Loading...
HomeMy WebLinkAbout12102020 Historic Preservation Laydown - Furlong - Jesse Lee Park Plans COLORMemorial Park Concept Green Space/ Pavilion As shown this concept has a pavilion with the some area as the waterfront pavilion with lots of Green Space for residents to enjoy Parking layouts could be adjusted, this layout has 22 Parking spots assuming the pavilion could host up to $$ people As shown we have an area for a dog runt park, community garden beds along the existing walking trail, and a restroom building for Memorial for the Jesse Lee Home and Residents Parking is shown as one way angled parking with 3 handicap spaces. Putting the restrooms in this location would require significantly less installation of utility infrastructure Additional electric infrastructure may be required for the pavilion. Memorial Park Concept Pavilion/ Amphitheater As shown this concept has a pavilion with the some area as the waterfront pavilion and an open air amphitheater Parking layouts could be adjusfed but would need to keep the 39 spots assuming the pavilion/ amphitheater combination could constructed to also be used as a group assembly wifh the capacity of 156 people As shown we have a 32' diameter Gazebo, an area for a dog run/ park, community garden beds along the existing walking trail, and a restroom building for Memorial for the Jesse Lee Home and Residents Parking is shown as one way angled parking with 3 handicap spaces. Putting the restrooms in this location would require significantly less installation of utility infrastructure Additional restrooms and elecfric infra sf ru cture may be required for f h e pavilion. u 1 9 --%W • J7 _x..._ Jesse Lee Home Memorial Concepts ,�• �� a y 411P}r a r i Ji a T-7 ♦ — - ram_ � ate,: •.r �. �- �� / �N[n cti[a5•[3 Y Memorial Park Concept Community ' ` e Center/ Museum Community Cenfer, Child Care Center, or Museum built on the footprint of the Jesse Lee Home this would require an institutional zoning and land use Parking could be adjusted but would need to keep the 39 spots for a Community center that had a capacity rr _ a of T 56 people As shown we have Green Space, 32' • diameter Gazebo, an area for a dog t run/ park, community garden beds along the trail, •' existing walking and a restroom building for Memorial for the Jesse Lee Home and Residents 46* Parking is shown as one way angled parking with 3 handicap spaces. . Putting the restrooms in this location would require significantly less installation of utility infrastructure The community center building would+. require additional resfrooms and electric infrastructure. C r OWN M- M' " Me Park Concept Community s Center/ Museum - 2 � Community Center, Child Care Center, or Museum built on the footprint of the Jesse Lee Home this ^� would require an institutional zoning and land use ' + I Parkin could be adjusted but would r . 9 1 ��. need to keep the 39 spots for a 1 community center that had a capacity of 156 people As shown we have added a , Playground the same size as by the waterfront 1 4