Loading...
HomeMy WebLinkAboutRes2007-090Sponsored by: Oates CITY OF SEWARD, ALASKA RESOLUTION N0.2007-090 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A SECOND EXTENSION OF THE AGREEMENT WITH TRYCK NYMAN HAYES, INC. TO PROVIDE ENGINEERING AND DESIGN SERVICES FOR THE I & T DOCKS AND THE TRAVEL LIFT/BULKHEAD IN THE SMALL BOAT HARBOR FOR AN AMOUNT NOT TO EXCEED $52,000 WHEREAS, in a final report dated December 22, 2005, Tryck Nyman Hayes, Inc. provided the City of Seward the results of its inspection and recommendations for renovating the I & T docks and the travel lift/bulkhead in the Small Boat Harbor; and WHEREAS, a Request for Proposals dated April 8, 2006 sought engineering and design proposals for the I & T docks and travel lift/bulkhead; and WHEREAS, in June 2006 Tryck Nyman Hayes, Inc. ("TNH") was selected as a result of a review of the proposals received by the City and the parties entered into a contract for an amount of $124,196.00; and WHEREAS, the original project capital budget was $2 million but the City later obtained an additional $2.2 million for a total budget of $4.2 million for improvements to the I&T docks and the travel lift/bulkhead; and WHEREAS, in February 2007 the City and TNH approved an amendment to the contract with TNH to provide the additional services needed for the expanded scope of the project, along with design, engineering, permitting and construction administration for the prof ect, at an additional cost of not to exceed $88,890.00; and WHEREAS, significant additional unforeseen work was needed, primarily to address environmental and permitting requirements, as well as the City's desire to take advantage of the timing of this project in order to upgrade water and other critical utility infrastructure; and WHEREAS, TNH has requested an amendment to include the additional services for an amount of $52,000. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, that: +~. CITY OF SEWARD, ALASKA RESOLUTION 2007-090 Section 1. The City Manager is authorized to enter into a second amendment to the agreement for providing engineering and design services for renovations of the I and T docks and the travel lift/bulkhead facility with Tryck Nyman Hayes, Inc. of Anchorage, Alaska for an amount not to exceed $52,000.00, in accordance with the proposal submitted by TNH and presented at this meeting. Section 2. Funding for these services is appropriated as follows: $12,000 from the Water Enterprise Fund reserves account no. 701-0000-3070-0315 for the upgrade of water utility infrastructure, and $40,000 from the Small Boat Harbor Repair and Renovation Capital Project account no. 315-3150-4680-0200, for a total appropriation of $52,000 to the contracted services account no. 315-3150-5390 Section 3. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 24th day of September, 2007. THE CITY OF SEWARD, ALASKA v/Cc.- Vanta Shafer, Mayor AYES: Dunham, Bardarson, Thomas, Amberg, Shafer NOES: Valdatta, Schafer ABSENT: None ABSTAIN: None ATTEST: ~ ~ Jea Lewis, C rty Clerk ~a~ ~F S~rY ~~~ v~ sL~ ~ ........ q ~I (City Seal) , s ; . • p ~ as y ~~ ~~ • • r ,i°vy ~~: vG~~ 1 19~~ ,~? ,~~ Council Agenda Statement Meeting Date: September 24, 2007 Through: Phillip Oates, City Manager~fl From: Scott A. Ransom, Harbormaster Agenda Item: Authorizing the City Manager to Negotiate and Execute, on Behalf of the City of Seward, a Second Amendment to the Agreement with Tryck Nyman Hayes, Inc. to Provide Engineering Services for the I & T Docks and the Travel LiftlBulkhead in the Small Boat Harbor. BACKGROUND & JUSTIFICATION: In June 2006, the City entered into an agreement with Tryck Nyman Hayes, Inc. ("TNH") to provide engineering services for the I & T docs and the travelliftlbulkhead in the Small Boat Harbor. The agreement was the result of a Request for Proposals and evaluation of each of the proposals received by the City. TNH's proposal ranked highest with 95.67 points out of a total of 100. Other proposals scored 66.00 and 69.33. The City first obtained grants in the amount of $2 million, but later obtained an additional $2.2 million for a project total of $4.2 million. To fully utilize the grant funds and expand the project accordingly, the design, engineering, permitting, and project management scope of work required modification. In February 2007, the City Council approved an amendment to the contract with TNH to provide additional services, including additional design and permitting work, at a cost of not-to- exceed $88,890.00. Environmental work at the site and extensive permitting requirements, among other things, have increased the design, permitting and project management tasks. TNH requests a second amendment to the contract to perform the additional environmental and permitting, design of upland utilities, design of erosion protection for the area adjacent to the hotel sheet pile bulkhead, and related project management services. The additional services would beprovided at acost ofnot-to-exceed $52,000. CONSISTENCY CHECKLIST: Where applicable, this resolution is consistent with the Seward City Code, Charter, Comprehensive Plans, Land Use Plans, Strategic Plan and City Council Rules of Procedures. FISCAL NOTE: , Approved by Finance Department RECOMMENDATION: Council approve Resolution 2007-~ authorizing the City Manager to negotiate and enter into a second amendment to the contract with Tryck Nyman Hayes, Inc. for engineering and design services for the I & T docks and the travelliftlbulkhead. 44