CITY OF SEWARD, ALASKA
RESOLUTION NO. 82-47
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, APPROVING AN AWARD OF
CHANGE ORDER NO. 1 TO THE SPRING CREEK
CLEARING AND RELOCATION PROJECT, NO. 242000.
WHEREAS, the Spring Creek clearing and relocation
project contract has been awarded to Stephan & Sons, Inc., and
includes the clearing and removal of stumps, brush, and slash
from the Spring Creek area located north of the developing Seward
Marine Industrial Center, and
WHEREAS, it is in the public interest of the City of
Seward to expand the area available for use by industry, and
WHEREAS,
organic cover will
user areas, and
the stripping of an upper silt layer and
be necessary for the developMent of additional
WHEREAS, prior to the commencement of the contract for
the clearing and relocation, it was difficult, if not impossible,
to determine the extent of stripping necessary, and
WHEREAS, the same equipment used for the clearing and
relocation project can be utilized for the stripping and removal
of organic cover, and
WHEREAS, Stephan & Sons, Inc., has proposed a price per
cubic yard of $2.70 for removal of all stripping materials based
upon an estimate of 22,000 cubic yards within a 6.4 acre parcel
is less than the price paid by the City in a similar contract
($3.00 per cubic yard for Phase III construction by Chris Berg,
Inc., after competitive bidding), and
WHEREAS, the current construction near Spring Creek
provided additional information which makes possible the
computation of expected stripping quantities which were not
possible prior to the award of the clearing and relocation
contract which itself was not capable of being awarded by reason
of U.S. Army Corps of Engineers I permit restrictions prior to
June 1, 1982, and
WHEREAS, going to public bid prior to the present time
and therefore prior to the current information having been
developed would have most likely resulted in even higher bid
estimates by reason of bidder uncertainty of site conditions and
equipment requirements, and
WHEREAS, mobilization for future stripping operation
would, in the opinion of the City and Project Engineer, exceed
$10,000.00, and
-1-
r
I
I
I
i
I
CITY OF SEWARD, ALASKA
RESOLUTION NO. 82-47
WHEREAS, it will be less expensive for the City to
supervise the operation of a single large contract covering both
stripping and clearing and the City Engineer has estimated such
savings to be in excess of $10,000.00, and
WHEREAS, it would cost in excess of $3,000.00 to go
through the pUblic bidding process, and
WHEREAS, it is possible that there may be additional
savings by use of hydraulic fill from the current project with
Chris Berg, Inc., for filling after stripping has occurred which
savings would not be possible were the stripping to be delayed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF SEWARD, ALASKA, that:
Section 1. Change Order No. 1 be awarded to Stephan &
Sons, Inc., in an amount not to exceed FIFTY-NINE THOUSAND FOUR
HUNDRED AND !'YO/looms DOT.T,ARS (S 59.400.00 ) for stripping
of the Sprlng Creek area adjacent to the Seward Marine Industrial
Park in accordance with the proposed Change Order No. 1 reviewed
by the City Council on June 21, 1982.
Section 2. The City Council finds that the public
bidding requirements of Section 10-8(a) are not necessary for the
reasons set forth above and that the public interest would be
best served by not requiring competitive bidding for the reasons
set forth above.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
SEWARD, ALASKA, this 21st day of June, 1982.
F SEWARD, ALASKA
AYES:
NOES:
ABSENT:
BURGESS, CRIPPS, GILLESPIE, MEEHAN, O'BRIEN, SORIANO AND SWARTZ
NONE
NONE