area. All public water distribution systems must be
sized and constructed to meet fire flow and hydrant requirements and provide the
necessary fire flows for fire protection. All improvements must be constructed in
accordance with the International Fire Code, as adopted by the City, and applicable City
standards.
a. Where an alternative water supply is approved under this section, the applicant
shall demonstrate that adequate water supply and access for fire protection will
be provided in accordance with the International Fire Code and as approved by
the Fire Chief.
b. Water storage required for fire protection shall be in addition to the potable water
supply and storage necessary to meet the anticipated domestic or commercial
demand of the development, unless a combined system is specifically designed
and approved to satisfy both potable water and fire protection requirements
c. Fire protection facilities and improvements shall comply with the International
Fire Code, as adopted by the City, and all other applicable City requirements.
Section 13. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.035 Sewage disposal system.
A. The connection to and provision of sewage disposal system is governed by this chapter and
chapter 14.20.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 16 of 20
B. Sewage disposal system required. A developer must provide an approved sewage disposal
system for every subdivided lot. Each sewage disposal system must comply with all
applicable local, state, and federal health and environmental laws.
C. Public sewer connection. A developer of any subdivision or any new residential or
commercial construction must install and connect to the public sewer system it the
development is within 200 feet of the existing public sewer system. If the development is
more than 200 feet from the existing public sewer system, then the developer may install
and connect to a private on -site sewage disposal system. If the development is more than
200 feet from the existing public sewer system and cannot satisfy the requirements of a on -
site sewage system, then the developer must connect to the public sewer system. For the
purpose of this section, distance is measured from the closest sewer main along the right-
of-way to the nearest point of the boundary of the proposed subdivision or development.
1. All sewage disposal systems must be designed and constructed in substantial
conformance with the current Municipality of Anchorage code standards applicable
to utility construction, as adopted and in effect at the time of application.
a. The Public Works Director may approve deviations from such standards when
strict compliance is impracticable due to documented site constraints, including
topography, environmental conditions, or existing development patterns
D. Private on -site sewage disposal system. If a proposed development is located at greater
distances from the existing public sewer system than specified above, unless the developer
chooses to connect to the public system, then an on -site sewage disposal system is required.
Either of the following on -site sewage disposal systems may be installed:
1. Community wastewater systems. Community wastewater systems, which have shared
collection, treatment, and disposal: or cluster wastewater systems, which have
individual on -site treatment with a shared collection and disposal system are
acceptable if the following requirements are met:
a. The developer must provide a report and certification by a registered, qualified
engineer licensed by the State of Alaska, which clearly shows that the proposed
community or cluster wastewater system will operate satisfactorily, and how it
will meet all other state and federal standards, to the satisfaction of the
administrative official.
b. The proposed wastewater system(sl must be approved by the Alaska Department
of Environmental Conservation and any other agencies having jurisdiction.
Proof of approval must be submitted to the department.
2. On -site wastewater systems. Wastewater systems, which have individual on -site
treatment and individual on -site disposal, are acceptable if all the _following
requirements are met:
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 17 of 20
a. The developer must provide a report and certification by a registered, qualified
engineer or geologist licensed by the State of Alaska, which clearly shows one of
the following:
i. that the proposed lots are large enough and have existing soils of sufficient
permeability to permit the construction of on -site wastewater treatment and
disposal systems.
ii. if adequate soil is not available onsite, the applicant can propose alternative
methods for individual on -site wastewater systems. Alternative methods may
include mound systems, or other suitable wastewater systems.
b. The proposed wastewater system must be approved by the Alaska Department of
Environmental Conservation and any other agencies having jurisdiction. Proof
of approval must be submitted to the department.
Section 14. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.040. Communication and Electricity system.
A. The connection to and provision of electricity is governed by this chapter, chapter 14.15,
and by the standards and specifications of the Electric Utility.
B. A developer of any subdivision or any new residential or commercial construction must
install and connect the development to the public electricity system in accordance with
Electric Utility design standards.
C. All new communication and electric lines must be installed underground unless the
Electric Utility Director determines that underground installation is impractical and
approves an alternative installation. All installations must comply with the design,
construction, and material standards of the Electric Utility.
D. A11 new electric distribution lines and communication lines, including fiber, cable, and
similar facilities, must be located within the outer edge of the public right-of-way or within
a 10-foot utility easement adjacent to the right-of-way.
E. Conduit sizing, vault and transformer placement, service pedestals, secondary enclosures,
and access clearances are subject to review and approval by the Electric Utility.
Section 15. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.045 Drainage Plan
A. Drainage systems required. The drainage plan and associated drainage &cilities must be
designed and constructed to prevent additional waterflow damage to neighboring
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 18 of 20
properties. The developer must install all on and off -site improvements depicted in the
drainage plan.
B. Drainage Plan required. The developer must submit a surface drainage plan prepared by
a civil engineer licensed to practice in the State of Alaska as part of the required
construction plans. The plan must show all drainage facilities, and must include:
1. The calculated increase in stormwater runoff resulting from the proposed
development as well as the runoff from the total drainage area(sl associated with the
site. Runoff calculation must be based on a fully developed subdivision and a 25-year
storm event.
2. An evaluation of existing drainage ways and structures located between the
development and the receiving water body must verity that the existing drainage ways
can accommodate the increased runoff.
3. All public and anyrequired private drainage facilities.
4. A demonstration of how drainage from the proposed subdivision will outlet into an
established drainage channel, unless the administrative official approves an
alternative drainage way.
5. The drainage plan must demonstrate that the drainage from the new subdivision will
not be detrimental to the public welfare or injurious to other property in the area in
which the subdivision is situated.
C. Construction timing. Any drainage improvements required by this section must be
constructed prior to or at the same time as the completion of any street construction. A
certificate of occupancy may not be issued until the drainage improvements are completely
constructed and .functional.
Section 16. Seward City Code Chapter 16.05 Improvements is hereby amended by enacting a new
section to read as follows (new language is in bolded italics and underlined):
16.05.050. Streets and Street lighting.
A. Street standards. The developer must construct streets to the following standards. All
rights -of -way within a subdivision subject to the requirements of this title must be not less
than 60 feet in width. The portion of the right-of-way constructed and used for vehicular
travel must be paved in accordance with city specifications.
1. Blocks must be designed to provide reasonable connectivity and must not be less than
300_ feet or more than 1,000 feet in length. Longer blocks may be approved as part of
a preliminary plat where necessary due to topography, environmental constraints, or
existing development patterns. Where blocks exceed 1,000 feet, pedestrian access
connections may be required to maintain walkability.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 19 of 20
2. Permanent cul-de-sac streets are prohibited. Dead-end streets may be approved only
as stub streets intended for extension to adjoining property, or where extension is not
feasible due to documented physical or legal constraints. All approved dead-end streets
must provide a turnaround that meets city standards.
3. Public streets must include pedestrian facilities located outside the vehicular travel
lane. All pedestrian facilities must be a minimum of five feet wide. Where pedestrian
facilities are not constructed as traditional sidewalks, they must be clearly delineated
from the vehicular travel way by painted lines, signage, and/or other traffic control
devices approved by the City.
4. The paved roadway section must be symmetrically located about the centerline of the
dedicated right-of-way, unless an alternative alignment is approved by the Public
Works Director due to site constraints, existing improvements, or adopted street design
standards.
5. Alljublic streets must be designed and constructed in substantial conformance with
the current Kenai Peninsula Borough municipal code standards applicable to street
construction, as adopted and in effect at the time of application.
a. The Public Works Director may approve deviations from such standards when
strict compliance is impracticable due to documented site constraints including
topography, environmental conditions, or existing development patterns.
B. Street lighting. Public streets must be illuminated to provide safe and adequate visibility for
vehicular and pedestrian travel while balancing community expectations, dark -sky
preservation, energy efficiency, and long-term operational costs. Street lighting must be
installed in accordance with the requirements of the city.
1. Street lighting systems must be designed in conformance with the most current
roadway lighting guidelines published by the Illuminating Engineering Society (IES),
or equivalent nationally recognized standard approved by the City.
2. Intersections and required pedestrian facilities, including sidewalks, crosswalks, and
shared -use paths, must be illuminated.
3. Lighting intensity, spacing, and configuration are determined based on roadway
classification, traffic volumes, and pedestrian activity.
4. All street lig_htingfixtures must be directional LED units or equivalent energy -efficient
technology approved by the City.
5. Fixtures must provide downward illumination with controlled distribution patterns to
minimize glare, light trespass, and skyglow.
6. Street lighting layout, fixture type, pole height, and spacing are subject to review and
approval by the Electric Utility prior to construction.
CITY OF SEWARD, ALASKA
ORDINANCE 2026-009
Page 20 of 20
Section 17. This ordinance shall take effect immediately upon adoption.
ENACTED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA THIS 12T11
DAY OF OCTOBER 2026.
G
Sue McClure, Mayor
AYES: Calhoon, Barnwell, Draper, Osenga, Warner, McClure
NOES: None
ABSENT: Crites
ABSTAIN: None
ATTEST:
Kris Peck
City Clerk
(City Seal)
City Council Agenda Statement
Meeting Date: September 28, 2026
To: City Council
Through: Planning & Zoning Commission
Subject: Ordinance 2026-009: Amending Seward City Code §16.01 and §16.05 to
Clarify Public Improvement Requirements When Subdividing, Developing,
or Selling Land
Background and justification:
This proposed ordinance clarifies and updates the City of Seward's subdivision requirements for
the installation of public improvements. For approximately 50 years, the City has required
developers subdividing property within City limits, unless an applicable exception applies, to
provide public infrastructure such as streets, communication and electrical lines, water and sewer
systems, and street lighting.
Requiring public improvements as part of the subdivision process helps ensure that newly created
lots have the infrastructure and access necessary for development. Completing improvements at
the subdivision stage may also allow those costs to be incorporated into the purchase price of the
property and financed through a long-term mortgage. When improvements are deferred until after
lots are sold, individual property owners may face substantial costs that are more difficult to
finance, potentially delaying development and shifting the initial cost of improvements to property
owners or the City through a local improvement district.
The proposed ordinance maintains the City's longstanding requirement that developers provide
required public improvements while clarifying when those improvements must be provided and
establishing more specific standards and procedures for subdivision review, construction plans,
utilities, drainage, streets, pedestrian facilities, and street lighting.
The Planning and Zoning Commission held work sessions on February 17, 2026 and March 17,
2026 to review and discuss the proposed changes. On September 1, 2026, the Planning and Zoning
Commission approved Resolution 2026-013 recommending City Council approval of this
Ordinance.
The effect of the proposed legislation would be to:
• Clarify that developers are responsible for required public improvements
• Make the timing of improvements more explicit
• Eliminate existing exceptions for certain older subdivisions
• Clarifies the formal City preliminary plat review process before Borough platting review
• Adds detailed construction -plan requirements
• Adds utility -access and easement standards
• Establishes more specific public -water connection requirements and a waiver process
• Allows specified alternative water systems and standards when a waiver is approved
• Creates a specific 200-foot standard for public sewer connections
• Establishes standards for alternative wastewater systems
• Strengthens electrical and communications infrastructure requirements
• Makes drainage a specifically defined required public improvement
• Significantly expands street construction standards
• Adds subdivision design and pedestrian requirements
• Creates more detailed street -lighting standards
Comprehensive and Strategic Plan Consistency Information
This legislation is consistent with (citation listed):
Comprehensive Plan: Vol 1, Chapter 2.2 — Community Values
• 2.2.8 — City Government: "Continue to review and update the
city code."
• 2.2.10 — Land Development: "Ensure all adopted codes reflect
community values."
Vol 1, Chapter 3.2.1.1
• "Ensure uniform and consistent enforcement of the zoning code,
building code, subdivision ordinance, and city lease agreements,
and evaluate potential code changes to make enforcement
easier."
Strategic Plan:
Other:
Total amount of funds listed in this legislation:
This legislation (✓):
Creates revenue in the amount of:
Creates expenditure in the amount of:
Creates a savings in the amount of:
Has no fiscal impact
X
Funds are (✓):
Budgeted Line item(s):
Not budgeted
Not applicable
X
$ 0
$
Fund Balance Information
Affected Fund (✓):
General
Boat Harbor
Motor Pool
Available Fund Balance
SMIC
Parking
Other
Electric
Water
Wastewater
Healthcare
Note: amounts are unaudited
$ N/A
Acting Finance Director Signature: gam She
Attorne Review
Yes
Attorney Signature: /s/ Rob Palmer
Not applicable Comments:
Administration Recommendation
Adopt Resolution
Other: