Loading...
HomeMy WebLinkAboutRes1991-037 . . . Sponsored by: Schaefermever CITY OF SEWARD, ALASKA RESOLUTION NO. 91-037 (Substitute) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AWARDING A CONTRACT FOR STREET AND SIDEWALK IMPROVEMENTS WHEREAS, the city of Seward approved a General Obligation Bond for street and sidewalk improvements, and approximately $1,184,000 remains in the uncommitted balance of said funds: and WHEREAS, the state of Alaska awarded funds for replacement of Lowell Canyon Bridge, and $26,222 of that amount is available for paving the bridge: and WHEREAS, the intent of the General Obligation Bond issue was to repair and improve certain streets, sidewalks and street lighting facilities to provide for public safety and preservation of essential public works facilities: and WHEREAS, it has just become apparent that Adams and Washington Streets must be repaired this season to preserve the street structure: and WHEREAS, it is very desirable to accomplish other downtown and paving improvements if the funds are available: and WHEREAS, a contract was advertised for bid proposals to accomplish said work, and the lowest bid for the entire project exceeds the funds available: and WHEREAS, there are sufficient funds available to award a contract for the most essential work: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, that: Section 1. The public interest would be best served by authorizing the city manager to sign a contract to Summit Paving and Construction to construct Schedules A, C, G, H and I, copies of which are attached and incorporated herein by reference, for an amount not to exceed $1,148,333.50. Section 2. The public interest would be best served by authorizing the city manager to negotiate a contract with Summit paving and Construction for repair and overlay of Adams and Washington Streets from Third Avenue through the intersection of Fifth Avenue, except that award of such contract or contracts shall be subject to approval by the City Council and the availability of funds. -1- . CITY OF SEWARD, ALASKA RESOLUTION NO. 91-037 (Substitute) Section 3. The public interest would be best served by authorizing the city manager to sign a contract with Summit Paving and Construction for paving of Government and Dairy Hill Roads, Schedules E and F, copies of which are attached and incorporated herein by reference, except that a Notice to Proceed shall only be issued if additional funding is available prior to completion of other contract work, and such notice to proceed receive the prior approval of the City Council. Section 4. The public interest would be best served by authorizing the city manager to negotiate with Summit Paving and Construction the contract price to install guard rails included in Schedules E and F if a Notice to Proceed with Schedules E and F is not issued. . Section 5. The public interest would be served and the city manager is hereby authorized to execute a contract with Summit Paving and Construction for installation of downtown pedestrian poles (Schedule B) except that a Notice to Proceed shall be issued only if additional funds are available prior to completion of work authorized by Sections 3 and 4 above and provided further such Notice to Proceed receives prior approval of the City Council. Section 6. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the City Council of the city of Seward, Alaska, this 22nd day of April, 1991. THE CITY OF SEWARD, ALASKA ~C'-I:~ David L. Hilton, Mayor AYES: NOES: ABSENT: ABSTAIN: Burgess, None None None Dunham, Krasnansky, Meehan, Sieminski, Simutis and Hilton ATTEST: APPROVED AS TO FORM: . Perkins Coie, Attorneys for the city of Seward, Alaska 7~)t/ ~ Fred B. Arvidson -2- . The project will be divided into Schedules of work as follows: . Schedule A . Downtown Sidewalk Improvements (Base Bid) Includes all work required to provide pedestrian improvements in the Downtown area (south of Jefferson Street) except the area included in Schedule D. The work includes the removal and replacement of the existing sidewalks and light poles. The area shall be provided with a complete standard street lighting system. Foundations and wiring shall be provided for pedestrian light poles in a portion of Fourth Avenue. . Schedule B . Downtown Pedestrian Poles (Additive Alternate #1) Includes all work required to furnish and install pedestrian light poles onto the bases furnished in schedule A. . Schedule C . Downtown Public Address System (Additive Alternate #2) Includes all work required to furnish and install conduit. junction boxes and wiring necessary for a public address system. The system electronic hardware. including the speakers. amplifier, microphones and audio receptacles, are not included in this work. : - . . . Schedule D . Southeast Downtown Sidewalk Improvements (Additive Alternate #3) Includes all work required to provide pedestrian improvements on the east side of Fifth Avenue south of the City Library as shown on the Plans. The work includes the removal and replacement of the :existing sidewalks and light poles. The area shall be provided with a complete standard street lighting system. . Schedule E . Government Road Street Improvements (Additrve Alternate #4) This schedule includes all work required to regrade, realign, widen and pave the existing gravel roadway on Government Road. The work will include excavation and backfill of the road base as well as drainage improvements and guardrails. . . Schedule F . Dairy Hili Lane Streef Improvements (Additive Alternate #5) This schedule includes all work required to regrade. realign. widen and pave the existing gravel roadway on Dairy Hill Lane. The work will include excavation and backfill of the road base as well as drainage improvements and guardrails. . Schedule G . Fourth Avenue Sidewalk Improvements (Base Bid) ::-..... -..... Includes all work required to provide pedestrian improvements on Fourth Avenue north of Jefferson Street including new sidewalks. drainage improvements and a complete street lighting system. . . Schedule H . Fifth Avenue Sidewalk Improvements (Base Bid) Includes all work required to provide a new roadway with pedestrian improvements on Fifth Avenue between Jefferson Street and Madison Street. The work will include new sidewalks, asphalt paving, drainage improvements and a complete street lighting system. . Schedule I. Lowell Creek Bridge Surfacing (Additive Alternate #6) This schedule includes all work required to regrade. realign. widen and pave the gravel roadway that crosses Lowell Creek over a new bridge to be installed by ~hers. 8