HomeMy WebLinkAboutRes2019-080 Sponsored by: Meszaros Substitute: September 23, 2019 CITY OF SEWARD,ALASKA RESOLUTION 2019-080 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH HAMILTON CONSTRUCTION FOR CONSTRUCTION SERVICES FOR THE DECEMBER 4, 2017 SEWARD STORM SURGE DAMAGE REPAIRS PROJECT IN AN AMOUNT NOT TO EXCEED $3,744,153.90, AND APPROPRIATING FUNDS WHEREAS, on December 4, 2017, a winter storm event that combined an ocean storm surge, exceptionally high winds, and high tides causing extensive shoreline erosion damages along the Lowell Point Road, and the Alaska SeaLife Center seawall; and WHEREAS, the City Manager declared an emergency disaster for the Storm Surge Damage; and WHEREAS, City Council passed Resolution 2017-091 to support the declaration; and WHEREAS,the Kenai Peninsula Borough Mayor, the State of Alaska Governor, and the President of the United States all signed disaster declarations for this event; and WHEREAS,those declarations enabled the City to qualify for damage repair funding from the Alaska Division of Homeland Security and Emergency Management (DHS&EM), and Federal Emergency Management Agency (FEMA) for assistance for damages; and WHEREAS, the City will be reimbursed for disaster-related construction services from FEMA at (75%), and DHS&EM (25%); and WHEREAS, a bid for construction was advertised and completed, resulting in five bid submissions from very experienced firms; and WHEREAS, on August 30, 2019, the submitted bids were opened publicly and properly recorded; and WHEREAS, Hamilton Construction, based on their low bid of $2,446,157.20 and Additive Alternate bid of $1,297,996.70 for mitigation for a total of $3,744,153.90, was selected and sent a"letter of intent to award' pending City Council approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD,ALASKA that: CITY OF SEWARD, ALASKA RESOLUTION 2019-080 Substitute Section 1. The City Manager is hereby authorized to enter into a contract with Hamilton Construction, Inc. in an amount not to exceed $3,744,153.90 for repairs to both the seawall and Lowell Point Road, in substantial form as attached hereto. Section 2. Funding is hereby appropriated as follows: 1) $251,108 for repairs to the seawall, to contracted services account no. 70052-0000-7009; and 2) $3,493,045.90 to contracted services account no. 70051-0000-7009 for repairs and mitigation to Lowell Point Road. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward, Alaska, this 23rd day of September, 2019. THE CITY OF SEWARD, ALASKA Sue McClure, Vice Mayor J AYES: Horn, Osenga, Lane, Towsley, Seese, McClure NOES: None ABSENT: Squires ABSTAIN: None ATTEST: rends J. Ballo , MMC City Clerk ey5c , (City Seal,'rA • ? `+.� y • .ate... it n9 P. �Ow. Agenda Statement Meeting Date: September 23, 2019. To: City Council16 Through: Scott Meszaros, City Manager From: Doug Schoessler, Public Works Director Agenda Item: December 2017 Storm Surge Repair Construction Contract BACKGROUND & JUSTIFICATION: On December 4,2017 the City of Seward City Manager declared a disaster after experiencing a powerful storm surge that badly eroded the coastline along the Sea Life Center and Lowell Point Road. The Kenai Peninsula Borough followed with a declaration and soon thereafter the Governor of the State of Alaska followed. About six months later the President of the United States signed a Federal Declaration.Thus,the storm surge qualified for both State and Federal Disaster funding. The project is under Federal Emergency Management Agency (FEMA) guidelines for repairs to pre-disaster condition. The cost reimbursement is 75% Federal funds and 25% State funds. A bid for construction was advertised and completed. We received bids from live very experienced firms. Hamilton Construction,based on their low Base Bid of$2,446,157.20, and Additive Alternate bid of$1,297,996.70 was selected and sent a"letter of intent to award" pending City Council approval. Bid submissions received for the December 2017 Storm.Surge Repair Construction Contract are as follows: Bidder Base Bid Add Alt 1 ewit Infrastructure West Company $7,232,625.00 $4,518,880.00 Granite Construction Company#2 $3,735,900.00 $3,078,635.00 Tutka General Contractor $3,364,495.00 $2,317,070.00 Brice, Inc $3,342,165.00 $2,017,600.00 Hamilton Construction $2,446,17.20 $1,297,996.70 Ia To authorize the City Manager to enter into an agreement with Hamilton Construction for the Construction work for the Seward Storm Surge Damage Repair and Mitigation project. 70 CONSISTENCY CHECKLIST: Yes N / Comprehensive Plan 2.2.12.1 - Traffic Management I .4.1 Provide safe and efficient vehicular transportation 3. .1 Promote community safety from natural disasters through miti ation measures 2. Strategic Plan Provide safe and efficient vehicular transportation 3. Other X F A . TF: This contract is 100%funded through FEM (75%)and the Alaska Division of Homeland Security and Emergency Management (25%). Approved by Finance Department: ATTORNEY REVIEW: Yes X No RECOMMENDATION: Recommend approval of Resolution 2019- authorizing the city manager to enter into an agreement with Hamilton Construction Inc. for the Storm Surge Damage Repair and Mitigation Project. 71 SECTION 00500-CONTRACT CITY OF SEWARD,ALASKA 2017 Storm Surge Damage Repairs [PROJECT NAME AND NUMBER] CONTRACT("Contract"), between the City of Seward,Alaska,herein called the City,acting by and through its City Manager,and upon signing;this document shall serve as the notice to proceed,and Hamilton Constrution, LLC Company Name PO Box 241952,Anchorage,Alaska 99524-1952 Company Address(Street or PO Box,City, State,Zip) X-Single Member LLC a/an M Individual ElPartnership nJoint Venture FISole Proprietorship nCorporation incorporated under the laws of the State of Alaska its successors and assigns, herein called the Contractor, is effective the date of the signature of the City Manager on this document. The Contractor,for and in consideration of the payment or payments herein specified and agreed to by the City, hereby covenants and agrees to furnish and deliver all the materials and to do and perform all the work and labor required in the construction of the above-referenced project as bid by the Contractor, which bid and prices named, together with the Contract Documents (as hereinafter defined) are made a part of this Contract and accepted as such. It is distinctly understood and agreed that no claim for additional work or materials,done or furnished by the Contractor and not specifically herein provided for, will be allowed by the City, nor shall the Contractor do any work or furnish any material not covered by this Contract, unless such work or materials is ordered in writing by the City. In no event shall the City be liable for any materials furnished or used, or for any work or labor done, unless the materials, work, or labor are required by the Contract or on written order furnished by the City. Any such work or materials which may be done or furnished by the Contractor without written order first being given shall be at the Contractor's own risk, cost, and expense and the Contractor hereby covenants and agrees to make no claim for compensation for work or materials done or furnished without such written order. Notwithstanding the foregoing, payment under this Contract shall not exceed Two Million Four Hundred Forty Six Thousand dollars ($ 2A0,157.20 ) for all base items, additional work, r 1 Ptft seven Daum 11nu A WMIUy It affV!lWUrUUr5. The Contractor further covenants and agrees that all materials shall be furnished and delivered and all work and labor shall be done and performed, in every respect,to the satisfaction of the City,on or before: 1. Substantial Completion:October 31,2019 2. Final Completion:November 15,2019 It is expressly understood and agreed that in case of the failure on the part of the Contractor, for any reason, except with the written consent of the City, to complete the furnishing and delivery of materials and the doing and performance of the work before the aforesaid date, the City shall have the right to deduct from any money due or which may become due the Contractor, or if no money shall be due, the City shall have the right to recover One Thousand Five Hundred dollars (J1,500 per day for each ) calendar day elapsing between the time stipulated for the completion and the actual date of completion in 2017 SEWARD STORM SURGE CONTRACT DAMAGE REPAIRS Page 00500-1 72 SECTION 00500-CONTRACT accordance with the terms hereof, such deduction to be made, or Sum to be recovered, not as a penalty but as liquidated damages. Provided, however, that upon receipt of"written notice from the Contractor of the existence of causes over which the Contractor has no control and which uILIst delay furnishing of materials or the coulpletion of the work, the Contracting Officer may, at his or her discretion, extend the period specified for the furnishing of' materials or the completion of the work, and in such case tile Contractor shall become liable for liquidated damages for delays commencing from the (late oil which the extended period expires. The bonds given by the Contractor in the surn of$ 2—LKLO 11'aynient Bond,and $ gj�j_j_ Performance Bond, to secure 111C proper compliance with the terms and provisions of this Contract, are submitted herewith and made a part hereof. The Contractor further covenants and agrees that the entire colistrLICti011 will be done under the administration of and to the complete satisfaction of the City sub*ject to the inspection at all times and approval by any regulatory agency of the Local, State, or Federal Government of the United States of' America, and in accordance with the laws of the State of Alaska and the City ol'Seward. Unless otherwise provided in the Contract Documents, this Contract shall be governed by the laws of the State of`Alaska. Following exhaustion of the dispute resolution process set forth in Article 15 of the General Conditions of tile, Contract, any remaining dispute arising from or pertaining to this Contract shall be resolved by litigation in the Superior Court for the State of Alaska, Third Judicial District at Kenai. For pUrposes of this Contract, Contracting Officer rneans or any other person designated by the City Manager. The Contractor is an independent contractor and not an employee or agent of the City. Contract DoCUIllentS shall have the meaning ascribed by the General Conditions of the Construction Contract, and include but are not limited to this Contract, the General Conditions of the Construction U IUSL 20 Contract (located at Sections 00700-00930 of the City's� fee(1�6st ib9r Bids), and Su)flernentar�,, ust 0 9 Conditions,the Technical Specifications (located at Section 010 10-03301 of the City's 1 e4uest for Bids), and the following listed documents: (1) —..--; (2) ........................-. ......................................... IN WITNESS WHEREOF the parties hereto have executed this Contract and agree to its terms and conditions. CONTRACTOR Hamilton Construction,/LLC Conipan, N i- Signatoile d-Xilthorized Company Representative Jeff Hamilton - Member Typed Name and Title August 30, 2019 Date 2017 SE WARD STORM SURGE CONTRACT DAMAGE REPAIRS Page 00500-2 73 SECTION 00500-CONTRACT CITY OF SEW'ARD Signature of City Manager Typed Name Date City Clerk (ATTES-1) 2017 SE" ARD STORM SURGE CONTRACT DAMAGE REPAIRS Page 00500-3 74 CITY OF SEWARD Main Office(907)224-405O Po kv(907)224-3338 RO. BOX 167 Harbor(907)224-3138 SMARD, ALASKA 9?664,0167 a Fire(907)224-3446 City Clwk(907)2244046 Commurdty Deveoment(907)2244049 Willies(907)224-40SO Fax(907)2244038 NOTICE OF INTENT TO AWARD Dear Hamilton Construction, On behalf of the City of Seward,I am pleased to inform you that based on the City's recent Request for Bids for the City of Seward 2017 to Surge Repair Construction ContracL, we intend to award the contract to Hamilton Construction upon City Council approval. Please provide a draft contract for our attorney to review at your earliest convenience. We will need to have a contract signed by September 2' in order to make it on the September 9* regular City Council Meeting Agenda. If you have any questions, please do not hesitate to contact me at (907) 224-4020 or hhLckok(&cayot`§ewardstet. We look forward to woddng with your firm. Regar&, B Hickok Assistant City Manager 53 SECTION 300-BID CITY OF SEWARD,ALASKA 2017 Seward Storm Surge Damage Repairs BED NAME: Hamilton Construction, LLC ADDRESS. PO Box 648 Sk ,�AK 9984O����� In compliance with your Invitation For Bids dated ..26M2!1St 1 the Undersigned proposes to furnish all equipment, material and labor required to complete the above project by Novem,hajL 2019. The Undersigned hereby agrees to execute the said contract as directed or such her time as may be allowed in writing by the Contracting Officer after receiving notification of the acceptance of this bid,and it is hereby mutually understood and agreed that in case the Undersigned does not, the said Contracting Officer may proceed to award the contract to others. The Undersigned acknowledges receipt of the following addenda to the Bid Documents(give number and date of each). ADDENDA DATE ISSUED ADDENDA DATE ISSUED Addendum No. I ust 6, 2019 a QDW MM 5 Gi'u4a 0-&-za I q Addendum No. 2 August 14, 2019 5 no rt'W(kWV 0AA0 JA,5t ZAP, V The Undersigned has read the foregoing bid and hereby agrees to the conditions stated therein by affixing his signature below: Bidding pany amilton '.onstruction., C Jeff Ha mi Ito n,,..,man,ggjgg_MgM§g Signatui 7, Title 30862 12/31/2020 ——------------------ Contractor's License Number Expires Hamilton Construction, LLC-- . ..........-'- usincss Address Telephone PO Box 648 ....................................... §"a y1y, AK 99840 2017 SEWARD STORM SURGE BED DAMAGE REPAIRS Page 00300-1 54 SECTION 00310-BED SCHEDULE BED SCHEDULE A-LOWELL POINT ROAD Pay Item Approximate Unit Price Amount No. Pay Item Description Pity Unit Quantity Dollars& Dollars& Cents Cents 1505.1 Mobilization LS All Req'd 2--L4. 1580.1 Protected Species Observer LS All Req'd g7,000.0 2201.1 Clearing and Grubbing LS All Req'd 2-1, -I-C;0.00 Z1,30-00 2202.1 Excavation and Di§Rosal CY 6,150 Gil-S-00-00 2204.1 Base Course,Grading D-1 TON 6,175 43,00 2.6,9,925,00 2205.1 Filter Rock CY 2,285 L47-.00 qar 910.90 2205.2 Riprap,Class IV CY 13,560 %3.01 1 1'26 4 A 2206.1 Armor Rock LS All Req'd 10,17s.00 12.5' 00 2206.2 Reclaimed Armor Rock EA 200 100,00 -10, 000,00 Calcium Chloride for Dust 2210.1 Control TON 1 13.5 1 11500.00 1-1017-50.0--- 1 2702.1 Construction Surveying LS All Req'd ]AW0.00 TOTAL BED SCHEDULE A AMOUNT IN FIGURES: $ G (I Lj !2j 0 TOTAL BED SCHEDULE A AMOUNT IN WORDS: Two n I 1-,o j3 one k Wad rrtA n;al-tA -PV-t--bacusarict Pa du -n*vc +weA4-vA fu"ai j 2017 SEWARD STORM SURGE BED SCHEDULE DAMAGE REPAIRS Page 00310-1 SECTION 00310-BED SCHEDULE BED SCHEDULE B-SEALDFE CENTER Pay Item Approximate Unit Price Amount No. Pay Item Description Pay Unit Quantity Dollars& Dollars& Cents, Cents 1505.1 Mobilization LS All Reg'd 7-C11-1qn.60 19.1 1580.1 Protected S ecies Observer LS n --L3A00'00 2060.1 Demolition and Dis osal LS All Req'd 1-1 195a.09 504-0 i 2201.1 -24120-0- �OO 2205.1 Filter Rock CY 40 2205.2 �gY I,440 110 .00 2702.1 Construction Serve ing LS All Reg'd ?2 3301.1 Concrete Fill LS t All.R;qd _LSA�. d 00 TOTAL BID SCHEDULE B AMOUNT IN FIGURES:S Z ti Q 0 TOTAL BED SCHEDULE B AMOUNT IN WORDS: LLJO InlAnArtA E,"1,C4-!4'-0vje +kg�.16oj,,c ant Igunjrec 2017 SEWARD STORM SURGE BID SCHEDULE DAMAGE REPAIRS(AD 56 Page 00310-2 SECTION 00310-BID SCHEDULE BED SCHEDULE C—LOWELL POINT ROAD ENHANCEMENTS(ADDITIVE ALTERNATE NO. 1) Pay Item Approximate Unit Price Amount No. Pay Item Description Pay Unit Quantity Dollars& Dollars& Cents Cents 1505.1 Mobilization LS All Req'd zqlano-00 Z&000-00 2202.1 Excavation and Disposal CY 475 lso 2204.2 Selected Material,Type A TON 18,140 13-03 M369.20 2205.1 Filter Rock CY 1,060 91,00 44 ,520.00 2205.2 Riprap,Class IV CY 13,750 Gq 13LI 1 953092.9, 2702.1 Construction Surveying LS All Req'd 5100-on TOTAL BED SCHEDULE C AMOUNT IN FIGURES: S 1121-7 9q(,o,70 TOTAL BED SCHEDULE C AMOUNT IN WORDS: nw- rnM,on 4gA)a \1unArrd o,,e)4-LA- Scac-vi lbo,&6an_ ni-ne- h(A- SCA/,C,+�� cavv4s 2017 SEWARD STORM SURGE BID SCHEDULE DAMAGE REPAIRS 4A'D. "#�4 57 Page 00310-3 SECTION 00310-BID SCHEDULE BID SUMMARY AND AUTHORIZATION TOTAL BASE BED (SUM OF BID SCHEDULE A&B) AMOUNT IN FIG URES: s 7-, L4 LA 5-1 ,10 TOTAL BASE BID (SUM OF BID SCHEDULE A& B) AMOUNT IN WORDS: Two =cgvr 'hwadad P:arviAz sip a ha,&KeL,-iJ Qna 6,Aad mrj E;f-+M::5evetj +wtKAI ccst TOTAL ADDITIVE ALTERNATE NO. 1 (BID SCHEDULE Q AMOUNT IN FIGURES: S -9 C-A (0 0 TOTAL ADDITIVE ALTERNATE NO. I (BED SCHEDULE Q AMOUNT IN WORDS: Qnj The undersigned represents(check appropriate boxes)that he/she operates as an Individual, Joint Venture, Partnership,or Corporation, incorporated in the State of,__________ ___ BIDDER:— - Company(Print) 11 1 07'Ci'vy', Authorized preMK uthorize rMK Authorized Represdritative(Signature) k Legsq�" Title(Print) -' --tc Date z- Telephone CORPORATE SEAL(If Corporation) 2017 SEWARD STORM SURGE BID SCHEDULE DAMAGE REPAIRS (A00 58 Page 003104 SECTION 00320-BID BOND CITY OF SEWARD P.O. BOX 167 SEWARD,ALASKA 99664 BED BOND DATE BOND EXECUTED August 29,2019 PRINCIPAL(Legal name and business address) TYPE OF ORGANIZATION Hamilton Construction, LLC [ ]Individual Partnership PO Box 648 [ ]Joint Venture Corporation Skagway,AK 99840 SURETY(IES)(Name and business address) Berkley Insurance Company 475 Steamboat Road 11.--'.-'------------- ........... Greenwich, CT 06830 PENAL SUM OF BOND Five Percent(5%)of Amount Bid ,GATE OFBID August2g, 2019 NOW,THEREFORE, (a) If said Bid shall be rejected,or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said Bid)and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected any extension of the time within which the Owner may accept such Bid: and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF,the Principal and the Surety have hereunto set their hands and seals,and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be siped by their proper officers, the day and year first set forth above. Ha;mll ,Co fion, Berkley Insurance Company Pri ipal Surety—p& (Seal) 2017 SEW ARD STORM SURGE BID BOND DAMAGE REPAIRS Page 00320-1 59 POWER OF ATTORNEY" BERKLEY INSURANCE COMPANY WIILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company'), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has Trade,constituted and appointed, and does by these presents make constitute and appoint: Holly E. Ulfers;Roxuna Palacias; liiatharine Janelle ." Snider; John Drummey, Jr.; Scott C, Alderman; Kathleen Af. Mitchell, .Debbie A. Lindstrom; Peggy A. F"1rxh, Timothy S. ` Buhile;Jamie Stroh;Branldi Nicole Helnbaugh;or Amber Engel of Kibble&Prentice Holding Company dba USI Insurance -gw Services Northwest rr,,}"'Seattle, WA its true and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars (U.S.$SO,000,000. 0),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office µ d in their own proper persons. °m This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof, This Power of Attorney is granted pursuant to the following . resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:. sP ty y erkley Surety, the Chairman of the Board, Chief C7LVED that, with respect to the Sure business written b l3 mm: Executive Officer, President or any Vice President of the Company,, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such &mm w attorney-in-fact and revoke any power of attorney previouslygranted;and further RESOLVED,that such power of attorney limits the acts of those named therein to the bonds, undertakings,recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the m:^ manner and to the extent therein stated;and further - y„ RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named;, and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance, or e: . m other suretyship obligation of'the Company; and such signature and seal when so used shall have the same force and effect as �wpw. though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. x IN WITNESS WHEREOF, the Corn 9&y has caused these presents to be signed and attested by its appropriate officers and its 15 corporate—seal hereunto affix this l day of 1 Attest Berl Insurance Company w (Seal) By 13y ; I .Lederman � Je after a` Executive Vice President&Secretary Se i e sident WARNING:THIS POWER,INVALID IF NOT PRIINTED ON BLUE"BERKLEY"SECURITY PAPER. STATE OF CONNE+CTICUT) COUNTY OF FA IRFIELD ) r+E Sworn to before me, a Notary Public in the State of Connecticut, this kl day!of _, ' , by Its S. Ledennan lj and Jeffrey M. llaRer who are sworn to me to be the Executive Vice President Secretary, and t>q Senior Vice President, respectively,or Berkley Insurance Company, 0ARIA C riura M NOTARY PURI IC CO NdECTICU'r rltrCIs�s a <pIRES —AAA State o Connw°eticut 's CERTIFICATE I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that-the foregoing is a " true correct,and complete i P copy of the original Power of Attorney;that said Power of Attorney,has not been revoked or rescinded and,that the authority of the Attorney-in-Fact set forth therein, who executed the bond or un 9—which. this Power of Ammey is at`.ached,is in full farce and effect as of this date, Given under my hand and seal of the Company,this ° day of, � (Seal) 60 Vincent Forte SECTION 00360-STATEMENT OF QUALIFICATIONS BIDDING & CONTRACT REQUIREMENTS This form will be the basis of establishing the qualifications of the Construction Team for undertaking a construction project for the City of Seward. This questionnaire forms a part of the bid and failure to submit is a basis for rejection of the: bid. If space for answering questions is insufficient,attachments are permitted. 1. 9GENERAL Legal Name and Address of Bidding Organization: Hamilton Construction, LLC PO Box 648 Skagway, AK 99840 b. Name, title,and telephone number of Bidder's representative for project: Jeff Hamilton, managing member (907) 983-2702 c. Organization Status(Check One):* - Corporation, _ Partnership,or Individual d, If Organization is a Corporation: "None: Limited Liability Company Date of Incorporation: State in which Incorporated: Principal Officers: Name: Title: Date Assumed Position 2. EMAN-CIAL a. Have you ever failed to complete a contract due to insufficient resources? Yes- No X If yes,explain: 2017 SEWARD STORM SURGE STATEMENT OF QUALIFICATIONS DAMAGE REPAEP.S Page 00360-1 61 SECTION 3 -STATEMENT C S b. Describe any arrangements you have made,to finance this work.- E . a. Describe:in detail the equipment you have available for this work. ITEM QUAN. MAKE MODELSI /C C PRESENT MARKET 1 t chi 470LC-3,670LC 5,87OLC-6 3.3y+3,4.2m3,6.1in2 $1,500,000.00 Rock Drill 2 Aflas Copco ECM 590 $250,000.00 Rock Truck 2 Volvo A40 2 .5y3 $330,000.00 Side L7 4SrnithCo 23 3 $200,000.00 Loader 2 Volvo L250 5.1-10.2 I/min $400,000.00 C C Quarry ' g 100-950 $250,000.00 b, Do you understand that if you are warded this contract,you may be required to use some or all of the equipment listed above on the work covered by this contract? S C. Do you propose to purchase any equipment for use on this project? Yes No If yes,describe type,quantity,and approximate cast: We own and wi.1l mobilize our o d. Do you propose to rent any equipment for this work? Yes No X If yes,describe type and quantity: e. Is your proposal based n firm offers for all materials necessary for this project? Yes No f Do you intend to subcontract any of the work contained in this project? Yes X No If yes,describe: 7 SEWARD STORM SURGE STATEMENT OF QUALMCATIONS, Page!DAMAGE REPAIRS 0- 62 SECTION 00360-STATEMENT OF QUALIFICATIONS Construction surveying, rock placement 4. EXPERIENCE a. Have you had previous construction contracts or subcontracts with the City of Seward? Yes X No Describe the most recent or current contract completion date,and scope of work: Seward South Harbor Boat Launch Renovation, completion date 08/04/19 Replace the existing concrete boat launch and floats with a new concrete ramp and timber boarding floats supported 01 new galvanized_steel pi pe b. List, as an attachment to this questionnaire,other construction projects you have completed;the dates of completion, scope of work, and total contract amount, for each project completed in the past 12 months. C. List any projects you have failed to complete per the specifications within the contractual timeline. Include an explanation for the missed deadline. Seward South Harbor Boat Launch Renovation, long procurement lead times EM L SUPPLIERS List below all Subcontractors and major material suppliers. This listing does not fulfill the requirements of paragraph 6,13.1 of the General Conditions of the Construction Contract and award of a contract does not constitute approval of the Subcontractors. Name/address Subcontractor/Material Supplier Specialty I All Points North, Palmer AK Subcontractor Construction surveying 2. Polar Supply, Anchorage AK Material Supplier Material supply 3. Metco Inc, Seward AK Subcontractor& Material supplier Concrete/gravel 4. 2017 SEWARD STORM SURGE STATEMENT OF QUALIFICATIONS DAMAGE REPAIRS Page 00360-3 63 SECTION 00360-STATEMENT OF QUALIFICATIONS Dated at--.Skaaway, Alaska ,this 26th day of August ,2019 I hereby certify that the above statements are true and complete. Hamilton Construction, LLC Name of Contractor m Jeff Hamilton, managing member Sig t e Title of Person Signing 07 SEWARD STORM SURGE STATEMENT OF QUALIFICATIONS DAMAOE REPAIRS Page 00360 4 64 TON CONSTRUCTION, Lli.k."111 Hamilton Construction Company Resume, COMPLEINED PE PROUS AUGUST 26, 2019 August 2018 -August 2019 Seward South Harbor Boat Launch Renovation Completion date:08/04/2019 Replace the existing concrete boat launch and floats with a new concrete ramp and timber boarding floats supported by new galvanized steel pipe.The associated scope Includes demolition and disposal of the existing ramp, cast-place-concrete slabs and abutments,pre-cast concrete panels,timber boarding floats, fendering,galvanized steel pipe, riprap revetment,excavation,embankment,storm drain,asphalt paving, bollards, public and private utility relocations,diving inspections,and other miscellaneous improvements. Elements of the scope require in-water work. Contract amount:$2,313,154.80 Seward Breakwater(SMIC Harbor Improvements Phase 1) Completion date:05/20/2019 Construct a new 1,009' rubble mound breakwater structure to extend the northerly end of the existing breakwater structure. The breakwater provides the SMIC basin with Improved protection from swell and wake action, thereby Improving the functionality and capacity of the SMIC harbor for maritlme operations. Contract amount:$15,032,101.80 2018 DOT Highway&Maintenance Sand Completion date: 10/01/2018 Produce and deliver 3,000cy of spec 1 highway maintenance sand to AK DOT&PF Skagway maintenance yard for stockpile. Contract amount:$154,800.00 Old Harbor Aggregate Processing Completion date:08/01/2018 Provide an experienced operator/foreman and all necessary equipment to run and oversee crushing operations in Old Harbor,Alaska. Contract amount: NTE$50,000.00 CL 65 14CL a P.O. Box 648 Skagway,Alaska 99840 p Tele: (907)983.2702 11 I?= (907)983A865 CERTIFICATIONS AND REPRESENTATIONS (GRANT FUNDS) 1.BYRD ANTI-LOBBYING AMENDMENT COMPLIANCE AND CERTIFICATION for all orders above the limit prescribed In 2 CI R 215,Appendix A,Section 7(currently 100, d ),the Offeror must complete and sign the following: The following certification and disclosure regarding payments to Influence certain federal transactions are made per the provisions contained In OMB Circular A-110 and 31 U.S.C.1352,the"Byrd Anti-Lobbying Amendment' The offeror,by signing its offer,hereby certifies to the best of his or her knowledge and belief that: No Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to Influence an officer or employee of any agency,a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress on his or her behalf In connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering Into of any cooperative agreement,and the extension,continuation,renewal,amendment or modiflcation of any Federal contract, grant,loan,or cooperative agreement, If any funds other than Federal appropriated funds(including proflt or fee received under a covered Federal transaction)have been paid,or will be paid,to any person for influencing or attempting to Influence an officer or employee of any agency,a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress on his or her behalf in connection with this solicitation,the offeror shall complete and submit,with Its offer,OMB standard form LLL,Disclosure of Lobbying Activities,to the Contracting Officer;and He or she will Include the language of this certification In all subcontract awards at any tier and require that all recipients of subcontract awards in excess of$100,000 shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance Is placed when this transaction was made or entered into.Submission of this certiflcation and disclosure is a prerequisite for making or entering into this contract imposed by section 1352,title 31,United States Code.Any person making an expenditure prohibited under this provision or who falls to file or amend the disclosure form to a filed or amended by this provision,shall be subject to a civil penalty of not less than$;, Hton' and n re than$1, for each such failure. SIGNATURE: aCOMPANY NAME: instruction, L DATE: 08/26/2019 66 MOM 0 rsco I to —r s a 1 � Z f qj -r P tTj g r 0 vs .IF ° r►s �s r* '` Zhl y� to �e to � , ►� J r G cs Cr is h � " . N m ems► :�- "`" q, rs J � * 4A Of i � f f _ lei. s IrN c gloom Room