HomeMy WebLinkAbout11082019 City Council Work Session Laydown - Capital Improvement Plan Capital Improvement Plan
General Fund-Related Capital Projects
Fiscal Year 2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost City Portion Other Source Source
Projects Slated for Funding in 2020 and 2021:
Public Works and P&R Warehouse Relocation EnglDesign R 2020 $125,000 $125,000 Capital Acquisition Fund
Relocation of PW&Shop R 2021 $2,700,000 $2,700,000 Financing sources
Parks&Rec warehouse replacement R 2021 $750,000 $750,000 Capital Acquisition Fund
Campgrounds:additional utility sites on waterfront N 2020 $400,000 $400,000 Capital Acquisition Fund
Japanese Creek feasibility study N 2020 $900,000 $275,000 $625,000 CitylUSACEIKPBlSBCFSA
Heat Loop project N $1,325,000 $600,000 $725,000 City/AEA Grant
Williams Park restroomfshowerhouse N 2020 $300,000 $200,000 $100,000 Capital Acquisition Fund
Parks&Rec dumpster replacements R 2020 $65,000 $65,000 Capital Acquisition Fund
Ballaine playground equipment update R 2020 $300,000 $300,000 Capital Acquisition Fund
City Hall boiler&roof repairs R 2020 $85,000 $85,000 Capital Acquisition Fund
Annex heating system&building upgrades R 2020 $40,000 $40,000 Capital Acquisition Fund
Breathing apparatus-Fire R 2020 $23 7,000 $23 7,000 Capital Acquisition Fund
Lowell Point Road safety design(Flap grant match of 9.3%) R 2020 $2,400,000 $223,200 $2,176,800 City/Flap Grant
City Hall fire alarm system upgrade R 2020 $40,000 $40,000 Capital Acquisition Fund
Library plumbing repairs R 2020 $11,000 $11,000 Capital Acquisition Fund
Library roof leak repairs R 2020 $68,000 $68,000 Capital Acquisition Fund
Library LED lights&repairs R 2020 $17,000 $17,000 Capital Acquisition Fund
City Hall ADA ramp&parking N 2020 $45,000 $45,000 Capital Acquisition Fund
ADA sidewalk improvements R 20121 $75,000 $75,000 Capital Acquisition Fund
Gateway,Forest Acres playground equipment update R 2021 $25,000 $25,000 Capital Acquisition Fund
Wellington Pavilion:design and construction(ADA) N 2021 $400,000 $400,000 Capital Acquisition Fund
Bike path resurfacing R 2021 $60,000 $60,000 Capital Acquisition Fund
Total Projects in 2020 and 2021: $10,368,000 $4,041,200 $6,326,800
PUBLIC SAFETY:
New animal shelter R $1,000,000 $1,000,000 General Fund
Fire Hydrant upgrades-Ph.II R $200,000 $200,000 General Fund
Public Safety Building R $5,665,000 $5,665,000 General Fund
Total Public Safety Projects: $6,865,000 $6,865,000
PARKS&RECREATION:
Lagoon Boardwalk rebuild R $240,000 $240,000 General Fund
Resurface playgrounds;Gateway,Forest Acres,Ballaine,3rd P R $285,000 $285,000 General Fund
Tennis court refurbishment R $75,000 $75,000 General Fund
John Perry field fencing R $50,000 $50,000 General Fund
TYC landscape,fence,play area R $75,000 $75,000 General Fund
Little League concession stand replacement R $250,000 $250,000 General Fund
Total Parks&Recreation Projects: $975,000 9 ,0 0
CITY HALIJLIBRARYIOTHER:
Paint City Hall R $20,000 $20,000 General Fund
City Hall building envelope and windows upgrades R $500,000 $500,000 General Fund
City Hall electrical upgrades R $65,000 $65,000 General Fund
Fix venitilation at City Hall R $85,000 $85,000 General Fund
Community Rec Center N
Total City Hall/Library Projects: $650,000 $650,000 $0
Total General Fund Projects: $18,858,000 $12,531,200 $6,326,800
Total General Fund Projects for 2020 and 2021: $10,368,000 $4,041,200 $6,326,800
GENERAL FUND
Cash Balance at December 31,2018-General Fund&Related Capital Projects
Fund 01000- General Fund $7,174,587
Committed:
Working Capital $1,500,000
Insurance $126,418
Hospital line of credit $500,000
Assigned:
Insurance $307,976
Other $I00,000
Fund 80010- Capital Acquisiton Fund $1,658,920
City of Seward
Capital Improvement Plan
Harbor-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
NE Boat Launch Ramp R 2021 $2,000,000 C $500,000 $1,500,000 City/ADFG
Replace K&L and remainder of G Float R 2022 $3,500,000 M $3,500,000 City/Grant
Replace anodes on concrete floats R 2022 $200,000 M $200,000 city
50 Ton wash down pad N 2022 $500,000 New $500,000 City
Replace dumpsters R 2023 $80,000 M $80,000 city
5 Ton crane I-dock N 2024 $400,000 New $400,000 City
Total Harbor Fund Projects: $6,680,000 $5.180,000 $1,500,000
Total Harbor Fund Projects for 2020 and 2021: $2,000,000 $500,000 $1,500,000
Rating(a):
Critical Risk(Q.- Likely to fail within next 5 years
High Risk(H).- Likely to fail in 5-10 years
Moderate Risk(M).-continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
HARBOR FUND
Cash Balance at December 3I,20I8 -Harbor Fund&Related Capital Projects
Fund II000-Boat Harbor Enterprise Fund $3,I59,290
Fund 11001 -Harbor Major Repair&Maintenance Fund(MRRF) 384,383
Fund II002-Harbor Passenger Transit Fee Fund I,I95
Fund I 1103 State CPV Fund 7I2,9I3
Fund IIII3 KPB CPV Fund I9,5I3
Fund I I42?Harbor Launch Ramp Fund 776,589
Total Harbor-related Cash: $5,053,883
17II000 Earmarked for Bond Reserves $690,I98
FI I00I Earmarked for Capital Projects/Grants $376,7I I
FII002 Earmarked for Harbor Bonds $I,I95
FIII03 Earmarked for CPV-eligible Projects $7I2,9I3
FIIII3 Earmarked for CPV-eligible Projects $I9,5I3
FI I42?Earmarked for Launch Ramp Projects $776,589
Unavailable for Appropriation $2,577,II9
Harbor Cash available to meet future capital needs: $2,476,764
City of Seward
Capital Improvement Plan
SMIC -Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Additional water services N 2020 $10,000 N $10,000 City
Improve Drainage and Fence Storage Area N 2022 $1,500,000 N $1,500,000 City/Financing
Additional power stalls N 2023 $500,000 N $500,000 City
Additional restroom N 2024 $75,000 N $75,000 City
Pave City owned boat yard roads N 2024 $1,000,000 N $1,000,000 City/Financing
North dock paving N 2024 $1,000,000 N $1,000,000 City/Financing
Total SMIC Fund Projects: $4,085,000 $4,085,000 $0
Rating(a):
Critical Risk(Q. Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
SMIC FUND
Cash Balance at December 3I,20I8 -SMIC Fund&Related Capital Projects
Fund I2000-SMIC Enterprise Fund $256,499
Budgeted Use of Cash 20I9(payoff 330-Ton Lift Loan) -$256,499
Fund I2332-SMIC Breakwater -$I,397,670
Total Harbor-Related Cash -$I,I4I,I7I
FI2332 Receivable from Granting Agencty -$I,I4I,I7I
Unavailable for Appropriation -$I,I4I,I7I
SMIC Cash available to meet future capital needs; $0
City of Seward
Capital Improvement Plan
Electric-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Critical Capital Needs:
Lake Drive(Stoney Creek) R 2020 $175,000 G $175,000 Electric
Jesse Lee Underground R 2021 $72,000 C $72,000 Electric
Radiator Hoods R 2020 $200,000 G $200,000 Electric
Fort Raymond Substation Fence Upgrade R 2020 $130,000 C $130,000 Electric
High-Risk Capital Needs:
Old Mill#3 R 2021 $200,000 H $200,000 Electric
Gateway(Upper) R 2021 $90,000 H
$90,000 Electric
Gateway(Lower) R 2020 $80,000 H
$80,000 Electric
Woodland Hills R 2021 $120,000 H
$120,000 Electric
Downtown Alley(2nd and 3rd)underground R 2030 $1,000,000 H $1,000,000 Electric
Downtown Alley(3rd and 4th)underground R 2030 $2,000,000 H $2,000,000 Electric
Downtown Alley(4th and 5th)underground R 2030 $2,000,000 H $2,000,000 Electric
Moderate-Risk Capital Needs:
Quests Woods R 2020 $80,000 M $80,000 Electric
Lawing to Victor Creek Overhead R 2020 $75,000 M
$75,000 Electric
Convert transmission line to 115 kV R 2030 $12,000,000 M
$12,000,000 State/Electric
Security Upgrades to substations N 20-22 $130,000 M
$130,000 Electric
T-Line Replace Nash Rd N 2030 $2,000,000 M $2,000,000
Total Electric Fund Projects: $20,352,000 $8,352,000 $12,000,000
Total Electric Fund Projects for 2020 and 2021: $1,352,000 $1,352,000 $0
Rating(a):
Critical Risk(Q. Likely to fail within neat 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
ELECTRIC FUND
Cash Balance at December 31,2018-Electric Fund&Related Capital Projects:
Fund ISOOO-Electric Enterprise Fund $ 6,589,592.60
Fund 1500 1-Major Maintenance,Repair&Replacement $ 957,30I.76
Fund I S3 10-Electric Tranismission Line Project _$ S66J3S.S5
Total Electric-related Cash: $ 8,113,029.9 1
F I SOOO Earmarked for Bond Reserves $ 349,739.31
Fl SOO I Earmarked for Capital Projects $ 957,30I.76
FI53I0 Earmarked for T-Line Upgrade/Extension Project $ 566,I35.55
Unavailable for Appropriation: $ 1,873,176.62
Electric Cash available to meet future capital needs: $ 6,239,853.29
City of Seward
Capital Improvement Plan
Water-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Critical Capital Needs:
Replace Lowell Canyon 200K gallon Tank with 500K gallon tan] R 2021 $975,000 C $195,000 $780,000 City/State
High Risk Capital Needs:
Gateway Tank Roof R 2020 $300,000 H $300,000 City/CPVtLoan
Abandon wells at Fort Raymond R 2020 $250,000 H $250,000 City
Moderate Risk Capital Needs:
Refurbish#4 production well R $85,000 M $85,000 City
Distribution Piping upgrades(ductile iron pipe) R 2023 $500,000 M $500.000 City
Facility Control upgrades R $80,000 M $80,000 City
GIs system N $60,000 M $60,000 City
Replace 10"and 14"AC water line btwn Phoenix and Sea Lion R 2026 $1,860,000 M $1,860,000 City
Replace water lines R 2024 $400,000 M $400,000 City
Total Water Fund Projects: $4,510,000 $3,730,000 $780,000
Total Water Fund Projects for 2020 and 2021: $1,525,000 $745,000 $780,000
Rating(a):
Critical Risk(Q. Likely to fail within next 5 years
High Risk(H). Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
WATER FUND
Cash Balance at December 3 L 20 18 - Water Fund&Related Capital Projects
Fund 17000- Water Enterprise Fund $ I,456,I78.70
Fund 17001 -Major Maintenance,Repair&Replacement Fund $ 852,572.I5
Fund 17330-Lowell Canyon Water Storage Tank $ 221,295.I7
Total Water-related Cash: $ 2,530,046-02
F17330 Earmarked for Capital Project $ 221,295.17
Total Earmarked for Capital: $ 221,295.I7
Water Cash available to meet future capital needs: $2,308,75I
City of Seward
Capital Improvement Plan
Wastewater-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Critical Capital Needs:
Lowell Point sludge pile disposal R 2020 $60,000 C $60,000 Wastewater Fund
Liftstation#1 mobile standby generator R 2022 $75,000 C $75,000 Wastewater Fund
High-Risk Capital Needs:
SMIC piping for bypass(engineering/design)&constructi R 2024 $150,000 H $150,000 Wastewater Fund
Four double wall fuel tanks.25k in 2021-2024 R 2021 $100,000 H $100,000 Wastewater Fund
Manhole refurbishment R 2021 $120,000 H $120,000 Wastewater Fund
Moderate-Risk Capital Needs:
SMIC lower lift station(engineering only) R 2020 $250,000 M $250,000 Wastewater Fund
SMIC lower lift station construction N 2021 $320,000 M $320,000 Wastewater Fund
SMIC Sludge pile disposal R 2019 $25,000 M $25,000 Wastewater Fund
Replace existing collection part R 2021 $140,000 M $140,000 Wastewater Fund
Replace infrastructure past useful life($75K) R 2027 $330,000 M $330,000 Wastewater Fund
Wastewater Lagoon sludge removal 2025 $2,000,000 $2,000,000 Wastewater Fund
Total Wastewater Fund Projects: $3,570,000 $3,570,000 $0
Total Wastewater Fund Projects for 2020 and 2021: $990,000 $990,000 $0
Rating(a):
Critical Risk(Q. Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M):continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing an existing asset
WASETWATER FUND
Cash Balance at December 31,2018 Wastewater Fund &Related Capital Projects:
Fund 18000 - Wastewater Enterprise Fund $1,621,877
Fund 18001 -Major Maintenance,Repair&Replacement Fund 742,025
Total Wastewater-related Cash: $2,363,902
F18001 Earmarked for Capital Project $742,025
Total Earmarked for Capital: $742,025
Wastewater Cash available to meet future capital needs: $1,621,877
Capital Improvement Plan
Parking-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost Rating(a) City Portion Other Source Source
Parking office/chalet replacement R 2020 $100,000 $100,000 Parking
Other:
NE Parking lot paving N 2020 $150,000 $150,000 Parking
Total Parking Fund Projects: $250,000 $250,000
Total Parking Fund Projects for 2020 and 2021: $250,000 $250,000
Rating(a):
Critical Risk(C): Likely to fail within next 5 years
High Risk(H): Likely to fail in 5-10 years
Moderate Risk(M).continuous increasing cost to maintain and operate.
"New"reflects creation or purchase of a new asset;not replacing on existing asset
PARKING FUND
Cash Balance at December 3I,20I8 -Parking Fund
Fund I3000-Parking Enterprse Fund $I,037,02I
Capital Improvement Plan
Motor Pool-Related Capital Projects
2020 and 2021
New or Project Funding Source
Project Description Replace Year Cost City Portion Other Portion Source
Parking truck R 2020 17,000 17,000 Parking
Public Works loader wlsnow blower R 2020 340,000 340,000 Motor Pool
TYC van R 2020 30,000 30,000 Motor Pool
Police cruisers with equipment(3) R 2020 135,000 135,000 Motor Pool
Building inspection vehicle R 2021 40,000 40,000 Motor Pool
Police cruiser with equipment R 2021 45,000 45,000 Motor Pool
Harbor flatbed wlplow R 2021 80,000 80,000 Motor Pool
Public Works sweeper R 2021 250,000 250,000 Motor Pool
Parks maintenance truck R 2021 40,000 40,000 Motor Pool
Total Motor Pool Fund Projects: $977,000 $977,000 $0
Total Motor Pool Fund Projects for 2020 and 2021: $977,000 $977,000 $0
City of Seward
Capital Improvement Plan
Healthcare-Related Capital Needs
2020 and 2021
Project Project
Cost Cost
Project Description Year 2020 2021
Lab:
Blood gas analyzer 2020 $10,575
Centrifuge 2020 $10,000
Microscope 2020 $70,000
$90,575
Mountain Haven:
Air Matresses 2020 $28,000
Bariatric transport chair 2021 $4,999
Bus 2020 $60,000
Epic Upgrade 2021 $150,000
Gravel Shed 2020 $5,000
Mattresses and Furniture 25% 2020 $45,000
Nurse Call System 2020 $30,000
Paint Mountain Haven 2020 $30,000
Parking lots patched and re-sealed 2020 $10,000
PSMH lodge front siding 2020 $6,000
PSMII roofs 2021 $40,000
Replacement computers&wall mounts 2020 $10,000
Scales 2020 $5,000
Specialty Wheel Chair 2021 $4,999
Workstations on wheels 2020 $12,000
$241,000 $199,998
Hospital:
Badge readers SCHC front entrance and, 2020 $10,000
Communications Closet 2021 $100,000
Expansion IT Room 2020 $200,000
Infant warmer 2020 $10,000
Monitors,bedside,fetal 2020 $6,850
Nurse Call System 2020 $180,000
Paint Medical Center Exterior 2021 $30,000
Parking lots patched and re-sealed 2020 $10,000
Portable ventilator 2020 $16,000
PSMC fuel tank re-do manhole 2021 $7,000
Storage/Space 2021 $30,000
VentBipap Machine 2020 $20,000
$452,850 $167,000
Facilities
Gravel Spreader 2020 $8,500
Poolcars 2020 $45,000
$53,500
Total Healthcare Projects for 2020 and 2021 $837,925 $366,998