Loading...
HomeMy WebLinkAboutRes2011-046 Sponsored by: Oates CITY OF SEWARD, ALASKA RESOLUTION 2011 -046 A RESOLUTION OF THE CITY COUCIL OF THE CITY OF SEWARD, ALASKA AUTHORIZING THE CITY MANAGER TO ENTER INTO A CHANGE ORDER FOR AN AMOUNT NOT -TO- EXCEED $47,600 FUNDED BY THE CRUISE SHIP HEAD TAX TO COMPLETE THE INTERIOR SLAB WORK NECESSARY TO RELOCATE THE USCG STRUCTURE WHEREAS, the City of Seward was awarded grant money to provide a foundation and utilities to relocate the USCG facility to the North Harbor and the construction of the water line to the Z float; and WHEREAS, the City was allocated $300,000 State funding for the USCG grant, contributed $168,617 in cruise ship head tax to construct the foundation and utility extensions necessary to relocate the USCG to the North Harbor and prepare for the Z float development; and WHEREAS, the City developed a competitive bid package for the USCG foundation, relocation of the storm drain, and phase 1 and 2- water utilities and advertised according to SSC6.10.210 and SCC6.10.215; and WHEREAS, Metco Inc. was the most qualified and responsive bidder with a bid of $423,027; and WHEREAS, the City contributed $168,617 in cruise ship head tax to complete phase 2- water utilities; and WHEREAS, of the $300,000 State funding $254,410 were allocated to construct the building foundation, water and sewer service, removal of storm drain, realignment of storm drain and phase 1- water utilities; and WHEREAS, the City completed the foundation and utilities in 2010 with the exception of the interior slab; and WHEREAS, there was additional work added to the project that was not in the original scope of work; and WHEREAS, this additional work requires more funding and requires Metco Inc.'s contract be increased $47,600 by an approved change order; and WHEREAS, this change order will provide the funding necessary to complete the interior slab work in preparation for the relocation of the USCG structure. CITY OF SEWARD, ALASKA RESOLUTION 2011 -046 NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SEWARD, ALASKA: Section 1. The City Manager is hereby authorized to enter into a change order as attached hereto, with Metco Inc. for the USCG slab /foundation. Section 2. Funding in an amount not to exceed $47,600 is hereby appropriated from account no. 402 - 0000 - 3071 -0277 to account no.277- 2770 -5390. Section 3. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 13` day of June 2011. THE CIT OF .EWARD, ALASKA Ina 'illard E. Dun am, Mayor AYES: Valdatta, Bardarson, Smith, Keil, Shafer, Casagranda, Dunham NOES: None ABSENT: None ABSTAIN: None ATTEST: ohanna Kinney, CMC City Clerk (C i ty*Ifast rqr 04 Or °ftki • . a 1 i • r. .4016r0114 Council Agenda Statement Meeting Date: June 13, 2011 r 4 se% To: Phillip Oates, City Manager (" 31j, A a From: William Casey, Public Works qWP Agenda Item: Change order for the USCG relocation project to construct the phase interior slab BACKGROUND & JUSTIFICATION: The City of Seward was awarded grant money to construct a foundation and provide utilities in preparation to relocate the USCG facility to the North Harbor and construct the water line to the Z float. The City was allocated $300,000 State funding for the USCG grant, and is utilizing $168,617 in cruise ship head tax to complete this project. The City developed a competitive bid package for the USCG foundation, relocation of the storm drain, phase 1 and 2- water utilities and advertised according to SSC6.10.210 and SCC6.10.215. Of the total $300,000 of State funding, $254,410 was allocated to construct the building foundation, water and sewer service, removal of storm drain, realignment of storm drain and phase 1- water utilities. The City contributed an additional $168,617 in cruise ship head tax to complete phase 2- water utilities. Metco Inc. was the most qualified and responsive bidder with a bid amount of $423,027. The foundation, relocation of the storm drain and water utilities were constructed in 2010. There was additional work added to the project that was not in the original scope of work and requires additional funding to increase Metco Inc's contract by $47,600. The interior slab of the foundation is the last scope of work to prepare the site for the relocation of the USCG structure. In order to complete the work, the City needs to issue a change order as described above and in the attached Metco Inc. estimate. INTENT: To authorize the City Manager to enter into a change order with Metco Inc. to complete the interior slab of the USCG foundation in the North Harbor. Such work will prepare the site for the relocation of the USCG structure. FISCAL NOTE: Funding for this project will come from State cruise ship passenger vessel taxes, as the relocation of the U.S. Coast Guard to the security float was considered part of the overall project to provide improved response and security to the cruise ships, and relocating the U.S. Coast Guard building to closer proximity with the security float completes this portion of the project. 44,01,argS Approved by Finance Department: je ATTORNEY REVIEW: Yes X No RECOMMENDATION: Council approves Resolution 2011 - Jlf a uthorizing the city manager to enter into a change order with Metco Inc. for the purpose of completing the interior slab of the foundation prepared for the relocation of the USCG structure.