Sponsored by: Tones
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. 93-089
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, AMENDING THE ELECTRICAL TARIFF
WHEREAS, the city of Seward contracted with R. W. Beck to perform a utility rate
study; and
WHEREAS, the R. W. Beck report recommended several amendments to the city's
electric tariff in order to assure this fund's self sufficiency;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SEWARD, ALASKA, that:
Section 1. City of Seward Resolution No. 92-064 and Resolution No. 92-186 are
hereby repealed, and the rates and charges attached hereto and incorporated herein by
reference are hereby ADOPTED.
. Section 2. This resolution shall take effect July 1, 1993.
PASSED AND APPROVED by the City Council of the city of Seward, Alaska, this
14th day of June, 1993.
THE CITY OF SEWARD, ALASKA
~ k~. OM~
Dave w. Crane, Mayor
AYES:
NOES:
ABSENT:
ABSTAIN:
Bencardino, Crane, Darling, Krasnansky, Sieminski, Swartz, White
None
None
None
.
.
.
.
Electrical Rates and Charges
Rates for Electrical Power by Class of Service
Class of Service Energy Charge Demand Charge Monthly
Customer Charge
Residential $O.0917/KWH n/a $15.00
Small General Service
(Less than 25KW) $O.l120/KWH n/a $30.00
$O.0751/KWH
Large General Service (1st 200 KWH/KW)
(Greater than 25KW) $13.83/KW' $30.00
with demand meters $O.0434/KWH
(Additional KWH's)
Industrial Service"
(Over 750 KW Demand) $0.0141 $14.94 $100.00
Yard Lights n/a $ 6.75 (175 watts)
$10.00 (250 watts)
Street Lights $O.1188/KWH n/a $30.00
*
Demand Charges will be based on the maximum demand recorded over a IS-minute
period, except, if other provisions are included in a special contract.
**
This rate is based on the cost of energy and demand from Chugach Electric Association (CEA)
plus 2S% and is subject to change at any time based on CEA rates charged to the city of Seward.
A Small General Service customer may elect to be billed under the Large General Service
schedule; however, the election to change the billing rate from one customer group to
another may not be made more often than once every 12 months.
City of Seward Electrical Tariff
Page 2-1
.
.
.
Definitions and Miscellaneous Charges
1.
CEA Fuel Adjusbnent: The fuel adjusbnent charge from Chugach Electric
Association directly distributed to Seward Electric Utility customers prorated
according to the number of KWH the customers consumed during the
billing period.
2. Seward Fuel Adjusbnent: The cost of operating the standby generation
plant, including fuel, labor, maintenance and repair when it exceeds the
amount budgeted to date for the fiscal year. The cost will be prorated
according to the number of KWH the customer consumed during the
billing period.
3. Special Contracts: Special contracts may be negotiated by the Utilities
Manager with customers that have a demand in excess of 750 KW or that
have unique power requirements that cannot be reasonably addressed by
the large general service tariff. Special contracts may include, but are not
limited to, provisions for instantaneous demand charges, time of service,
interruptible power, minimum and maximum demand, adjusbnent of
demand level, ownership and payment of new distribution facilities,
termination charges and power factor. Special contracts must be approved
by the City Council.
4.
V AR Change (Power Factor Adjusbnent): All schedules requiring demand
metering will be subject to the following power factor adjusbnent
provisions:
1. Demand-metered customers should attempt to maintain a
unity power factor. If the power factor falls below ninety percent lagging,
the customer will take corrective steps to return the power factor to ninety
percent or higher. Also, the following charge for billed kilowatts will apply:
Month Billing Demand = Maximum Demand x 90%
Actual Power Factor
2. All power factor adjustment equipment installed by the
customer must be approved by the city. Power factor can be determined
by permanently installed monitoring equipment or by periodic testing at
reasonable intervals, at the discretion of the city.
4. Standby Generation: The cost of operating the standby generation plant
to meet a specific customer's need will be charged directly to that customer.
Such cost will be the total cost of operating the plant, including fuel, labor,
overtime, maintenance, repair and overhead, less the value of energy
generated in excess of the customer's need.
City of Seward Ekctrical Tariff
Page 2-2
.
.
.
5.
Other Miscellaneous Fees and Charges: Fees and charges for existing
facilities follow on Page 4. Engineering service fees and charges for new
facilities follow on Page 5. Fees on Pages 4 and 5 are listed according to
service zone as follows:
ZONE I Inside City Limits (excluding the Small Boat
Harbor).
ZONE II City Limits to Mile 12, Seward Highway, and all
roads connecting the Highway within this area
ZONE III Mile 12 to Lawing
6. APUC Regulatory Cost Charge: A special surcharge of $O.OOO626/KWH
imposed on electrical utilities by the Alaska Public Utilities Commission in
response to the state's intent to assess user fees to support activities of the
Alaska Public Utilities Commissions and departments. This charge was
recommended by APUC as a pass through charge to retail utility customers.
City of Seward Electrical Tariff
Page 2-3
.
.
.
Existing Facilities
Schedule of Fees and Charges
Service Zone I Zone II Zone III
Meter testing, per test, when
previous test occurred within $50.00 $70.00 $90.00
the last 24 months
Reconnection to approved
existing meter installation $20.00 $25.00 30.00
Reconnection to approved
existing meter installation $140.00 $170.00 $200.00
outside regular business hours
New Connection Fee $150.00 $150.00 $150.00
Deposit - Residential Account $100.00 $100.00 $100.00
Deposit - Commercial or
Industrial Account $200.00 $200.00 $200.00
Deposit - Interruptible, Off-
Peak Account: The larger of
twice the estimated monthly $200.00 $200.00 $200.00
bill OR
Tampering with or unauthorized
breaking of meter seal $500.00 $500.00 $500.00
Per Annum Interest on
delinquent account 12% 12% 12%
Dishonored check fee $10.00 $10.00 $10.00
Reconnection during regular
business hours following dis- $40.00 $50.00 $60.00
connection of delinquent account
Reconnection outside regular
business hours following dis- $140.00 $170.00 $200.00
connection of delinquent account
NOTE: See Page 2-3 for description of Zones I, II, and III.
City of Seward Electrical Tariff
Page 2-4
.
.
.
New Facilities
Engineering Service Charges
Schedule of Fees and Charges
Service Zone I Zone II Zone III
Temporary Secondary Service $50.00 $60.00 $70.00
Primary Overhead Extensions
(Residence) $50.00 $60.00 $70.00
Primary Underground
Extensions (Residence) $50.00 $60.00 $70.00
Secondary Service $50.00 $60.00 $70.00
Primary Overhead Extensions
(Subdivision, Mobile Home $100.00 $120.00 $140.00
Park, Multi-Residential)
Primary Overhead Extensions
(Commercial & Industrial) $200.00 $240.00 $260.00
Primary Underground
Extensions $200.00 $240.00 $260.00
(Commercial & Industrial)
Modifications of Existing
Facilities $100.00 $120.00 $140.00
Street Lighting Systems
and Yard Lights $50.00 $60.00 $70.00
NOTE:
The Zone Fee or Charge is non-refundable until the service
is connected. If the service is constructed and connected, the
charge will be adjusted to the actual cost of engineering
services.
See Page 2-3 for description of Zones I, II, and III.
City of Seward Electrical Tariff
Page 2-5
.
.
.
CITY OF SEWARD, ALASKA
RESOLUTION NO. 93-089
ATTEST:
APPROVED AS TO FORM:
Wohlforth, Argetsinger, Johnson &
Brecht, Attorneys for the city of Seward,
Alaska
/
~~~
City Attorney