HomeMy WebLinkAboutRes2015-032 Sponsored by: Hunt CITY OF SEWARD,ALASKA RESOLUTION 2015-032 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH HOTWIRE ELECTRIC LLC TO REPLACE ELECTRICAL CONDUCTORS ALONG MOAT WAY AND THE SOUTHERN END OF EXCALIBUR DRIVE FOR AN AMOUNT NOT TO EXCEED $58,722 WHEREAS, electric service was installed in along Moat Way and the southern end of Excalibur Drive before 1988, which makes it at least 27 years old; and WHEREAS,the wire used in that installation has a twenty year life span; and WHEREAS, the City electric utility has experienced failures due to deterioration with increasing frequency in recent years; and WHEREAS,the replacement of those conductors has been on the Critical Needs list for at least six years and is a line item on the Electric Department's Capital Projects budget for 2015;and WHEREAS, the City developed a scope of work and, on March 8, 2015, advertised a competitive bid package to provide labor and equipment to replace the conductors on Moat Way and the southern end of Excalibur Drive, according to SCC 6.10.210 and SCC 6.10.215; and WHEREAS,the low bid proved to be responsible,responsive and qualified and was in the amount of$53,384; and WHEREAS,it is prudent engineering practice to allow 10%of any construction bid to cover unforeseen contingencies, and the contingency will not be utilized unless approved in writing, in advance,by the City Manager. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA that: Section 1. The City Manager is authorized to enter into an agreement with Hot Wire Electric LLC for labor and equipment to replace the electrical conductors along Moat Way and the southern end of Excalibur Drive for an amount not to exceed $53,384. Section 2. An additional contingency in the amount of $5,338 is available to address unforeseen conditions and can be added to the contract only upon written approval in advance,by the City Manager. CITY OF SEWARD,ALASKA RESOLUTION 2015-032 Section 3. Funding for this contract in an amount not to exceed $58,722 is available in the Electric Department 2015 budget. Section 4. This resolution shall take effect immediately upon its adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska,this 13th day of April, 2015. THE CITY OF SEWARD,ALASKA ---- ;t4-,e_i>A2t-<- Mar anna Keil, Vice M or AYES: Casagranda, Terry, Squires, Butts, Darling, Keil NOES: None ABSENT: Bardarson ABSTAIN: None ATTEST: Jo anna Kinney, MC • Clerk (City Seal) OF SFL, : —e— : _ a . SEAT ! ° I. I %.*5)1 ...;1Z 1,15:b"..43.* • ti:l' OF.A'P;•b‘ Agenda Statement Meeting Date: April 13, 2015 C40 To: City Council * q�Sip Through: Jim Hunt, City Manager From: John Foutz, Electric Department Manager Agenda Item: Contract to replace the electrical conductors along Moat Way and the southern end of Excalibur Drive BACKGROUND & JUSTIFICATION: Electric service was installed in along Moat Way and the southern end of Excalibur Drive before 1988, which makes it at least 27 years old. The wire used in that installation has a twenty year life span. The electric utility has experienced failures due to deterioration with increasing frequency in recent years. One of the conductors in that area has failed entirely.The replacement of those conductors has been on the Critical Needs list for at least six years and is a line item on the Electric Department's Capital Projects budget for 2015. The City developed a scope of work and,on 08 March 2015,advertised a competitive bid package to provide labor and equipment to replace the conductors on Moat Way and the southern end of Excalibur Drive, according to SCC 6.10.210 and SCC 6.10.215. Bids were received at the Clerk's office on time,as required by the Invitation to Bid. Two bids were received. The low bid proved to be responsible,responsive and qualified and was in the amount of$53,384.It is prudent engineering practice to allow 10%of any construction bid to cover unforeseen contingencies.Thus,total funding for this project would be$53,384+$5,338=$58,722. The contingency will not be utilized unless approved in advance and in writing,by the city manager. INTENT: To enter into an agreement with HotWire Electric LLC to replace electrical conductors along Moat Way and the southern end of Excalibur Drive CONSISTENCY CHECKLIST: Yes No N/A 1. Comprehensive Plan (1 3, 3.7.3.1, 3.7.3.2): X 2. Strategic Plan (document source here): X 3. Other (list): X FISCAL NOTE: Funding for this project is available in the Electric Enterprise Fund 2015 Budget for infrastructure repair and replacement account no. 15000-3005-8101. Although the CIP has been approved, individual expenditures require appropriation by the City Council. Approved by Finance Department: Ion ATTORNEY REVIEW: Yes No X RECOMMENDATION: 0 qD1' City Council Approve Resolution 2015- Authorizing the City Manager to enter into an agreement with HotWire Electric LLC for labor and equipment to replace the electrical conductors along Moat Way and the southern end of Excalibur Drive for an amount not to exceed$58,722,including a 10% contingency. Io,