CITY OF SEWARD, ALASKA
RESOLUTION NO. 82-28
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, REGARDING APPROVAL OF
CONTRACT CHANGE WITH ARCTIC ENGINEERS, INC.
WHEREAS, Arctic Engineers, Inc., f/k/a Arctic Engineers, has
an existing contract with the City of Seward for the design and
construction management of the Seward Interceptors and Waste
Water Treatment Facilities Project, CPA No. C020051-03, and
WHEREAS, certain delays have been caused in that project,
and
WHEREAS, there have been particilar problems with pump
stations 1 and 3 but those difficulties have been resolved by
agreement with the contractor, Brown & Associates, a joint
venture, and with Arctic Engineers, Inc., by letter agreement
dated April 14, 1982, and
WHEREAS, under the terms of those agreements, the Ci ty of
Seward is to bear no cost for the repairs and modifications
necessary to pump stations 1 and 3 either by reason of redesign
and construction management, or actual construction thereof, and
WHEREAS, the Department of Environmental Conservation, State
of Alaska, on behalf of the Environmental Protection Agency, has
agreed to the agreement between the City of Seward and the
contractor and engineer by letter dated April 9, 1982, and
WHEREAS, the project is, or will be, complete in the very
,-
near future, and
WHEREAS, Arctic Engineers, Inc., has agreed to conclude all
work on the project at no further cost to the City of Seward
beyond those costs originally estimated in its contract plus the
additional costs incurred prior to the failure of pump stations 1
and 3, and
WHEREAS, the Department of Environmental Conservation has
agreed that the costs to the City in terms of anrninistration and
attorneys' fees will be eligible for grant funds, and
WHEREAS, the Ci ty and Arct ic Enq ineers, Inc., have agreed
that an increase in the contract in the' amount of FIFTY-THREE
THOUSAND THREE HUNDRED FIFTY-FIVE AND 26/100 DOLLARS ($53,355.26)
is necessary to adequately reflect work performed and to be
performed under the contract.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEWARD, ALASKA, that:
-1-
r
I
I
I
I
CITY OF SEWARD, ALASKA
RESOLUTION NO. 82-28
Page 2
Section 1. The existing not-to-exceed price of THREE HUNDRED
SIXTY-SEVEN THOUSAND SEVEN HUNDRED FORTY-THREE AND NO/lOO DOLLARS
($367,743.00) with Arctic Engineers, Inc., be increased to FOUR
HUNDRED TWENTY-ONE THOUSAND NINETY-EIGHT AND ~6./l00 DOLLARS
($421,098.26"-), representing an increase of FIFTY-THREE THOUSAND
THREE HUNDRED FIFTY-FIVE AND 2Q1l00 DOLLARS ($53,355.2EB).
Section 2. This increase and the payment thereof represents
a final and complete payment to Arctic Engineers, Inc., for
services performed but does not act as a release by the City of
Seward of Arctic Engineers, Inc., for any disputes or
disagreements not covered in the letter agreement dated April 14,
1982, between the City and Arctic Engineers, Inc.
CITY
May
COUNCIL OF THE
, 1982.
CITY OF
PASSED AND APPROVED BY THE
SEWARD, ALASKA, this lOth day of
AYES: BURGESS, MEEHAN, O'BRIEN, SORIANO, SWARTZ AND CAMPBELL
NOES: NONE
ABSENT: CRIPPS
ATTEST:
APPROVED AS TO FORM:
HUGHES, THORSNESS, GANTZ,
POWELL & BRUNDIN
ZJ f?/~
Fred B. Arvldson, Attorney
(City
-2-