HomeMy WebLinkAboutRes2019-072 Sponsored by: Meszaros
CITY OF SEWARD,ALASKA
RESOLUTION 2019-072
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD,
ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A
CONTRACT WITH LUMEN DESIGN, LLC FOR THE SEWARD
ANIMAL SHELTER PROJECT, PROFESSIONAL ARCHITECTURAL
SERVICES FOR CONCEPT DESIGN, IN AN AMOUNT NOT TO
EXCEED $28,000,AND APPROPRIATING FUNDS
WHEREAS, for a number of years the Council, administration and community have
made the City's Animal Shelter a priority; and
WHEREAS, Council passed Resolution 2018-049 authorizing the creation of the animal
shelter relocation fund; and
WHEREAS, Council passed Resolution 2018-080 selecting 605 Sea Lion Avenue as the
new animal shelter location; and
WHEREAS, Council passed Ordinance 2019-007 to amend zoning code to allow for
animal shelters within the Institutional Zoning District; and
WHEREAS, Council has passed numerous City and State legislative priority
Resolutions seeking funding and support; and
WHEREAS, in order to further fund raising and grant submission efforts the City issued
a Request For Proposals (RFP) for Professional Architectural Services for Concept Design; and
WHEREAS, the City received four submittals which were scored by the City Manager,
Assistant City Manager and Community Development Planner; and
WHEREAS, Lumen Design, LLC scored the highest with 270 points, followed by Wolf
Architecture at 251.1, Stantec at 235.4, and ECI at 220.4; and
WHEREAS, Lumen Design, LLC will perform the services as outlined in their Proposal,
and within the attached contract, for$28,000.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEWARD,ALASKA that:
Section 1. The City Manager is authorized enter into a contract with Lumen Design, LLC
in substantially the form attached hereto for the Seward Animal Shelter Project Professional
Architectural Services for Concept Design in an amount not to exceed $28,000.
CITY OF SEWARD, ALASKA
RESOLUTION 2019-072
Section 2. Funding in the amount of $28,000 is hereby appropriated from the general
fund undesignated reserves account no. 01000-0000-3710-80015 to the animal shelter fund
account no. 80015- 0000-3700-01000.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this
12'day of August, 2019.
THE CITY OF SEWARD,ALASKA
David Squires, Mayor
AYES: Seese, Lane, Osenga, Horn, McClure, Squires
NOES: None
ABSENT: Towsley
ABSTAIN: None
ATTEST:
rends J. Ballo , MMC
City Clerk
. y.
('�SMSr. se-
�'•ne
ergt
� • SEAL • g
•
..a l41
vie•y OF t'°;••`�•
J
Agenda Statement
Meeting Date: August 12, 2019
To: Seward City Council
From: Scott Meszaros, City Manager
Agenda Item: Authorizing the City Manager to execute a contract with Lumen
Design LLC for Professional Architectural Services ... Conceptual
Design for the Seward Animal Shelter
BACKGROUND & JUSTIFICATION:
The City of Seward Community, Council and administration have made the City's Animal Shelter
relocation a priority through Council action, administrative support and community input.
Seward City Council passed Resolution 2018-049 which authorized the creation of the Animal
Shelter relocation fund, Resolution 2018-080 which selected 605 Sea-Lion Avenue as the new
Animal Shelter location as well as Resolutions 2018-094 and 095 which Placed the Animal Shelter
relocation on the City and State legislative priorities list in order to seek funding and support. City
Code was also amended through Ordinance 2019-007 to allow for animal shelters within the
Institutional Zoning District.
In order to further fund raising and grant submission efforts, the City issued an RFP for
Professional Architectural Services for Concept Design.The RF'P was issued on June 121h and was
published in a paper of local circulation on June 12111 and June 191h. Submittals were accepted
through the Clerk's Department with a deadline of July 12, 2019. Four proposals were properly
submitted and scored as summarized below:
Background and
Technical Expaicnce or Nicthodolog)
Understanding or FinnSimilar AprimprMIC Including Public
Nanv or Firm Liccnsin-(IS) Input(75) Wacnces(15) Coss(105) Total(300)
Ircl 37 39 15 60 11 58.4 220A
1 Wolf A rch itecturc 43 45 11 (A 15 65 1 251 1
1unx-n Desin LLC 40 40 is 59 11 105 270
Isranicc 44 431 15 671 101 MA 2354
Lumen Design LLC will perform the services as outlined in their RFP and within the attached
contract for$28,000.
INTENT: Execute a contract with Lumen Design LLC to perform services as proposed in their
submittal and the attached contract.
CONSISTENCY CHECKLIST: Yes No N/A
E1. Comprehensive Plan: X
2.2.7- Community P
3.7.1.5 —Plan to relocate and rebuild selected facilities to improve
compatibility with land uses and increase cost-effectiveness of
services
2. Strategic Plan: X
3. Other:
FISCAL NOTE: There are sufficient funds within the general fund undesignated reserves
account to execute this contract.
Approved by Finance:
ATTORNEY REVIEW: Yes X No
............
RECOMMENDATION: Approve Resolution 2019- 072 authorizing the City Manager enter
into a contract with Lumen Design LLC for architectural services conceptual design.
112
111111111 ��������������� IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII
lumendesign
""
Petra Sattler-Smith Scott Meszaros
Principal,AIA City Manager
306 G Street City of Seward
Anchorage,AK 99501 410 Adams Street
(907) 771 9940 (907) 224 4012
petra@lumenak.com smeszaros@cityofseward.net July 31,2019
Project Seward Animal Shelter Project- Concept Design
Phase Standard Short Form of Agreement between Owner and Architect
AGREEMENT made as of the thirty-first day of July in the year 2019
(In wards„ indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status,address and other information)
Scott Meszaros
City Manager
City of Seward
410 Adams Street
Seward,AK 99664
(907) 224 4012
and the Architect:
(Name, legal status,address and other information)
Lumen Design LLC
306 6 Street
Anchorage,AK 99501
(907) 771 9940
for the following Project:
(Name, location and detailed description)
Seward Animal Shelter
Lot 6A-2 Fort Raymond Subdivision
605 Sea Lion Avenue
Seward,AK 99664
Provide professional architectural services for concept design for the Seward Animal Shelter Project.The building will be approx.4,000
sf facility for dogs and cats.
The Owner and Architect agree as follows.
ARTICLE 1 ARCHITECT'S RESPONSIBILITIES
The Architect shall provide architectural services for the Project as described in this Agreement.The Architect shall perform its services
consistent with the professional skill and care ordinarily provided by architects practicing in the same or similar locality under the
same or similar circumstances.The Architect shall perform its services as expeditiously as is consistent with such professional skill and
care and the orderly progress of the Project.The Architect shall assist the Owner in determination consulting services required for the
Project.The Architect's services include the following consulting services, if any:
1
113
I. Architectural: site analysis and programming,initial client meeting,concept design (site plan,floor plans and elevations,
sections)concept design presentation meeting
II. Civil:site analysis and concept design (site plan including building location,water and sewer alignment,parking and access
drive arrangement,site drainage).
III. Structural:concept design narrative
IV. Mechanical:concept design narrative
V. Electrical:concept design narrative
VI. Cost estimate based on final concept design
During the Design Phase,the Architect shall review the Owner's scope of work, budget and schedule and reach an understanding with
the Owner of the Project requirements. Based on the approved Project requirements,the Architect shall develop a design,which shall
be set forth in drawings and other documents appropriate for the Project.
The anticipated concept design schedule is the following:
Contract finalized August 12 2019
Phase 1 Site visit/analysis+ client meeting 7 days August 19 -25 2019
Phase 2 Preliminary concept design 35 days August 26-September 29 2019
Phase 3 Final concept design/estimate 14 days September 30—October 14 2019
The architect will retain the following consultants:
Civil engineer Enterprise Engineering Inc
Nick Homerding, PE
2525 Gambell Street
Anchorage,AK 99503
Structural engineer Arete, Ilc
Seth Andersen, PE
1017 N Street
Anchorage,AK 99501
Mechanical engineer Jernstrom Engineering Ilc
Greg Jernstrom, PE
721 W 1st Avenue # 100
Anchorage,AK 99501
Electrical Engineering EIC Engineering, Inc
Eric Cowling, PE
6927 Old Seward Hwy# 200
Anchorage,AK 99518
Cost Estimating Criterion General, Inc.
Kyle Scalis
2820 Commercial Drive
Anchorage,AK 99501
ARTICLE 2 OWNER'S RESPONSIBILITIES
The Owner shall provide full information about the objectives,schedule,constraints and existing conditions of the
Project,and shall establish a budget that includes reasonable contingencies and meets the Project requirements.The
Owner shall provide decisions and furnish required information as expeditiously as necessary for the orderly progress of the Project.
The Architect shall be entitled to rely on the accuracy and completeness of the Owner's information.
The Owner shall furnish consulting services not provided by the Architect, but required for the Project,such as surveying,which shall
include property boundaries,topography, utilities,and wetlands information;geotechnical engineering;and environmental testing
services.The Owner shall employ a Contractor,experienced in the type of Project to be constructed,to perform the construction Work
and to provide price information.
2
114
ARTICLE 3 USE OF DOCUMENTS
Drawings,specifications and other documents prepared by the Architect are the Architect's Instruments of Service,and are for the
Owner's use solely with respect to constructing the Project.The Architect shall retain all common law,statutory and other reserved
rights, including the copyright. Upon completion of the construction of the Project, provided that the Owner substantially performs its
obligations under this Agreement,the Architect grants to the Owner a license to use the Architect's Instruments of Service as a
reference for maintaining,altering and adding to the project.The Owner agrees to indemnify the Architect from all costs and expenses
related to claims arising from the Owner's use of the Instruments of Service without retaining the Architect.When transmitting
copyright-protected information for use on the Project,the transmitting party represents that it is either the copyright owner of the
information,or has permission from the copyright owner to transmit the information for its use on the Project.
ARTICLE 4 TERMINATION,SUSPENSION OR ABANDONMENT
In the event of termination,suspension or abandonment of the Project by the Owner,the Architect shall be compensated for services
performed.The Owner's failure to make payments in accordance with this Agreement shall be considered substantial nonperformance
and sufficient cause for the Architect to suspend or terminate services.
Either the Architect or the Owner may terminate this Agreement after giving no less than seven days'written notice if the Project is
suspended for more than 90 days,or if the other party substantially fails to perform in accordance with the terms of this Agreement.
Except as otherwise expressly provided herein,this Agreement shall terminate one year from the date of Completion.
ARTICLE 5 MISCELLANEOUS PROVISIONS
This Agreement shall be governed by the law of the place where the Project is located. Neither party to this Agreement shall assign the
contract as a whole without written consent of the other.
Nothing contained in this Agreement shall create a contractual relationship with,or a cause of action in favor of,a third party against
either the Owner or the Architect.
The Architect shall have no responsibility for the discovery, presence, handling, removal or disposal of,or exposure of persons to,
hazardous materials or toxic substances in any form at the Project site.
ARTICLE 6 PAYMENTS AND COMPENSATION TO THE ARCHITECT
The Architect's Compensation shall be:
1-he lurnp-.sum cost for the services described above shall be$25,000.00
The Owner shall reimburse the Architect for expenses incurred in the interest of the Project, plus ten percent(10 0/0).
Reimbursable expenses are in addition to compensation for services described above and include expenses incurred by the architect
directly related to the project,as follows:
1. Large format printing and reproduction of documents
2. Expense of postage and handling of drawings and Specifications and other documents
3. Renderings, models, mock-ups and/or presentation materials requested by the owner
4.Additional site visits to Seward requested by the owner including but not limited to transportation, lodging and meals are considered
reimbursable expenses
S. Additional insurance coverage or limits if the owner requests such insurance in excess of that normally carried by the Architect
6. Expense of special consultants when authorized in advance in writing by the owner.
7.Topographic and Boundary Survey if required
Payments are due and payable upon receipt of the Architect's monthly invoice.
Payrnent schedule shall be the following:
1. Payment $13,000
2. Payment$13,600
3. Payment $1,400
Amounts unpaid thirty-five (35) days after the invoice date shall bear interest from the date payment is due at the rate of one
percent(1 %) Monthly,or in the absence thereof,at the legal rate prevailing at the principal place of business of the Architect.
At the request of the Owner,the Architect shall provide additional services not included in Article 1 for additional compensation.Such
additional services may include, but not be limited to, providing or coordinating services of consultants not identified in Article 1;
revisions due to changes in the Project scope,quality or budget, or due to Owner-requested changes in the approved design; evaluating
changes in the Work and Contractors' requests for substitutions of materials or systems; providing services necessitated by the
Contractor's failure to perform;and the extension of the Architect's Article 1 services beyond twelve(12) months of the date oftl1 is
Agreement through no fault of the Architect.
3
115
ARTICLE 7 OTHER PROVISIONS
(Insert descriptions of other services and modifications to the terms of this Agreement.)
This document establishes the relationship, rights and responsibilities of the Owner and the Architect.
If additional site visits are required or requested by the owner those will billed hourly in addition to the lump sum fee.
Lumen design hourly billing rates for services of the architect are set forth below.
Employee or Category Rate Principal $ 160/hour
Architect$ 12S/ hour
Clerical or travel $80/hour
Lumen design Ilc reserves the copyright to the design and prior written permission is required for any usage including copy and reuse of
the developed design. Lumen design Ilc reserves the right to use the project for marketing purpose and publications.
This agreement entered into as of the day and year first written above.
OWNER (Signature)
Scott Meszaros, City manager,City of Seward
(Printed name and title)
ARCHITECT(Signature)
Petra Sattler-Smith, Principal, Lumen Design LLC
(Printed name, title,and license number,. if required)
4