HomeMy WebLinkAboutRes2013-090 Sponsored by: Hunt INN CITY OF SEWARD, ALASKA RESOLUTION 2013-090 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, ADOPTING THE 2014 - 2015 CAPITAL IMPROVEMENT PLAN WHEREAS, the City Manager has submitted to the City Council a proposed biennial budget for the City of Seward for Calendar Years 2014 and 2015; and WHEREAS, the biennial budget was reviewed by the City Council in budget work sessions on September 16, 19, and 24, 2013, which were televised to the public; and WHEREAS, a public hearing is scheduled on the proposed budget and Capital Improvement Plan for October 28, 2013 with an additional public hearing and final adoption scheduled for November 12, 2013; and WHEREAS, there is $600,000 designated in the Calendar Year 2014 General Fund Budget and $250,000 designated in the CY 2015 General Fund Budget to finance capital improvements, contingent on receipt of$250,000 per year from State Revenue Sharing; and WHEREAS, the Capital Acquisition Fund will receive funding in the amount of$76,840 from the Sewer Enterprise Fund as partial repayment of a 1990 loan from the General Fund. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, that: Section 1. The Capital Improvement Plan for Calendar Years 2014 and 2015, which is attached hereto and made a part hereof by reference, is HEREBY ADOPTED. Section 2. Funding in the amount of $600,000 is hereby appropriated in 2014 and $250,000 in 2015 for the purpose of meeting capital needs for the General Fund, subject to receipt of$250,000 per year in funding from the State of Alaska revenue sharing program. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 12`x' day of November, 2013. CITY OF SEWARD, ALASKA RESOLUTION 2013-090 THE CITY OF SEWARD, ALASKA ..r ,C1/NJ nLl an Bardarson, Mayor AYES: Keil, Shafer, Casagranda, Terry, Squires, Bardarson NOES: None ABSENT: None ABSTAIN: None VACANT: One ATTEST: - J n hanna Ki' , CMC ity Clerk (City Seal) i`tfiiit•�;• r� at r q—• 9 • SEAL N/ • • aid Capital Improvement Plan General Fund-Related Capital Projects Fiscal Year 2014 and 2015 1 New or Project Funding Source i Project Description Replace Year Coat City Portion Other Portion Source Projects Slated for Funding in 2014 and 2015: City Shop: Diesel fuel dispensing system R 2014 $75,000 $75,000 Capital Acquisition Fund Campgrounds: Automation of fee collection N 2014 $100,000 $100,000 Capital Acquisition Fund Campgrounds:Small Outdoor Restroom-Williams Park N 2014 $125,000 $25,000 $100,000 Capital Acquisition Fund City Hall: Carpet replacement(carried forward from 2013) R 2014 $95,000 $95,000 Capital Acquisition Fund Clerk: City Code pagination projection R 2014 $10,000 $10,000 Capital Acquisition Fund Public Works: ADA sidewalk improvements R 2014 $100,000 $100,000 Capital Acquisition Fund Public Works: address the most immediate road repair neet R 2014 $270,000 $270,000 Capital Acquisition Fund Public Works: Federal funding for road improvements R 2014 $2,800,000 $2,800,000 Federal earmark Total Projects in 2014: $3,575,000 $675,000 $2,900,000 City Hall roof repairs 2015 $100,000 $100,000 Capital Acquisition Fund Total Projects in 2015: $100,000 $100,000 $0 CITY SHOP: City Shop Facility Phase I:Site Layout/Design R $75,000 $75,000 General Fund Total City Shop Projects: $75,000 $75,000 $0 PUBLIC SAFETY: New animal shelter R $1,000,000 $200,000 $800,000 General Fund/Grant Fire Hydrant upgrades-Ph.II R $200,000 $200,000 General Fund Refurbish Fireboat dings,dents,bottom paint,repaint R $27,000 General Fund Lowell Point erosion mitigation R $200,000 $200,000 Federal/State Generator for AVTEC emergency shelter N $125,000 $125,000 General Fund Satellite Fire Station/Storage Facility(Forest Acres) N $6,000,000 $6,000,000 Grant Ladder Platform Vehicle N $950,000 $950,000 Grant Satellite Station on Nash Road N $1,407,600 $1,407,600 Grant Fire Hall electric meter base relocate,rewire,security N $65,000 $65,000 General Fund Road improvements R $2,700,000 $300,000 $2,400,000 Federal/State Replace existing fire station R $4,446,000 $4,446,000 State/General Expand SMIC building storing engine N $33,000 $33,000 General Fund Public Safety Building N $5,665,000 $5,665,000 General Fund Total Public Safety Projects: $22,818,600 $6,588,000 $16,203,600 a', PARKS&RECREATION: Replace Warehouse R Unknown Unknown General Fund him Replace Wellington Pavilion R $400,000 $400,000 General Fund TYC landscape,fence,play area R $25,410 $25,410 General Fund Beach Erosion Engineering Study N $150,000 $150,000 Federal/General Beach Erosion repairs at waterfront R $88,000 $88,000 Federal/General Beach Erosion control finger construction N $88,000 $88,000 Federal/General Lagoon Boardwalk rebuild R $264,000 $264,000 General Fund Restroom and Concession Stand Upgrade R $179,300 $179,300 General Fund Informational/directional maps N $23,100 $23,100 General Fund Forest Acres campground improvements R $35,000 $35,000 General Fund Jon Perry softball field fence replacement R $75,000 $75,000 General Fund Sweet Smelling Toilet at culvert N $48,400 $48,400 General Fund Marathon Campground rehabilitation R $52,800 $52,800 General Fund Forest Acres Park playground upgrades R $38,500 $38,500 General Fund Harborside Park-Phase I/Seaview Campground R $150,150 $150,150 General Fund Harbor Park(new south harbor uplands) N $890,900 $890,900 State/General Little League Field restrooms R $187,000 $187,000 General Fund Boulder Field-turf,fence,grade,drains R $275,000 $275,000 General Fund Total Parks&Recreation Projects: $2,970,560 $2,970,560 $0 CITY HALL/LIBRARY/OTHER: City Hall electrical upgrades R $65,000 $65,000 General Fund City Hall ADA improvements N $40,000 $40,000 General Fund City Hall fire alarm system upgrade R $40,000 $40,000 General Fund Fix venitilation at City Hall R $85,000 $85,000 General Fund Total City Hall/Library Projects: $230,000 $230,000 $0 Total General Fund Projects: $29,769,160 $10,638,560 $19,103,600 Total General Fund 1°rojeots for 2014: $3,575,000 Total General Fund Projects for 2015: $100,000= Note: 2014 Budget includes$523,160 and 2015 includes$250,000 for capital projects;$250K each year based on receipt of State Revenue Sharing funding Isom City of Seward Capital Improvement Plan , Harbor-Related Capital Projects 2014 and 2015 r Critical-Risk-C New or Project High-Risk-H Funding Source Project Description Replace Year Cost Moderate-Risk_M City Portion Other Portion Source D-float replacement R 2013/2014 $2,360,000 C $1,180,000 $1,180,000 MRRF/State Harbormaster restrooms R 2013/2014 $130,000 H $130,000 State grant 5-Ton crane N 2014 $300,000 New $300,000 City NE Fish cleaning station N 2014 $579,000 New $579,000 State grant Replace trash dumpsters R 2014 $70,000 H $70,000 City 50-ton boat lift wash down pad N 2014 $500,000 New $250,000 $250,000 Harbor/Grant Replace floats A,B,C,S R 2015 $6,100,000 H $3,050,000 $3,050,000 City/State Replace K&L floats R $2,250,000 M $1,125,000 $1,125,000 City/State Replace S launch ramp R $1,000,000 M $1,000,000 State Replace N launch ramp R $1,000,000 M $1,000,000 State Boardwalk S.Harbor Uplands(a) N $200,000 New $200,000 State South harbor uplands pave and landscape N $500,000 New $500,000 City T,U,V Floats(off of Z-Float) N $4,000,000 New $2,000,000 $2,000,000 City/State Power to X-Float N $200,000 New $100,000 $100,000 City/State Fishing pier recreation area N $2,600,000 New $2,600,000 State Total Harbor Fund Projects: $21,789,000 $8,575,000 $13,214,000 Total Harbor Fund Projects for 2014 and 20I$ $10,039,000 $4,8501000 415,189,000 *Critical Risk: Likely to fail within next 5 years;High Risk: Likely to fail in 5-10 years;Moderate Risk is continuous increasing cost to maintain and operate. I.Funding for City-funded projects has not yet been identified by the City Council and requires appropriation. wail Capital Improvement Plan Seward Marine Industrial Center (SMIC)-Related Capital Projects 2014 and 2015 New or Project Funding Source Project Description Replace Year Cost City Portion Other Portion Source Breakwater,dredging,and new docks N 2014 $100,000,000 $100,000,000 State/Fed/City $20 Million for Phase 1(breakwater only;does not include dredging and new docks)(2014-2015) Ship transfer system N 2014 $4,000,000 $4,000,000 State/Fed/City North Dock Repairs R 2015 $750,000 $750,000 City Improve drainage and fence storage area N 2015 $1,500,000 $1,500,000 Federal 300-ton boat lift R $1,500,000 $1,500,000 Grant/City Two restroom facilities N $75,000 $75,000 Grant/City Total S.M.I.C.Fund Projects: $107,825,000 $750,000 $107,075,000 Total S.M.I.C.Fund Projects for 2014 and 2015: $1084250,000: $750,000 $105,500,000 hurt 'lam City of Seward Capital Improvement Plan Electric-Related Capital Projects tandi2014 and 2015 * Critical-Risk-C New or Project High-Risk-H Funding Source Project Description Replace Year Cost Moderate-Risk_M City Portion Other Portion Source Critical Capital Needs: Lake Drive(Stoney Creek) R 2014 $150,000 C $150,000 Electric Camelot Underground,phase II R 2014 $100,000 C $100,000 Electric Transformer Renovation-Substation Phase II R 2014 $200,000 C $200,000 Electric Meter Relay and View Screen N 2015 $20,000 C $20,000 Electric Lagoon-Underground R 2015 $450,000 C $450,000 Electric Jesse Lee Underground R 2015 $30,000 C $30,000 Electric SMIC Underground R 2015 $105,000 C $105,000 Electric Sectionalized Pole Replacement-$17K/pole generally R $1,700,000 C $1,700,000 Electric High-Risk Capital Needs: Old Mill#3 R $120,000 H $120,000 Electric Gateway(Upper) R $180,000 H $180,000 Electric Gateway(Lower) R $80,000 H $80,000 Electric Woodland Hills R $120,000 H $120,000 Electric Software for inventory N $50,000 H $50,000 Electric Downtown Alley(2nd and 3rd)underground R $1,000,000 H $1,000,000 Electric Downtown Alley(3rd and 4th)underground R $2,000,000 H $2,000,000 Electric 1 imilDowntown Alley(4th and 5th)underground R $2,000,000 H $2,000,000 Electric Moderate-Risk Capital Needs: Update Fort Raymond Controls N $450,000 M $450,000 Electric Security Upgrades to substations N $130,000 M $130,000 Electric Switch at Nash Road R $100,000 M $100,000 Electric Lawing Poles R $25,000 M $25,000 Electric Victor Creek Poles R $110,000 M $110,000 Electric Questa Woods R $80,000 M $80,000 Electric AVTEC Underground R $15,000 M $15,000 Electric Southwest boat ramp R $33,000 M $33,000 Electric Lawing to Victor Creek Overhead R $75,000 M $75,000 Electric Automatic meter reading N $950,000 M $950,000 Electric Purchase 9 mega-watts of Bradley Lake Power fm ML&P N $1,100,000 $1,100,000 State/Electric Update sectionalizing study and purchase oil circuit reclosui N $132,000 $132,000 Electric Install 25kV underground across Snow River N $450,000 $450,000 State/Electric Convert transmission line to 115 kV R $12,000,000 $12,000,000 State/Electric Extend the 12.5kV distribution line on Nash Road N $165,000 $165,000 State/Electric Total Electric Fund Projects: $21,365,000 $7,650,000 $13,715,000 Total Electric Fund Projects for 2014 and 2015: $1,066,000 $ 0660000 *Critical Risk: Likely to fail within next 5 years;High Risk: Likely to fail in 5-10 years;Moderate Risk is continuous increasing cost to maintain and operate & Funding for City-funded projects requires appropriation. Budget includes$452K in 2014 and$87K in 2015 to MRRF for major repairs/replacement %Ili City of Seward Capital Improvement Plan Water-Related Capital Projects 2014 and 2015 Critical-Risk-C New or Project High-Risk-H Funding Source Project Description Replace Year Cost Moderate-Risk_M City Portion Other Portion Source Maple Street Water Line Extension N 2014 $400,000 New $400,000 City Critical Capital Needs: Water Storage Tank(500K gallons) (b,c) N 2014 $4,500,000 C $4,500,000 State Refurbish Lowell Canyon 400K gallon Tank and R 2014 $575,000 C $575,000 State Remove 200K gallon Lowell Canyon tank fm service(b) Mobile generation for water wells R 2014 $175,000 C $175,000 City High Risk Capital Needs: Gateway Tank Roof R 2015 $300,000 H $300,000 State Abandon wells at Fort Raymond(b) R 2015 $250,000 H $250,000 City New production well#7 N 2015 $650,000 H $650,000 City Moderate Risk Capital Needs: Refurbish#4 production well R $85,000 C $85,000 City Distribution Piping upgrades(ductile iron pipe) R Annual $500,000 H $500,000 City Facility Control upgrades R $80,000 M $80,000 City GIS system N $60,000 M $60,000 City Formal rate study of Water utility(a) N $30,000 $30,000 City Replace 10"and 14"AC water line btwn Phoenix and Sea Lion R $1,860,000 M City Replace 5%of water lines annually($1 million/yr.) R Annual $1,000,000 M $1,000,000 City Total Water Fund Projects: $10,465,000 $2,830,000 $5,375,000 f $6,850,000 War/S�sver Fund Projects.for 2014 and 211L4 X6,850000 $1,475y000 55,375,000 *Critical Risk: Likely to fail within next 5 years;High Risk: Likely to fail in 5-10 years;Moderate Risk is continuous increasing cost to maintain and operate. Funding for capital projects requires appropriation. 2014 Budget includes$900K reimburse from SMH Fund to MRRF and$400K for Maple Street Water Line;2015 includes$0 to MRRF for critical and high-risk capital needs. Chaim City of Seward Capital Improvement Plan Wastewater-Related Capital Projects 2014 and 2015 'nisi Critical-Risk-C New or Project High-Risk-H Funding Source Project Description Replace Year Cost Moderate-Risk-M City Portion Other Portion Source Critical Capital Needs: Maple Street Wastewater N 2014 $400,000 $400,000 State Grant Secure Spruce Creek sewer N 2014 $90,000 C $90,000 Wastewater Fund SMIC bypass valving R 2014 $72,000 C $72,000 Wastewater Fund Lowell Point sludge pile disposal R 2014 $490,000 C $490,000 Wastewater Fund #1 standby generator R 2014 $150,000 C $150,000 Wastewater Fund Lowell Point Sewer Pond repairs R 2014/2015 $1,200,000 C $100,000 $1,000,000 Wastewater/Grant SMIC Sewer Pond repairs R 2014/2015 $3,000,000 C $200,000 $2,800,000 Wastewater/Grant Forest Acres lift station(engineering) N 2015 $92,000 C $92,000 Wastewater Fund High-Risk Capital Needs: SMIC piping for bypass(engineering/design) R 2015 $50,000 H $50,000 Wastewater Fund Double wall fuel tanks R 2015 $150,000 H $150,000 Wastewater Fund Manhole refurbishment R $120,000 H $120,000 Wastewater Fund Moderate-Risk Capital Needs: SMIC lower lift station(engineering only) R $250,000 M $250,000 Wastewater Fund GIS system N $30,000 M $30,000 Wastewater Fund Wastewater utility rate study N $30,000 M $30,000 Wastewater Fund SMIC Sludge pile disposal R $25,000 M $25,000 Wastewater Fund Replace existing distribution system($800K/yr.) R Annual $800,000 M $75,000 Wastewater Fund Replace infrastructure past useful life($75K/yr.) R Annual $75,000 M $75,000 Wastewater Fund MO ill Total Wastewater Fund Projects: $7,024,000 $1,999,000 $4,200,000 Total Wastewater Fund Projects for 2014 and 2015: $6,6941000 $1,394,000 $4,2U4�000 *Note: Appropriations must be made to fund any capital needs in 2014 and 2015. MRRF Contributions of$57,867 in 2014 and$36,596 in 2015 from the Wastewater Fund, *Critical Risk: Likely to fail within next 5 years;High Risk: Likely to fail in 5-10 years;Moderate Risk is continuous increasing cost to maintain and operate. i" J Capital Improvement Plan Parking-Related Capital Projects 2014 and 2015 New or Project Funding Source Project Description Replace Year Cost City Portion Other Portion Source Parking office/chalet replacement R $10,000 $10,000 Parking Other: New Harbor Uplands projects N $125,000 $125,000 Parking/Grant NE Parking Fencing on W.and N.borders N $140,000 $140,000 Parking Total Parking Fund Projects: $275,000 $275,000 Total Parking Fund Projects for 2014 and 2015: $0 $0 Note: No Parking Major Maintenance, Repair&Replacement Fund Imo 1✓ Capital Improvement Plan Motor Pool-Related Capital Projects saw j 2014 and 2015 New or Project Funding Source Project Description Replace Year Cost City Portion Other Portion Source Street Flatbed-replaces Unit 120 R 2014 75,000 75,000 Motor Pool Shop truck-replaces Unit 131 R 2014 62,000 62,000 Motor Pool Grader wing R 2014 32,000 32,000 Motor Pool Toolcat for maintenance parks/campgrounds R 2014 70,000 70,000 Motor Pool Harbor oil truck R 2014 60,000 60,000 Motor Pool Motor Grader R 2014 300,000 300,000 Motor Pool City manager vehicle N 2014 30,000 30,000 Motor Pool Electric Digger/Derrick R 2014 400,000 400,000 Motor Pool Parking truck R 2015 18,000 18,000 Motor Pool Plow truck for City facilities(parks) R 2015 45,000 45,000 Motor Pool Street Unit#119 replacement R 2015 50,000 50,000 Motor Pool TYC van R 2015 42,000 42,000 Motor Pool Fire truck refurbish of Engine#3 R 2015 350,000 350,000 Motor Pool Wire trailer with puller(electric) N 2015 25,000 25,000 Motor Pool Total Motor Pool Fund Projects: $1,559,000 $1,559,000 $0 Total Motor Tool Fund Projects for 2014 and 2015: $1,569,000 $1,569,000 $0 mid i J City of Seward Capital Improvement Plan Healthcare-Related Capital Needs 2014 and 2015 Project Funding Source Project Description Year Cost City Portion Other Portion Source Facilities: Delivery Vehicle 2014 $25,000 $25,000 Healthcare Fund Helistop lighting 2014 $12,000 $12,000 Healthcare Fund Remodel hospital therapy space 2014 $150,000 $150,000 Healthcare Fund Clinic: Colposcopy w/digital camera 2014 $8,800 $8,800 Healthcare Fund Fetal monitor 2014 $7,000 $7,000 Healthcare Fund Exam beds x 4 2014 $24,000 $24,000 Healthcare Fund Radiology/Imaging/Lab: Portable x-ray 2014 45000 45000 Healthcare Fund Vascular imaging 2014 75000 75000 Healthcare Fund Mammography upgrade 2014 $300,000 $300,000 Healthcare Fund Lab-microscope 2014 $70,000 $70,000 Healthcare Fund Radiology-printers/video 2014 $20,000 $20,000 Healthcare Fund Lab-sedimentation rate units 2014 $14,287 $14,287 Healthcare Fund Hospital/ER/Nursing: Well water cooling system 2014 $45,000 $45,000 Healthcare Fund Plow truck with plow 2014 $40,000 $40,000 Healthcare Fund Storage building 2014 $60,000 $60,000 Healthcare Fund Paint medical center exterior 2014 $8,000 $8,000 Healthcare Fund Exam room lights x 5 2014 $24,000 $24,000 Healthcare Fund lbw Surgical lights x 2 2014 $30,000 $30,000 Healthcare Fund Stress test monitor 2014 $20,000 $20,000 Healthcare Fund Treadmill 2014 $6,000 $6,000 Healthcare Fund Infant warmer 2014 $10,000 $10,000 Healthcare Fund Electrosurgical Units/cautery 2014 $10,750 $10,750 Healthcare Fund Seward Mountain Haven: Bladder scan 2014 $12,000 $12,000 Healthcare Fund Sound absorption panels 2014 $7,000 $7,000 Healthcare Fund Vital sign monitors x 4 2014 $12,000 $12,000 Healthcare Fund Bariatric transport Chair 2014 $10,000 $10,000 Healthcare Fund EKG machine portable 2014 $15,000 $15,000 Healthcare Fund Sidewalk remodel 2014 $10,000 $10,000 Healthcare Fund Specialty wheelchairs 2014 $5,000 $5,000 Healthcare Fund Bariatric Bed 2014 $18,210 $18,210 Healthcare Fund Electric supply truck 2014 $25,000 $25,000 Healthcare Fund Lab-centrifuge 2015 $10,000 $10,000 Healthcare Fund Lab-Freezer 2015 $12,000 $12,000 Healthcare Fund Hospital-Portable ventilator x 2 2015 $16,000 $16,000 Healthcare Fund Hospital-Electrosurgical units 2015 $10,750 $10,750 Healthcare Fund Total Healthcare Related Projects: $1,167,797 $1,167,797 $0 'total Healthcare Projects for 2014 and 2016: $1,187,797 $1,167,797 $0 Foam